Professional Documents
Culture Documents
CME QUALITY REQUIREMENT STANDARD - v4
CME QUALITY REQUIREMENT STANDARD - v4
CME QUALITY REQUIREMENT STANDARD - v4
This document has been developed by Huawei Technologies (M) Sdn Bhd (hereinafter referred to as Huawei),
for Sarawak Digital Economy Corporation Sdn. Bhd. (hereinafter referred to as SDEC) for the
“CME Quality & Requirement Standard”.
This Report is the foundation for the supply of equipments and materials. Once approved by both parties, it
should not be altered. If the customer wants a change for special reasons, please contact with the
Representative Office of Huawei. Huawei is not responsible for any delay in delivery caused by the change of
customer's demand.
Contents
No. Title Rev Page No
1 Cable Ladder details 0 3
7 Genset Caging 0 9
8 PDU Dimension 2 10
9 PDU Details 2 11
HUAWEI
4/10/2022
REVISION NO: 0 SDEC SMART PROJECT SITE NAME SITE ID: PREPARED BY HUAWEI
SURVEY DATE: APPROVED BY: TITLE: LRD: SUBJECT RESPONSIBILITY
DRAWN BY: HUAWEI SCALE: As Shown UNITS: mm DATE: 4/10/2022
CABLE LADDER SIDE VIEW
MW/TE:
REVISION NO: 0 SDEC SMART PROJECT SITE NAME SITE ID: PREPARED BY HUAWEI
SURVEY DATE: APPROVED BY: TITLE: LRD: SUBJECT RESPONSIBILITY
DRAWN BY: PE SCALE: As Shown UNITS: mm DATE: 4/10/2022
CAGING 5M WIDTH (1)
MW/TE:
REVISION NO: 0 SDEC SMART PROJECT SITE NAME SITE ID: PREPARED BY HUAWEI
SURVEY DATE: APPROVED BY: TITLE: LRD: SUBJECT RESPONSIBILITY
DRAWN BY: PE SCALE: As Shown UNITS: mm DATE: 4/10/2022
CAGING 5M WIDTH (2)
MW/TE:
REVISION NO: 0 SDEC SMART PROJECT SITE NAME SITE ID: PREPARED BY HUAWEI
SURVEY DATE: APPROVED BY: TITLE: LRD: SUBJECT RESPONSIBILITY
DRAWN BY: PE SCALE: As Shown UNITS: mm DATE: 4/10/2022
CAGING 4M WIDTH (1)
MW/TE:
REVISION NO: 0 SDEC SMART PROJECT SITE NAME SITE ID: PREPARED BY HUAWEI
SURVEY DATE: APPROVED BY: TITLE: LRD: SUBJECT RESPONSIBILITY
DRAWN BY: PE SCALE: As Shown UNITS: mm DATE: 4/10/2022
CAGING 4M WIDTH (2)
MW/TE:
REVISION NO: 2 SDEC SMART PROJECT SITE NAME SITE ID: PREPARED BY HUAWEI
SURVEY DATE: APPROVED BY: TITLE: LRD: SUBJECT RESPONSIBILITY
DRAWN BY: PE SCALE: As Shown UNITS: mm DATE: 4/10/2022
PDU DIMENSION
MW/TE:
REVISION NO: 2 SDEC SMART PROJECT SITE NAME SITE ID: PREPARED BY HUAWEI
SURVEY DATE: APPROVED BY: TITLE: LRD: SUBJECT RESPONSIBILITY
DRAWN BY: PE SCALE: As Shown UNITS: mm DATE: 4/10/2022
PDU DETAILS
MW/TE: