Where an exclusion zone is required, the SWMS must clearly state the detail of the required exclusion zone,
including the person responsible for implementation and supervision.
Work Location (Attach Site Plan): Refer Attachments Duration: From 18/01/2017 (Date) to 18/02/2017 (Date)
Remarks:
- Nil
2 Yes No
3 Yes No
4 Yes No
5 Yes No
6 Yes No
7 Yes No
8 Yes No
Name: Jeganathan Nair Signed: Name: Kevin Che Kam Seng Signed:
Designation: Safety and Health Officer Date: ……20…. /…1……. /……17…. Designation: Project Manager Date: …20……. /……1…. /…17…….
Applicable Environment, Safety & Health (ES&H)
Risk Assessment Team Approved Code of Practice (COP) and/or CSR
Legislation
Name Designation Signature
NO Job Steps Hazard Risk Risk Control / Control Measures L I Risk Accountable Person
Rating
1 Delivery of Reinforcement and Formwork, Lorry Crane Uncontrolled Major injury due to Designated & Trained Traffic controllers to be assigned. 2 4 Moderate Supervisor
to Work Site Traffic/Vehicle Traffic controller to be equipped with whistle, high visibility clothing & batons/ flags
contact with moving
Movement Proper signage to be placed to warn the public
vehicles or machineries
2 Unload Reinforcement, Formwork Material Dropping Major Injury due to material Minimum 2 workers to unload materials from low levels 2 3 Site Supervisor
dropping Ensure workers not lifting weight greater than 20kg on each lift
3 Mobilization of Excavator to excavation zones Uneven access and Excavator toppling over and Ground must be checked for level and stability by competent person 2 4 Site Supervisor/Excavator
unstable ground Major Injury due to hit Work zone to be barricaded and no workers to be in the barricaded zone Operator
4 Excavation and Cart Away of spoil Uncontrolled swinging Major Injury due to hit by Excavator shall only be operated with the guide of banks men 2 4 Site Supervisor and banks men
of the bucket swinging boom/bucket Work area must be fully barricaded to prevent unauthorised entry
5 Levelling of excavation, installation of base rebar and Concrete burns, Injury Minor injury to hands and feet, Wear proper PPE Site Supervisor
concrete pouring due to rebar Trips and Fell Ensure timber walkway to prevent trips and falls
installation, Poor
housekeeping
6 Installation of formwork and rebar for wash trough Material droppings, Major injury due to collapse of Minimum two workers handling the installation of formwork, Concreting done from Site Supervisor and Concrete
walls and concreting Poor housekeeping and formwork, Trip and fell outside by competent pump operator only Pump Operator
collapse of formwork
7 Delivery and Installation of steel beams and metal Material droppings, Major injury due to contact with To use competent operator 1 4 Lifting Supervisor
grille and pump and gen sets Unsafe lorry crane and load or machinery during lifting Crane to be inspected & with valid fitness certificates
lifting operation operation Crane to use 1m x 1m steel plate for out riggers
Out riggers to be fully extended
Wheels to be slightly above the ground
Crane to be balanced -refer level meter / water leveller on the body
Barricade the work area
Unsafe Slinging Major injury due to material fall To use competent rigger 1 4 Lifting Supervisor
To use tested and certified slings & lifting gears
To lift using designated lifting points only
No overhead lifting or standing under suspended load
Section 3: Verification
I have provided, accurate and sufficient information and instructions pertaining to this Safe Work Method Statement - the aspects / hazards associated with each work process and activity, the type of potential impact,
incident or accident, and the risk controls / practicable measures to be taken in the course of work and during an emergency - to ensure its / their safe undertaking.
Instructed by (print name): …………………………………………………………………….. Signed: ………………………………………….. Date: …..../…...../……… Time: .............. am / pm