Revised Detailed Difference
Detailed Estimate Approved BOQ (Revised Detailed
S.No Description Estimate Amount VO-1 Amount (Million) (BOQ - VO-1)
Amount (Million) Amount (Million) Estimate - BOQ)
(Million) (Million)
(Million)
Project Manager
Siran Right Bank Canal Project
Pakistan Engineering Services (Pvt.) Ltd.
in association with: Dynatech Consultants
Construction of Siran Right Bank Canal
District Mansehra
ABSTRACT OF COST
COMPARISION B/W PC-I AND DETAILED ESTIMATE
Amount (Rs. Million)
PC-I Detailed Revised T.S Difference Revised Difference Detailed
Sr. No. ITEMS / DESCRIPTION Estimate T.S & PC 1 Estimate & Revised T.S
B PRELIMINARIES
C GENERAL
S/E best quality ceiling fan complete with G-I rod ATR
53 15-68-c No 15.00 3,845.53 57,682.95
canopy blade & regulator 56" sweep. BOQ Item #53
Supply and Erection girder clamp hook, 5/8" dia.for ATR
54 15-25 Each 9.00 318.11 2,862.99
hanging ceiling fans BOQ Item #54
Supply and Erection tube light, including rod, choke
ATR
55 15-24-a etc complete Double rod (2x40 watts) with 2 chokes & Set 14.00 975.58 13,658.12
BOQ Item #55
2 starters
ATR
56 15-24-b S/E tube light rod and choke complete 40 watt. No 14.00 454.14 6,357.96
BOQ Item #56
ATR
57 15-82 Supply and Fixing Asia porcelin power plug 30 Amp Each 30.00 151.88 4,556.40
BOQ Item #57
Wiring of 2/3 pin 5 AMP plug point in 3/029 pvc ATR
58 15-51 No 30.00 368.80 11,064.00
insulated cable in pvc pipe recessed. BOQ Item #58
Wiring of light / fan / call bell point in 3-29 pvc ATR
59 15-50 No 90.00 850.55 76,549.50
insulated cable in pvc pipe recessed. BOQ Item #59
Making and fixing grating in opening, including fixing ATR
60 25-32 M2 60.00 2,344.44 140,666.40
at site with flat iron 2"x3/8" and 3/4" sq. bars BOQ Item #61
Filling, watering and ramming earth under floor with ATR
61 03-16-a M3 99.16 103.30 10,243.12
surplus earth from foundation, etc BOQ Item #62
Shoes, bends or offsets for cast iron rain water down ATR
62 09-21 Each 17.00 1,747.97 29,715.49
pipe, including fixing & painting BOQ Item #63
Heads for cast iron rain water down pipe fixed in place ATR
63 09-20 Each 17.00 1,832.34 31,149.78
including cost of clamp holdfast and painting BOQ Item #64
ATR
89 11-09-b Cement plaster 1:4 upto 20' height 1/2" thick M2 1,562.34 215.00 335,903.39 BOQ Item #90 &
#114
Cement plaster 3/8" thick under soffit of RCC roof ATR
90 11-10-b M2 309.76 253.11 78,402.39
slabs only upto 20' height : (1:3) BOQ Item #91
Pacca brick work in ground floor Cement, sand mortar ATR
91 07-05-a-05 M3 186.29 8,003.98 1,491,042.06
1:6 BOQ Item #92
Damp proof course of cem. conc. 1:2:4 including
ATR
92 06-22-a-03 bitumen coat, 1 layer polythene & 1 coat bitumen (3" M2 4.23 770.95 3,257.38
BOQ Item #93
thick)
Pacca brick work in foundation and plinth in Cement, ATR
93 07-04-a-05 M3 79.61 7,433.74 591,830.93
sand mortar 1:6 BOQ Item #94
Erecting & removing formwork to concrete in any ATR
94 06-38-b M2 176,353.21 515.47 90,904,789.16
shape / position (Vertical) BOQ Item #95
ATR
Supply fabricate M.S reinforcement for cement
95 06-07-c Tonne 2,294.75 103,529.94 237,574,843.91 BOQ Item #96 &
concrete ( hot rolled deformed bars Grade 40)
#127
ATR
RCC in roof slab , beam , column and other structural
96 06-06-a-03 M³ 6,096.85 8,710.19 53,104,756.31 BOQ Item #97 &
member , in sithu or precast. Type C 1:2:4.
#129
ATR
RCC in raft foundation slab, base slab of column & ret.
97 06-06-b-03 M3 15,436.56 7,830.79 120,880,438.90 BOQ Item #98 &
wall etc, not including in 06-06. Type C (1:2:4)
#128
ATR
Plain Cement Concrete including placing, compacting,
98 06-05-i M3 8,281.12 5,090.88 42,158,166.91 BOQ Item #99 &
finishing & curing (Ratio 1:4:8)
#133
Excavation in foundation of building bridges etc ATR
99 03-23-d M³ 254.45 273.34 69,551.24
complete in Shingle gravel. BOQ Item #100
ATR
Erection and removal of steel formwork for RCC or
101 ATR M² 70.00 47.98 3,358.60 BOQ
plain concrete vertical (Labor Rate only) (06-39-b)
Item #102
ATR
Supplying and Fixing PVC Water Stopper 8" wide 3/8"
102 24-40 M 9,016.93 440.77 3,974,391.06 BOQ
thick
Item #103
Grouting stone pitching or apron etc, in : Cement, ATR
103 19-31-a M2 696.12 -
sand mortar 1:3 BOQ Item #104
ATR
Providing and Laying stone pitching/filling, dry hand
104 19-25 M3 1,990.491 1,676.39 3,336,840.03 BOQ
packed in pitching & aprons
ATRItem #105
Providing and Laying stone pitching for top layer only :
105 19-28-b M3 815.520 2,655.28 2,165,433.95 BOQ
On level
ATRItem #106
Providing and Laying stone pitching for top layer only :
106 19-28-a M3 3,979.47 3,052.57 12,147,619.10 BOQ
On slope
ATRItem #107
Random rubble masonry in foundn. & plinth Dry
107 08-01-a M³ 28,533.91 2,715.59 77,486,396.53 BOQ
masonry
Item #108
ATR
