S-000-1520-002 - 3b Quality Control Requirment To Vendor
S-000-1520-002 - 3b Quality Control Requirment To Vendor
0-0831-00-0000 S-000-1520-002 3B
PAGE 1 0F 17
CPY
REV. DATE PAGE DESCRIPTION PREP’D CHK’D APP’D
APP’D
1A 12-Sep-2022 All Issued for Review Arief R. Anthonius F.T. Zola M.
2A 5-Dec-2022 All Issued for Approval Arief R. Anthonius F.T. Zola M.
3A 17-Jan-2022 All Approved for Construction Arief R. Anthonius F.T. Zola M.
3B 17-Jul-2022 All Approved for Construction Arief R. Anthonius F.T. Zola M.
S
THIS DOCUMENT / DRAWING INCLUDING ATTACHEMENT EMBODIES PROPRIEATRY INFORMATION OF PT. JGC INDONESIA IN ANY FORM OR MEDIUM TO THIRD
J-24D M- 2 0 2
PARTIES, OR USED FOR OTHER THAN THE PURPOSE FOR WHICH IT HAS BEEN PROVIDED IN WHOLE OR IN PARTY IN ANY MANNER EXCEPT AS EXPRESSLY
3
PERMITTED BY PT. JGC INDONESIA
-Jul ED
PRINT
WHEN
LLED
NCONTRO
JOB CODE DOCUMENT NO. Rev.
0-0831-00-0000 S-000-1520-002 3B
SUMBAWA LNG TERMINAL & REGAS FACILITY
QC REQUIREMENT TO VENDOR Page 2 of 17
RECORD OF REVISION
The revisions listed below have been incorporated in this copy of the document.
REV. SECTION PAGE DESCRIPTION OF CHANGES
NO. NO.
3A 1 5 Add project description
Add sentences “to give the guideline for minimum quality requirement to
3A 1.2 5
vendor to proceed the works”
3A 3 6 Add the references of MFS and CPY specification
Add sentences “VENDOR shall implement quality management
4.1 7
system…”
3A 4.6 9 Add sentences “When outsource Testing Laboratory ….”
3A 4.8 9 Change word “Inspector” to “Personnel”
Change sentences “VENDOR’s non-destructive Testing (NDE)
3A 4.8 9 Inspector who sign the report shall be qualified and certified in
accordance with ASNT-TC-1A level 2….”
3A 5.1 11 Add word “by CONTRACTOR”
Add sentences “In case found serious or repeated non-conformity
3A 5.1 11
during in process inspection….”
3A 6.2 13 Add sentences “KOM minutes agenda…..”
Change sentences “After final step inspection is conducted,
3A 9 15 CONTRACTOR inspector shall prepare Punch List when found
following condition:”
3A 10.1 16 Delete sentences
3A 4.6 9 Add sentences “When outsource Testing Laboratory to….. “
Add sentence “(11) Prior to used, Measuring and testing equipment
3B 4.6 9
shall be ensured in normal and good condition”
3B 6.1 12 Add wording “as per procurement plan “
3B 7.5 15 Add sentence “(3) VENDOR shall provide required inspection report.. “
S
THIS DOCUMENT / DRAWING INCLUDING ATTACHEMENT EMBODIES PROPRIEATRY INFORMATION OF PT. JGC INDONESIA IN ANY FORM OR MEDIUM TO THIRD
J-24D M- 2 0 2
PARTIES, OR USED FOR OTHER THAN THE PURPOSE FOR WHICH IT HAS BEEN PROVIDED IN WHOLE OR IN PARTY IN ANY MANNER EXCEPT AS EXPRESSLY
3
PERMITTED BY PT. JGC INDONESIA
-Jul ED
PRINT
WHEN
LLED
NCONTRO
JOB CODE DOCUMENT NO. Rev.
0-0831-00-0000 S-000-1520-002 3B
SUMBAWA LNG TERMINAL & REGAS FACILITY
QC REQUIREMENT TO VENDOR Page 3 of 17
Table of Contents
1. GENERAL............................................................................................................................. 5
1.1 SCOPE.................................................................................................................................. 5
1.2 PURPOSE ............................................................................................................................. 5
1.3 OBJECTIVES........................................................................................................................ 5
2. ABBREVIATIONS AND DEFINITIONS ................................................................................. 5
2.1 ABBREVIATIONS ............................................................................................................................. 5
2.2 DEFINITIONS .................................................................................................................................... 6
3. REFERENCES ...................................................................................................................... 6
4. VENDOR’S RESPONSIBILITIES FOR QUALITY CONTROL............................................... 7
4.1 GENERAL REQUIREMENTS ........................................................................................................... 7
4.2 CONFIRMATION AND CONTROL OF ADEQUATE DATA............................................................. 7
4.3 SUBMISSION OF VENDOR’S DOCUMENTS .................................................................................. 7
4.4 CONTROL OF SUB-VENDOR.......................................................................................................... 8
4.5 MATERIAL TRACEABILITY ............................................................................................................. 8
4.6 CONTROL OF MEASURING AND TEST EQUIPMENT .................................................................. 9
4.7 INDONESIAN GOVERNMENT INSPECTION .................................................................................. 9
4.8 NON-DESTRUCTIVE TESTING PERSONNEL .............................................................................. 10
4.9 PMI OPERATOR ............................................................................................................................. 10
4.10 WELDER AND WELDING OPERATOR ......................................................................................... 10
4.11 WELDING PROCEDURE ................................................................................................................ 10
4.12 VERIFICATION OF PERFORMANCE OF EQUIPMENT AND MATERIALS................................. 10
4.13 FREE ENTRY .................................................................................................................................. 11
4.14 INSPECTOR'S SAFETY ................................................................................................................. 11
4.15 INSPECTION FACILITY AND OFFICE........................................................................................... 11
5. INSPECTION REQUIREMENTS ......................................................................................... 11
5.1 INSPECTION LEVEL ...................................................................................................................... 11
5.2 SCOPE OF INSPECTION ............................................................................................................... 12
5.3 INSPECTION & TEST PLAN (ITP)...................................................................................... 12
6. CONFIRMATION OF QC REQUIREMENTS WITH VENDOR ............................................. 12
6.1 BEFORE PO.................................................................................................................................... 12
6.2 KICK-OFF MEETING (AFTER PO)................................................................................................. 12
6.3 SUBMISSION OF VENDOR’S QC DOCUMENTS ......................................................................... 13
6.4 PRE-INSPECTION MEETING (PIM) ............................................................................................... 13
S
THIS DOCUMENT / DRAWING INCLUDING ATTACHEMENT EMBODIES PROPRIEATRY INFORMATION OF PT. JGC INDONESIA IN ANY FORM OR MEDIUM TO THIRD
J-24D M- 2 0 2
PARTIES, OR USED FOR OTHER THAN THE PURPOSE FOR WHICH IT HAS BEEN PROVIDED IN WHOLE OR IN PARTY IN ANY MANNER EXCEPT AS EXPRESSLY
3
PERMITTED BY PT. JGC INDONESIA
-Jul ED
PRINT
WHEN
LLED
NCONTRO
JOB CODE DOCUMENT NO. Rev.
