GRAND SUMMARY
BLOCK No. Contract Executed
NAME
No Block amount amount
1 B1 Administration block 1 2,115,822.32 557,741.36
2 B1a Administration block extra 1 2,715,986.20 803,825.38
3 B1b Administration Building 1 4,944,490.73
Reading room, book store & 517,165.71
4 B2 demonstration room 1 1,545,266.60
5 B3 Store 1 634,308.80 241,709.42
6 B4 Computer lab store 1 721,834.90 168,106.35
7 B5-1 Class room 3 5,086,809.66 526,439.30
8 B5-2 Class room 2 13,359,695.18
9 B5-3 G+2 Class room 1 16,147,396.69 2,636,283.98
10 B6-2 Toilet 2 963,822.60 144,855.00
11 B6-3 Toilet 2 1,557,172.78 203,938.50
12 B7 Generator room 2 537,884.00
13 B8 Guard house 2 401,944.90
14 B9 Workshop 1 689,982.40 228,675.19
15 B10 Dining hall 2 3,171,057.80 1,136,819.69
16 B11 Directors residence 1 1,276,841.50 379,489.51
17 B12 Lounge (Cafeteria) 1 2,083,070.30
18 B13 Sport Office 1 2,921,090.77 548,195.15
19 LAB - 1 Physics laboratory 1 1,157,604.90 273,538.50
20 LAB - 2 Chemistry laboratory 1 1,145,292.90 270,022.31
21 LAB - 3 Biology laboratory 1 1,099,039.40
22 LAB - 4 Computer laboratory 1 1,310,815.00 545,444.91
23 LAB - 5 Laboratory Building 1 6,832,555.70
24 M1 Multi-purpose hall 1 4,794,201.59 1,273,654.96
25 M2 Multi-purpose hall Building 1 3,971,569.34 711,160.70
26 Library Library 1 836,790.60 349,555.11
27 Library-2 G+1 Library Building 1 7,469,141.64
28 PEDG Pedagogical 1 1,329,474.20 522,957.51
29 Site EL&SL Site Electrical & Sanitary 1 6,443,392.20
30 LCTH Lecture Hall (Main Campus) 1 7,617,306.21 Err:509
31 CLRM M G+4 Classroom (Main Campus) 1 28,162,678.08 #REF!
contractor_________________ consultant_______________
MUBP - 86 3 of 20
525,447.93 55,712.92
1 EXCAVATION AND EARTH WORK
B SUPER STRUCTURE
contractor________________ consultant_______________
MUBP - 86 4 of 20
CONTRACT EXECUTED
ITEM DESCRIPTION UNIT RATE EXCUTED AMOUNT
QTY QTY
A SUB-STRUCTURE
contractor___________ consultant______________
MUBP - 86 5 of 20
3.03 Ditto but two coats to receive ceramic wall tile . m2 57.44 105 -
3.04 Stone cladding on HCB external wall m2 850.33 Err:509 401 Err:509
Total Carried to Summary Birr Err:509
contractor___________ consultant______________
BOKRA CONSTRUCTION & TRADING PLC
Project:- COMMERCIAL Takeoff No 2
Location:- WUKRO Block:-
Client:- ATO ABADI MEBRAHTU
Consultant:- Page No:- 1
No LWH QTY Description No LWH QTY Description
SUB-STRUCTURE 1.05/Back fill around footings
1) EXCAVATION & EARTH WORK and trench foundation to maintain
