Construction Of CGI Communal shared latrines

CGI Roof
Perrmanent vents
Corrugated iron sheet Walls
0.20 1.40 0.20

3.00
Vent pipe
0.20 1.00 0.20

CGI Door
Drop hole
20 cm thick
Reinforced Concrete
S.Tank Door step

0.20
G.L

150mm thick cement flooring


1.60

2.50
Septic 160mm Delivery pipe
Tank

1.80

Drawn by: Date: Floor Plan & Section

Check by: Project No: