CME QUALITY REQUIREMENT STANDARD - v4

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 12

CME QUALITY & REQUIREMENT STANDARD

Project SMART 600

This document has been developed by Huawei Technologies (M) Sdn Bhd (hereinafter referred to as Huawei),
for Sarawak Digital Economy Corporation Sdn. Bhd. (hereinafter referred to as SDEC) for the
“CME Quality & Requirement Standard”.

Huawei Technologies (M) Sdn Bhd


Submission By
Name James Peter Anak Diyi
Designation Wireless Engineer

Signature & Date JP , 4 th


October 2022

Sarawak Digital Economy Corporation Sdn. Bhd


Approved By Network Implementation Network Operation
Name Zamhari Salleh Mahendran Daniel
Designation Head Network Implementation Senior Executive
Signature &
Date 05 October 2022 05 October 2022

This Report is the foundation for the supply of equipments and materials. Once approved by both parties, it
should not be altered. If the customer wants a change for special reasons, please contact with the
Representative Office of Huawei. Huawei is not responsible for any delay in delivery caused by the change of
customer's demand.

Site Survey Report 1 of 2


HUAWEI Technologies (M) Sdn Bhd
CME QUALITY & REQUIREMENT STANDARD

Contents
No. Title Rev Page No
1 Cable Ladder details 0 3

2 Cable ladder Side View 0 4

3 Smart Caging 5m Width (1) 0 5

4 Smart Caging 5m Width (2) 0 6

5 Smart Caging 4m Width (1) 0 7

6 Smart Caging 4m Width (2) 0 8

7 Genset Caging 0 9

8 PDU Dimension 2 10

9 PDU Details 2 11

Site Survey Report 2 of 2


HUAWEI Technologies (M) Sdn Bhd
0 SDEC SMART PROJECT SITE NAME:
SITE ID: HUAWEI

APPROVED BY; CABLE LADDER DETAILS

HUAWEI
4/10/2022
REVISION NO: 0 SDEC SMART PROJECT SITE NAME SITE ID: PREPARED BY HUAWEI
SURVEY DATE: APPROVED BY: TITLE: LRD: SUBJECT RESPONSIBILITY
DRAWN BY: HUAWEI SCALE: As Shown UNITS: mm DATE: 4/10/2022
CABLE LADDER SIDE VIEW
MW/TE:
REVISION NO: 0 SDEC SMART PROJECT SITE NAME SITE ID: PREPARED BY HUAWEI
SURVEY DATE: APPROVED BY: TITLE: LRD: SUBJECT RESPONSIBILITY
DRAWN BY: PE SCALE: As Shown UNITS: mm DATE: 4/10/2022
CAGING 5M WIDTH (1)
MW/TE:
REVISION NO: 0 SDEC SMART PROJECT SITE NAME SITE ID: PREPARED BY HUAWEI
SURVEY DATE: APPROVED BY: TITLE: LRD: SUBJECT RESPONSIBILITY
DRAWN BY: PE SCALE: As Shown UNITS: mm DATE: 4/10/2022
CAGING 5M WIDTH (2)
MW/TE:
REVISION NO: 0 SDEC SMART PROJECT SITE NAME SITE ID: PREPARED BY HUAWEI
SURVEY DATE: APPROVED BY: TITLE: LRD: SUBJECT RESPONSIBILITY
DRAWN BY: PE SCALE: As Shown UNITS: mm DATE: 4/10/2022
CAGING 4M WIDTH (1)
MW/TE:
REVISION NO: 0 SDEC SMART PROJECT SITE NAME SITE ID: PREPARED BY HUAWEI
SURVEY DATE: APPROVED BY: TITLE: LRD: SUBJECT RESPONSIBILITY
DRAWN BY: PE SCALE: As Shown UNITS: mm DATE: 4/10/2022
CAGING 4M WIDTH (2)
MW/TE:
REVISION NO: 2 SDEC SMART PROJECT SITE NAME SITE ID: PREPARED BY HUAWEI
SURVEY DATE: APPROVED BY: TITLE: LRD: SUBJECT RESPONSIBILITY
DRAWN BY: PE SCALE: As Shown UNITS: mm DATE: 4/10/2022
PDU DIMENSION
MW/TE:
REVISION NO: 2 SDEC SMART PROJECT SITE NAME SITE ID: PREPARED BY HUAWEI
SURVEY DATE: APPROVED BY: TITLE: LRD: SUBJECT RESPONSIBILITY
DRAWN BY: PE SCALE: As Shown UNITS: mm DATE: 4/10/2022
PDU DETAILS
MW/TE:

You might also like