Atheeb Data Center

Daily Check List

Atheeb Daily Check List Date: 04 AUGUST 2023

Location: Muruj DC Shift: B-Shift: 1400 HRS

CRAC Units Readings


CRAC-01 to 04 – Electrical Room, CRAC 03-13-Zone 1 Data Room and CRAC-14-26 Zone 2 Data Room.

A/C units No. CRAC-01 CRAC-02 CRAC-03 CRAC-04 CRAC-05 CRAC-06 CRAC-07 CRAC-08

Hum Set point (%) 40


40 40 40 40 40 40 40
Hum (%) LOCAL 34 49 39 39 39 38 39

Temp set point (⁰C) 21.5


21.5 21.5 21.5 21.5 21.5 21.5 21.5
Temp(⁰C) 22 OFF 23 22 22 23 22 22
High room High High
Last Alarms REPAIR PMR High pressure PMR PMR
temp pressure pressure
Date 15-07-2023 17-07-2023 23-07-2023 15-07-2023 26-07-2023 12-07-2023 23-07-2023 23-07-2023

Current Alarms

A/C units No:


CRAC-09 CRAC-10 CRAC-11 CRAC-12 CRAC-13 CRAC-14 CRAC-15 CRAC-16

Hum Set point (%) 40


40 40 40 40 40 40 40
Hum (%) 38 34 37 33 40 44 LOCAL LOCAL

Temp set point (⁰C) 21.5


21.5 21.5 21.5 21.5 21.5 21.5 21.5
Temp (⁰C) 23 20 23 22 22 22 OFF OFF
comp 1motor
Last Alarms High pressure PMR PMR PMR PMR PMR PMR
protection
Date 13-07-2023 23-07-2023 23-07-2023 23-07-2023 23-07-2023 23-07-2023 23-07-2023 23-07-2023

Current Alarms

A/C units No:


CRAC-17 CRAC-18 CRAC-19 CRAC-20 CRAC-21 CRAC-22 CRAC-23 CRAC-24

Hum Set point (%) 40


40 40 40 40 40 40 40
Hum (%) LOCAL 42 49 39 40 36 36 39

Temp set point (⁰C) 21.5


21.5 21.5 21.5 21.5 21.5 21.5 21.5
Temp (⁰C) OFF 22 22 23 23 22 25 20
Last Alarms
Off in End of PMR PMR REPAIR PMR PMR PMR PMR
Date July 2022 23-07-2023 23-07-2023 23-07-2023 23-07-2023 23-07-2023 23-07-2023 23-07-2023

A/C units No: SITE ACTIVITY


CRAC-25 CRAC-26
*Low pressure alarm crac unit 20 is under observation.
Hum (%) 40 41
*Compressor 1 low pressure alarm crac unit 20
Temp (⁰C) 22 22
LOW
Last Alarms PMR
PRESSURE

Current Alarms 23-07-2023 27-06-2023

Generator Readings
Ground Floor:

Daily check sheet V3.0


Atheeb Data Center
Daily Check List

Hour Run Current Last


Genset No. Battery volt Main Tank % Auto/ Manual
meter Any Alarm Alarms Alarms Date

Generator A 481 NO 26.33Vdc 90% AUTO NO PMR 23-07-2023


Generator B 234 NO 26.29Vdc 90% AUTO NO PMR 23-07-2023

Transformer temperature 44⁰c

Transformer load percentage (KVA/1050*100) Leg A 33%

Transformer load percentage (KVA/1050*100) Leg B 31%

Vibration of both Transformers (Normal/Abnormal) Normal

Any oil leakage No Leak

RMU Gas level Normal

1. Rectifier Readings
Electrical Room:-

Modules Modules Modules


Rectifier Leg A Rec-1A Rec-2A Rec-3A
Status Status Status
Voltage (VDC) 54.4 12 54.4 14 54 14
Current(ADC) 155 MODULE 1 MODULE 28 MODULE
KW 8.4 0 1.5
Current Alarms NO NO NO
Last Alarms PMR PMR PMR
Date 23-07-2023 23-07-2023 23-07-2023

