THE INFORMATION ON THIS FORM IS CONFIDENTIAL TO JOHNSON MATTHEY PLC AND SHALL NOT BE DISCLOSED TO A THIRD PARTY WITHOUT PRIOR WRITTEN PERMISSION.
Project No.: Title: NER- Meeting No.: 01
a) 11kV panel (VCB)
HAZARD b) Transformer
c) MSB4
STUDY 4 d) SSB-CSF
e) SSB-batching
Author: Mohd Aiman File: Meeting Date: 20-Jun-23
1.1 Installation Check pipework, valves, instrumentation configuration Verified By MHT QAQC, Pending punch list clearance RIFDI
(See also HS4 Installation and support against P&ID's and isometrics?
checklist)
Update P&ID to reflect changes and ensure suitable
management of change system has been used and
hazards suitably assessed.
Guidance Ref: G12B Version 2.0 Effective From: August 2021 Review Due: August 2024 Page 1 of 77
FORM D: HAZARD STUDY 4 REPORT
1.2 Check equipment labelling, lagging and valve Verified By MHT QAQC NADZIRAH
numbering, testing and labelling of stop and start
buttons and isolators?
1.3 System followed to ensure correct materials of Verified By MHT QAQC RIFDI
construction used?
3.1 Trips and Alarms All commissioning checklists completed? To be verify before SAT Activity HAIKAL
(Commissioning Team to
check:)
3.2 Datasheets and test schedules in place? SAT Procedure HAIKAL
3.4 List of persons responsible for testing in place? Asses by E&I(JM) HAIKAL
Hanafi,Ikhwan,Haikal,INEA
3.5 Procedure in place for control of trip defeats? Site procedure will be follow. SAT to be perform during HAIKAL
shutdown.
3.6 Has the Functional Safety Assessment (FSA) been SAT Procedure-Interlock safety assessment HAIKAL
completed?
(mandatory if SIL-rated trips are installed)
Guidance Ref: G12B Version 2.0 Effective From: August 2021 Review Due: August 2024 Page 2 of 77
FORM D: HAZARD STUDY 4 REPORT
4 Restrictor orifices or other Check in place, labelled, documented and system N/A RIFDI
flow restricting devices installed to sustain?
5.1 Critical Machines / Commissioning inspections carried out? Verified By MHT QAQC,Pending punch list clearance RIFDI
Pipelines
5.2 Schedule of Protective Systems and Inspection in N/A RIFDI
place?
5.3 Operating and maintenance instructions in place? Yes,as per vendor instruction RIFDI
6 Inspections Check availability of equipment manufacturers and Yes,Refer FAT report RIFDI/HAIKAL
independent authorities’ test certificates?
7.1 Operating Instructions and Written and validated for normal operation, start-up, Refer Functional Design Specification(FDS) document:4014- INEA
Maintenance planned and emergency shutdowns. Also, special MH-J313-ME-STD-1533
maintenance and decontamination procedures if
appropriate.
7.4 Task risk assessment completed (if appropriate)? Risk Assessment: (EHS-MS-03-01-F26) AIMAN
7.6 Systems for control of materials used e.g. gaskets, N/A AIMAN
valves, instruments etc?
Guidance Ref: G12B Version 2.0 Effective From: August 2021 Review Due: August 2024 Page 3 of 77
FORM D: HAZARD STUDY 4 REPORT
8.1 Control of Substances Assessments complete and in place? (Including N/A AIMAN
Hazardous to Health (in engineering materials such as lubricants, fibrous
UK, COSHH Regulation insulation or packing, cleaning solvents etc.)
Requirements)
8.2 Control by engineering means implemented? N/A INEA
9.1 Control of Major Accident Assessments complete and in place? N/A AIMAN
Hazards if appropriate
(1999 Regulations)
9.2 Authority concerns resolved? Emergency Vent-Chimney :DOE Notification AIMAN
Process Exhaust Air Cooler :CF Pending from DOSH
10.1 Noise Meets specification (may be done after chemicals To be verify during SAT AIMAN
admitted)?
10.2 Monitoring schedules in place, zones marked? N/A AIMAN
10.4 Alarm levels set to provide audible warnings without N/A AIMAN
excessive and disrupting nuisance noise
11.1 Environmental Permitting Assessments complete & authorisations in place? N/A AIMAN
/ Effluents / Waste
(gaseous, liquid and solid)
Guidance Ref: G12B Version 2.0 Effective From: August 2021 Review Due: August 2024 Page 4 of 77
FORM D: HAZARD STUDY 4 REPORT
11.2 Monitoring schedules in place? N/A AIMAN
13 Key Isolations Accessibility, operability and labelling of key isolation N/A AIMAN
valves checked?
14.1 Emergency Power, Check for satisfactory operation? Existing System IKHWAN
Services &
Communications
14.2 Test schedules in place? Existing System IKHWAN
15.1 Training Programmed complete, validated and records in place Verify by Hanafi AIMAN
(should cover operating & maintenance personnel)?
17.1 Control of Modifications System to control in place? New system at existing process layout AIMAN
Guidance Ref: G12B Version 2.0 Effective From: August 2021 Review Due: August 2024 Page 5 of 77
FORM D: HAZARD STUDY 4 REPORT
17.3 P&ID’s updated and indexed? Latest: 4014-MH-J313-ME-PID-1547 AIMAN
18 Emergency Procedures Confirm that any necessary changes have been made Existing System AIMAN
to plant, site or off-site emergency procedures. Have
the procedures been practiced?
19 Other Site Procedures Do other site procedures need to be modified and has N/A AIMAN
this been done?
24 Actions Outstanding An inventory of outstanding actions from previous Yes, as per “CSF Line Expansion-HAZOP Worksheet”
Hazard Studies? Note:
1)Counterweight damper (DP-01) at fresh air line 18”-
XX10004-01SD0S02 are not apply on this system
commissioning due to unreadiness of the items at site.
2)LEL Analyzer (AIT-1001/01 and AIT-1001/02) at Process
air from Oven 2&3 (12”-XX10002-01SD0S02_1-IH & 12”-
XX10003-01SD0S02_1-IH) are not apply on this system
commissioning due to unreadiness of the item at site.
Guidance Ref: G12B Version 2.0 Effective From: August 2021 Review Due: August 2024 Page 6 of 77
FORM D: HAZARD STUDY 4 REPORT
Team Members (name and role): Issue No.: Responsibility for progressing actions:
Date:
Guidance Ref: G12B Version 2.0 Effective From: August 2021 Review Due: August 2024 Page 7 of 77
FORM D: HAZARD STUDY 4 REPORT
Guidance Ref: G12B Version 2.0 Effective From: August 2021 Review Due: August 2024 Page 8 of 77
FORM D: HAZARD STUDY 4 REPORT
Guidance Ref: G12B Version 2.0 Effective From: August 2021 Review Due: August 2024 Page 9 of 77
FORM D: HAZARD STUDY 4 REPORT
Guidance Ref: G12B Version 2.0 Effective From: August 2021 Review Due: August 2024 Page 10 of 77
FORM D: HAZARD STUDY 4 REPORT
Guidance Ref: G12B Version 2.0 Effective From: August 2021 Review Due: August 2024 Page 11 of 77
FORM D: HAZARD STUDY 4 REPORT
16 General Housekeeping
– remaining construction materials
Access to tank tops
Lifting equipment / hoists
Security systems
Quality Control equipment
Is SOP physically possible
Commissioning procedures
Commissioning and test records
Telephone / Tannoy / data points