Professional Documents
Culture Documents
Document
Document
Document
#2 Fresh Water tank starboard side vent head replaced in good orddr
2. #4 Fresh water tank port and starboard side existing sounding pipe section without screw type
cap cropped off new section weld in good order from the position new section with screw type
cap weld in good order with caps not of screw type & not locked.
3. #8 No.3 Engine room ventilation fan damper unable to be fully closed due to defective gaskets.
4. #11 Numerous U-bolts, brackets, expansion joints for hydraulic lines, fire lines, electrical conduit pipes
found heavily
5. #13 accommodation ladder Port and starboard support brackets in-way-of falls/wire replaced in good
order
fabrication U-bolt, bracket, expansion joint, and our side arrange replacement.
6. #15 Rescue boat davit hydraulic tank filing cap renewed with damaged one.