Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 1

P.T. SEIWA INDONESIA Document No.

Date of Issue Note) Please make a note for each packing specification.
PRODUCT, PACKING & PURCHASING STANDARD
Revised Date - Revised No. 0 Item Content
Material Form
Product ref no Packing Specification

Product Name Manufucture Standard Packaging Unit ( )


Chemical Name Outside Dimension w(㎜)×l(㎜)×h(㎜) × ×
or Composition Delivery Destination PT.SEIWA INDONESIA
Actual Item Photo (Please take the picture and attach)
Existing Chemical Substance No. Overall Image
Supplier Company Seal
Contain Environmentally Hazardous Substances

Color

Form

[Guaranteed Quality]
Standard Value Measuring Method
Measure
Numbers
Test Items Unit Lot units ment (ASTM,JIS No.,etc) Remarks
min x max of Sample
Time
Please attached

Display Label Image

1. As a result of the inspection specified above, the recepient has the right to return the products
if the products are not meeting the standard and/or classified as a rejected products.
2. COA must be submitted in advance or attached to the actual item by the delivery date.
3. Please notify the party concerned if there is any unusual condition about the certain product.
Restriction on packaging, storage, and handling 4. All involved parties shall notify in advance if any changes and/or adjustment are necessary.
Appropriate packaging that does not impair the quality shall be provided, and the product name, supplier, 5. All available documents regarding the products provided by the seller.
net weight, size, lot number, etc. shall be entered with a tag, etc., to avoid mixing with other items. (Enviromentally hazardous substances survey,Regulation,Compliance,ISO certification etc)

Packaging (Specification/Unit) P.T. SEIWA INDONESIA Approval

Storage Handling Restrictions

Effective Use Period QC/QA Dept PE Dept Purchasing Dept PM/Director


<Remarks>
Name of Manufacturing Plant Establishment 2/25/2021 New registration

Location

Others

If there is any change in the items described in the future, be sure to apply for a revision and submit a revised version. If there is any change in the items described in the future, be sure to apply for a revision and submit a revised version.
FM.QC.00-208, Eff. Date : 10 Jan.2020 FM.QC.00-208, Eff. Date : 10 Jan.2020

You might also like