Download as pdf or txt
Download as pdf or txt
You are on page 1of 22

TOTAL PRODUCTIVE

MAINTENANCE (TPM) –
IMPLEMENTATION

UNIT : M5 Hygiene Plant


3 DAYS TRAINING (30th Aug ~ 1st Sep)
CREDIT HOURS : 5 hrs.

Trainer : Muhammad Umar


Manager Lean & Transformation
SCHEDULE DAY 1~2
SCHEDULE DAY 3
INTRODUCTION !
INTRODUCTION !
HOW TPM HELPS TO ACHIEVE LEAN GOALS ?
HOW TPM HELPS TO ACHIEVE LEAN GOALS ?
PILLERS / ELEMENTS OF TPM !
Any of the following two sets of mandates can be adopted TPM 8 Pillars or TPM 5 Elements

8 PILLARS 5 Elements
1 • Autonomous Maintenance • Operators Involvement in Maintenance
1
2 • Focused Improvements
• Planned Maintenance • Efficient & Effective Maintenance
3 2
• Quality Maintenance
4
• Training
3
5
• Early Equipment Management
6
• Training & Education • Equipment Life Cycle & Robust Design
4
7
• Safety & Health
• Improve Equipment Effectiveness by reducing loss
• Office TPM 5
8

TPM structure will fall if following elements are not aligned

A. Efficient Maintenance Strategy (EAM, CMMS)


B. Technical Trainings of Operators & Floor Engineers
C. Operators Engagement in Level 1~1.5 maintenance
PILLERS / ELEMENTS OF TPM !
PILLERS / ELEMENTS OF TPM !
PILLERS / ELEMENTS OF TPM !
PILLERS / ELEMENTS OF TPM !
PILLERS / ELEMENTS OF TPM !
PILLERS / ELEMENTS OF TPM !
PILLERS / ELEMENTS OF TPM !
PILLERS / ELEMENTS OF TPM !
PILLERS / ELEMENTS OF TPM !
TPM ACTIVITIES !
TPM ACTIVITIES !
TPM ACTIVITIES !
TPM ACTIVITIES !
THANK YOU
DAY 1 CONCLUDED

You might also like