Modules Modules Modules


Rectifier Leg B Rec-1B Rec-2B Rec-3B
Status Status Status
Voltage (VDC) 54.8 12 54.4 9 54.8 12
Current(ADC) 200 MODULE 1 MODULE 128 MODULE
KW 10.9 0 7
Current Alarms NO NO NO
Last Alarms PMR PMR PMR
Date 23-07-2023 23-07-2023 23-07-2023

UPS Readings

UPS No. Line to Line Voltage (V) Line to neutral Voltage (V) Current (A) Active Apparent
L1-L2 L2-L3 L3-L1 L1-N L2-N L3-N L1 L2 L3 Power Power

Daily check sheet V3.0


Atheeb Data Center
Daily Check List

(kW) (kVA)
UPS-A1 379 380 380 220 220 219 72 61 61 40.2 40.6
Current Alarms NO

Last
Alarms PMR 23-07-2023

Line to Line Voltage (V) Line to neutral Voltage (V) Current (A) Active Apparent
UPS No. Power Power
L1-L2 L2-L3 L3-L1 L1-N L2-N L3-N L1 L2 L3 (kW) (kVA)
UPS-A2 380 380 381 219 219 219 64 55 54 38.3 38.7
Current Alarms NO

Last
Alarms PMR 23-07-2023

Line to Line Voltage (V) Line to neutral Voltage (V) Current (A) Active Apparent
UPS No. Power Power
L1-L2 L2-L3 L3-L1 L1-N L2-N L3-N L1 L2 L3 (kW) (kVA)
UPS-A3 379 380 380 219 220 220 67 56 56 41.8 42.4
Current Alarms NO

Last
Alarms PMR 23-07-2023

Line to Line Voltage (V) Line to neutral Voltage (V) Current (A) Active Apparent
UPS No. Power Power
L1-L2 L2-L3 L3-L1 L1-N L2-N L3-N L1 L2 L3 (kW) (kVA)
UPS-B1 380 380 380 219 219 220 46 47 43 29.3 29.7
Current Alarms NO

Last
Alarms PMR 23-07-2023

Line to Line Voltage (V) Line to neutral Voltage (V) Current (A) Active Apparent
UPS No. Power Power
L1-L2 L2-L3 L3-L1 L1-N L2-N L3-N L1 L2 L3 (kW) (kVA)
UPS-B2 380 380 380 219 220 219 46 45 43 29.6 30.3
Current Alarms NO

Last
Alarms PMR 23-07-2023

Line to Line Voltage (V) Line to neutral Voltage (V) Current (A) Active Apparent
UPS No. Power Power
L1-L2 L2-L3 L3-L1 L1-N L2-N L3-N L1 L2 L3 (kW) (kVA)
UPS-B3 379 379 380 220 219 219 46 45 43 29.1 29.5
Current Alarms NO

Last
Alarms PMR 23-07-2023

PPC Readings

PPC-A1,A2,A3,B1,B2,B3- Zone 1 Data Room,


PPC- A4,A5,B4,B5 – Zone 2 Data Room.

Daily check sheet V3.0


Atheeb Data Center
Daily Check List
PPC-Z1:-

Line to Line Voltage (V) Line to neutral Voltage (V) Current (A) Active Apparent
PPC No: Power Power
L1-L2 L2-L3 L3-L1 L1-N L2-N L3-N L1 L2 L3 (kW) (kVA)
PPC-A1 373 374 376 216 215 216 25 36 23 19 19
PPC-B1 376 374 376 216 215 217 10 16 15 7 7
PPC-A2 377 375 377 217 217 217 38 31 22 19 19
Current Alarms NO

Last
Alarms NO

Line to Line Voltage (V) Line to neutral Voltage (V) Current (A) Active Apparent
PPC No: Power Power
L1-L2 L2-L3 L3-L1 L1-N L2-N L3-N L1 L2 L3 (kW) (kVA)
PPC-B2 374 374 376 216 215 215 34 38 23 19 20
PPC-A3 373 374 375 217 217 218 61 42 53 32 34
PPC-B3 377 377 378 217 216 216 51 31 48 27 28
Current Alarms NO