Supply and Fixing of GI Pipe as per required diameter
108 ATR R. Ft. 1,220.000 1,295.00 1,579,900.00 BOQ
on the direction of Engineer Incharge
Item #109
ATR
Providing and Laying RCC pipe sewers complete as
109 23-03-c-09 M 20.000 12,118.93 242,378.60 BOQ
per ASTM C-76-79, Class IV : 36" i/d, Wall B
Item #110
ATR
Providing and Laying RCC pipe sewers complete as
110 23-03-c-05 M 20.000 5,465.50 109,310.00 BOQ
per ASTM C-76-79, Class IV : 24" i/d, Wall B
Item #111
ATR
Providing and Laying RCC pipe seweres complete as
111 23-03-c-03 M 50.000 3,850.96 192,548.00 BOQ
per ASTM C-76-79, Class IV : 18" i/d, Wall B
Item #112
ATR
Supplying stone and stone filling in GI wire crate and
120 19-26 M3 3,491.42 1,716.12 5,991,701.22 BOQ
its sewing, excluding cost of crates
Item #122
Construction of Siran Right Bank Canal
District Mansehra
ITEM WISE SUMMARY OF COST (WORKS)
ATR
Supply & fabricate M.S. reinforcement for cement
124 06-07-b Tonne 1,702.23 110,254.06 187,677,768.55 BOQ
concrete (Hot rolled deformed bars Grade 60)
Item #126
ATR
4" thick PCC lining. using washed screened & graded
125 17-10-a-01 M³ 6,818.71 - BOQ
stone aggregate : in bed : ratio 1:2:4
Item #130
ATR
Plain Cement Concrete including placing,
126 06-05-f M³ 6,817.97 6,758.12 46,076,689.08 BOQ
compacting,finishing & curing (Ratio 1:2:4)
Item #132
ATR
Structural Excavation in Rock Material requiring
127 03-60-b M3 4,557.29 1,629.01 7,423,872.55 BOQ
blasting
Item #134
ATR
128 03-60-a Structural Excavation in Common Material M³ 30,565.278 315.25 9,635,704.00 BOQ
Item #135
ATR
Rock Excavation, dressing & disposal up to 50m
129 03-11-b M3 7,054.25 643.35 4,538,352.59 BOQ
Medium hard rock, requiring occasional blasting
Item #136
Single layer of tiles 10"x5"x1.25" laid over 4" earth and Required as per
135 09-05 M2 327.75 1,261.92 413,595.28
1" mud plaster on top of RC roof slab site conditions
Required as per
136 14-69-a-02 P/F Fiber glass Water Tank 400 gallons. No. 1.00 9,379.42 9,379.42
site conditions
Required as per
137 14-69-a-01 P/F Fiber glass Water Tank 300 gallons. No. 1.00 7,884.51 7,884.51
site conditions
Making and fixing steel grated doors, complete with Required as per
139 25-30 M2 13.75 8,088.33 111,214.54
locking arrangements & angle iron frame site conditions
Construction of Siran Right Bank Canal
District Mansehra
ITEM WISE SUMMARY OF COST (WORKS)
Supply & fill new synthetic fibre/plastic bags 4-5 cft Required as per
141 19-04-a Nos. 16,587.00 218.85 3,630,064.95
capacity with sand or earth,sewing, stacking : in dry site conditions
Supplying clean and screened river or pit sand within Required as per
143 03-43 M3 4,696.76 715.12 3,358,750.07
150m including removal of loose earth or overburden. site conditions
Required as per
144 16-14 Providing and fixing GI pipe railing (3 feet high) M 10.65 2,752.93 29,309.77
site conditions
Providing and Laying expansion joint of neoprene strip Required as per
145 16-44 R. M. 1,097.68 643.06 705,876.44
4"x1/4" and plastic bitumen site conditions
Providing and Laying cut, joint, test & disinfect GI pipe Required as per
146 24-16-c-03 R. M. 120.69 392.44 47,363.58
line Using light quality GI Pipe : 1" i/d site conditions
Required as per
147 19-33 Grouting stone filling or pitching with bajri M3 85.93 610.21 52,433.75
site conditions
Levelling and dressing stone filling under blocks and Required as per
148 19-36 M 3
107.04 498.07 53,312.21
grouting with shingle site conditions
Boring for Cast-in-place RCC Piles in Alluvial Soils : Required as per
149 16-27-a R. M. 4,583.97 5,103.35 23,393,594.64
Dia up to 760mm site conditions
Required as per
151 03-14-b Rehandling of Earthwork up to a lead of 25 m. M³ 113,682.05 69.53 7,904,312.81
site conditions
Formation of Embankment from Roadway Excavation
Required as per
152 03-61-a in Common Material including compaction by power M³ 29,150.22 321.26 9,364,800.70
site conditions
roller
Required as per
153 16-03-a Granular Sub Base Course using Pit Run Gravel M³ 54,699.89 1,257.96 68,810,269.54
site conditions
Required as per
154 06-21-a Filling expansion joints with bitumen R. M 11,000.71 294.62 3,241,029.42
site conditions
Required as per
155 17-01-a Formation, dressing and preparing sub-grade In bed M² 42,602.80 69.36 2,954,929.88
site conditions
Required as per
156 17-01-b Formation, dressing and preparing sub-grade On slope M² 111,394.77 96.84 10,787,469.59
site conditions
Providing and Laying cut, joint, test, disinfect PVC Required as per
157 24-18-a-01 R. M 18,273.88 375.08 6,854,168.02
pipeline BSS Class 'B' working pressure : 3" i/d site conditions
168 NSI Provide and place1.5" thick Cement sand Mortar M3 Taken in PC-I
Supply & fill bricks in wire crates including sewing Required as per