0-0831-00-0000 S-000-1520-002 3B
SUMBAWA LNG TERMINAL & REGAS FACILITY
QC REQUIREMENT TO VENDOR Page 4 of 17
S
THIS DOCUMENT / DRAWING INCLUDING ATTACHEMENT EMBODIES PROPRIEATRY INFORMATION OF PT. JGC INDONESIA IN ANY FORM OR MEDIUM TO THIRD
J-24D M- 2 0 2
PARTIES, OR USED FOR OTHER THAN THE PURPOSE FOR WHICH IT HAS BEEN PROVIDED IN WHOLE OR IN PARTY IN ANY MANNER EXCEPT AS EXPRESSLY
3
PERMITTED BY PT. JGC INDONESIA
-Jul ED
PRINT
WHEN
LLED
NCONTRO
JOB CODE DOCUMENT NO. Rev.
0-0831-00-0000 S-000-1520-002 3B
SUMBAWA LNG TERMINAL & REGAS FACILITY
QC REQUIREMENT TO VENDOR Page 5 of 17
1. GENERAL
The EPCC Sumbawa LNG Storage and Regasification Terminal are initiated by PT Medco Sumbawa
Gas to supply natural gas to PT Amman Mineral Nusa Tenggara (AMNT) for its new Combined Cycle
Power Plant (CCPP) and smelter. The project site is on Benete Bay, South Benete, West Nusa
Tenggara, Indonesia
The project scope is to build onshore LNG storage tank capacity of 50,000 m3 Double Wall Steel Full
Containment and 160,000 m3 PC Wall with Steel Roof Full Containment, a regasification facility
maximum of 77 MMSCFD, a Jetty and Trestle, pipeline to CCPP, and Utility and Building facilities.
1.1 Scope
This procedure specifies the requirements to VENDOR for Quality Control activities including inspection
and test for purchased equipment and materials for Sumbawa LNG Terminal & Regassification Project.
1.2 Purpose
The purpose of this document is to give the guideline for minimum quality requirement to VENDOR and
define the ways to proceed the works with respective responsibilities and activities of VENDOR and
CONTRACTOR’s QC Group for the project and to define interfaces between CONTRACTOR and
VENDOR in relation with Quality Control matters.
1.3 Objectives
The objective of this procedure is to maintain the uniformity and consistency of the Quality Control
Activities by all parties and personnel involved to reduce any deviation of product during manufacturing
& fabrication which have impact to safety, cost and schedule, which is not covered by vendor’s
obligation.
The objectives of Quality Control for purchased equipment and materials are:
Only qualified, inspected and accepted equipment and materials are delivered to the construction
job site.
No defects / troubles / nonconformities of delivered equipment and materials will be detected at the
construction job site.
S
THIS DOCUMENT / DRAWING INCLUDING ATTACHEMENT EMBODIES PROPRIEATRY INFORMATION OF PT. JGC INDONESIA IN ANY FORM OR MEDIUM TO THIRD
J-24D M- 2 0 2
PARTIES, OR USED FOR OTHER THAN THE PURPOSE FOR WHICH IT HAS BEEN PROVIDED IN WHOLE OR IN PARTY IN ANY MANNER EXCEPT AS EXPRESSLY
3
PERMITTED BY PT. JGC INDONESIA
-Jul ED
PRINT
WHEN
LLED
NCONTRO
JOB CODE DOCUMENT NO. Rev.
0-0831-00-0000 S-000-1520-002 3B
SUMBAWA LNG TERMINAL & REGAS FACILITY
QC REQUIREMENT TO VENDOR Page 6 of 17
2.2 DEFINITIONS
3. REFERENCES
The latest revision of the following documents shall be referred to and shall form a part of this procedure:
S
THIS DOCUMENT / DRAWING INCLUDING ATTACHEMENT EMBODIES PROPRIEATRY INFORMATION OF PT. JGC INDONESIA IN ANY FORM OR MEDIUM TO THIRD
J-24D M- 2 0 2
PARTIES, OR USED FOR OTHER THAN THE PURPOSE FOR WHICH IT HAS BEEN PROVIDED IN WHOLE OR IN PARTY IN ANY MANNER EXCEPT AS EXPRESSLY
3
PERMITTED BY PT. JGC INDONESIA
-Jul ED
PRINT
WHEN
LLED
NCONTRO
JOB CODE DOCUMENT NO. Rev.
