HSE compliance inspection done on 26.04.

2023
No Location Picture Remark
1 CH 00 Silt trap is covered up by
excavated material

Action required:
-to remove/ dispose this
material to dumping
ground
-to reactivate the silt trap

2 CH 00

Salvaged old pipes and


specials

Action required:
To send to PBAPP store
and be documented

3 CH 00 Under utilised wash


trough

Action required:
-to activate
4 CH 00

Unsatisfactory
housekeeping

Action required:
-to clear
5 CH00

To install the barricade


around the excavated
area

6 CH 00

Excavated material
dumped outside site
(beyond hoarding)

Action required:
-to remove/ dispose this
material to dumping
ground
7 CH 00

Missing Hoarding

Action required:
-to reinstate

8 CH00

Cover to rebar

Action required:
-to expedite
9 Near
Petronas
reserve

Safety Signages on site

10 Near Cut off pile to remove


Petronas
reserve

REMARK:
-this is typical. There
are many cut off piles
along pipe route
especially at river
crossing sites
11 Near Unsatisfactory
Petronas housekeeping
reserve
Action required:
-to clear

12 Near Unsatisfactory
Petronas housekeeping
reserve
Action required:
-to clear

13 PJ 4 Site clearing
-To expedite
14 Mak Sulong To turf
Pump
House

15 Near To turf
Mosque

16 Near Mud on road to clear


mosque

Remark: to clear the


earth been washed
down at toe of slope
17 Near Turfing work done. To
mosque spray water regularly

18 End Turfing work done. To


chainage spray water regularly