173 19-18-a M3 7,678.690 1,247.67 9,580,471.15
crates, excl cost of crates: Stone orboulders site conditions
Required as per
176 17-02 Stabilized layer of cement, sand mortar 1:30 2" thick M² 134,974.708 259.42 35,015,138.75
site conditions
4" thick PCC lining, using washed screened & Required as per
177 17-10-a-01
graded/crushed stone aggregate : in bed : Ratio 1:2:4
M³ 3,836.125 6,818.71 26,157,420.64
site conditions
Construction of Siran Right Bank Canal
District Mansehra
ITEM WISE SUMMARY OF COST (WORKS)
Required as per
180 NSI Admixture Chemical Liter 3,406.850 500.00 1,703,425.24
site conditions
M Required as per
NSI HDPE Pipe for Syphon-1 975.310 174,862.00 170,544,657.22
site conditions
M Required as per
NSI HDPE Pipe for Syphon-2 76.200 141,861.00 10,809,808.20
site conditions
M Required as per
NSI HDPE Pipe for Syphon-3 914.340 88,450.00 80,873,373.00
site conditions
3 23-11 Soakage pit ( 6' dia x 15' deep ) complete. No 6.00 6.00 6.00 6.00 16,376.25 98,257.50 98,257.50 98,257.50 98,257.50 - -
Providing and installing PVC tees BSS Class
4 24-27-a-02 Each 30.00 30.00 25.00 25.00 500.45 15,013.50 15,013.50 12,511.25 12,511.25 2,502.25 -
'B'working pressure : 3" i/d
Providing and installing PVC bends BSS
5 24-26-c-02 Each 22.00 22.00 18.00 18.00 291.54 6,413.88 6,413.88 5,247.72 5,247.72 1,166.16 -
Class 'D'working pressure : 3" i/d
Providing and Laying cut, joint, test, disinfect
6 24-18-c-05 PVC pipe line BSS Class 'D' working R. M 25.00 25.00 18.00 18.00 699.29 17,482.25 17,482.25 12,587.22 12,587.22 4,895.03 -
pressure : 3" i/d
Providing and installing PVC tees BSS Class
7 24-27-a-03 Each 15.00 15.00 10.00 10.00 687.85 10,317.75 10,317.75 6,878.50 6,878.50 3,439.25 -
'B'working pressure : 4" i/d
Providing and installing PVC bends BSS
8 24-26-c-03 Each 15.00 15.00 10.00 10.00 438.29 6,574.35 6,574.35 4,382.90 4,382.90 2,191.45 -
Class 'D'working pressure : 4" i/d
Providing and Laying cut, joint, test, disinfect
9 24-18-c-06 PVC pipe line BSS Class 'D' working R. M 90.00 90.00 55.00 55.00 788.70 70,983.00 70,983.00 43,378.50 43,378.50 27,604.50 -
pressure : 4" i/d
Providing and installing PVC sockets BSS
10 24-28-a-04 Each 10.00 10.00 5.00 5.00 1,360.30 13,603.00 13,603.00 6,801.50 6,801.50 6,801.50 -
Class 'B'working pressure : 6" i/d
Providing and installing PVC bends BSS
11 24-26-a-04 Each 9.00 9.00 4.00 4.00 920.87 8,287.83 8,287.83 3,683.48 3,683.48 4,604.35 -
Class 'B'working pressure : 6" i/d
Providing and Laying cut, joint, test, disinfect
12 24-18-a-03 PVC pipe line BSS Class 'B'working pressure R. M 160.00 160.00 105.00 105.00 914.20 146,272.00 146,272.00 95,991.00 95,991.00 50,281.00 -
: 6" i/d
Providing and Fixing of poly dex high
13 14-71-b pressure PPR (green including testing ect R. M 185.00 185.00 110.00 110.00 399.64 73,933.40 73,933.40 43,960.40 43,960.40 29,973.00 -
complete 20 mm(including all special etc)
Providing and Fixing of poly dex high
14 14-71-a pressure PPR(green including testing ect R. M 160.00 160.00 90.00 90.00 427.66 68,425.60 68,425.60 38,489.40 38,489.40 29,936.20 -
complete 25 mm(including all special etc)
Supply and Fixing CI manhole cover with
15 14-37-b Each 10.00 10.00 12.00 12.00 1,909.96 19,099.60 19,099.60 22,919.52 22,919.52 (3,819.92) -
frame etc complete 18" dia
Providing and fixing CI main hole cover with
16 14-37-a No 10.00 10.00 12.00 12.00 1,110.86 11,108.60 11,108.60 13,330.32 13,330.32 (2,221.72) -
frame etc complete 12" dia
22 14-25 Providing and Fixing 1/2" CP tee stop cock Each 11.00 11.00 12.00 12.00 567.53 6,242.83 6,242.83 6,810.36 6,810.36 (567.53) -
26 14-15 Providing and fixing CP tailot paper holder. No 5.00 5.00 6.00 6.00 286.92 1,434.60 1,434.60 1,721.52 1,721.52 (286.92) -
27 14-13 Providing and fixing CP soap dish. No 5.00 5.00 6.00 6.00 537.03 2,685.15 2,685.15 3,222.18 3,222.18 (537.03) -
35 ATR Supply and erection plastic box size 7"x4" No. 22.00 22.00 30.00 30.00 600.00 13,200.00 13,200.00 18,000.00 18,000.00 (4,800.00) -
36 ATR Supply and erection plastic box size 4"x4" No. 22.00 22.00 8.00 8.00 500.00 11,000.00 11,000.00 4,000.00 4,000.00 7,000.00 -
Supply and Erection gate-light fitting
37 15-63-a complete with holder & 160-Watt mercury Each 12.00 12.00 6.00 6.00 796.65 9,559.80 9,559.80 4,779.90 4,779.90 4,779.90 -
blended lamp: Small
69 11-25-a-03 White washing: New surface : Three coats M2 1,987.95 1,987.95 1,384.89 1,384.89 40.16 79,835.90 79,835.90 55,617.18 55,617.18 24,218.72 -
73 13-08-a French polishing complete : on new work . M² 358.12 358.12 257.52 257.52 671.13 240,345.08 240,345.08 172,829.40 172,829.40 67,515.68 -
Varnishing wood work, including cleaning &
74 13-09-c M2 358.12 358.12 257.52 257.52 53.44 19,137.93 19,137.93 13,761.87 13,761.87 5,376.06 -