0-0831-00-0000 S-000-1520-002 3B
SUMBAWA LNG TERMINAL & REGAS FACILITY
QC REQUIREMENT TO VENDOR Page 7 of 17
The followings documents, as a minimum, shall be approved by CONTRACTOR and/ COMPANY before
Pre-Inspection Meeting (PIM) conducted:
(1) Quality Manual or Certificate of VENDOR’s Quality Management System
(2) Inspection and Test Plan (ITP) which clearly specify “Hold Point”, “Witness Point”, “Review Point”
for CONTRACTOR, COMPANY, Third Party Inspection Agency (TPIA) / MIGAS, and VENDOR /
Manufacturer.
S
THIS DOCUMENT / DRAWING INCLUDING ATTACHEMENT EMBODIES PROPRIEATRY INFORMATION OF PT. JGC INDONESIA IN ANY FORM OR MEDIUM TO THIRD
J-24D M- 2 0 2
PARTIES, OR USED FOR OTHER THAN THE PURPOSE FOR WHICH IT HAS BEEN PROVIDED IN WHOLE OR IN PARTY IN ANY MANNER EXCEPT AS EXPRESSLY
3
PERMITTED BY PT. JGC INDONESIA
-Jul ED
PRINT
WHEN
LLED
NCONTRO
JOB CODE DOCUMENT NO. Rev.
0-0831-00-0000 S-000-1520-002 3B
SUMBAWA LNG TERMINAL & REGAS FACILITY
QC REQUIREMENT TO VENDOR Page 8 of 17
S
THIS DOCUMENT / DRAWING INCLUDING ATTACHEMENT EMBODIES PROPRIEATRY INFORMATION OF PT. JGC INDONESIA IN ANY FORM OR MEDIUM TO THIRD
J-24D M- 2 0 2
PARTIES, OR USED FOR OTHER THAN THE PURPOSE FOR WHICH IT HAS BEEN PROVIDED IN WHOLE OR IN PARTY IN ANY MANNER EXCEPT AS EXPRESSLY
3
PERMITTED BY PT. JGC INDONESIA
-Jul ED
PRINT
WHEN
LLED
NCONTRO
JOB CODE DOCUMENT NO. Rev.
0-0831-00-0000 S-000-1520-002 3B
SUMBAWA LNG TERMINAL & REGAS FACILITY
QC REQUIREMENT TO VENDOR Page 9 of 17
S
THIS DOCUMENT / DRAWING INCLUDING ATTACHEMENT EMBODIES PROPRIEATRY INFORMATION OF PT. JGC INDONESIA IN ANY FORM OR MEDIUM TO THIRD
J-24D M- 2 0 2
PARTIES, OR USED FOR OTHER THAN THE PURPOSE FOR WHICH IT HAS BEEN PROVIDED IN WHOLE OR IN PARTY IN ANY MANNER EXCEPT AS EXPRESSLY
3
PERMITTED BY PT. JGC INDONESIA
-Jul ED
PRINT
WHEN
LLED
NCONTRO
JOB CODE DOCUMENT NO. Rev.
0-0831-00-0000 S-000-1520-002 3B
SUMBAWA LNG TERMINAL & REGAS FACILITY
QC REQUIREMENT TO VENDOR Page 10 of 17
S
THIS DOCUMENT / DRAWING INCLUDING ATTACHEMENT EMBODIES PROPRIEATRY INFORMATION OF PT. JGC INDONESIA IN ANY FORM OR MEDIUM TO THIRD
J-24D M- 2 0 2
PARTIES, OR USED FOR OTHER THAN THE PURPOSE FOR WHICH IT HAS BEEN PROVIDED IN WHOLE OR IN PARTY IN ANY MANNER EXCEPT AS EXPRESSLY
3
PERMITTED BY PT. JGC INDONESIA
-Jul ED
PRINT
WHEN
LLED
NCONTRO
JOB CODE DOCUMENT NO. Rev.
0-0831-00-0000 S-000-1520-002 3B
SUMBAWA LNG TERMINAL & REGAS FACILITY
QC REQUIREMENT TO VENDOR Page 11 of 17
VENDOR is responsible for the verification of performance of equipment and materials. VENDOR shall
conduct all tests and inspections which are required to confirm and verify the performance of equipment
and materials as their internal inspection, even if they are not included in Contractor’s requirements.
4.13 Free Entry
VENDOR shall provide CONTRACTOR, CONTRACTOR’s Inspector, and COMPANY with the right of
access and free entry to any areas of VENDOR or Sub-VENDOR’s premises where fabrication from raw
material receiving to shipping of equipment and materials is performed.
CONTRACTOR and COMPANY reserve the right to conduct surveillance, monitoring and audit that
VENDOR performs quality fabrication activities and control activities in accordance with PO
requirements.
VENDOR shall also provide with right of access to TPIA/MIGAS in relation with their witness inspection.
TPIA/MIGAS witness points shall be included in the Inspection and Test Plan (ITP).
4.14 Inspector's Safety
VENDOR shall provide a safe working environment for Inspectors and shall alert the Inspector of
potential hazards. If in the opinion of the Inspector, the working conditions are unsafe, then the Inspector
will not perform any inspection activities and inspector has a right to stop any fabrication activities until
safe working condition has been confirmed.
4.15 Inspection Facility and office
VENDOR shall provide a furnished office complete with IT communications and internet
systems, all test equipment facilities required for the witnessed inspection or test at VENDOR
cost.
5. INSPECTION REQUIREMENTS
5.1 Inspection Level
Inspection level is determined considering the equipment criticality rating and specified in the applicable
Requisition and document H-000-13A0-001 “Equipment Critically Rating Assessment Report”.
Inspection level may be adjusted and extent of inspection may be increased or decreased during
execution depend on selected VENDOR’s past experience with CONTRACTOR and/or VENDOR’s
performance during manufacturing process.
Level – 1
Full time resident Inspector shall be assigned by CONTRACTOR to daily monitor quality of fabricated
equipment / materials include witness inspection and test in accordance with approved Vendor’s ITP.
Level – 2
In-process inspection and Factory Acceptance Test (FAT) and final inspection shall be witnessed in
accordance with approved Vendor's ITP.
