Professional Documents
Culture Documents
K130S Service Instruction English
K130S Service Instruction English
MAX K130S
Service manual
TABLE OF CONTENT
Page 2 of 15
1. Functional testing of the lubricator
Move the lever of the steering valve to the REVERSE (R) position. Air supply handle should be in closed position
(Figure 1). Connect the air supply hose to the lubricator.
Figure 1
Move the lever of the steering valve to the FORWARD (F) position (Figure 2).
With the lever moved to FORWARD position compressed air should blast out of the thin hose connector of the
lubricator. Then block the thin hose connector with the lever moved to REVERSE position. Compressed air should
blast out of the silencer.
Check the oil level and fill the tank with EcoMax oil up to the top.
Then connect the lubricator to the source of compressed air, move the air supply handle to the maximum and
move the lever of the steering valve into the FORWARD position. In addition, turn oil regulator into the maximum
position. (Figure 3).
Figure 3
Page 3 of 15
With these settings adjusted, air and oil mixture should blast out of the thick and thin air hose connectors of the
lubricator.
Make sure, that the control tube seal (o-ring) is in the right place and its technical condition is appropriate (Figure
4).
Figure 4
In case of any defects, wrinkles or other damages, it should be replaced with a new seal, according to the
specifications indicated in Table 1.
Set the air supply handle in closed position and lever of pneumatic steering valve to REVERSE position (Figure 1).
Connect the air hose to the lubricator and move the lever of pneumatic steering valve to FORVARD position
(Figure 5).
Figure 5
Compressed air should blast out of the inner connector of thin air hose responsible for machine’s steering (Figure
6).
Machine’s steering
Figure 6
Then block the thin hose connector of the air hose with the lever moved to REVERSE position. Compressed air
should blast out of the silencer in the lubricator.
Page 4 of 15
With the air hose connected to the lubricator, the end cap (male) should be screwed in. Then move the air supply
handle to the maximum and move the lever of the steering valve into the FORWARD position (Figure 3). Observe
the air hose for few second. Make sure that there is no leakage in pneumatic air hose. In case of air hiss locate
the leak and eliminate it.
The end screw should be dismantled using eye tool and hook tool dedicated for the machine’s diameter. Make
sure that threaded studs of the eye tool and hook tool got into the corresponding sockets of the end screw and
the tail screw. (Figure 7).
Figure 7
Threaded studs should be screwed in by a hex key according to the specifications indicated in TABLE 2.
Table 2
Make sure that threaded studs of the eye tool and hook tool got into the corresponding sockets of the end screw
and the tail screw. Only then you could start unscrewing by hitting hook tool handle with a hammer. After that,
the steering could be pulled out.
The tail screw should be dismantled using eye tool and hook tool dedicated for the machine’s diameter. Make
sure that threaded studs of the eye tool and hook tool got into the corresponding sockets of the end screw and
the tail screw (Figure 8). Make sure that threaded studs of the eye tool and hook tool got into the corresponding
sockets of the tail screw and the cylinder. Only then you could start unscrewing by hitting hook tool handle with
a hammer. After that, the mail piston could be pulled out.
Figure 8
Measure the thickness of piston sliding rings using vernier calliper. Depending on the diameter of the machine
the residual thickness of the sliding ring should be not less than indicated in Table 3. Measurements should be
made at least for four different parts of each sliding ring.
Page 5 of 15
MACHINE NOMINAL THICKNESS MINIMAL THICKNESS
OF THE SLIDING RING [mm] OF THE SLIDING RING [мм]
MAX K130S 3 2,7
Table 3
It is necessary to make a split in sliding rings before its installation onto main piston. Figure 9 shows how to make
such split.
Figure 9
Cut width and dimension sizes of sliding rings are shown in Table 4.
Table 4
Besides, a new set of piston's sealings should be mounted as it shown on Figure 10 according to the specification
indicated in Table 5.
Figure 10
Table 5
Teflon sealing ring could be mounted using special set of tools: assembly sleeve and assembly mandrel in sizes
corresponding with machine’s diameter Figure 11.
Figure 11
Page 6 of 15
A new teflon sealing ring (Figure 12) size is indicated in Table 6.
Figure 12
Set the air supply handle on the lubricator in closed position. The lever of the steering valve should be set to
REVERSE (R) position (Figure 1). Connect the steering to the lubricator with the air supply hose. Than move the
lever of pneumatic steering valve to FORVARD position (Figure 5). As a consequence, the control piston will pull
out (Figure 12).
Figure 12
With the lever moved to FORWARD and control piston in pulled out position check every connection of steering
for air leakage.
The steering should be griped in a bench-vice by securing thick air hose connection. A bench-vice should be
equipped with removable or stationary aluminum jaws. Than an exhausted polymeric connection block should
be removed. Remove the screw with bilateral wrench. (Figure 13).
Page 7 of 15
Figure 13
Make sure, that the control tube seal (o-ring) is in the right place and its technical condition is appropriate (Figure
14).
Figure 14
In case of any defects, wrinkles or other damages, it should be replaced with a new seal, according to the
specifications indicated in TABLE 7.
Table 7
Control tube security and steering tube guide piece should be dismantled (Figure 14).
The steering should be griped in a bench-vice by securing steering cylinder. The thick air hose connection should
be unscrewed with a flat wrench S=50 mm to dismantle the hose. Than the control tube should be unscrewed
and dismantled with a crowfoot spanner S=13 mm.