preparing surface : Third coat
Varnishing wood work, including cleaning &
75 13-09-b M 2
358.12 358.12 257.52 257.52 61.53 22,035.12 22,035.12 15,845.21 15,845.21 6,189.92 -
preparing surface : Second coat
77 12-17-b P/F hydraulic Door Closer (Best Quality) Each 18.00 18.00 12.00 12.00 1,682.50 30,285.00 30,285.00 20,190.00 20,190.00 10,095.00 -
89 11-09-b Cement plaster 1:4 upto 20' height 1/2" thick M2 1,562.34 1,562.34 148,081.19 148,081.19 215.00 335,903.39 335,903.39 31,837,455.85 31,837,455.85 (31,501,552.46) -
115 16-64 Bailing out water by Mechanical mean. M3 106,468.86 220,280.39 220,280.40 220,280.40 17.90 1,905,792.59 3,943,018.98 3,943,019.16 3,943,019.16 (2,037,226.57) -
128 03-60-a Structural Excavation in Common Material M³ 30,565.278 27,046.412 62,673.89 62,673.890 315.25 9,635,704.00 8,526,381.49 19,757,943.82 19,757,943.82 (10,122,239.83) -
Construction of Siran Right Bank Canal
District Mansehra
ITEM WISE COMPARISON BETWEEN DETAILED ESTIMATE BOQ & VO-1 QUANTITIES AND COSTS
Revised
Detailed Approved Difference
Sr. MRS 2016 Detailed VO-1 MRS 2016 Revised Detailed Detailed Estimate Approved BOQ Difference
Description of Items Unit Estimate BOQ VO-1 Amount ( Revised Detailed
No. Item Code Estimate Quantity Rate Estimate Amount Amount Amount (BOQ - VO-1)
Quantity Quantity Estimate - BOQ)
Quantity
137 14-69-a-01 P/F Fiber glass Water Tank 300 gallons. No. 1.00 1.00 7,884.51 7,884.51 7,884.51 - - 7,884.51 -
147 19-33 Grouting stone filling or pitching with bajri M3 85.93 85.93 610.21 52,433.75 52,433.75 - - 52,433.75 -
154 06-21-a Filling expansion joints with bitumen R. M 11,000.71 5,448.52 294.62 3,241,029.42 1,605,242.06 - - 3,241,029.42 -
Formation, dressing and preparing sub-grade
155 17-01-a M² 42,602.80 1,783.36 69.36 2,954,929.88 123,694.12 - - 2,954,929.88 -
In bed
161 NSI Providing and installing air/water relief valves Nos. 13.000 10.000 78,185.55 1,016,412.21 781,855.54 - - 1,016,412.21 -
165 04-19-b Dismantling: Plain cement concrete 1:3:6 M3 226.501 226.501 1,727.81 391,349.94 391,349.94 - 391,349.94 -
Providing and Laying cut, joint, test & disinfect Required as per
1.19 24-16-c-03 R. M. 120.69 392.44 47,363.58
GI pipe line Using light quality GI Pipe : 1" i/d site conditions
Required as per
1.20 19-33 Grouting stone filling or pitching with bajri M3 85.93 610.21 52,433.75
site conditions
Required as per
1.31 NSI Admixture Chemical Liter 3,406.85 500.00 1,703,425.24
site conditions
ATR
Structural Back fill using Common Material
2.6 03-60-c M³ 87,450.67 435.23 38,061,154.89 BOQ Item #
available at site
115
Required as per site
2.7 03-14-b Rehandling of Earthwork up to a lead of 25 m. M³ 113,682.05 69.53 7,904,312.81
conditions
Formation of Embankment from Roadway
Required as per site
2.8 03-61-a Excavation in Common Material including M³ 29,150.22 321.26 9,364,800.70
conditions
compaction by power roller
Required as per site
2.9 16-03-a Granular Sub Base Course using Pit Run Gravel M³ 54,699.89 1257.96 68,810,269.54
conditions
ATR
Random rubble masonry in foundn. & plinth Dry
2.10 08-01-a M³ 28,533.91 2715.59 77,486,396.53 BOQ Item #
masonry
ATR 108
PCC 1:3:6 in mass concrete less formwork
2.11 06-36-b M³ 52,281.25 4221.30 220,694,832.40 BOQ Item #
using 40% boulders
120
ATR
Plain Cement Concrete including placing,
2.12 06-05-h M3 4,216.54 5,861.65 24,715,872.21 BOQ Item #66
compacting, finishing & curing (Ratio 1:3:6)
& #131
ATR
Plain Cement Concrete including placing,
2.13 06-05-f M³ 5,987.30 6758.12 40,462,921.54 BOQ Item #
compacting,finishing & curing (Ratio 1:2:4)
132
ATR
Plain Cement Concrete including placing,
2.14 06-05-i M³ 7,033.14 5090.88 35,804,859.90 BOQ Item #99
compacting, finishing & curing (Ratio 1:4:8)
& #133
07-30 Supplying and filling sand under floor or M3 Required as per site
2.42 670.05 1106.79 741,607.79
plugging in wells conditions
17-11-a Providing and Laying segments in Precast lining M Required as per site
2.43 4,268.82 2420.66 10,333,362.99
(Parabola type) Type A conditions
Add 8% for District Mansehra Area Cost Factor Except in NSI/Market Rate 108,388,586.404
A: Syphons (4 Nos.)
ATR
A-1 03-60-a Structural Excavation in Common Material M³ 8,220.266 315.25 2,591,438.749 BOQ Item
# 135
ATR
Plain Cement Concrete including placing, compacting,
A-2 06-05-i M3 396.326 5,090.88 2,017,646.839 BOQ Item
finishing & curing (Ratio 1:4:8)
#99 & #133
ATR
Supply & fabricate M.S. reinforcement for cement
A-4 06-07-c Tonne 207.580 103,529.94 21,490,744.945 BOQ Item #96 &
concrete (Hot rolled deformed bars Grade 40)
#127
ATR
Providing and fixing MS steel grated trash rack as per
A-6 ATR M2 113.800 13,000.00 1,479,400.000 BOQ Item
drawings and instructions of Engineer.
