CIVIL MATERIAL
1 CEMENT ISI MARKED ULTRATECH/MYCEM/ACC
ELECTRICAL MATERIAL
1 PVC CONDUIT ISI MARKED
2 SWITCHES,SOCKETS ANCHOR/PENTA/HAWELLS
ETC./FORECIELING RIO
3 WIRES HAWELLS/POLYCAB
PLUMBING MATERIAL
1 PIPE FITTING CPVC
2 TEE
3 SOCKET
4 REDUCERS
5 UNIONS
6 NIPPLE
SUPREME
7 BEND
8 BALL VALVE
9 PVS PIPE FITTING ISI MARKED ASTRAL
10 SANITARY PIPE FITTING &
FIXTURES
11 NAHANI TRAP PRINCE
12 PORS TAP
13 SOCKETS
14 DOOR TEE
15 BENDS
S.NO. Item Description Manufacturer
16 SHOE
17 EUROPEAN WC WITH SEAT HINDWARE/PARYWARE
COVER,PVC CISTERN & CP
WASTE PIPE
18 WASH BASIN
19 KITCHEN SINK STEEL ISI MARKED WITH 10 YEARS
REPLACEMENT WARRANTYY
OF BREKAGE
20 TAPS & MIXTURE
CARPENTARY WORK
1 FLUSH DOORS ISI MARKED ₹130/SQ.FT
2 WOOD FOR DOORS & WINDOW SINGLE PATAM / MALAYSIAN SAKHU
FRAMES DOUBLE PATAM
FINISHING ITEMS
1 TILES ON FLOOR GRANITE
STAIR
DOUBLE CHARGED
(KAJARIA/SOMANY-2*2)
2 CIELING POP
1. Walls and partitions shall be building according to drawing and design of ground floor.
2. All building material (namely steel, cement, course & fine sand) to be
7. The height of the ceiling from floor shall be 10'9". 8. Inside and outside plaster shall be 12 mm
and done with 1:5.
9. Wooden frames of doors and windows opening out of the house shall
have double rebate and made of Malaysian sakhu. 3.5mm thick plain float
glass is provided in window panes. 10.Each door shutter shall have 2 handles. Main door shutter
would also be provided with inter-lock. Each window shutter shall be provided with one
handle, two 4" bolts. All door fittings like tower bolts, latches etc shall be
of steels.
11.100 mm dia PVC pipe shall be used for water closet, 75 mm PVC pipe for wash basin and
bathroom disposal and for rain water. All pipe shall be ISI marked. 12. All pipe and fittings used
for fresh water line shall be of C.P.V.C.
14.The toilets shall have provision of one W.C., one wash basin, one shower, 1 mixer (bath and
shower), arrangement of fixing geyse and one bibcock near W.C and 1 bibcock for fresh water.
15.All floors shall have tile flooring. All bathroom wall shall have tiles upto 7' In terrace, floor
will be neat cement coat with plaster.
16.All wiring would be concealed. Electrical work shall include lying of wires,