One-Line Diagram - OLV1 (Short-Circuit Analysis)

RED-EPM
192,05 MVAsc

BUS-TX-PRIM 8,4
13,2 kV
0

TX-1
225 kVA

10,915
BUS-TX-SEC
0,22 kV
0
Cable1

10,722
BUS-SE
0,22 kV

10,722
BUS-GIS
0,22 kV
0

ALIM-GIS

TGA-GIS3,55
0,22 kV

page 1 18:07:20 feb. 28, 2022 Project File: GIS_Villa_Hermosa


Amps X 100 BUS-GIS (Nom. kV=0,22, Plot Ref. kV=0,22)
,5 1 3 5 10 30 50 100 300 500 1K 3K 5K 10K
1K 1K
ALIM-GIS
Ampacity
500 TX-1 Cable1 500

FLA - OA 65 Ampacity
300 300

GIS-CB CB-GRAL
100 100

50 50

30 30

CB-TGA-GIS

10 Cable1 - P 10

RED-EPM
192,05 MVAsc
5 5
Seconds

Seconds
BUS-TX-PRIM
3 TX-1 3

TX-1
225 kVA

BUS-TX-SEC
1 1
ALIM-GIS - P
Cable1

15-1/C 4/0
,5 ,5

CB-GRAL
,3 ,3

BUS-SE

GIS-CB

,1 ,1
BUS-GIS
TX-1
Inrush
,05 ALIM-GIS ,05
9-1/C 4/0

,03 CB-TGA-GIS ,03

TGA-GIS

,01 ,01
,5 1 3 5 10 30 50 100 300 500 1K 3K 5K 10K

Amps X 100 BUS-GIS (Nom. kV=0,22, Plot Ref. kV=0,22) ETAP Star 20.0.0C

GLOBAL INDTECH

Project: GIS-Villa Hermosa Date: 02-28-2022


Location: PPAP Villa Hermosa Rev: Base
Contract: CW-149629 Fault: Phase
Engineer: Jorge H. Garzón
Project: GIS-Villa Hermosa ETAP Page: 1

Location: PPAP Villa Hermosa 20.0.0C Date: 02-28-2022

Contract: CW-149629 SN:

Engineer: Jorge H. Garzón Revision: Base


Study Case: SC
Filename: GIS_Villa_Hermosa Config.: Normal

Electrical Transient Analyzer Program

Short-Circuit Analysis

IEC 60909 Standard

3-Phase, LG, LL, & LLG Fault Currents

Swing V-Control Load Total

Number of Buses: 1 0 4 5

Line/Cable/
XFMR2 XFMR3 Reactor Busway Impedance Tie PD Total

Number of Branches: 1 0 0 2 0 1 4

Synchronous Power Synchronous Induction Lumped


Generator Grid Motor Machines Load Total

Number of Machines: 0 1 0 0 0 1

System Frequency: 60.00

Unit System: English

Project Filename: GIS_Villa_Hermosa

Output Filename: C:\ETAP 2000\GIS_Villa_Hermosa\Falla-SC.SI2S


Project: GIS-Villa Hermosa ETAP Page: 2

Location: PPAP Villa Hermosa 20.0.0C Date: 02-28-2022

Contract: CW-149629 SN:

Engineer: Jorge H. Garzón Revision: Base


Study Case: SC
Filename: GIS_Villa_Hermosa Config.: Normal

Adjustments

Apply Individual
Tolerance Adjustments /Global Percent

Transformer Impedance: Yes Individual

Reactor Impedance: Yes Individual

Overload Heater Resistance: No

Transmission Line Length: No

Cable / Busway Length: No

Apply Individual
Temperature Correction Adjustments /Global Degree C

Transmission Line Resistance: Yes Individual

Cable / Busway Resistance: Yes Individual


Project: GIS-Villa Hermosa ETAP Page: 3

Location: PPAP Villa Hermosa 20.0.0C Date: 02-28-2022

Contract: CW-149629 SN:

Engineer: Jorge H. Garzón Revision: Base


Study Case: SC
Filename: GIS_Villa_Hermosa Config.: Normal

Bus Input Data

Bus Initial Voltage


ID Type Nom. kV Base kV Sub-sys %Mag. Ang.