# 124
ATR
Structural backfill using Common Material available at
A-7 03-60-c M3 5,349.120 435.23 2,328,097.498 BOQ Item
site
# 115
Required as per
A-8 NSI Providing and installing air/water relief valves Nos. 13 78,185.55 1,016,412.207
site conditions
ATR
A-9 03-60-b Structural Excavation in Rock Material requiring blasting M3 1,404 1,629.01 2,287,651.323 BOQ Item
# 134
NSI HDPE Pipe for Syphon-1 M 975.310 174,862.00 170,544,657.220
0.000
ATR
Plain Cement Concrete including placing, compacting,
B-4 06-05-f M3 737.750 6,758.120 4,985,803.030 BOQ Item
finishing & curing (Ratio 1:2:4)
# 132
RCC in roof slab, beam, column & other structural ATR BOQ
B-5 06-06-a-03 M3 3,260.060 8,710.190 28,395,742.011
members, insitu or precast. Type C (1:2:4) Item #97 & #129
Construction of Siran Right Bank Canal
District Mansehra
BILL OF QUANTITY
Bill No. 03 Canal Affiliated Structues
MRS 2016 Item
Sr. No. Description of items Unit Quantity Rate Amount Remarks
Code
06-12-a + 06- Extra labour for laying concrete (plain or reinforced) For Required as per
B-8 M3 681.340 1,589.160 1,082,758.274
12-b every extra10' height (upto 60' height) site conditions
ATR
Supply & fabricate M.S. reinforcement for cement
B-9 06-07-c Tonne 1,069.880 103,529.940 110,764,612.207 BOQ Item #96 &
concrete (Hot rolled deformed bars Grade 40)
#127
ATR
Supplying and Fixing PVC Water Stopper 8" wide 3/8"
B-10 24-40 M 7,548.970 440.770 3,327,359.507 BOQ Item
thick
ATR # 103
Structural backfill using Common Material available at
B-11 03-60-c M3 5,862.220 435.230 2,551,414.011 BOQ Item
site
ATR # 115
PCC 1:3:6 in mass concrete less formwork using 40%
B-12 06-36-b M3 2,786.360 4,221.300 11,762,061.468 BOQ Item
boulders
ATR # 120
Erection and removal of steel Form work for RCC or
B-13 06-39-b M² 2.000 772.270 1,544.540 BOQ Item
Plain Concrete vertical
ATR # 118
Erection and removal of steel formwork for RCC or
B-14 ATR M² 10.00 47.98 479.800 BOQ Item
plain concrete vertical (Labor Rate only) (06-39-b)
# 102
Required as per
B-15 17-01-a Formation, dressing and preparing sub-grade In bed M² 327.86 69.36 22,740.66
site conditions
Required as per
B-16 17-01-b Formation, dressing and preparing sub-grade On slope M² 585.04 96.84 56,655.44
site conditions
ATR
Providing and Laying stone pitching/filling, dry hand
B-17 19-25 M3 603.671 1,676.390 1,011,988.015 BOQ Item
packed in pitching & aprons
Provide & weave GI wire netting for wire crates 6"x9" ATR # 105
B-18 19-13-a-03 mesh : 8 SWG wire M2 917.26 369.52 338,947.336 BOQ Item
ATR # 123
Supplying stone and stone filling in GI wire crate and its
B-19 19-26 sewing, excluding cost of crates M3 339.80 1,716.12 583,137.576 BOQ Item
# 122
Painting two feet wide gauges, reading to 1/10th of a Required as per
B-20 13-18 M 115.82 422.610 48,945.992
foot. site conditions
Supply and Fixing Neoprene Bearing Pad as per specs
Required as per
B-21 16-30-a & design cm3 200,000.00 1.610 322,000.000
site conditions
RCC in roof slab, beam, column & other structural ATR BOQ
C-3 06-06-a-03 M3 920.602 8,710.190 8,018,615.217
members, insitu or precast. Type C (1:2:4) Item #97 & #129
RCC in raft foundation slab, base slab of column & ret. ATR BOQ
C-4 06-06-b-03 M3 6,197.054 7,830.790 48,527,826.515
wall etc, not including in 06-06. Type C(1:2:4) Item #98 & #128
ATR
Supply & fabricate M.S. reinforcement for cement
C-5 06-07-c Tonne 726.474 103,529.940 75,211,852.034 BOQ Item #96 &
concrete (Hot rolled deformed bars Grade 40).
#127
ATR
Erection and removal of steel Form work for RCC or
C-6 06-39-b M2 3.000 772.270 2,316.810 BOQ Item
Plain Concrete vertical
# 118
ATR
Erection and removal of steel formwork for RCC or
C-7 ATR M² 15.00 47.98 719.700 BOQ Item
plain concrete vertical (Labor Rate only) (06-39-b)
# 102
Construction of Siran Right Bank Canal
District Mansehra
BILL OF QUANTITY
Bill No. 03 Canal Affiliated Structues
MRS 2016 Item
Sr. No. Description of items Unit Quantity Rate Amount Remarks
Code
ATR
PCC 1:3:6 in mass concrete less formwork using 40%
C-8 06-36-b M3 1,500.500 4,221.300 6,334,060.650 BOQ Item
boulders
ATR # 120
Provide & weave GI wire netting for wire crates 6"x9"
C-9 19-13-a-03 mesh : 8 SWG wire M2 13,582.88 369.52 5,019,147.19 BOQ Item
# 123
Construction of Siran Right Bank Canal
District Mansehra
BILL OF QUANTITY
Bill No. 03 Canal Affiliated Structues
MRS 2016 Item
Sr. No. Description of items Unit Quantity Rate Amount Remarks
Code
Supplying stone and stone filling in GI wire crate and its ATR
C-10 19-26 sewing, excluding cost of crates M3 3,062.29 1,716.12 5,255,253.09 BOQ Item
ATR # 122
Providing and Laying stone pitching/filling, dry hand
C-11 19-25 M3 1,386.820 1,676.390 2,324,852.015 BOQ Item
packed in pitching & aprons
ATR # 105
Structural backfill using Common Material available at
C-12 03-60-c M3 2,792.816 435.230 1,215,517.171 BOQ Item
site
# 115
Erecting & removing formwork to concrete in any
C-13 06-38-b shape / position (Vertical) M² 9,311.770 515.470 4,799,938.082
RCC in raft foundation slab, base slab of column & ret. ATR BOQ
D-3 06-06-b-03 M3 673.130 7,830.790 5,271,139.673
wall etc, not including in 06-06. Type C(1:2:4) Item #98 & #128
RCC in roof slab, beam, column & other structural ATR BOQ
D-4 06-06-a-03 M3 310.600 8,710.190 2,705,385.014
members, insitu or precast. Type C (1:2:4) Item #97 & #129
ATR
Supply & fabricate M.S. reinforcement for cement
D-5 06-07-c Tonne 154.470 103,529.940 15,992,269.832 BOQ Item #96 &
concrete (Hot rolled deformed bars Grade 40).
