Professional Documents
Culture Documents
Professional Practice
Professional Practice
Professional Practice
Art. 1723. The engineer or architect who drew up the - Special Provisions or conditions
plans and specifications for a building is liable for - General Conditions
damages if within fifteen years from the completion of - Drawings
the structure, the same should collapse by reason of a - Specifications
defect in those plans and specifications, or due to the - Other Bid Documents
defects in the ground. The contractor is likewise
responsible for the damages if the edifice falls, within RA 9266
the same period, on account of defects in the SECTION 9. Grounds for Suspension or Removal of
construction or the use of materials of inferior quality Members of the Board
furnished by him, or due to any violation of the terms of
the contract. If the engineer or architect supervises the SECTION 10. Compensation and Allowances of the
construction, he shall be solidarily liable with the Board
contractor. Acceptance of the building, after
SECTION 11. Annual Report
completion, does not imply waiver of any of the cause
of action by reason of any defect mentioned in the SECTION 12. Examination Required
preceding paragraph. The action must be brought
SECTION 13. Qualifications of Applicant for Examination
within ten years following the collapse of the building.
SECTION 17. Oath