BUS-GIS Load 0.220 0.220 1 100.00 -150.00


BUS-SE Load 0.220 0.220 1 100.00 -150.00
BUS-TX-PRIM SWNG 13.200 13.200 1 100.00 0.00
BUS-TX-SEC Load 0.220 0.220 1 100.00 -150.00
TGA-GIS Load 0.220 0.220 1 100.00 -150.00

5 Buses Total

All voltages reported by ETAP are in % of bus Nominal kV.


Base kV values of buses are calculated and used internally by ETAP .
Project: GIS-Villa Hermosa ETAP Page: 4

Location: PPAP Villa Hermosa 20.0.0C Date: 02-28-2022

Contract: CW-149629 SN:

Engineer: Jorge H. Garzón Revision: Base


Study Case: SC
Filename: GIS_Villa_Hermosa Config.: Normal

Line/Cable/Busway Input Data

ohms or siemens per 1000 ft per Conductor (Cable) or per Phase (Line/Busway)

Line/Cable/Busway Length

ID Library Size Adj. (ft) % Tol. #/Phase T (°C) R1 X1 Y1 R0 X0 Y0

ALIM-GIS 0,6MCUN1 4/0 984.3 0.0 3 75 0.0640000 0.0496920 0.2016000 0.1222560

Cable1 0,6MCUN1 4/0 16.4 0.0 5 75 0.0640000 0.0496920 0.2016000 0.1222560

Line / Cable / Busway resistances are listed at the specified temperatures.


Project: GIS-Villa Hermosa ETAP Page: 5

Location: PPAP Villa Hermosa 20.0.0C Date: 02-28-2022

Contract: CW-149629 SN:

Engineer: Jorge H. Garzón Revision: Base


Study Case: SC
Filename: GIS_Villa_Hermosa Config.: Normal

2-Winding Transformer Input Data

Transformer Rating Z Variation % Tap Setting Adjusted Phase Shift

ID MVA Prim. kV Sec. kV %Z X/R + 5% - 5% % Tol. Prim. Sec. %Z Type Angle

TX-1 0.225 13.200 0.220 5.75 3.09 0 0 0 0 0 5.75 Dyn 150.00

2-Winding Transformer Grounding Input Data

Grounding
Transformer Rating Conn. Primary Secondary

ID MVA Prim. kV Sec. kV Type Type kV Amp ohm Type kV Amp ohm

TX-1 0.225 13.200 0.220 D/Y Solid


Project: GIS-Villa Hermosa ETAP Page: 6

Location: PPAP Villa Hermosa 20.0.0C Date: 02-28-2022

Contract: CW-149629 SN:

Engineer: Jorge H. Garzón Revision: Base


Study Case: SC
Filename: GIS_Villa_Hermosa Config.: Normal

Branch Connections

CKT/Branch Connected Bus ID % Impedance, Pos. Seq., 100 MVAb

ID Type From Bus To Bus R X Z Y

TX-1 2W XFMR BUS-TX-PRIM BUS-TX-SEC 759.95 2348.24 2468.15

ALIM-GIS Cable BUS-GIS TGA-GIS 4338.30 3368.42 5492.46

Cable1 Cable BUS-TX-SEC BUS-SE 43.38 33.68 54.92

GIS-CB Tie Breakr BUS-SE BUS-GIS


Project: GIS-Villa Hermosa ETAP Page: 7

Location: PPAP Villa Hermosa 20.0.0C Date: 02-28-2022

Contract: CW-149629 SN:

Engineer: Jorge H. Garzón Revision: Base


Study Case: SC
Filename: GIS_Villa_Hermosa Config.: Normal

Power Grid Input Data

% Impedance
Rating 100 MVA Base
Grounding
Power Grid ID Connected Bus ID MVASC kV R X" R/X" Type

RED-EPM BUS-TX-PRIM 192.050 13.200 7.00095 51.59703 0.14 Wye - Solid

Total Connected Power Grids ( = 1 ): 192.050 MVA


Project: GIS-Villa Hermosa ETAP Page: 8

Location: PPAP Villa Hermosa 20.0.0C Date: 02-28-2022

Contract: CW-149629 SN:

Engineer: Jorge H. Garzón Revision: Base


Study Case: SC
Filename: GIS_Villa_Hermosa Config.: Normal

SHORT- CIRCUIT REPORT

Fault at bus: BUS-GIS


Nominal kV = 0.220
Voltage c Factor = 1.05 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"

