NYINAHIN LARRY PARK PROJECT

EXPENSES

(DANIEL)

22 DECEMBER 2023

FUEL 240

TOTAL 240

GRAND TOTAL 240

4 JANUARY 2023

CYBER BOARD (45) 1260

PEGS (60) 300

T&T 130

PICK AXE (3) 255

SHAVELS (3) 165

NAILS 160

SQUARE 25

MARKER PEN 5

DRINKS AND BISCUITS 97

ENGINEER 1000

BOYS 50

MASONS 200

SAND (2 TRIPS) 2700

FUEL 230

EXCAVATION 500

TOTAL 7,077

GRAND TOTAL 7,317

05 JANUARY 2023

2×4 (50) 1050

PUMP REPAIR 500

PUMP INSTALLATION 1200


EXCAVATION 500

WATER 10

ASSEMBLYMAN 200

FUEL 230

NAILS (2 BOXES) 140

TOTAL 3,830

GRAND TOTAL 11,147

6 JANUARY 2023

ROOFING SHEET (1 PACKET) 790

WATER HOSE 200

WOOD CHEM 40

WOODEN STRUCTURE W/MANSHIP 300

EXCAVATION 500

HOTEL 70

ROOFING NAILS 55

ROOFING FELT 30

TOTAL 1,985

GRAND TOTAL 13,132

7 JANUARY 2023

CYBER BOARD (62) 1240

T&T 70

CEMENT (45 BAGS ) 3780

CEMENT LOADING 10

STRUCTURE W/MANSHIP 700

TAB LOCKERS 30

HINGES AND LOCKERS 90

RUBBER BUCKES (2) 20

WATER 10

FUEL 230
TOTAL 6180

GRAND TOTAL 19,312

9 JANUARY 2023

HEAD PAN (2) 70

SHAVEL (1) 45

FUEL 80

TOTAL 195

GRAND TOTAL 19,507

10 JANUARY 2023

BLOCKS W/MANSHIP (1600) 1280

EXCAVATION 500

FUEL 230

WHEEL BARROW REPAIRS 100

MASON (SUPERVISION) 200

TOTAL 2,310

GRAND TOTAL 21,817

23 JANUARY 2023

FUEL 260

TOTAL 260

GRAND TOTAL 22,077