ACCRA HOUSING PROJECT

CHIPPINGS (6 CUBIC) - 900

BLOCKS (1200 PIECES @ 4.1) = 4920

GATE 4500

GATE TNT 100

CLEARING 300

EXCAVATION 900

DIGGING FEE 300

CONCRETE WORKS 800

BLOCKS LAYING 3100

CEMENT 20 BAGS 1100

TRANSPORT 120

IRON ROD 2769

WOOD 800

CARPENTER 700

STEEL BENDER 250

NAILS 75

WATER (CONCRETE) 140

PURE WATER 30

CEMENT 30 BAGS 1700

BLOCKS (300 PCS @ 4.3) 1290

BAMBOO (10 PCS) 100

CHIPPINGS (6 CUBIC)) 900

CEMENT 15 (BAGS) 900

BLOCKS 200 (@ 3.5) 700

SAND CLEARING =100

CEMENT (8 BAGS) 480


WATER = 60

AMOUNT GIVEN TO KEN

22/6/22 = 5100

25/6/22 = 2200

28/622 = 3900

03/07/22 = 2300

TOTAL AMOUNT SPENT = 27624

FACIAL BOARD (3) = 450

2×2 (22 PCS) = 550

2×4 (1) = 60

PLYWOOD (36 PCS) = 2240

NAILS = 170

ROOFING PLASTER = 60

WINDOW NET = 180

WEEDICIDE 80

CEILING BUTTONS = 160

LOUVER FLAME (2 PAIRS) 180

ROOFING SHEETS (6) = 330

PLUMBING MATERIALS = 1185

PLUMBING W/MANSHIP = 350

CARPENTER W/MAMSHIP = 1700

MASON W/MANSHIP = 1800


WATER = 80

BLOCKS (160) 720

CEMENT (10) = 860

WOOD CHEM = 75

BRUSH = 8

T&T = 120

ROOFING NAILS = 22

LOUVER BLADE (38PCS) 527

BIO-DIGESTER = 700

SINK 707

CEMENT (8 BAGS) = 688

T&T 22

NAILS = 40

WATER = 80

31st August 2023

AMOUNT SENT TO KEN

2500

4000

1000