In case found serious or repeated non-conformity during in process inspection, COMPANY has right to
ask CONTRACTOR to increase the inspection level to level I
Level – 3
Factory Acceptance Test (FAT) and final inspection shall be witnessed in accordance with approved
Vendor’s ITP.
S
THIS DOCUMENT / DRAWING INCLUDING ATTACHEMENT EMBODIES PROPRIEATRY INFORMATION OF PT. JGC INDONESIA IN ANY FORM OR MEDIUM TO THIRD
J-24D M- 2 0 2
PARTIES, OR USED FOR OTHER THAN THE PURPOSE FOR WHICH IT HAS BEEN PROVIDED IN WHOLE OR IN PARTY IN ANY MANNER EXCEPT AS EXPRESSLY
3
PERMITTED BY PT. JGC INDONESIA
-Jul ED
PRINT
WHEN
LLED
NCONTRO
JOB CODE DOCUMENT NO. Rev.
0-0831-00-0000 S-000-1520-002 3B
SUMBAWA LNG TERMINAL & REGAS FACILITY
QC REQUIREMENT TO VENDOR Page 12 of 17
Level – 4
Document required by approved Vendor's ITP shall be reviewed prior to issue Inspection Release
Certificate (IRC). No inspection activities shall be witnessed.
Some photograph may be required to send by VENDOR to confirm the final appearance of the
equipment/materials.
S
THIS DOCUMENT / DRAWING INCLUDING ATTACHEMENT EMBODIES PROPRIEATRY INFORMATION OF PT. JGC INDONESIA IN ANY FORM OR MEDIUM TO THIRD
J-24D M- 2 0 2
PARTIES, OR USED FOR OTHER THAN THE PURPOSE FOR WHICH IT HAS BEEN PROVIDED IN WHOLE OR IN PARTY IN ANY MANNER EXCEPT AS EXPRESSLY
3
PERMITTED BY PT. JGC INDONESIA
-Jul ED
PRINT
WHEN
LLED
NCONTRO
JOB CODE DOCUMENT NO. Rev.
0-0831-00-0000 S-000-1520-002 3B
SUMBAWA LNG TERMINAL & REGAS FACILITY
QC REQUIREMENT TO VENDOR Page 13 of 17
For major and/or critical equipment and materials in which that have delivery/completion time are directly
interrelated such that each has a definite influence on achieving the date of project completion, Kick-Off
Meeting (KOM) with VENDOR will be held to confirm that the specification requirements are correctly
transferred to those who are responsible for implementation of the order.
Standard agenda of KOM for QC session is shown in Attachment-2.KOM minutes agenda may be
shared to COMPANY for information.
6.3 Submission of VENDOR’s QC Documents
VENDOR’s QC related documents which are required by Requisition such as shown in Attachment-3
shall be submitted to CONTRACTOR/COMPANY for approval. This is to ensure that the Project
Requirements are correctly documented by VENDOR in its own words. They shall be submitted as early
as possible regardless the requirements in the requisition so that they shall be approved by Contractor
before Pre-Inspection Meeting (PIM) or start of fabrication.
6.4 Pre-Inspection Meeting (PIM)
Unless otherwise agreed, Pre-Inspection Meeting (PIM) shall be held before start of fabrication.
The main purpose of PIM is as follows:
(a) To ensure the quality requirements in PO are fully understood by VENDOR, especially those who
are responsible for fabrication of equipment and materials (staffs in the fabrication shops and quality
control team).
(b) To reconfirm the coordination procedure between VENDOR, CONTRACTOR and COMPANY in
respect with quality control matters
(c) To discuss any unclear matters of quality requirements.
PIM is the final confirmation of VENDOR’s understanding to all project requirements before fabrication
starts. PIM is normally held at VENDOR’s manufacturing shops. Staffs responsible for fabrication must
attend PIM. Shop tour and surveillance should be conducted during PIM to confirm VENDOR’s
implementation of their quality system.
Considering the purpose of PIM, PIM is allowed to be held only when all VENDOR’s fabrication related
documents (Drawings, Specifications, Procedures, etc.) have been approved without comments or
approved with minor comments.
Fabrication shall also be started only when VENDOR’s fabrication related documents (Drawings,
Specifications, Procedures, etc.) have been approved without comments or approved with minor
comments.
The standard agenda for PIM is shown in Attachment-4.
PIM is in principle initiated by PQCM and / or QCE and chaired by PQCM or his/her designee. VENDOR
shall prepare the MOM. MOM for PIM shall use form as in Attachment-4 and shall be completed,
reviewed, action items identified and signed by all participants at the location of the meeting before
leaving the meeting place. Required action points shall be reiterated to assure complete understanding
at the end of the meeting. The PQCM or QCE shall be responsible to distribute all action items to the
relevant organizations.
MOM of PIM shall also be distributed to COMPANY by 48 hours after completion of the PIM.
PIM may be waived under the following conditions with prior approval from CONTRACTOR /
COMPANY:
1) PIM is not required in the Requisition.
2) VENDOR has been doing business with Contractor and is recognized as maintaining sufficient
inspection and quality control systems.
3) VENDOR has extensive experience and no troubles are anticipated in the fabrication process.
S
THIS DOCUMENT / DRAWING INCLUDING ATTACHEMENT EMBODIES PROPRIEATRY INFORMATION OF PT. JGC INDONESIA IN ANY FORM OR MEDIUM TO THIRD
J-24D M- 2 0 2
PARTIES, OR USED FOR OTHER THAN THE PURPOSE FOR WHICH IT HAS BEEN PROVIDED IN WHOLE OR IN PARTY IN ANY MANNER EXCEPT AS EXPRESSLY
3
PERMITTED BY PT. JGC INDONESIA
-Jul ED
PRINT
WHEN
LLED
NCONTRO
JOB CODE DOCUMENT NO. Rev.
