RESCUE PLAN

HOT-TAP TIE-IN POINT 05 INSTALLATION WORK FOR NEW BOG PROJECHOT-TAP


RESCUE PLAN FOR HOT TAP OF 36” FLARE HEADER – P51.B_62551 TO
HANDLE FLARE FROM THE NEW BOIL OFF GAS FACILITY.
Permit is confined space due to newly required welding booth to contain sparks during cutting, grinding, and
welding activities.
Space Designation: There is enough space for persons to work around the Work locations
Unit / Equipment Name / ID#: BY ROAD G&H
Location: UNIT 3400 New BOG line to flare existing 36” line
Permit To Work No: 68774
High Risk Type: - Low / Medium / HIGH
Working at height Risk Severity (Based on potential Severity RAM rating): HIGH

Number of Personnel likely to be in work location: 40


Layout of Space: Elevated: Yes/No Congested: Yes / No

Means of communication (Entrants to Attendant)


:: Audible Signal-Klaxon : : Whistle: : : Other:

If others, please state means TETRA RADIO?

Means to Summon Rescue (Attendant to CCR)


:: Phone: 3999 :: Radio: Channel # IA Emergency (for rescue team only)
: : Other:

If others, please state means

1. Call CCR on 3999 and state:


 Your name Type of incident: fire, medical, etc.
 Your exact location in the plant
 How you can be contacted.
 Number of the persons at the incident/Victim Assessment.
2. ENSURE the message is repeated correctly by the recipient in the CCR.
3. Take care of your own safety.
4. Take care of safety of others.
5. Confirm any action to the CCR till arrival of incident Commander.

Possible Potential Scenarios: Fire and injury to personnel and equipment while caring out grinding
and welding job during the HOT-TAP at ROAD H&G BY OLD FLARE U-6200.

Aim: To provide a plan to enable Involved person to be safely removed from the work area and Conveyed
to the ambulance

Objectives: To ensure that nominated personnel are competent in the methods of casualty rescue and
in use of rescue equipment.

Doc No: HSQ-FR23 Revision: 2 Date: 14/01/2022 Page 1 of 6


RESCUE PLAN
Equipment Required: 1 x Basket Stretcher, 1 x First-Aid Kit, 3pcs Fall Arrestor, 4x30M Rescue line and
appropriate fire extinguisher.

Personnel: Minimum number of 4 (2 at the top and 2 at the bottom of stretcher) 1 Medic to ensure
Involved person is carried in the correct manner, should they have spinal injuries. There must be a least 1
first aider

Method:
 Casualty to be carefully placed into the stretcher under supervision of Medic
 Ensure casualty is securely strapped into the stretcher
 Rescue line to be secured to the top/leg of the stretcher unless otherwise instructed by Medic
 The stretcher will be lowered down by two personnel at the upper scaffold platform, while the two other
personnel will guide the stretcher with the rescue lines on both top/leg of the stretcher from swinging.
 Both personnel on the platform or grinding point must secure the stretcher and hoisting ropes firmly sling round
the platform railings before hoisting.
 Before hoisting ensures no slips or free-fall.
 IP should be safely carried into the ambulance as directed by the medic
 Drive IP to site clinic/RA Hospital as required by the medic.

Note: This method to be practiced by personnel who are likely to be nominated as stretcher
bearers

Doc No: HSQ-FR23 Revision: 2 Date: 14/01/2022 Page 3 of 6


RESCUE PLAN
Rescue Methodology:

Step one; Place Casualty Securely in Stretcher.

Entrant in distress to Assess casualty and Place casualty into Brief casualty of the Two Rescue lines to
be immediately administer first aid the stretcher with the intention to reassure to be secured to the
retrieved as necessary supervision of the him/her if conscious top and bottom of
Medic the stretcher

Step two: Safe carriage to the Ambulance – Life threatening injuries


Lower stretcher hand over hand, while
Both lines attached to the 2 other Rescue team will be at the stretcher, one
supporting the other who will be holding on to the team members on the ground gently pull
stretcher should be lowered their lines guiding the stretcher until it
to two team members stretcher and at the same time maintaining as the
stretcher slides down the edge of the stairs, 3-point reaches the ground.
stationed on the ground contact at all times.

STEP THREE: Internal lowering through the installed ladder – non-life-threatening injuries

Two lines should


Two lines should be secured Two men should be 2 Men at the bottom, guide the You may stand the
be secured at the stretcher down while those
at the top corners of the bottom corners to located at each end stretcher to turn and
stretcher to enable lowering of the stretcher release the line gently sliding
guide the down the stairs always maneuver to the next
of the stretcher stretcher stairway
maintaining three-point contact.

Doc No: HSQ-FR23 Revision: 2 Date: 14/01/2022 Page 4 of 6


Possible Conditions of Persons to be Rescued: – tick as appropriate ()
(a) Injured by fall  (b) Electrocuted (c) Injured by Falling Objects
(d) Unconscious (e) Others

If others, please state:

Likely Methods of Rescue: – tick as appropriate ()

(a) External [retrieval (b) Internal (c) Hauling system required

If Hauling System Required:


Victim-Hoisting system require x Hoisting area:

Anchorage (a) Overhead (b) Beam (c) Support Strut


(d) Support Column (e) Anchored Steel Pipe  (f) Welded steel handrail 
(g) Stairwell (h) Other

If Other, please specify:

Rescue Equipment Requirement: – tick as appropriate ()

On Site or Outsource 

(a) BA System (b) Harness (FALL ARRESTOR)  (c) Winches/Retrieval System


(d) Rescue Rope  (e) Tripod (f) Other

If Other, please specify:


Medical Attendance
 How quickly can the rescue team be in attendance? 10mins
 Are there needs to alert the medical personnel? (Y/N) Yes
Commencement time to be communicated to CCR / Medics/Fire Station? 3999

PPE Requirement:
 Basic PPEs and Escape set
 Nose Mask, Disposable Coveralls, and Leather hand gloves (Standard PPE).

Doc No: HSQ-FR23 Revision: 2 Date: 14/01/2022 Page 5 of 6


Space Description:
Work involves: Fire Water Hose Handling/Deployment, Fire Extinguisher Operations, Firefighting, Search
and Rescue Tactics.

Sketch or Diagram of Space:

Hot Set up Split Tee on Pipe

10” to 36” Pipe

Job Supervisor: Radio Channel #:91469


Engineering / Project /
Maintenance
Ops Supervisor

Fire Service

HPSO/SSI
Medical (as appropriate )

Doc No: HSQ-FR23 Revision: 2 Date: 14/01/2022 Page 6 of 6