MMR PROJECT
Contract No:
Scope of Work
For
Scaffolding Rent
Pack. No.: -
OWNER
REV DATE DESCRIPTION PREPARED CHECKED APPROVED
APPROVED
Comment Response Sheet
(This comment response sheet is filled after IFR/IFA and above only)
Section& Rev.
No Comment By Originator Response
Page
4 Work Included
4.1 Preparation and General Work
a) Provide manpower including equipment, tools, consumables, and PPE.
b) Provide registered/professional/competent engineers to perform design, calculation,
supervise, and inspect.
c) Scaffolding technicians/crew shall be well-trained in erecting, adjusting, dismantling the
system, connecting scaffolding, ensuring that the scaffolding system is installed
correctly and quickly, ensuring sustainability and safety for construction.
d) Provide survey, measurement, marking, and reporting.
e) Mobilization & demobilization of all Subcontractor’s personnel, equipment, tools, etc.
f) Local transport for sub-contractor’s personnel.
g) Compliance with Contractor’s and Client’s Quality & HSE management systems and
procedures.
Scaffolding Boards
Width 310 mm – 360 mm
5 Subcontractor’s Proposal
The subcontractor shall provide at least the following information with their quotation /
proposal:
a) Vendor to submit priced quotation / proposal with 2 types of contracts:
Installed volume
Duration contract (per month, 3 months, or etc)
b) Preliminary, vendor to provide the material as following:
Scaffolding Pipe 6 meters: 3000 pcs
Scaffolding Pipe 4 meters: 100 pcs
Scaffolding Pipe 3 meters: 100 pcs
Scaffolding Pipe 2 meters: 100 pcs
Scaffolding Pipe 1 meters: 100 pcs
Asiba (Metal Plank) 4 meters: 580 pcs
Asiba (Metal Plank) 3 meters: 1200 pcs
Asiba (Metal Plank) 2 meters: 580 pcs
Clamp Fixed BS 1139: 15000 ea
Clamp Swivel BS 1139: 1000 ea
Clamp Asiba: 2000 ea
Sleeve Coupler: 600 ea
Clamp Beam BS 1139: 1000 ea
Base Plate: 300 ea
c) Manpower, and material rate (format by Contractor).
d) Curriculum vitae and professional certificates of key engineer.
e) Subcontractor’s project management and/or engineering management plan.
f) Statement of Compliance or Exceptions, clarifications and/or deviations list to any
referenced documents as part of the complete Request of Quotation (RFQ) package.
g) Priced quotation / proposal.
h) Project organisation chart.
i) List of current projects and workload forecast for the next 1 year.
j) Company financial statement for the last 3 years (preferably audited).
k) List of previous disputes related to provision of Services.
l) Provision of certificate of currency (CoC) for insurance related with the Services.
All deviation from requirements of referenced tender documents, their attachment, codes, and
standard shall be stated in the quotation. In absence of such deviation statement from
subcontractor, Contractor will notice as a full compliance.