Ashiana Housing Ltd.

Ashiana Malhar Date- 2/9/23


Rate Analysis
Sr No Discription Unit Area (sqm) Rate Amount Remarks
1 Total block work
100 mm block work per floor sqm 311
Total for t4 tower 4354
Total for t5 tower 4354
Total Qty for PH 1 sqm 8708.0

Cement Consumption bag 783.7 316 247655.52 Theo coeff- 0.09 bag
Stone dust Consumption cu.ft 6095.6 37.82 230535.59 Theo coeff- 0.7 Cuft
478191.11

Magicrete consumption bag 967.56 388 375411.56 9 sqm per 40kg bag

A Per sq.ft cost to measurement area (Chemical Cost) Per sqft 4.01

Estimated cost as per cement mortar


B material cost Per sqft 5.10