Rim Gap of Performance Test Roof Seal T2708 Rev.1

You might also like

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 2

Inspection and Test Plan

FOR Roof Seal of T-2708 Installation at site

Tank internal roof seal replacement


T-2708 PROJECT
FIELD INSPECTION REPORT

PROJECT TITLE : REPORT NO:

REPORT NO:
SUBMIT DATE:
Rim gap of Performance test roof seal T2708
REV:
INSPECTION DATE : TANK NO :

Rim gap of Performance test roof seal T2708

Level
Fill water Drain water Empty
Degree tank
50% 75% 100% 75% 50% 25%
0° 340 341 320 329 334 330 360
45° 355 343 338 334 343 353 350
90° 355 359 350 347 350 339 363
135° 340 338 363 337 334 319 321
180° 341 345 361 329 300 337 302
225° 336 298 344 303 301 304 306
270° 309 320 314 308 303 320 307
315° 318 300 308 295 317 302 327

INSPECTION BY INSPECTION BY APPROVED BY


TOP ENERGY: GCME : PTTGC :
SIGNATURE

NAME Pheera Udomsaree

DATE 16-Feb-23
Inspection and Test Plan
FOR Roof Seal of T-2708 Installation at site

Tank internal roof seal replacement


T-2708 PROJECT
FIELD INSPECTION REPORT

PROJECT TITLE : REPORT NO:

REPORT NO:
SUBMIT DATE:
Rim gap of Performance test roof seal T2708
REV:
INSPECTION DATE : TANK NO :

Rim gap of Performance test roof seal T2708


Fill water 25%

INSPECTION BY INSPECTION BY INSPECTION BY APPROVED BY


GCME : PTTGC : TOP ENERGY:
SIGNATURE

NAME Pheera Udomsaree


DATE 16-Feb-23