Download as pdf or txt
Download as pdf or txt
You are on page 1of 10

SAUDI ARAMCO ID/PID - 2/19/05 - REV 0 (Standards Cutoff - August 2004)

SAIC NUMBER DATE APPROVED QR NUMBER


SAUDI ARAMCO INSPECTION CHECKLIST
Review of Welding Procedure Specification for Tanks SAIC-W-2075 25-May-05 WELD-
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.

LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.

SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?

SAUDI ARAMCO INSPECTION LEVEL CONTRACTOR INSPECTION LEVEL

ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.

A WPS submitted for Technical Approval by Saudi Aramco :

The package of welding procedures, qualification test records, weld


SAES-W-017,
A1 maps and weld descriptions, were submitted to and approved by CSD,
Para. 7.1.2
on Forms as shown in Attachment 1, Attachment 2 and Attachment 3

Form "Request For Welding Procedure Approval" as shown in


SAES-W-017,
A2 Attachment 1 is completed in full and signed by the submitting Saudi
Para. 7.1.2
Aramco Organization (Construction Agency - SAPMT).
The Weld Map shows a simple single-line sketch of the tank (use the SAES-W-017,
A3
form shown in Attachment 1.) Para. 7.1.2
Each Weld Map is complete and shows the Saudi Aramco equipment tag
SAES-W-017,
A4 number and PO number. Identical equipment items may be combined
Para. 7.1.3
on one set of forms.
The PQRs include certified copies of all test records (for IK qualification,
SAES-W-017,
A5 the independent testing agency that issued the test record shall have
Para. 7.1.9
certified the copies).
Originals of all test records, mill certificates, etc. including records from
SAES-W-017,
A6 the independent test laboratory are available for review by Saudi
Para. 7.1.10
Aramco, upon request.
The WPS conforms with the latest applicable Saudi Aramco Welding SAES-W-011,
A7
Standards and Industry Codes. Para. 7.2.1
SAES-W-017,
A8 All WPSs and PQRs conform to the latest edition of the ASME SEC IX.
Para. 7.2.1
All information shown on the PQR, such as amperage, voltage, travel
SAES-W-017,
A9 speed, postweld heat treatment time and temperature, as applicable, is
Para. 7.2.3
actual data as recorded using calibrated instruments.
Qualification of welding procedures for all shop fabrication in Saudi
Arabia and field erection work, is performed IK. SAES-W-017,
A10
NOTE: Approval for use of welding procedures qualified OOK shall be Para. 7.2.4
obtained through the welding procedure review process.

NOTE After satisfactorily meeting the above checklist (Items A1 to A10), the WPS & PQR Package may be forwarded to
#1 CSD-Welding Group for technical review and approval.

Review of Technically Approved WPS for project specific


B
application:

Welding Procedure Specifications (WPS's) and Procedure Qualification


SAES-W-011,
B1 Records PQR's) have been prepared and submitted on form "Request
Para. 7.1.2
For Welding Procedure Approval." as shown in Attachment 1.)

"Request For Welding Procedure Approval, Page A1." as shown in


SAES-W-011,
B2 Attachment 1 is completed in full and signed by Submitting Saudi
Para. 7.1.2
Aramco Organization (Construction Agency - SAPMT).
SAES-W-011,
Attachments 2 & 3 -Weld Map & Weld Description are completely filled-
B3 Para. 7.1.3 &
up.
7.1.4

Page 1 of 10
SAUDI ARAMCO ID/PID - 2/19/05 - REV A (Standards Cutoff - August 2004)
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
Review of Welding Procedure Specification for Tanks SAIC-W-2075 25-May-05 WELD-
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.
SAES-W-017,
B4 The PQR number conforms with the PQR referenced on the WPS.
Para. 7.1.2
CSD has affixed their technical approval on the WPS for the following
applications: SAEP-352,
B5
a. Pressure Vessels and Heat Exchangers. Para. 5.1
b. Boilers and Fired Heaters.
The WPS conforms with the latest applicable Saudi Aramco Welding SAES-W-011,
B6
Standards and Industry Codes. Para. 7.2.1
SAES-W-017,
B7 All WPSs and PQRs conform to the latest edition of the ASME SEC IX.
Para. 7.2.1
Form "Request For Welding Procedure Approval" as shown in
SAES-W-017,
B8 Attachment 1 is completed in full and signed by the submitting Saudi
Para. 7.1.2
Aramco Organization (Construction Agency - SAPMT).

Any GMAW electrode to be used for procedures with impact toughness


requirements and any SAW flux or FCAW electrode shall be restricted to
SAES-W-017,
B9 the specific brand, type, and maximum size as used for the PQR. If so
Para. 7.3.1
restricted, the brand name and type of flux or electrode shall be specified
on both the WPS and PQR.