From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

BUS-GIS Total 0.00 10.722 0.00 104.16 106.12 10.694 10.694 8.11E+002 2.44E+003 8.97E+002 2.43E+003

TGA-GIS BUS-GIS 0.00 0.000 0.00 104.16 106.12 0.000 0.000

BUS-TX-SEC BUS-SE 2.24 10.722 3.66 104.49 104.75 10.694 10.694 8.11E+002 2.44E+003 8.97E+002 2.43E+003

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 10.722 10.694 9.285 10.807
Peak Current (kA), Method C : 20.945 20.890 18.139 21.111
Breaking Current (kA, rms, symm) : 10.694 9.285 10.807
Steady State Current (kA, rms) : 10.722 10.694 9.285 10.807

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer.
Project: GIS-Villa Hermosa ETAP Page: 9

Location: PPAP Villa Hermosa 20.0.0C Date: 02-28-2022

Contract: CW-149629 SN:

Engineer: Jorge H. Garzón Revision: Base


Study Case: SC
Filename: GIS_Villa_Hermosa Config.: Normal

Fault at bus: BUS-SE


Nominal kV = 0.220
Voltage c Factor = 1.05 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"

From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

BUS-SE Total 0.00 10.722 0.00 104.16 106.12 10.694 10.694 8.11E+002 2.44E+003 8.97E+002 2.43E+003

BUS-TX-SEC BUS-SE 2.24 10.722 3.66 104.49 104.75 10.694 10.694 8.11E+002 2.44E+003 8.97E+002 2.43E+003

TGA-GIS BUS-GIS 0.00 0.000 0.00 104.16 106.12 0.000 0.000

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 10.722 10.694 9.285 10.807
Peak Current (kA), Method C : 20.945 20.890 18.139 21.111
Breaking Current (kA, rms, symm) : 10.694 9.285 10.807
Steady State Current (kA, rms) : 10.722 10.694 9.285 10.807

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer.
Project: GIS-Villa Hermosa ETAP Page: 10

Location: PPAP Villa Hermosa 20.0.0C Date: 02-28-2022

Contract: CW-149629 SN:

Engineer: Jorge H. Garzón Revision: Base


Study Case: SC
Filename: GIS_Villa_Hermosa Config.: Normal

Fault at bus: BUS-TX-PRIM


Nominal kV = 13.200
Voltage c Factor = 1.10 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"

From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

BUS-TX-PRIM Total 0.00 8.400 0.00 110.00 110.00 8.400 8.400 7.70E+000 5.68E+001 7.70E+000 5.68E+001

BUS-TX-SEC BUS-TX-PRIM 0.00 0.000 63.51 110.00 63.51 0.000 0.000

RED-EPM BUS-TX-PRIM 110.00 8.400 110.00 110.00 110.00 8.400 8.400 7.70E+000 5.68E+001 7.70E+000 5.68E+001

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 8.400 8.400 7.275 8.400
Peak Current (kA), Method C : 19.866 19.866 17.204 19.866
Breaking Current (kA, rms, symm) : 8.400 7.275 8.400
Steady State Current (kA, rms) : 8.400 8.400 7.275 8.400

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer.
Project: GIS-Villa Hermosa ETAP Page: 11

Location: PPAP Villa Hermosa 20.0.0C Date: 02-28-2022

Contract: CW-149629 SN:

Engineer: Jorge H. Garzón Revision: Base


Study Case: SC
Filename: GIS_Villa_Hermosa Config.: Normal

Fault at bus: BUS-TX-SEC


Nominal kV = 0.220
Voltage c Factor = 1.05 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"

From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

BUS-TX-SEC Total 0.00 10.915 0.00 104.49 104.73 10.997 10.997 7.68E+002 2.41E+003 7.60E+002 2.35E+003

BUS-SE BUS-TX-SEC 0.00 0.000 0.00 104.49 104.73 0.000 0.000

BUS-TX-PRIM BUS-TX-SEC 102.65 10.915 103.94 103.70 105.00 10.997 10.997 * 7.68E+002 2.41E+003 7.60E+002 2.35E+003

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 10.915 10.997 9.453 10.969
Peak Current (kA), Method C : 21.551 21.713 18.664 21.658
Breaking Current (kA, rms, symm) : 10.997 9.453 10.969
Steady State Current (kA, rms) : 10.915 10.997 9.453 10.969

