Anti Crash Barrier For Rectangular Piers - Shop Drawing

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

A B C D E F G H J

SCHEDULE OF OF
SCHEDULE REINFORCEMENT
REINFORCEMENT

A A
TANGENTIAL /
LONGITUDINAL AXIS 2400

7 7

Pier side

B B

6 6

SUGGESTED CONSTRUCTION SCHEME OF CRASH BARRIER

SECTION 1-1

TANGENTIAL /
LONGITUDINAL AXIS

SECTION 2-2
CROSS SECTION
TRANSVERSE

5
(SECTION SHOWING REINFORCEMENT
RADIAL /

1 2 3 4 NOTES:-
AXIS

CRASH BARRIER DETAIL OF CRASH BARRIER)

1 1
DETAIL `X'
LEGEND:-

8 7 6 5
4 4

REFERENCE DRAWING:-
2 2

PLAN SHOWING PILE LAYOUT

CONCRETE GRADE -M40


RENIF. GRADE -Fe500D

3 25 mm GAP TO BE MAINTAINED 3

BETWEEN PIER & CRASH BARRIER

SECTION `A' SECTION `B'

DETAIL `Y'
PLAN SHOWING
REINFORCEMENT DETAIL OF CRASH BARRIER REFERENCE DESIGN DOCUMENT

2 DOC. NO : MML4-CA10-RIFAST-CIV-STN-CLN-7511 2
DOC.TITLE : DESIGN OF CRASH BARRIER FOR STATION PIERS
DETAIL `X' DETAIL `Y' REV. NO. : C
DATE : 20.05.2020

CONTRACTOR: CONTRACTOR'S CONSULTANT: PROJECT:


EMPLOYER:

COMPOSITES COMBINE
TECHNOCRAFTS PVT. LTD. DESIGNATION NAME SIGN DESIGNATION NAME SIGN
RINFRA-ASTALDI JOINT VENTURE
DRAWING TITLE :
OTHER DEPARTMENT CLEARANCE:
1 DATE DATE 1
CHECKED BY SIGN CHECKED BY SIGN
GENERAL CONSULTANTS :
C:\Users\milan\Downloads\WhatsApp Image 2022-08-01 at 4.50.14 PM.jpeg

CHECKED BY REVIEWED BY PROJECT DIRECTOR

REV. NO. DESCRIPTION OF REVISIONS DATE DRN. DGN. CHD. APD. CR. REV. NO. DESCRIPTION OF REVISIONS DATE DRN. DGN. CHD. APD. CR.
A1 A B C D E F G H J

You might also like