#127
ATR
Structural backfill using Common Material available at
D-6 03-60-c M3 627.350 435.230 273,041.541 BOQ Item
site
# 115
Required as per
D-7 17-01-b Formation, dressing and preparing sub-grade On slope M² 2,902.78 96.84 281,105.22
site conditions
Required as per
D-8 17-01-a Formation, dressing and preparing sub-grade In bed M² 1,340.16 69.36 92,953.50
site conditions
ATR
Providing and Laying stone pitching for top layer only :
D-9 19-28-a M3 883.210 3,052.570 2,696,060.350 BOQ Item
On slope
ATR # 107
Providing and Laying stone pitching for top layer only :
D-10 19-28-b M3 815.520 2,655.280 2,165,433.946 BOQ Item
On level
# 106
Plain Cement Concrete including placing, compacting, ATR BOQ
D-11 06-05-h M3 127.41 5,861.65 746,832.83
finishing & curing (Ratio 1:3:6) Item #66 & #131
ATR
PCC 1:3:6 in mass concrete less formwork using 40%
D-12 06-36-b M3 428.150 4,221.300 1,807,349.595 BOQ Item
boulders
ATR # 120
Erection and removal of steel Form work for RCC or
D-13 06-39-b M² 4.000 772.270 3,089.080 BOQ Item
Plain Concrete vertical
# 118
ATR
Erection and removal of steel formwork for RCC or
D-14 ATR M² 20.00 47.98 959.600 BOQ Item
plain concrete vertical (Labor Rate only) (06-39-b)
# 102
Erecting & removing formwork to concrete in any
ATR BOQ
D-15 06-38-b shape / M² 2,724.81 515.47 1,404,557.811
Item #95
position (Vertical)
RCC in raft foundation slab, base slab of column & ret. ATR BOQ
E-3 06-06-b-03 M3 89.040 7,830.790 697,253.542
wall etc, not including in 06-06. Type C(1:2:4) Item #98 & #128
RCC in roof slab, beam, column & other structural ATR BOQ
E-4 06-06-a-03 M3 68.350 8,710.190 595,341.487
members, insitu or precast. Type C (1:2:4) Item #97 & #129
ATR
Supply & fabricate M.S. reinforcement for cement
E-5 06-07-c Tonne 15.550 103,529.940 1,609,890.567 BOQ Item #96 &
concrete (Hot rolled deformed bars Grade 40)
#127
ATR
Plain Cement Concrete including placing,
E-6 06-05-f M³ 92.92 6758.12 627,964.510 BOQ Item
compacting,finishing & curing (Ratio 1:2:4)
# 132
ATR
Structural backfill using Common Material available at
E-7 03-60-c M3 150.860 435.230 65,658.798 BOQ Item
site
# 115
Total Amount Rs. 3,881,909.032
Add 8% for District Mansehra Except in NSI 310,552.723
G. Total Amount Rs. 4,192,461.755
Converting into millions 4.192
RCC in raft foundation slab, base slab of column & ret. ATR BOQ
F-3 06-06-b-03 M³ 265.486 7,830.790 2,078,962.828
wall etc, not including in 06-06. Type C(1:2:4) Item #98 & #128
ATR
Supply & fabricate M.S. reinforcement for cement
F-4 06-07-c Tonne 41.688 103,529.940 4,315,957.065 BOQ Item #96 &
concrete (Hot rolled deformed bars Grade 40).
#127
ATR
Supply and Fixing of GI Pipe as per required diameter
F-5 ATR R. Ft. 1,220 1,295.00 1,579,900.000 BOQ Item
on the direction of Engineer Incharge
# 109
ATR
Structural backfill using Common Material available at
F-6 03-60-c M3 333.399 435.230 145,105.419 BOQ Item
site
# 115
Total Amount Rs. 8,362,598.460
RCC in raft foundation slab, base slab of column & ret. ATR BOQ
G-3 06-06-b-03 M³ 9.900 7,830.790 77,524.821
wall etc, not including in 06-06. Type C(1:2:4) Item #98 & #128
ATR
Supply & fabricate M.S. reinforcement for cement
G-4 06-07-c Tonne 1.360 103,529.940 140,800.718 BOQ Item #96 &
concrete (Hot rolled deformed bars Grade 40).
#127
ATR
P/I gates for head regulator i/c hoisting device complete
G-5 ATR M2 0.730 260,000.00 189,800.000 BOQ Item
in all respect.
ATR # 116
Providing and fixing MS steel grated trash rack as per
G-6 ATR M2 0.730 13,000.00 9,490.000 BOQ Item
drawings and instructions of Engineer.
# 124
Plain woodwork for regulation karries or needles etc. Required as per
G-7 12-02-a M3 0.09 144,275.56 12,984.80
complete as per specs : Deodar wood site conditions
ATR
Structural backfill using Common Material available at
G-8 03-60-c M3 4.760 435.230 2,071.695 BOQ Item
site
# 115
Total Amount Rs. 440,408.915
Add 8% for District Mansehra Area Cost Factor Except in NSI 19,289.513
G. Total Amount Rs. 459,698.428
Converting into millions 0.460
H: Escape Regulator (03 Nos.)
ATR
H-1 03-60-a Structural Excavation in Common Material M3 339.800 315.250 107,121.950 BOQ Item
# 135
ATR
Plain Cement Concrete including placing, compacting,
H-2 06-05-i M3 12.740 5,090.880 64,857.811 BOQ Item
finishing & curing (Ratio 1:4:8)
#99 & #133
RCC in raft foundation slab, base slab of column & ret. ATR BOQ
H-3 06-06-b-03 M³ 407.760 7,830.790 3,193,082.930
wall etc, not including in 06-06. Type C(1:2:4) Item #98 & #128
ATR
Supply & fabricate M.S. reinforcement for cement
H-4 06-07-c Tonne 64.030 103,529.940 6,629,022.058 BOQ Item #96 &
concrete (Hot rolled deformed bars Grade 40).
#127
ATR
Supplying stone and stone filling in GI wire crate and its
H-5 19-26 M3 89.336 1,716.120 153,310.553 BOQ Item
sewing, excluding cost of crates
#122
ATR
Provide & weave GI wire netting for wire crates 6"x9"
H-6 19-13-a-03 M2 6.98 369.52 2,579.25 BOQ Item
mesh : 8 SWG wire
# 123
ATR
P/I gates for head regulator i/c hoisting device complete
H-7 ATR M2 6.980 260,000.00 1,814,800.000 BOQ Item
in all respect.
