Professional Documents
Culture Documents
LG 37sl8000 Reworking Guide
LG 37sl8000 Reworking Guide
LG 37sl8000 Reworking Guide
Step 2.
1.Check cushion on ICM assy how depth cushion is applied on it
2. Cushion depth is 1mm Apply Step <3>
Cushion depth is 2mm Do not apply Step <3>
Step 3.
1. Add cushions on 4 corners of ICM filter as below picture (Yellow color).
Don’t need to take off original cushions.
③
2. Cushion attachment order is ① → ② → ③ like below picture
②
3. Press cushions with fingers firmly in order to be attached
①
with original cushions completely
(No gap between original cushion and added cushion)
※ Caution
No gap between bottom cushion and side cushion
Rework Working
WorkingInstruction
Rework Guide
Guide Instruction
② tape ② tape
① Tape ② Tape ③ Tape
① tape
①tape
③ tape ③ tape
① tape ① tape
1 ~ 2 mm
summary
Keep the distance
Attach the additional tape on the existing CR Cushion. from the existing cushion
Additional tape spec MDS61915999(25*120, PP Cushion tape) Existing cushion is
Bend the tape at the edge point.
CR sponge (1mm+1mm)
Press the tape on the side wall.
or PE foam 2mm
32SL80
32SL80 37/42/47/55SL80
37/42/47/55SL80
vertical
Printing
line Vertical direction Horizontal direction
10±5mm 30±5mm
2)Attach gasket around module
32SL80
37SL80
42SL80
47SL80
55SL80
①
• Tape Quantity: 4 EA
① • Working Method: refer to the guide
Detail
DetailView
View
2~ Rear
3 mm
m
3m
2~
Front