Professional Documents
Culture Documents
Garbege Shoot
Garbege Shoot
54
TANKER
clinker cladding
ROOF
1 2 2' 3 4
1902 ROOF +24.14
350 150 350 720 clinker cladding
LEVEL
55mm Almunium framed
non reflective tinted glass
20 160 30 30 30 140 20
A 195 Laundary
Almunium framed glass
hand rail
Almunium framed glass
hand rail
Almunium framed glass
hand rail
SIXTH +20.74
/ FLOOR
150
6.4 sq.m
non reflective tinted glass 55mm Almunium framed
Ceramic FF.
non reflective tinted glass
392
362
10.3 sq.m
417
100
322
505
20.74 310 15 15 550 clinker cladding
232
160
FIFTH +17.34
B
Porcelain FF.
660
20 FLOOR
GARBEGE
80
SHOOT
130
FOURTH +13.94
500
clinker cladding
181
FLOOR
15 191
154
182
270 Toilet
Laundary Ceramic FF.
230
260
228
130 15 BALCONY
150
Ceramic FF. PVC FF. Ceramic FF.
5.2 sq.m 6.9 sq.m 4.2 sq.m
205
1896
1885
327 70 58 80 40 90 15 225 15
Shower
285 20 530 40 FLOOR
180
Ceramic FF.
155
5.1 sq.m
70
20 450 215 15
25 90 10
5 90 110 0
15 180 20
62
125
530
SECOND
510
PVC FF.
385
340
340
25.3 sq.m
320 15 400 20
505
D Almunium framed glass
hand rail
FIRST
FLOOR
+3.74
20 185 40 225 85 40 460 40 150
120
120
BALCONY
182
55mm Almunium framed
non reflective tinted glass
453 595 180 SKYLINE Consultants
350 500 720
Consulting Architects & Engineers plc
GROUND ± 0.00 e.mail - ethioskyline@yohoo.com
200
FLOOR Tel. (office)0116-62 95 02,(mob) 0911- 25 20 43
-1.53 Project:
1937 MIXED APARTMENT BUILDING
BASEMENT -3.06 Location: ADDIS ABABA, NIFAS SILK LAFTO SUB CITY
WOREDA 03 PLOT CODE NO: MIX-000-11524
FLOOR Owner:
Ato Metsihafe Mekbib
Des By Skyline CAE PLC
Title: 6th FLOOR PLAN & FRONT ELEVATION
Cad file:D/Skyline/Metsihafe Drawn By: Checked By:
Degarege Tsegaw Mekonnen Worku PPAR/150
Scale: 1:50 Project No.
Date:FEB. 2017
Dwg No. AR-03/05