0-0831-00-0000 S-000-1520-002 3B
SUMBAWA LNG TERMINAL & REGAS FACILITY
QC REQUIREMENT TO VENDOR Page 14 of 17
4) The requirements specified in the requisition are not complicated and no conflicts will occur between
VENDOR and Contractor during fabrication and inspection.
7. INSPECTION COORDINATION
7.1 Two-Months Look Ahead Inspection Schedule
VENDOR is required to prepare Two (2) Months Look-ahead Inspection Schedule using form in
Attachment-5 and submit it to Contractor as an attachment of “VENDOR Monthly Progress Report. It
shall indicate PIM schedule and all inspection/test items, which will be witnessed by CONTRACTOR,
COMPANY, and TPIA/MIGAS, if any, using the legend as shown in the form.
S
THIS DOCUMENT / DRAWING INCLUDING ATTACHEMENT EMBODIES PROPRIEATRY INFORMATION OF PT. JGC INDONESIA IN ANY FORM OR MEDIUM TO THIRD
J-24D M- 2 0 2
PARTIES, OR USED FOR OTHER THAN THE PURPOSE FOR WHICH IT HAS BEEN PROVIDED IN WHOLE OR IN PARTY IN ANY MANNER EXCEPT AS EXPRESSLY
3
PERMITTED BY PT. JGC INDONESIA
-Jul ED
PRINT
WHEN
LLED
NCONTRO
JOB CODE DOCUMENT NO. Rev.
0-0831-00-0000 S-000-1520-002 3B
SUMBAWA LNG TERMINAL & REGAS FACILITY
QC REQUIREMENT TO VENDOR Page 15 of 17
overseas inspection area. The final confirmation shall be sent by VENDOR to CONTRACTOR by
re-sent the original Inspection Notification by adding suffix (F) on the Inspection Notification number.
For more detailed, please refer to Attachment 9. QC Document Numbering.
Any delay or impact occurs from VENDOR’s late notification and/or cancellation and any abortive
visit by CONTRACTOR / COMPANY / TPIA shall be at VENDOR’s responsibility and charges.
7.3 Inspection Notification to COMPANY and TPIA/MIGAS
Upon receipt of Inspection Notification from VENDOR, CONTRACTOR submits a Notification of
Inspection to COMPANY by an official correspondence at least fifteen (15) working days prior to the
scheduled inspection date for domestic inspection and test and at least thirty (30) calendar days for
overseas inspection and test.
COMPANY and TPIA/MIGAS reply at the latest seven (7) working days prior to the notified inspection
date. COMPANY is responsible to coordinate with TPIA/MIGAS including visit confirmation.
7.4 Inspection Visit Confirmation
CONTRACTOR shall notify VENDOR of the intent by CONTRACTOR and COMPANY representative
to witness the inspection by J-PLUSP mailing system.
7.5 Witness Inspection and Shop Surveillance
Inspection of equipment and materials shall be conducted in accordance with approved VENDOR’s ITP.
(1) CONTRACTOR, COMPANY and TPIA/MIGAS will witness the inspections and tests for Hold or
Witness points in accordance with approved VENDOR’s ITP.
(2) VENDOR shall provide necessary inspection tools and equipment. VENDOR shall also supply the
latest approved documents when CONTRACTOR, COMPANY or TPIA/MIGAS request.
(3) VENDOR shall provide required inspection report which review points by CONTRACTOR,
COMPANY, or TPIA/MIGAS in accordance with ITP, during subsequence witness inspection by
required parties and complete report shall be compile for review during final inspection before
shipment.
(4) Adequate safety practices shall be enforced at all time in the test/inspection areas.
(5) In addition to the witness inspection, CONTRACTOR & COMPANY reserves the right to conduct
surveillance without the notification from VENDOR.
8. NONCONFORMITY CONTROL
When nonconformity arises, VENDOR shall issue a Nonconformity Report (NCR) in accordance with S-
000-1520-003 “Non-Conformance Control Procedure for Equipment and materials”. The non-conformity
shall be disposed as quickly as possible. Immediate report of NCR shall be submitted to contractor within
48 (forty eight) hours from the Non-Conformance is detected. CONTRACTOR and COMPANY may
initiate the NCR as needed.
9. PUNCH LIST
After final step inspection is conducted, CONTRACTOR inspector shall prepare Punch List when found
following condition:
(1) Any uncompleted items
(2) Any items which require further test / re-test
(3) Nonconformities which have not been closed
S
THIS DOCUMENT / DRAWING INCLUDING ATTACHEMENT EMBODIES PROPRIEATRY INFORMATION OF PT. JGC INDONESIA IN ANY FORM OR MEDIUM TO THIRD
J-24D M- 2 0 2
PARTIES, OR USED FOR OTHER THAN THE PURPOSE FOR WHICH IT HAS BEEN PROVIDED IN WHOLE OR IN PARTY IN ANY MANNER EXCEPT AS EXPRESSLY
3
PERMITTED BY PT. JGC INDONESIA
-Jul ED
PRINT
WHEN
LLED
NCONTRO
JOB CODE DOCUMENT NO. Rev.
0-0831-00-0000 S-000-1520-002 3B
SUMBAWA LNG TERMINAL & REGAS FACILITY
QC REQUIREMENT TO VENDOR Page 16 of 17
VENDOR is required to fill in due date (practically earliest close out date) of each item in Punch List and
to take appropriate action to close them out on schedule. Punch List shall be periodically updated
reflecting the latest status of the Punch items and is distributed to CONTRACTOR accordingly. Form of
Punch List is presented in Attachment-7.
When under certain conditions that some punch items cannot be closed at shop and the punch items
will be transferred and to be closed at site, VENDOR shall mark the open punch items and get approval
from CONTRACTOR and informed to COMPANY. The open punch items list shall be attached to the
IRC.
