Fire Stop Projects 2023
Fire Stop Projects 2023
1 Montazer Ghaem Combined Cycle Mapna Material and Installation 2002 Completed Moshanir
3 Khoy Combined Cycle Azarab Co. Material and Installation 2003 Completed Moshaver Niroo
4 Ramin Power Station (Unit 1) Khozestan Water & Power Org. Material and Installation 2003 Completed Ghods Niroo
5 Ramin Power Station (Unit2) Khozestan Power Co. Material and Installation 2004 Completed Ghods Niroo
6 Ramin Power Station (Unit3) Khozestan Power Co. Material and Installation 2005 Completed Ghods Niroo
8 Shahid Rajaee Combined Cycle Mapna Material and Installation 2003 Completed Moshanir
9 Neka Power Station Mazandaran Power Org. Material and Installation 2003 Completed
10 Fars Combined Cycle Mapna Material and Installation 2003 Completed Ghods Niroo
SPP
No.9 , 3rd floor ,1575 complex, Valiasr Ave. Upon Taleghani Ave. ,Tehran-Iran
Tel: (+9821) 88944246,88936166,88949528 Fax:(+9821) 88949529
Page 1 of 9
SINA POLYMER PART Co.
SEALING AND FIRE STOP PROJECTS
11 Esfahan Power Station Esfahan Power Station Material and Installation 2005 Completed Esfahan Power Station
12 Hormozgan Gas Turbine Power Station Tabdil Energy Co. Material 2005 Completed Moshanir
13 Hormozgan Gas Turbine Power Station Niro Pajouh Material 2005 Completed Moshanir
14 South Esfahan Power Station Ameran Ofogh Co. Material and Installation 2007 Completed Ameran Ofogh Co.
16 Zargan Power Station Khozestan Power Co. Material and Installation 2004 Completed Ghods Niroo
18 Fire Wall Of Feul Tanks saipa Material and Installation 2007 Completed saipa
SPP
No.9 , 3rd floor ,1575 complex, Valiasr Ave. Upon Taleghani Ave. ,Tehran-Iran
Tel: (+9821) 88944246,88936166,88949528 Fax:(+9821) 88949529
Page 2 of 9
SINA POLYMER PART Co.
SEALING AND FIRE STOP PROJECTS
23 Amir Abad Gas Power Station Arian Mahtab Gostar Co. Material 2010 Completed
25 Fajr 2 Petrochemical Gas Power Station Fajr Petrochemical Material and Installation 2010 Completed Moshanir
30 Ghaen Gas Power Station Neda Co. Material and Installation 2010 Completed
SPP
No.9 , 3rd floor ,1575 complex, Valiasr Ave. Upon Taleghani Ave. ,Tehran-Iran
Tel: (+9821) 88944246,88936166,88949528 Fax:(+9821) 88949529
Page 3 of 9
SINA POLYMER PART Co.
SEALING AND FIRE STOP PROJECTS
32 Damavand Combined Cycle Power Station Matris Co. Material and Installation 2013 Completed Moshanir
33 Khouy Power station WAPGM Material and Installation 2012 Completed WAPGM
36 Vian Steel Complex Vian Steel Material 2016 Completed Kara Sazeh
37 Isfahan 2 Gas Power Station Safa Nikoo Material and Installation 2014 Completed Moshaver Niroo
39 Alborz Steel Takestan Alborz Steel Material and Installation 2016 Completed
40 Kerman Gas Power station Mapna MD-2 Material and Installation 2015 Completed Moshanir
SPP
No.9 , 3rd floor ,1575 complex, Valiasr Ave. Upon Taleghani Ave. ,Tehran-Iran
Tel: (+9821) 88944246,88936166,88949528 Fax:(+9821) 88949529 Page 4 of 9
SINA POLYMER PART Co.
SEALING AND FIRE STOP PROJECTS
41 Yazd Khorshidi Mapna MD-2 Material and Installation 2013 Completed Moshanir
42 Yazd Shirkouh Notash Co. Material and Installation 2013 Completed Ameran Ofogh
43 Pare Sar Power Station Parsian Installation 2016 Completed Ameran Ofogh
45 Khorramshahr Power Station Mapna MD-2 Material and Installation 2014 Completed Moshaver Niroo
47 Qeshm Power station Nasb Nirou Material and Installation 2015 Completed Darya Pala
48 Abadan Power Station Mapna MD-2 Material and Installation 2015 Completed Moshanir
49 Damavand Asalouyeh Mapna MD-3 Material and Installation 2016 Completed Moshaver Niroo
SPP
No.9 , 3rd floor ,1575 complex, Valiasr Ave. Upon Taleghani Ave. ,Tehran-Iran
Tel: (+9821) 88944246,88936166,88949528 Fax:(+9821) 88949529
Page 5 of 9
SINA POLYMER PART Co.
SEALING AND FIRE STOP PROJECTS
51 Genaveh BOO Mapna MD-3 Material and Installation 2016 Completed Moshanir
55 Islam Abad Power Station Danesh Ferasat Co. Material 2016 Completed
56 Kavir Damghan Steel Kara Sazeh Matin Material and Installation 2016 Completed Kara Sazeh Matin
57 Khalij Fars Petrochemical Industrial Co. Fajr Pet. Material 2016 Completed
58 Persian Gulf Refinary Falat Faradast Energy Material and Installation 2018 Completed Star Oil Persian Gulf
59 Samangan Power Station Rastak Material and Installation 2017 Completed Chadormalo
60 Ford wide steel Ford wide steel Material and Installation 2017 Completed Ford wide steel
SPP
No.9 , 3rd floor ,1575 complex, Valiasr Ave. Upon Taleghani Ave. ,Tehran-Iran
Tel: (+9821) 88944246,88936166,88949528 Fax:(+9821) 88949529
Page 6 of 9
SINA POLYMER PART Co.
SEALING AND FIRE STOP PROJECTS
62 Kahnowj Gas Power Station Gil Sanat Iranian Material 2017 Completed
68 Shirvan Power Station Mapna MD-2 Material and Installation 2022 Completed
SPP
No.9 , 3rd floor ,1575 complex, Valiasr Ave. Upon Taleghani Ave. ,Tehran-Iran
Tel: (+9821) 88944246,88936166,88949528 Fax:(+9821) 88949529
Page 7 of 9
SINA POLYMER PART Co.
SEALING AND FIRE STOP PROJECTS
72 Jahrom CC Power station Unit 1 Mapna MD-2 Material and Installation 2019 Completed Ghods niroo
75 Jahrom CC Power station Unit 2 Mapna MD-2 Material and Installation 2020 Completed Ghods niroo
80 Khorram Abad Power Station Rastak Pouya Material 2022 Under Estimate
SPP
No.9 , 3rd floor ,1575 complex, Valiasr Ave. Upon Taleghani Ave. ,Tehran-Iran
Tel: (+9821) 88944246,88936166,88949528 Fax:(+9821) 88949529
Page 8 of 9
SINA POLYMER PART Co.
SEALING AND FIRE STOP PROJECTS
SPP
No.9 , 3rd floor ,1575 complex, Valiasr Ave. Upon Taleghani Ave. ,Tehran-Iran
Tel: (+9821) 88944246,88936166,88949528 Fax:(+9821) 88949529