Definition of the competence : Realization of elementary works

Title of the module: Practical


Class: First year civil engineering and wood Industry ( BC, WW,SI, DRAFTSMANSHIP, TILING, CARPENTRY, SAWMILLING)
Minimum weekly Workload: 06hours
Minimum annual Workload: 132hours.
Elements of
No Contents of the competence Assessment indicator Pedagogic recommendations
competence
 Cement blocks
Well fabricated Bricks and blocks in
01 Material production  Cement bricks
their correct dimensions
Marking of lines
- Alignment
- Marking of a line
- Marking of two parallel
lines
- Marking of two
- Correct identification of site or
perpendicular lines
post. - Do exercise on the
- Marking of two lines
- Correct sitting out of marking of geometrical
forming angles like: 30°,
alignment figures on flat floors or
45°, 60° and others.
- Exactness of lengths slightly inclined floors.
- Marking of curves on a
- Exactness of angles - Start in the workshop and
surface: circle, oval and
Setting out of - Respect of curves move progressively to
02 others.
structure - Exactness of forms open air.
- Marking of other forms of
- Exactness of horizontally - Begin with figures having
geometry: square,
- Respect of altitude or level small dimensions and
rectangle, parallelogram,
- Correct cleaning of working enter progressively into
rhombus, and trapezium,
post figures with large
regular polygons:
- Cleaning and arrangement of dimensions.
(pentagon, hexagon,
materials and tools.
octagon, decagon
dodecagon), irregular
polygons.
- Materializing a
horizontality
- Leveling and formation
1
MINESEC/IGE/IPTI - 1st cycle syllabus for Secondary Technical and Professional Education (ESTP) - Specialty : CIVIL ENG - Class : Form ONE
horizontal surface.
Dry bonding
Binding mortar
Brick work
Realization of - Vertically, level, alignment,
- Straight walls
structures in earth plainness and correct
- Pointing
bricks and cement dimensions
03 - Conglomerates work
blocks, cement - Constitution and correct laying
- Straight walls
conglomerates and of mortar
- Rubble stone work
rubble stone - Treatment of joints (pointing)
- Height of stone work
- Straight walls
- Pointing
Manual sawing
- sawing along the grain
- Sawing across the grain
- Curve sawing ( contour
sawing)
Planing
- Regular sawing following a
- First Face
04 Wood sizing marked line
- First edge
- Parallel faces
- Second face (opposite)
- Second edge (opposite
edge)
Marking
- Notching
- Mortising

2