S
THIS DOCUMENT / DRAWING INCLUDING ATTACHEMENT EMBODIES PROPRIEATRY INFORMATION OF PT. JGC INDONESIA IN ANY FORM OR MEDIUM TO THIRD
J-24D M- 2 0 2
PARTIES, OR USED FOR OTHER THAN THE PURPOSE FOR WHICH IT HAS BEEN PROVIDED IN WHOLE OR IN PARTY IN ANY MANNER EXCEPT AS EXPRESSLY
3
PERMITTED BY PT. JGC INDONESIA
-Jul ED
PRINT
WHEN
LLED
NCONTRO
JOB CODE DOCUMENT NO. Rev.
0-0831-00-0000 S-000-1520-002 3B
SUMBAWA LNG TERMINAL & REGAS FACILITY
QC REQUIREMENT TO VENDOR Page 17 of 17
14. ATTACHMENTS
Attachment-1 : ITP Form
S
THIS DOCUMENT / DRAWING INCLUDING ATTACHEMENT EMBODIES PROPRIEATRY INFORMATION OF PT. JGC INDONESIA IN ANY FORM OR MEDIUM TO THIRD
J-24D M- 2 0 2
PARTIES, OR USED FOR OTHER THAN THE PURPOSE FOR WHICH IT HAS BEEN PROVIDED IN WHOLE OR IN PARTY IN ANY MANNER EXCEPT AS EXPRESSLY
3
PERMITTED BY PT. JGC INDONESIA
-Jul ED
PRINT
WHEN
LLED
NCONTRO
Doc. No:
SUMBAWA LNG TERMINAL & REGAS FACILITY PROJECT
S-000-1520-002
Rev.: 3B Page : 1 of 3
QUALITY CONTROL REQUIREMENTS TO VENDOR
Date : 17-Jul 2022
Party (7)
CONTRACTOR
Quality verification Reference Acceptance Verified Extent of
No.
TPIA/MIGAS
COMPANY
activity Procedure Criteria Documents Inspection Remark
VENDOR
(1)
(2) (3) (4) (5) (6)
D M S
-
J24-Jul- 2 0 2 3
D
RINTE
ED WHEN P
T ROLL
NCON
Doc. No:
SUMBAWA LNG TERMINAL & REGAS FACILITY PROJECT
S-000-1520-002
Rev.: 3B Page : 2 of 3
QUALITY CONTROL REQUIREMENTS TO VENDOR
Date : 17-Jul 2022
Column Description
(1) No. Sequential No. shall be entered for each Quality Activity (e.g. 1, 1.1, 2, 2.1.1).
Quality verification activity / Quality activities shall be described, which will take place in the order of fabrication (e.g. Material Inspection, Dimensional
(2)
stage Inspection, Pressure Test, etc.).
(3) Reference Procedure Procedure name or Doc. No. / Standard code No. shall be entered, which will be used as reference for the quality activity.
(4) Acceptance Criteria Acceptance criteria or Doc. No. / Standard code No. for the quality activity shall be entered.
Documents which will be used to verify the results of the quality activity shall be described (e.g. Mill certificate, Test
(5) Verified Documents
records).
(6) Extent of Inspection Quantity of equipment / material / work to be taken sample for inspected on each activity (e.g 100%; 20%; 5%)
(7) Party Type inspection for each party shall be entered (e.g. H, W, SW, M, R).
D M S
-
J24-Jul- 2 0 2 3
D
RINTE
ED WHEN P
T ROLL
NCON
Doc. No:
SUMBAWA LNG TERMINAL & REGAS FACILITY PROJECT
S-000-1520-002
Rev.: 3B Page : 3 of 3
QUALITY CONTROL REQUIREMENTS TO VENDOR
Date : 17-Jul 2022
CONTRACTOR / COMPANY intends to conduct witness inspection/test by spot/randomly. VENDOR shall submit inspection
SW Spot witness notification to CONTRACTOR. However VENDOR can proceed with the inspection/test when CONTRACTOR’s / COMPANY’s
inspector is not present at the notified time.
M Implementation Preparation and execution of measurement, observation, examination or testing and reporting.
R Record review VENDOR is requested to submit the documents or inspection records to CONTRACTOR for review.
D M S
-
J24-Jul- 2 0 2 3
D
RINTE
ED WHEN P
T ROLL
NCON
SUMBAWA LNG TERMINAL & REGAS Doc. No:
FACILITY PROJECT S-000-1520-003
QUALITY CONTROL REQUIREMENTS TO Rev. : 3B Page : 1 of 4
VENDOR
Date : 17 Jul 2022
M S
J-24D
-Jul - 2 0 2 3
PRINT
ED
WHEN
LLED
NCONTRO
SUMBAWA LNG TERMINAL & REGAS Doc. No:
FACILITY PROJECT S-000-1520-003
QUALITY CONTROL REQUIREMENTS TO Rev. : 3B Page : 2 of 4
VENDOR
Date : 17 Jul 2022
KOM FORM
2. Safety Instruction
3.
General Information
3.1 Vendor name:
3.2 PO No.:
3.3 Requisition
No.(Rev):
4.
Vendor organization
5.
Sub-vendor formation
5.1 Sub-Vendor name
5.2 Sub-Vendor location
5.3 Sub-order item
6. Communication Channel (Name, E-mail address,
telephone No. etc.)
6.1 Method of corresponding system :
6.2 Name
(Position):
JIND: E-mail
address:
Telephone
No.:
6.3 Name
(Position):
Vendor: E-mail
address:
Telephone
No.:
7. Scope of Test & Inspection
Confirmation of scope of tests & inspections as per
Purchaser’s “Scope of tests & inspections” in
Requisition and Project Specifications.
Vendor is requested to submit ITP (Inspection & test
plan) incorporating above “Scope of inspection” and
other Project requirements by the date as shown in
below.
M S
J-24D
-Jul - 2 0 2 3
PRINT
ED
WHEN
LLED
NCONTRO
SUMBAWA LNG TERMINAL & REGAS Doc. No:
FACILITY PROJECT S-000-1520-003
QUALITY CONTROL REQUIREMENTS TO Rev. : 3B Page : 3 of 4
VENDOR
Date : 17 Jul 2022
12.
