LAPORAN MANAGER SHIFT DEPARTEMEN OPERASI P-IIB

Swing Shift
Sabtu, 02 September 2023

AMMONIA : Normal Operasi, Rate gas : 105 % (vent waste gas PV-1029 : 0 %)
15.00 : Rate gas 105%, Flushing rutin AI-1103, Bersihkan suction strainer pompa 109-LJA
16.00 : Forklift angkat motor 161-JA
: Listrik pasang motor 161-JA
16.30-17.30 : Turun rate 105%  102%  105 % ( imbangi Rate urea karna trip GA102A: Available NH3 )
17.00 : Lab extra check NH3 Out 124-D = Tracess
: Switch sumber H2 101-D dari 144 ke 124-D
:101-J Instrument PI-1023 sempat BAD (zero check, cek terminasi, cek marshalling OK)
20.00 : injeksi 100ml SAG ke 121-D1 (rutin)
: Safety Cek Explosive rutin area FT dan Tube katalis

UREA : Normal Operasi, Rate CO₂ : 110 % (PI-151: 0,78 kg/cm²)


15.00 : Lanjut isi dan injeksi UFC,
15.00-16.20 : Lanjut GA-403 transfer larutan ke FA-201
15.00-16.10 : Lanjut flushing line urea soln dari GA-403 ke P3 (IP)
15.25-19.55 : Start pump grease scraper JJ-301 CM, Pembersihan urea lump
15.35-16.40 : Stop prilling ( GA 201 trip thesis blank )
16.00 : Listrik reg in/out GA 201 B
16.05 : Flushing ulang dan genangi
16.15 : Terima urea sol'n dari Urea 3 ke FA 401
16.20-17.40 : Rate 110% ---> 90%  110 %( turunkan tekanan ACES ada bocoran di flange U/S CV FV 101 )
17.00 : Lab Analisa C = 11.6 NH3 = 0.60 Urea = 0.28
17.10/20.00 : Flushing line ke EA 506
17.15 : Mekanik Ikat flange U/S check valve FV 101  OK Pengamatan
17.20 : Flushing EE-201
17.30 : B/P ( persiapan siram ) EA 801
17.40 : Mekanik Lepas expantiont joint dan pasang talang
18.00 : Mekanik Cuci strainer suction GA-302 ( A ) dan dischard ( A )
20.10-20.20 : Flushing line d/s SV 101 A-C
20.45 : Flushing line urea sol'n dari GA 403 ke Urea 3

UTILITAS : Normal operasi


15.30 : BW ACF RO “B”
16.04 : BW PSF “A”
17.00 : Mekanik bersihkan barscreen CT ( disikat )
17.28 : Start RO “B”
18.40 : Stop RO “B”
19.49 : Angkat barscreen 6209 JAT JBT
20.25 : BW PSF “B”
21.30 : Non aktifkan Stripper
Info : - CO₂/ASP-3/ASP-4 : Shutdown perbaikan / Normal Operasi/ Normal Operasi
- NPK 1/2/3 : GL Sirk. Adjust Form / Norm Ops 20t/j 15.10.12 PSO / Norm Ops 18t/j 15.10.12 PSO
- Kondisi keamanan dan lingkungan : Aman terkendali

Pemakaian Steam 149 t/h


Tek Gas U/S 385 Psi
Plant P-1B P-2B P-2 P-3 P-4 STG/BB Unit
Rate Gas/Boiler#1 90 105 Stby 77 93 %
Rate Total/Boiler#2 HRU 105 - 79 87 %
Rate CO2 90 110 59 82 %
WHB/PB/B#1/B#2 7 55 / 90 58 SD / 65 67 / 42 225/210 t/h
GTG/STG 12,1 - 9,7 6,5 SD Perb 10,5 13,0 MW
Demin Water 11 10,7 7,8 10 10,9 11,0 m
NH3/Coal Storage 14.117 9.842 4.269 11.516 13.861 20.596 mm/MT
FA-201 5,5 3
4,9 4,1 0,7 m
FA-401 1,7 7 4 2 m
Tekanan Gas D/S 296 206 384 379 psi
Flow Gas/Total Flow GMS 52,73 65,66 10,95 47,35 176,69 mmscfd
Flow PEP/RBT/TEP/Grissik/Total 71,92 33,84 0,29 71,52 177,58 mmscfd

Tie-in : - Paralel Vapour NH3 (TP-04A 100 %) - Kirim Demin water Ke STG - Kirim udara P.A ke P3, P4 dan STG
-Tie in CO2 MOV-3001 (75 %) - Kirim Hot NH₃ & FW ke P3 -Terima Cold NH₃ dari P4

Manager Shift P-2B

Komaruzaman