# 116
Plain woodwork for regulation karries or needles etc. Required as per
H-8 12-02-a M3 0.88 144,275.56 126,962.49
complete as per specs : Deodar wood site conditions
ATR
Structural backfill using Common Material available at
H-9 03-60-c M3 101.940 435.230 44,367.346 BOQ Item
site
# 115
Add 8% for District Mansehra Area Cost Factor Except in NSI 825,704.351
MRS 2016
Sr. No. Description of Items Unit Qty Rate Amount Remarks
Item Code
Providing and fixing stainless steel sink with drain board ATR
4.1.1 14-06-b Each 3.00 2585.8 7,757.40
size 18"x36" including set of brackets, waste pipe etc BOQ Item #1
ATR
4.1.3 23-11 Soakage pit ( 6' dia x 15' deep ) complete. No 4.00 16376.25 65,505.00
BOQ Item #3
Providing and installing PVC tees BSS Class 'B'working ATR
4.1.4 24-27-a-02 Each 20.00 500.45 10,009.00
pressure : 3" i/d BOQ Item #4
Providing and installing PVC bends BSS Class ATR
4.1.5 24-26-c-02 Each 15.00 291.54 4,373.10
'D'working pressure : 3" i/d BOQ Item #5
Providing and Laying cut, joint, test, disinfect PVC pipe ATR
4.1.6 24-18-c-05 R. M 15.00 699.29 10,489.35
line BSS Class 'D' working pressure : 3" i/d BOQ Item #6
Providing and installing PVC tees BSS Class 'B'working ATR
4.1.7 24-27-a-03 Each 10.00 687.85 6,878.50
pressure : 4" i/d BOQ Item #7
Providing and installing PVC bends BSS Class ATR
4.1.8 24-26-c-03 Each 10.00 438.29 4,382.90
'D'working pressure : 4" i/d BOQ Item #8
Providing and Laying cut, joint, test, disinfect PVC pipe ATR
4.1.9 24-18-c-06 R. M 60.00 788.7 47,322.00
line BSS Class 'D' working pressure : 4" i/d BOQ Item #9
Providing and installing PVC sockets BSS Class ATR
4.1.10 24-28-a-04 Each 5.00 1360.3 6,801.50
'B'working pressure : 6" i/d BOQ Item #10
Providing and installing PVC bends BSS Class ATR
4.1.11 24-26-a-04 Each 5.00 920.87 4,604.35
'B'working pressure : 6" i/d BOQ Item #11
Providing and Laying cut, joint, test, disinfect PVC pipe ATR
4.1.12 24-18-a-03 R. M 110.00 914.2 100,562.00
line BSS Class 'B'working pressure : 6" i/d BOQ Item #12
Providing and Fixing of poly dex high pressure
ATR
4.1.13 14-71-b PPR(green including testing ect complete 20 R. M 115.00 399.64 45,958.60
BOQ Item #13
mm(including all special etc)
Providing and Fixing of poly dex high pressure
ATR
4.1.14 14-71-a PPR(green including testing ect complete 25 R. M 100.00 427.66 42,766.00
BOQ Item #14
mm(including all special etc)
Supply and Fixing CI manhole cover with frame etc ATR
4.1.15 14-37-b Each 7.00 1909.96 13,369.72
complete 18" dia BOQ Item #15
Providing and fixing CI main hole cover with frame etc ATR
4.1.16 14-37-a No 7.00 1110.86 7,776.02
complete 12" dia BOQ Item #16
Providing and Fixing CI floor trap including CI grating & ATR
4.1.17 14-31-b Each 4.00 793.8 3,175.20
concrete chamber all round : 4"x3" BOQ Item #17
ATR
4.1.18 14-26-b Providing and fixing CP shower rose : 3/4"x6". No 3.00 665.13 1,995.39
BOQ Item #18
Providing and fixing gun metal peet / gate valve ATR
4.1.19 14-28-a No 2.00 1331.8 2,663.60
(screwed ) 1" dia. BOQ Item #19
Providing and Fixing CP mixing valve for WHB, sink or ATR
4.1.20 14-27 No 3.00 2129.13 6,387.39
shower BOQ Item #20
Providing and Fixing CP or brass oxidized swan-neck ATR
4.1.21 14-29-b Each 3.00 2320 6,960.00
cock 1/2" dia : Double way BOQ Item #21
ATR
4.1.22 14-25 Providing and Fixing 1/2" CP tee stop cock Each 6.00 567.53 3,405.18
BOQ Item #22
Providing and Fixing glazed earthen ware soap dish ATR
4.1.23 14-14-b Each 4.00 421.13 1,684.52
Coloured BOQ Item #23
Providing and fixing best quality 5mm glass mirror ATR
4.1.24 14-17 No 3.00 914.81 2,744.43
22"x16" size BOQ Item #24
ATR
4.1.25 14-16-a Providing and fixing CP rail :24" long, 3/4" dia. No 3.00 787.13 2,361.39
BOQ Item #25
ATR
4.1.26 14-15 Providing and fixing CP tailot paper holder. No 3.00 286.92 860.76
BOQ Item #26
ATR
4.1.27 14-13 Providing and fixing CP soap dish. No 3.00 537.03 1,611.09
BOQ Item #27
Providing and Fixing glazed earthen ware low down ATR
4.1.28 14-10-b Each 3.00 2781 8,343.00
flushing cistern 3 gallons capacity : Coloured BOQ Item #28
ATR
4.1.30 14-78 Supply and Fixing low level plastic flushing cistern Each 3.00 1001.2 3,003.60
BOQ Item #30
Construction of Siran Right Bank Canal
District Mansehra
BILL OF QUANTITIES
Bill No. 4: BUILDING-I (SUB-ENGINEER OFFICE CUM RESIDENCE)
MRS 2016
Sr. No. Description of Items Unit Qty Rate Amount Remarks
Item Code
MRS 2016
Sr. No. Description of Items Unit Qty Rate Amount Remarks
Item Code
Heads for cast iron rain water down pipe fixed in place ATR
4.1.63 09-20 Each 9.00 1832.34 16,491.06
including cost of clamp holdfast and painting BOQ Item #64
Cast iron rain water down pipe fixed in position excluding ATR
4.1.64 09-19-a R. M 36.59 2212.05 80,928.66
heads & shoes : 4" dia BOQ Item #65
ATR
Plain Cement Concrete including placing, compacting,
4.1.65 06-05-h M3 19.62 5861.65 115,027.43 BOQ Item #66
finishing & curing (Ratio 1:3:6)
& #131
Preparing surface & painting with snowcem / ATR
4.1.66 13-38-b M2 293.73 85.56 25,131.26
weathershield paint : 2nd & subsequent coats BOQ Item #67
Preparing surface & painting with snowcem / ATR
4.1.67 13-38-a M2 293.73 166.86 49,011.25
weathershield paint : First coat BOQ Item #68
ATR
4.1.68 11-23-a-03 Distember New surface: three coats. M² 1,378.36 79.31 109,317.39
BOQ Item #69
ATR
4.1.69 11-25-a-03 White washing: New surface : Three coats M2 1,378.36 40.16 55,354.76
BOQ Item #70
ATR
4.1.70 11-22 Priming coat of chalk under distemper M2 1,378.36 19.34 26,657.40
BOQ Item #71
MRS 2016
Sr. No. Description of Items Unit Qty Rate Amount Remarks
Item Code
ATR
Supply fabricate M.S reinforcement for cement concrete BOQ
4.1.95 06-07-c TON 10.96 103529.94 1,134,428.82
( hot rolled deformed bars Grade 40) Item #96 &
#127
ATR
RCC in roof slab , beam , column and other structural
4.1.96 06-06-a-03 M³ 67.52 8710.19 588,150.85 BOQ Item #97
member , in sithu or precast.type C 1:2:4.