Special QC Requirements to follow prior to PIM (e.g.
material requirements, statutory requirements, etc.)
13.
Lessons Learned from the past projects
M S
J-24D
-Jul - 2 0 2 3
PRINT
ED
WHEN
LLED
NCONTRO
SUMBAWA LNG TERMINAL & REGAS Doc. No:
FACILITY PROJECT S-000-1520-003
QUALITY CONTROL REQUIREMENTS TO Rev. : 3B Page : 4 of 4
VENDOR
Date : 17 Jul 2022
Contractor : Vendor :
Name: Name :
Signature: Signature:
Date: Date:
Company :
Name :
Signature:
Date:
M S
J-24D
-Jul - 2 0 2 3
PRINT
ED
WHEN
LLED
NCONTRO
SUMBAWA LNG TERMINAL & REGAS Doc. No:
FACILITY PROJECT S-000-1520-002
QUALITY CONTROL REQUIREMENTS TO Rev. : 3B Page : 1 of 1
VENDOR
Date : 17 Jul 2022
M S
J-24D
-Jul - 2 0 2 3
PRINT
ED
WHEN
LLED
NCONTRO
SUMBAWA LNG TERMINAL & REGAS Doc. No:
FACILITY PROJECT S-000-1520-002
QUALITY CONTROL REQUIREMENTS TO Rev. : 3B Page : 1 of 4
VENDOR
Date : 17 Jul 2022
DM23S
CONTRACTOR ID: S-000-1520-002
J-24-Jul-20 PRINT
ED
WHEN
LLED
NCONTRO
SUMBAWA LNG TERMINAL & REGAS Doc. No:
FACILITY PROJECT S-000-1520-002
QUALITY CONTROL REQUIREMENTS TO Rev. : 3B Page : 2 of 4
VENDOR
Date : 17 Jul 2022
PIM FORM
SUB
NO. Items to be Discussed Discussion result Action by Due date
No.
2. Safety Instruction
3. Introduction of Attendees
Organization and Communication
Channel
4.1 Vendor Organization
4.2 Sub-vendor Formation
4.3 JIND QC Organization
4.4 Communication channel
Name, position,
JIND QC Email
4.
Telephone
Name, position,
Contractor
Email
Inspector
Telephone
Name, position,
Vendor Email
Telephone
Requirement of Notification for
4.5
Inspection
5. Confirmation of Order requirements
5.1 PO
Acknowledgemen
t
5.2 Requisition
Review
5.3 Exceptions,
Deviations and
clarification
5.4 Special
Requirements
6 Confirmation of Schedule
6.1 Fabrication .
Schedule
6.2 Sub-order /
Material Vendor
6.3 Status of
material delivery
and the
inventory in
vendor's stores
6.4 Fabrication
Start
DM23S
CONTRACTOR ID: S-000-1520-002
J-24-Jul-20 PRINT
ED
WHEN
LLED
NCONTRO
SUMBAWA LNG TERMINAL & REGAS Doc. No:
FACILITY PROJECT S-000-1520-002
QUALITY CONTROL REQUIREMENTS TO Rev. : 3B Page : 3 of 4
VENDOR
Date : 17 Jul 2022
SUB
NO. Items to be Discussed Discussion result Action by Due date
No.
11 Inspection / Fabrication
Requirements
11.1 Inspection and Test Plan (ITP)
11.2 Material procurement
specifications/work processes
11.3 WPS/PQR,NDT, Painting inspection
and all other inspection & test
11.4 Qualification requirements-Welder/NDT
inspector
11.5 PMI procedure, PMI analyzer, PMI
mapping and as built traceability
requirements. Qualification of PMI
operator etc
11.6 Traceability and certification .
Requirement
11.7 Procedure for cutting, forming, and
machining activities. etc
13 Preservation/packing Procedure
14 Confirmation of Drawing/
Engineering Status
16 Shop Tour
DM23S
CONTRACTOR ID: S-000-1520-002
J-24-Jul-20 PRINT
ED
WHEN
LLED
NCONTRO
SUMBAWA LNG TERMINAL & REGAS Doc. No:
FACILITY PROJECT S-000-1520-002
QUALITY CONTROL REQUIREMENTS TO Rev. : 3B Page : 4 of 4
VENDOR
Date : 17 Jul 2022
SUB
NO. Items to be Discussed Discussion result Action by Due date
No.
17 Others
DM23S
CONTRACTOR ID: S-000-1520-002
J-24-Jul-20 PRINT
ED
WHEN
LLED
NCONTRO
SUMBAWA LNG TERMINAL & REGAS Doc. No:
FACILITY PROJECT S-000-1520-002
QUALITY CONTROL REQUIREMENTS TO Rev. : 3B Page : 1 of 1
VENDOR
Date : 17 Jul 2022
Month:
Item Q’ty Place of Inspection
Week: Week: Week: Week: Week:
Glossary of Abbreviations:
PIM: Pre-inspection Meeting HT: Hydrostatic Test
PWHT: Post-weld Heat Treatment MET: Mechanical Running Test
NDT: Non-destructive Test PFT: Performance Test
DT: Dimensional Test FI: Final Inspection for Package Unit
VT: Visual Inspection FUT: Functional Test
M S
J-24D
-Jul - 2 0 2 3
PRINT
ED
WHEN
LLED
NCONTRO
SUMBAWA LNG TERMINAL & REGAS Doc. No:
FACILITY PROJECT S-000-1520-002
QUALITY CONTROL REQUIREMENTS TO Rev. : 3B Page : 1 of 1
VENDOR
Date : 17 Jul 2022
Job Code:
To: Ref. No.:
Attn.: e-mail. No.:
From: Date:
Copy to: (Inspection agency)
Inspection Notification
First Notice Final Confirmation
(1) Contractor Project Name : SUMBAWA LNG TERMINAL & REGAS FACILITY Project
Name Date
DM23S
CONTRACTOR ID: S-000-1520-002
J-24-Jul-20 PRINT
ED
WHEN
LLED
NCONTRO
Doc. No:
SUMBAWA LNG TERMINAL & REGAS FACILITY PROJECT
S-000-1520-002
Rev. : 3B Page : 1 of 1
QUALITY CONTROL REQUIREMENTSTO VENDOR
Date : 17 Jul 2022
Vendor CONTRACTOR
Issue Equipment Action to be taken by Due Close
No Punch Item Description Confirm. Accept Remarks
Date No Vendor Date Date
(Signature) (Signature)
1
2
3
4
5
DM23S
CONTRACTOR ID: S-000-1520-002
J-24-Jul-20 RINTE
D
ED WHEN P
T ROLL
NCON
SUMBAWA LNG TERMINAL & REGAS Doc. No:
FACILITY PROJECT S-000-1520-002
QUALITY CONTROL REQUIREMENTS TO Rev. : 3B Page : 1 of 1
VENDOR
Date : 17 Jul 2022
Note: Are there Licensable Goods included in the above inspected items?