The tee piece should be dismantled with a help of the special wrench (Figure 15).
Page 8 of 15
Figure 15
Pay particular attention to wrench’s head fully entered into corresponding socket of the tee piece.
Use steel inset and a hammer to beat the steering tube out (Figure 16).
Figure 16
After that we could take the steering cylinder off the control piston.
A new seal ring set should be mounted onto the steering tube as it shown on Figure 17 according to the
specification indicated in Table 8.
Figure 17
MACHINE SEALING RING (O-RINGS) OF THE TEFLON SEAL RING SLIDING RING OF
STEERING TUBE [mm] THE STEERING
[mm] TUBE [mm]
MAX K130S Ø 45 x 3; 80 NBR Ø 56 x 1,4 Ø 56 x 2
Table 8
It is necessary to make a split in the sliding ring before its installation onto the steering tube. Figure 18 shows
how to make such split.
Page 9 of 15
Figure 18
Cut width and dimension sizes of the sliding ring are shown in Table 9.
Table 9
A new control piston seal ring and control seal set II should be mounted onto the control piston as it shown on
Figure 19 according to the specification indicated in Table 10.
Figure 19
MACHINE CONTROL PISTON SEAL CONTROL SEAL O-RING II CONTROL SEAL TEFLON RING II
[mm] SIZE [mm] SIZE [mm]
MAX K130S Ø 75 x 3 Ø 60 x 3; 80 NBR Ø 70 x 1,4
Table 10
Teflon sealing ring could be mounted using special set of tools: assembly sleeve and assembly mandrel in sizes
corresponding with machine’s diameter. Figure 20.
Figure 20
Page 10 of 15
The new control piston sliding ring II and elements of control piston seal set III should be mounted into the control
piston as it shown on Figure 19 according to the specification indicated in Table 11.
MACHINE CONTROL SEAL TEFLON CONTROL SEAL O-RING III CONTROL SLIDING RING II
RING III SIZE [mm] SIZE [mm] [mm]
MAX K130S Ø 32 x 1,4 Ø 34 x 3; 80 NBR Ø 36 x 2
Table 11
It is necessary to make a split in the sliding ring before its installation into the control piston. Figure 21 shows
how to make such split.
Figure 21
Cut width and dimension sizes of the sliding ring are shown in Table 12.
MACHINE CUT WIDTH C [mm] SLIDING RING SIZE [mm]
MAX K130S 1–2 Ø 36 x 2
Table 12
The new tube seal o-ring should be mounted onto the tee piece as it shown on Figure 22 according to the
specification indicated in Table 13.
Table 13
Figure 22
The new screw seal I and screw seal II should be mounted onto the screw as it shown on Figure 23 according to
the table 14.
Table 14
Page 11 of 15
SCREW SEAL II O-RING
Figure 23
The special wrench for the steering tube should be griped in a bench-vice (Figure 24).
Figure 24
First put the steering tube on the special wrench and after that put the control piston on the steering tube. Then
put the steering cylinder on the control piston. Screw the tee piece tightly in with a special wrench shown on
Figure 15.
The steering should be griped in a bench-vice by securing steering cylinder. Than the control tube should be
screwed in with a crowfoot spanner S=13 mm. Make sure, that the control tube seal (o-ring) is in the right place
and its technical condition is appropriate (Figure 14, Table 7). After that the thick air hose should be mounted
and screwed in with a flat wrench S=50 mm.
The steering should be griped in a bench-vice by securing thick air hose connection. Control tube security and
steering tube guide piece should be assembled (Figure 14). Pull tight the screw into thick air hose connector with
bilateral wrench. (Figure 13).
Finally , assemble the polymeric connection block.
Page 12 of 15
6. Schematic drawing and parts list of K130S impact mole
Page 13 of 15
19. Steering cylinder PMCYLSTR-S130-00.07-M5 1
20. Tube seal (O-ring 38x3) MTSORNB0037 1
21. Tee piece PMROS-S130-00.08 1
22. Control hose connection PMKWC-S130-00.09 1
PMTULZW-W130-00.11-M1
23. Control hose injection sleeve 2
PMTULZW-W130-00.11-M1
24. Control tube MTSWG0006 1
25. Control tube connection nipple PMLWCM-W130-00.07 1
26. Control tube security MMEMNPZ0002 1
27. Control tube seal (O-ring 6x2) MTSORNB0054 1
28. Steering hose guide piece PMWWC-W130-00.08 1
29. Hose connection PMKWG-S130-00.11 1
PMTULZW-W130-00.10-M1
30. Hose sleeve 2
PMTULZW-W130-00.10-M1
31. Hose MTSWG0004 1
32. Hose connector PMLWG-W130-00.04 1
33. Screw PMSRB-W130-00.05-M1 1
34. Seal I (O-ring 36x5) MTSORNB0036 1
35. Seal II (O-ring 40,2x3) MTSORNB0039 1
36. End cap (f.) PMZAZ-W130-00.06-M1 1
Page 14 of 15
14. Control tube connection nipple PMLWCM-W130-00.07 1
15. Control tube seal (O-ring 6x2) MTSORNB0054 1
16. Screw seal (O-ring 40,2x3) MTSORNB0039 1
17. Screw PMSRB-W130-00.05-M1 1
18. End cap PMZAZ-W130-00.06-M1 1
Page 15 of 15