Polytechn Project Transmission Line Fault Safety System
Polytechn Project Transmission Line Fault Safety System
GOVERNMENT
POLYTECHNIC
Page 1
KURU PINDRA,VARANASI
TABLE OF CONTENTS
CERTIFICATE 3
DECLARATION 4
ACKNOWLEDGEMENTS 5
ABSTRACT 7
INTRODUCTION&BLOCK DIAGRAM 8
COMPONENTS DESCRIPITION 11
WORKIMG PRINCIPLE 14
CONCLUSION 16
Page 2
GOVERNMENT POLYTECHNIC KURU PINDRA
VARANASI
CERTIFICATE
Page 3
DECLARATION
I declare that this project report titled “Transmisson Line Fault Safety
System ” submitted in partial fulfillment of the certificate of Diploma in
Electrical Engineering is a record of original work carried out by me under
the supervision of Er. SHAILENDRA KUMAR MAURYA, and has not
formed the basis for the award of any other degree or diploma, in this or
any other Institution. In keeping with the ethical practice in reporting
scientific information, due acknowledgements have been made wherever the
findings of others have been cited.
Signature
Vishal Maddhesiya
Date: (E21447832800001)
Page 4
ACKNOWLEDGMENTS
VISHAL MADDHESIYA
Page 5
ABSTRACT
Electricity has become the most sought after amenity for all of us. Gone are the days when
electricity would be only limited to cities. It is now reaching to every distant parts of the
world. So we have now a complex network of power system. This power is being carried
by the transmission lines. These lines travel very long distances so while carrying power,
fault occurring is natural. These faults damages many vital electrical equipment like
transformer, generator, transmission lines. For the uninterrupted power supply we need to
prevent these faults as much as possible. So we need to detect faults within the shortest
possible time,
So In This Project We will use Relay detecting System when any fault detect the relay
detecting system then relay detecting system automatic cut the transmission line power
source so our substation save by any fault ,
This project is about designing the Numerical relay where the fault is detected when the
input value exceeds the reference value set in the relay which then gives the trip signal to
the circuit breaker .
Introduction
In This Project We solve the big problem by our idea , These days when three phase
transmission line first wire touch to second wire then that fault effect on substation and
sometimes substation transformer fused so we make a system for transmission line all type
of fault , for example in transmission any fault Line to Line fault or Line to ground fault or
fire fault then that time automatic transmission line electricity power cut so our substation
safe by that fault , So This is Our Idea For Solving This Big Problem.
Block Diagram
SN Component
1 Relay
2 Temperature Module
3 Capacitor 25v/1000uf
4 LED Bulb
5 Resistor
6 5V Adopter Circuit
7 Steel Plate
8 PCB
9 Line Filter
10 AC Bulb / Holder
11 Jumper Wire
5V Relay Module
What is a 5V Relay?
A 5v relay is an automatic switch that is commonly used in an automatic control circuit
and to control a high-current using a low-current signal. The input voltage of the relay
signal ranges from 0 to 5V.
Pin1 (End 1): It is used to activate the relay; usually this pin one end is connected to 5Volts
whereas another end is connected to the ground.
Pin2 (End 2): This pin is used to activate the Relay.
Pin3 (Common (COM)): This pin is connected to the main terminal of the Load to make it
active.
Pin4 (Normally Closed (NC)): This second terminal of the load is connected to either NC/
NO pins. If this pin is connected to the load then it will be ON before the switch.
Pin5 (Normally Open (NO)): If the second terminal of the load is allied to the NO pin, then
the load will be turned off before the switch.
Temperature Sensor Module
NTC Thermistor temperature sensor module is low cost, small size module. It is very
sensitive to ambient temperature. It is generally used to detect the temperature of the
surrounding environment. Through potentiometer adjustment, it is possible to change the
temperature detection threshold. DO output can be directly connected to the micro
controller to detect high and low, by detecting temperature changes in the environment.
The temperature detection range of the module is between 20 and 80 degrees Celsius. This
module can be replaced with a line temperature sensor for controlling the water
temperature, water tank, etc. Generally the 4 wire method of thermistor measurement is the
most accurate, because there is effectively no current flowing in either of the measurement
cable wires and therefore no added resistance due to the cable wires.
A voltage applied across the conductors creates an electrical field in the capacitor, which
stores energy. A capacitor operates like a battery in that, if a potential difference is
applied across it that can cause a charge greater than its "present" charge, it will be
charged up.
CONCLUSION:-
In This project we show how to save fault in transmission line and we make this project
and show successful working of project. So by our project successful work our conclusion
is this is best idea for safety many type of fault.
ESTIMATING
&
COSTING
OF
COMPUTER LAB
STEP 1:- ASSUPTION
Load current:-
= Total Lighting load/230V
= 1660/230
= 7.21Amp = 8*2 = 16Amp (safety factor is 2)
Required size of copper wire is 1.5m.m
Rating of Main switch board & Distribution board = 25A, 250V, 50Hz
1. 2 16 40 80
2. 3 16 35 70
3. 4 19 18 70
4. 5 19 1 5
5. 6 25 6 36
6. 7 25 8 56
7. 8 25 - -
8. 9 32 13.5 60.75
9. 10 32 4.5 45
TOTAL 422.75