( □ Yes /□ No )
If yes, put asterisk (*) behind the item(s).
Remarks:
This notice is a clearance for the inspection only and does not relieve the supplier of the
responsibility for rectifying any defects in the material / equipment found at later date.
Witness / Reviewed by
COMPANY (MSG)
Signed by
Date
D M S
-
J24-Jul- 2 0 2 3
ED
PRINT
LED WHEN
TROL
NCON
SUMBAWA LNG TERMINAL & REGAS Doc. No:
FACILITY PROJECT S-000-1520-002
QUALITY CONTROL REQUIREMENTS TO Rev. : 3B Page : 1 of 2
VENDOR
Date : 17 Jul 2022
1. Inspection Notice
(1) 1st Block of PO No. eliminating “P” and substituted by “IN” (Inspection Notice)
(2) 2nd block of PO No.
(3) 3rd block of PO No.
(4) 4th Block of PO No.
(5) Serial Number
(6) Suffix (F) shall be added for final confirmation
2. Non-Conformity Report
(1) 1st Block of PO No. eliminating “P” and substituted by “NCR” (Non-Conformity Report)
(2) 2nd Block of PO No.
(3) 3rd Block of PO No.
(4) 4th Block of PO No.
(5) Serial Number
(1) 1st Block of PO No. eliminating “P” and substituted by “IRC” (Inspection Released Certificate)
(2) 2nd Block of PO No.
(3) 3rd Block of PO No.
(4) 4th Block of PO No.
(5) Serial Number
M S
J-24D
-Jul - 2 0 2 3
PRINT
ED
WHEN
LLED
NCONTRO
SUMBAWA LNG TERMINAL & REGAS Doc. No:
FACILITY PROJECT S-000-1520-002
QUALITY CONTROL REQUIREMENTS TO Rev. : 3B Page : 2 of 2
VENDOR
Date : 17 Jul 2022
(1) 1st Block of PO No. eliminating “P” and substituted by “V” (Vendor Document).
(2) 2nd Block of PO No.
(3) 3rd Block of PO No.
(4) 4th Block of PO No.
(5) Serial Number starting from - 901
For the steel structure, considering the huge number of MDR, two digit suffix number to be allocated.
e. g.
V-2130-BBB-C-901-01, 02, 03….
V-2130-BBB-C-902-01, 02, 03….
Electric file:
(1) Other than steel structure
<first file> V-21AA-BBB-C-901_0010.pdf
<second file> V-21AA-BBB-C-901_0020.pdf
M S
J-24D
-Jul - 2 0 2 3
PRINT
ED
WHEN
LLED
NCONTRO
JOB CODE DOCUMENT NO. Rev.
0-0831-00-0000 S-000-1520-002 3B
SUMBAWA LNG TERMINAL & REGAS FACILITY
QC REQUIREMENT TO VENDOR Page 1 of 2
Commented Rev.
No. COMPANY Comment Description Comment Response
Page/Section No.
final report document, compiled
according to the material, and
1 Page 8 / 4.5 shared with the COMPANY final Incorporated in point 7.5 3A
report before the shipment
materials.
11. the conclusion is to make sure
2 Page 9 / 4.6 all the test equipment is in a usable Incorporated 3A
condition, before it is used.
during welding, welder and welding Noted, CONTRACTOR inspector will
Page 10 / operator VENDOR, CONTRACTOR monitor only approved qualified
3 welder/ operator carry out welding. 3A
4.10 must ensure compliance with
qualifications. Mentioned on paragraph
Invitation to be inspected from the
VENDOR to the COMPANY is
4 Page 15 / 7.4 Noted 3A
calculated after the travel time is 1
or 2 days before the inspection day.
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
M S
J-24D
THIS DOCUMENT / DRAWING INCLUDING ATTACHEMENT EMBODIES PROPRIEATRY INFORMATION OF PT. JGC INDONESIA IN ANY FORM OR MEDIUM TO THIRD
- 2 0 2 3
PARTIES, OR USED FOR OTHER THAN THE PURPOSE FOR WHICH IT HAS BEEN PROVIDED IN WHOLE OR IN PARTY IN ANY MANNER EXCEPT AS EXPRESSLY
-Jul ED
PERMITTED BY PT. JGC INDONESIA
PRINT
WHEN
LLED
NCONTRO
JOB CODE DOCUMENT NO. Rev.
0-0831-00-0000 S-000-1520-002 3B
SUMBAWA LNG TERMINAL & REGAS FACILITY
QC REQUIREMENT TO VENDOR Page 2 of 2
24
25
M S
J-24D
THIS DOCUMENT / DRAWING INCLUDING ATTACHEMENT EMBODIES PROPRIEATRY INFORMATION OF PT. JGC INDONESIA IN ANY FORM OR MEDIUM TO THIRD