USER REQUIREMENT
SPECIFICATION (URS)
APPROVAL OF URS
In-Charge Name & Title Signature Date
Prepared By
Production Department Head
Reviewed By
Maintenance Department Head
Reviewed By
Validation Department Head
Reviewed By
Quality Assurance Department Head
Approved By
Head – Quality & Technical Affairs
DATA & HMI screen shall be displayed all function like temperature ,batch no.
8
RPORTS date and time option shall be provided
Test certificates of the different Materials used in the construction of
TEST
the machine (MOC certificates).
9 CERTIFICATES
Calibration certificates of the all the instruments
(Hard Copies)
Data sheets of all major parts
DOCUMENTATI
10 One copy of operational , maintenance manuals in English
ON
CONFIDENTIAL INFORMATION SAUDI PHARMACEUTICAL INDUSTRIES - RIYADH
NOT TO BE REPRODUCED / DISCLOSED WITHOUT PRIOR WRITTEN APPROVAL
Page 3 of 4
SAUDI PHARMACEUTICAL INDUSTRIES - RIYADH
Start up & Required Start up & technical support on the user site during final
12
Technical support installation and qualification time.
Installation will be done at site by our Maintenance team.