Last
Alarms NO

Line to Line Voltage (V) Line to neutral Voltage (V) Current (A) Active Apparent
PPC No: Power Power
L1-L2 L2-L3 L3-L1 L1-N L2-N L3-N L1 L2 L3 (kW) (kVA)
PPC-STS-01 380 380 380 220 220 220 - - - - -
PPC-STS-02 380 380 380 220 220 220 - - - - -
Current Alarms

Last
Alarms Power On Feb 15 2023

Line to Line Voltage (V) Line to neutral Voltage (V) Current (A) Active Apparent
PPC No: Power Power
L1-L2 L2-L3 L3-L1 L1-N L2-N L3-N L1 L2 L3 (kW) (kVA)
PPC-A4 373 377 374 216 217 217 11 3 4 4 4
PPC-B4 375 376 376 216 216 216 5 1 3 2 2
Current Alarms

Last
Alarms Power On Feb 15 2023

Line to Line Voltage (V) Line to neutral Voltage (V) Current (A) Active Apparent
PPC No: Power Power
L1-L2 L2-L3 L3-L1 L1-N L2-N L3-N L1 L2 L3 (kW) (kVA)
PPC-A5 373 374 376 215 214 216 64 54 25 31 32
PPC-B5 376 374 374 215 215 215 54 70 46 34 35
Current Alarms NO
Last NO
Alarms

Daily check sheet V3.0


Atheeb Data Center
Daily Check List

ATS READING
Ground floor:-

Line to Line Voltage (V)


ATS No:
L1-L2 L2-L3 L3-L1
ATS-A 380 380 380
ATS Switch Position CONNECTED

Current Alarms NO

Last
Alarms
PMR 23-07-2023

Line to Line Voltage (V)


ATS No:
L1-L2 L2-L3 L3-L1
ATS-B 381 380 380
ATS Switch Position CONNECTED

Current Alarms NO

Last
Alarms
PMR 23-07-2023

MESB READING
Electrical Room

Line to Line Voltage (V) Line to neutral Voltage (V) Current (A) Active Apparent
MESB No. Power Power
L1-L2 L2-L3 L3-L1 L1-N L2-N L3-N L1 L2 L3 (kW) (kVA)
MESB-A 378 379 379 218 218 219 548 534 525 334 352
Visual Check OK

Line to Line Voltage (V) Line to neutral Voltage (V) Current (A) Active Apparent
MESB No. Power Power
L1-L2 L2-L3 L3-L1 L1-N L2-N L3-N L1 L2 L3 (kW) (kVA)
MESB-B 378 379 379 219 219 219 497 507 497 310 327
Visual Check OK

UPSDB READING
Electrical Room

Line to Line Voltage (V) Line to neutral Voltage (V) Current (A) Active Apparent
UPSDB No. Power Power
L1-L2 L2-L3 L3-L1 L1-N L2-N L3-N L1 L2 L3 (kW) (kVA)
UPSDB -A 381 380 380 219 220 220 198 177 176 120 121
Visual Check OK

Line to Line Voltage (V) Line to neutral Voltage (V) Current (A) Active Apparent
UDP No. Power Power
L1-L2 L2-L3 L3-L1 L1-N L2-N L3-N L1 L2 L3 (kW) (kVA)

Daily check sheet V3.0


Atheeb Data Center
Daily Check List

UPSDB -B 380 380 381 219 220 220 140 135 132 89 89
Visual Check OK

Fire Alarm

Location Reference Last Date Panel


Current Alarms Remarks
Number Alarms Auto/Manual

Data Room- MANUAL


FACP 1 NO NO NO NO
Zone 1
Electrical MANUAL
FACP 2 NO NO NO NO
Room
Staging Area MFACP NO NO OPERATION NO NO

FM200 Cylinders

Status Remarks
Location Reference Number
OK/Not OK

Zone 1 CYL1-4 OK -
Zone 2 CYL 5-8 OK -
Electrical Room CYL 9-11 OK -

Lamps replacement

All lights
Total number of Number of lights
Location Rows Remarks
lights changed
Checked

Zone 1 115 OK

Zone 2 120 OK

Electrical Room 36 OK

Staging Area 12 OK

Daily check sheet V3.0