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer.
Project: GIS-Villa Hermosa ETAP Page: 12

Location: PPAP Villa Hermosa 20.0.0C Date: 02-28-2022

Contract: CW-149629 SN:

Engineer: Jorge H. Garzón Revision: Base


Study Case: SC
Filename: GIS_Villa_Hermosa Config.: Normal

Fault at bus: TGA-GIS


Nominal kV = 0.220
Voltage c Factor = 1.05 (User-Defined)
Positive & Zero Sequence Impedances
Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"

From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

TGA-GIS Total 0.00 3.550 0.00 118.42 130.53 2.474 2.474 5.15E+003 5.81E+003 1.46E+004 1.07E+004

BUS-GIS TGA-GIS 74.31 3.550 84.59 104.92 105.26 2.474 2.474 5.15E+003 5.81E+003 1.46E+004 1.07E+004

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 3.550 2.474 3.075 3.369
Peak Current (kA), Method C : 5.465 3.808 4.733 5.186
Breaking Current (kA, rms, symm) : 2.474 3.075 3.369
Steady State Current (kA, rms) : 3.550 2.474 3.075 3.369

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer.
Project: GIS-Villa Hermosa ETAP Page: 13

Location: PPAP Villa Hermosa 20.0.0C Date: 02-28-2022

Contract: CW-149629 SN:

Engineer: Jorge H. Garzón Revision: Base


Study Case: SC
Filename: GIS_Villa_Hermosa Config.: Normal

Short-Circuit Summary Report

3-Phase, LG, LL, LLG Fault Currents

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground


ID kV I"k ip Ik I"k ip Ib Ik I"k ip Ib Ik I"k ip Ib Ik

BUS-GIS 0.220 10.722 20.945 10.722 10.694 20.890 10.694 10.694 9.285 18.139 9.285 9.285 10.807 21.111 10.807 10.807
BUS-SE 0.220 10.722 20.945 10.722 10.694 20.890 10.694 10.694 9.285 18.139 9.285 9.285 10.807 21.111 10.807 10.807
BUS-TX-PRIM 13.200 8.400 19.866 8.400 8.400 19.866 8.400 8.400 7.275 17.204 7.275 7.275 8.400 19.866 8.400 8.400
BUS-TX-SEC 0.220 10.915 21.551 10.915 10.997 21.713 10.997 10.997 9.453 18.664 9.453 9.453 10.969 21.658 10.969 10.969
TGA-GIS 0.220 3.550 5.465 3.550 2.474 3.808 2.474 2.474 3.075 4.733 3.075 3.075 3.369 5.186 3.369 3.369

All fault currents are in rms kA. Current ip is calculated using Method C.

* LLG fault current is the larger of the two faulted line currents.
Project: GIS-Villa Hermosa ETAP Page: 14

Location: PPAP Villa Hermosa 20.0.0C Date: 02-28-2022

Contract: CW-149629 SN:

Engineer: Jorge H. Garzón Revision: Base


Study Case: SC
Filename: GIS_Villa_Hermosa Config.: Normal

Sequence Impedance Summary Report

Bus Positive Seq. Imp. (ohm) Negative Seq. Imp. (ohm) Zero Seq. Imp. (ohm) Fault Zf (ohm)

ID kV Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance

BUS-GIS 0.220 0.00393 0.01180 0.01244 0.00393 0.01180 0.01244 0.00434 0.01177 0.01254 0.00000 0.00000 0.00000

BUS-SE 0.220 0.00393 0.01180 0.01244 0.00393 0.01180 0.01244 0.00434 0.01177 0.01254 0.00000 0.00000 0.00000

BUS-TX-PRIM 13.200 0.13418 0.98893 0.99799 0.13418 0.98893 0.99799 0.13418 0.98893 0.99799 0.00000 0.00000 0.00000

BUS-TX-SEC 0.220 0.00372 0.01164 0.01222 0.00372 0.01164 0.01222 0.00368 0.01137 0.01195 0.00000 0.00000 0.00000

TGA-GIS 0.220 0.02492 0.02811 0.03756 0.02492 0.02811 0.03756 0.07048 0.05188 0.08751 0.00000 0.00000 0.00000