BIDDING DOCUMENTS

SOUTH LUZON SUBSTATION UPGRADING PROJECT 2, SCHEDULE V –


DESIGN, SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF
HIGH VOLTAGE EQUIPMENT INCLUDING SECONDARY DEVICES AT
BIÑAN, DASMARIÑAS AND MUNTINLUPA SUBSTATIONS

Biñan Substation (SLD1): Brgy. San Vicente, Biñan, Laguna


Dasmariñas Substation (SLD1): Brgy. San Agustin, Dasmariñas, Cavite
Muntinlupa Substation (NCR): Brgy. Buli, Muntinlupa City, Metro Manila

Sp21.SLSUP2.Lt-0540(V)

COMPOSITION
VOLUME I - COMMERCIAL PROVISIONS
VOLUME II.1 - STANDARD SPECIFICATIONS (PART 1)
VOLUME II.2 - STANDARD SPECIFICATIONS (PART 3, 4, & 5)
VOLUME II.3 - STANDARD SPECIFICATIONS (PART 9, 10, 11 & ANNEXES)
VOLUME III.1 - TECHNICAL DATA SHEETS (PART 1)
VOLUME III.2 - TECHNICAL DATA SHEETS (PART 3, 4, 5 & ANNEXES)
VOLUME IV - BID PRICE SCHEDULE AND BID FORMS
VOLUME V.1 - BID DRAWINGS (ELECTRICAL WORKS)
VOLUME V.2 - BID DRAWINGS (PROTECTION, CONTROL & COMMU. WORKS)
VOLUME V.3 - BID DRAWINGS (CIVIL WORKS)
VOLUME V.4 - BID DRAWINGS (ARCHITECTURAL WORKS)
VOLUME V.5 - BID DRAWINGS (MECHANICAL WORKS)

Engineering Design Department


Attachment E Page 1 of 1
PM-PE-EDD-01 Sp21.SLSUP2.Lt-0540(V)

BIDDING DOCUMENT COMPOSITION


VOLUME I - COMMERCIAL PROVISIONS
Section 1 - Invitation to Bid
Section 2 - Instruction to Bidders
Section 2a - Bid Data Sheet
Section 3 - General Condition of Contract
Section 3a - Special Conditions of Contract

VOLUME II.1 - STANDARD SPECIFICATIONS


Part 1 - Substation Equipment and Materials
Part 2 - Transmission Line Materials (Not Applicable)
VOLUME II.2 - STANDARD SPECIFICATIONS
Part 3 - Substation Control System Equipment
Part 4 - Telecommunication Equipment
Part 5 - Protection and Monitoring System Equipment
Part 6 - Submarine Cables (Not Applicable)
Part 7 - Underground Cables
VOLUME II.3 - STANDARD SPECIFICATIONS
Part 8 - Transmission Line Construction (Not Applicable)
Part 9 - Civil Works
Part 10 - Architectural Works
Part 11 - Mechanical Works
Annex A - Classification System of Drawings and Documents
Annex B - Typical Sample of Masterlist of Design Documents/Drawings

VOLUME III.1 - TECHNICAL DATA SHEETS


Part 1 - Substation Equipment and Materials
Part 2 - Transmission Line Materials (Not Applicable)
VOLUME III.2 - TECHNICAL DATA SHEETS
Part 3 - Substation Control System Equipment
Part 4 - Telecommunication Equipment
Part 5 - Protection and Monitoring System Equipment
Part 6 - Submarine Cables (Not Applicable)
Part 7 - Underground Cables (Not Applicable)
Annex A - Scope of Works
Annex B - List of Approved Manufacturers of Materials/ Equipment
Annex C - Geological Investigation Report and Topographical Survey

VOLUME IV - BID PRICE SCHEDULE AND BID FORMS


Part 1 - Bid Price Schedule
Part 2 - Bid Forms

VOLUME V.1 - BID DRAWINGS


Part 1 - Electrical Works
VOLUME V.2 - BID DRAWINGS
Part 2 - Protection, Control and Communication Works
VOLUME V.3 - BID DRAWINGS
Part 3 - Civil Works
VOLUME V.4 - BID DRAWINGS
Part 4 - Architectural Works
VOLUME V.5 - BID DRAWINGS
Part 5 - Mechanical Works
VOLUME II.1 - ELECTRICAL WORKS
A. BIÑAN 230/115kV SUBSTATION
B. DASMARIÑAS 500/230/115kV SUBSTATION
CT enclosed are NGCP supplied equipment
6
6
6
6
6
6
C. MUNTINLUPA 230/115kV SUBSTATION
D. STANDARD DRAWINGS