The welding procedure specification has indicate the use of the type and SAES-W-017,
B10
brand of weldable primer if and when weldable primer is required. Para. 7.3.4

Procedures using any consumable with a "G" or "P1" designation (ASME


SEC IIC) shall be restricted to the brand and type of electrode used for SAES-W-017,
B11
the PQR. The nominal chemistry of the specific brand and type of Para. 7.3.6
electrode shall be identified on the WPS.

For welding of tanks requiring impact test, the WPS specified the range SAES-W-017,
B12
of heat input that was taken from the PQR. Para. 7.3.12.1

If multiple processes or consumables are used for welding of tanks


SAES-W-017,
B13 requiring impact test, separate impact test specimens are specified for
Para. 7.3.12.2
each process or consumable.

Hardness test was performed on the supporting PQR of the Welding


Procedure for the following installation:
a) Sour service tanks of any wall thickness.
SAES-W-017,
B14 b) For tanks requiring PWHT due to service (see 12.5).
Para. 7.4.2
(NOTE: Hardness testing is not required for sour service applications if
the weld procedure is to be used on external structural attachments only,
and the tank wall at the attachment point is at least 25 mm thick .)

Hardness testing performed on the PQR is by the Vickers test method (in SAES-W-017,
B15
accordance with ASTM E92) only, with a maximum test load of 10 kg. Para. 7.4.2 (a)

NOTE Page A1 of the WPS Package submittal shall be signed by PID for project use after verifying all items in Sec. B of
#2 this Checklist to be in compliance.

REMARKS:

REFERENCE DOCUMENTS:
1. SAEP-352, Welding Procedure Review and Approval, 1 June 2008
2. SAES-W-017, Welding Requirements for API Tanks, (31 July, 2000)

Page 2 of 10
SAUDI ARAMCO ID/PID - 2/19/05 - REV A (Standards Cutoff - August 2004)
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
Review of Welding Procedure Specification for Tanks SAIC-W-2075 25-May-05 WELD-
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.

ATTACHMENTS:
1. Attachment 1 - REQUEST FOR WELDING PROCEDURE APPROVAL
2. Attachment 2 - WELD MAP - Saudi Aramco Pressure Vessel and Heat Exchanger
3. Attachment 3 - WELD DESCRIPTION, Saudi Aramco Pressure Vessel and Heat Exchanger

Contractor / Third-Party Saudi Aramco


Construction Representative* PMT Representative
Work is Complete and Ready for Inspection: T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Inspector PID Representative


Performed Inspection Work / Rework May Proceed T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Supervisor Proponent and Others


Quality Record Approved: T&I Witnessed QC Record Reviewed Work Verified
Name, Organization,
Name, Sign and Date:
Initials and Date:

*Person Responsible for Completion of Quality Work / Test Y = YES N = NO F = FAILED

Page 3 of 10
SAUDI ARAMCO ID/PID - 2/19/05 - REV 0 (Standards Cutoff - August 2004)
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
Review of Welding Procedure Specification for Tanks SAIC-W-2075 25-May-05 WELD-

Attachment 1 - WPS & PQR Forms


1

Page 4 of 10
SAUDI ARAMCO ID/PID - 2/19/05 - REV 0 (Standards Cutoff - August 2004)
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
Review of Welding Procedure Specification for Tanks SAIC-W-2075 25-May-05 WELD-
Attachment 1 (cont)

Page 5 of 10
SAUDI ARAMCO ID/PID - 2/19/05 - REV 0 (Standards Cutoff - August 2004)
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
Review of Welding Procedure Specification for Tanks SAIC-W-2075 25-May-05 WELD-
Attachment 1 (cont)

Page 6 of 10
SAUDI ARAMCO ID/PID - 2/19/05 - REV 0 (Standards Cutoff - August 2004)
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
Review of Welding Procedure Specification for Tanks SAIC-W-2075 25-May-05 WELD-
Attachment 1 (cont)

Page 7 of 10
SAUDI ARAMCO ID/PID - 2/19/05 - REV 0 (Standards Cutoff - August 2004)
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
Review of Welding Procedure Specification for Tanks SAIC-W-2075 25-May-05 WELD-
Attachment 1 (cont)

Page 8 of 10
SAUDI ARAMCO ID/PID - 2/19/05 - REV 0 (Standards Cutoff - August 2004)
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
Review of Welding Procedure Specification for Tanks SAIC-W-2075 25-May-05 WELD-

Attachment 2 - Weld Map for Vessels

Page 9 of 10
SAUDI ARAMCO ID/PID - 2/19/05 - REV 0 (Standards Cutoff - August 2004)
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
Review of Welding Procedure Specification for Tanks SAIC-W-2075 25-May-05 WELD-

Attachment 3 - Weld Description for Tanks

Attachment 1 (cont)

Page 10 of 10

You might also like