1.01) Clearing of site to a depth the desired level with selected
not exceeding 200mm borrowed material and compact
L=22.83+2+0.8=25.63m in layers not exceeding 200 mm
1 25.63 W=8.6+2+0.75=11.35m →=[Total pit excavatiOn]-[lean cOncrete+
11.35 290.90 m2 total padcOncrete+foundatiOn column cOncrete]
#Total excavatiOn=pit and site clearing
&Bulk
1.02) Bulk excavation to a depth 209.31 m3
not exceeding 500m Lean Concrete
1 19.80 axis 1-6 b/n A&BL=19.8m 32.91 m3
5.60 W=5.6m Concrete pad
0.50 55.44 m3 total 15.72 m3
FoundatiOn column and shear walls
1 9.95 Axis 6-7 b/n A&B L=9.95m 2.05 m3
4.83 158.63 m3 Total
0.50 24.03 m3 total
79.47 m3 total
0.50 0.72
15.72 m3total
b) Foundation column assume var=0.5m
5 0.30 on 5 FC1
0.25 Davg =1.95m
1.95 0.73 m3
2 0.30 on 2FC2
0.20 Davg =2.05m
2.05 0.25 m3
4 0.30 4FC4
0.20 Davg =1.95m
1.95 0.47 m3
3 0.30 3FC5
0.20 Davg =1.95m
1.95 0.35 m3
2 0.30 2FC5
0.20 Davg =2.05m
2.05 0.25
2.05 m3 total
13.58 m3 Total
c) FLOOR BEAM
1 20.88 On axis A 1-7 LEXT=22.68-6*0.3=20.88
0.20
0.40 1.67 m3
1 21.26 On axis B 1-7 LINT=22.68-(5*0.2)-(2*0.15)=21.26
0.20
0.40 1.70 m3
1 4.03 On axis 1 b/n A&B L=(4.25-0.1-0.125)=4.025m
0.20
0.40 0.32 m3
5 4.00 On axis 2,3,4,5,6) b/n A&B L=(4.25-0.1-0.15)=4m
0.20
0.40 1.60 m3
1 4.05 On axis 7 b/n A&B L=(4.25-2*0.1)=4.05m
0.20
0.40 0.32
1 4.05 On axis 7 b/n B&C L=(4.25-2*0.1)=4.05m
0.20
0.40 0.32
1 3.98 On axis 6 b/n B&C L=4.25-0.15-0.125=3.98m
0.20
0.40 0.32
1 21.78 On axis C 1- 7 L=22.68-2*0.3-2*0.15=21.78m
0.20
0.40 1.74
7.99 m3total
0.20 0.81 m2
2 4.03 On axis 1( A&B)=L=(4.25-0.1-0.125)=4.025m
0.40 3.22 m2
1 4.03
0.20 0.81 m2
10 4.00 On axis( A&B)=-L=(4.25-0.1-0.15)=4m
0.40 16.00 m2
5 4.00
0.20 4.00 m2
2 4.05 On axis 7, b/n B&C external, L=4.25-2*0.1=4.05m
0.40 3.24 m2
1 4.05
0.20 0.81
2 3.98 On axis 6, internal, L=4.25-0.15-0.125=3.98m
0.40 3.18 m2
1 3.98
0.20 0.80
2 21.78 On axis C/1-7, external, L=22.68-2*0.3-2*0.15=21.78m
0.40 17.42 m2
1 21.78
0.20 4.36 m2
100.02 m2 Total
Total length (m) 119.20 0.00 0.00 220.44 160.32 0.00 0.00
Unit wt. (kg/m) 0.222 0.395 0.617 0.888 1.210 1.579 2.467 3.550
Tot.wt. (kg) 0.000 47.080 0.000 0.000 266.730 253.150 0.000 0.000
Total length (m) 1,258.78 0.00 0.00 0.00 0.00 0.00 0.00
Unit wt. (kg/m) 0.395 0.617 0.888 1.210 1.579 2.467 3.550
Tot.wt. (kg) 497.220 0.000 0.000 0.000 0.000 0.000 0.000
Total length (m) 295.30 0.00 0.00 0.00 245.56 0.00 0.00
Unit wt. (kg/m) 0.395 0.617 0.888 1.210 1.579 2.467 3.550
Tot.wt. (kg) 116.640 0.000 0.000 0.000 297.130 0.000 0.000