& #129
ATR
RCC in raft foundation slab, base slab of column & ret.
4.1.97 06-06-b-03 M3 2.26 7830.79 17,675.67 BOQ Item #98
wall etc, not including in 06-06. Type C(1:2:4)
& #128
ATR
Plain Cement Concrete including placing, compacting, BOQ
4.1.98 06-05-i M3 34.51 5090.88 175,694.88
finishing & curing (Ratio 1:4:8) Item #99 &
#133
Excavation in foundation of building bridges etc ATR
4.1.99 03-23-d M³ 101.20 273.34 27,661.72
complete in Shingle gravel. BOQ Item #100
Required as
4.1.100 14-69-a-02 P/F Fiber glass Water Tank 400 gallons. No. 1.00 9,379.42 9,379.42
per site
Supply and fixing of 2.0 HP Monoblock water pump
Required as
4.1.101 14-80-a 1.5"x1.25" 3 stage model DE-S3 (Deen Pump) single No. 1.00 22,790.62 22,790.62
per site
phase for 150 ft head with all accessories.
Making and fixing steel grated doors, complete with Required as
4.1.102 25-30 M2 8.75 8,088.33 70,772.89
locking arrangements & angle iron frame per site
Total Amount Rs. 8,388,420.02
MRS 2016
Sr. No. Description of Items Unit Qty Rate Amount Remarks
Item Code
Providing and fixing stainless steel sink with drain board ATR
4.2.1 14-06-b Each 1.00 2585.8 2,585.80
size 18"x36" including set of brackets, waste pipe etc BOQ Item #1
MRS 2016
Sr. No. Description of Items Unit Qty Rate Amount Remarks
Item Code
ATR
Providing and Fixing glazed earthen ware soap dish
4.2.23 14-14-b Each 2.00 421.13 842.26 BOQ Item
Coloured
#23
ATR
Providing and fixing best quality 5mm glass mirror
4.2.24 14-17 No 2.00 914.81 1,829.62 BOQ Item
22"x16" size
#24
ATR
4.2.25 14-16-a Providing and fixing CP rail :24" long, 3/4" dia. No 2.00 787.13 1,574.26 BOQ Item
#25
ATR
4.2.26 14-15 Providing and fixing CP tailot paper holder. No 2.00 286.92 573.84 BOQ Item
#26
ATR
4.2.27 14-13 Providing and fixing CP soap dish. No 2.00 537.03 1,074.06 BOQ Item
#27
ATR
Providing and Fixing glazed earthen ware low down
4.2.28 14-10-b Each 2.00 2781 5,562.00 BOQ Item
flushing cistern 3 gallons capacity : Coloured
#28
ATR
Providing and Fixing glazed earthen ware WC European
4.2.29 14-01-b Each 2.00 5118.63 10,237.26 BOQ Item
type excluding cost of seat & cover : Coloured
#29
ATR
4.2.30 14-78 Supply and Fixing low level plastic flushing cistern Each 2.00 1001.2 2,002.40 BOQ Item
#30
ATR
Providing and Fixing glazed earthen ware WC squatting
4.2.31 14-03-b Each 2.00 1719.75 3,439.50 BOQ Item
type with built-in foot rests : Coloured
#31
ATR
Providing and Fixing angle iron brackets for : WHB and
4.2.32 14-46-a Each 2.00 246 492.00 BOQ Item
cistern
#32
ATR
Providing and Fixing glazed earthen ware WHB
4.2.33 14-05-a-02 Each 2.00 3012.8 6,025.60 BOQ Item
complete Size 22"x16" : Coloured with pedestal
#33
ATR
Energy saver 32 Watts (Phillips or eq) with down light /
4.2.34 ATR No. 5.00 450 2,250.00 BOQ Item
simple holder and extra accessories etc as specified
#34
ATR
4.2.35 ATR Supply and erection plastic box size 7"x4" No. 7.00 600 4,200.00 BOQ Item
#35
ATR
4.2.36 ATR Supply and erection plastic box size 4"x4" No. 7.00 500 3,500.00 BOQ Item
#36
ATR
Supply and Erection gate-light fitting complete with
4.2.37 15-63-a Each 6.00 796.65 4,779.90 BOQ Item
holder & 160-Watt mercury blended lamp: Small
#37
ATR
Earthing of iron clad/aluminium switches etc with GI wire
4.2.38 15-41 Job 1.00 5822.66 5,822.66 BOQ Item
#8 SWG in GI pipe 0.5" dia
#38
Supply and Erection 2'x2'x1/8" copper plate including ATR
4.2.39 15-42 rivetting to copper tape & placing in mixture of salt and Each 1.00 9231.69 9,231.69 BOQ Item
charcol etc #39
ATR
Supply and Erection single phase imported auto circuit
4.2.40 15-71-d Each 1.00 624.94 624.94 BOQ Item
breaker 30 Amp.
#40
ATR
Supply and Erection single phase imported auto circuit
4.2.41 15-71-c Each 3.00 472.44 1,417.32 BOQ Item
breaker 20 Amp
#41
ATR
Supply and Erection single phase imported auto circuit
4.2.42 15-71-b Each 4.00 472.44 1,889.76 BOQ Item
breaker 15 Amp
#42
Construction of Siran Right Bank Canal
District Mansehra
BILL OF QUANTITIES
Bill No. 4: BUILDING-II (CHOWKIDAR HUT)
MRS 2016
Sr. No. Description of Items Unit Qty Rate Amount Remarks
Item Code
ATR
Supply and Erection transpower auto circuit breaker
4.2.43 15-70-a Each 2.00 2006.25 4,012.50 BOQ Item
3-phase, 400V fungus moisture proofing : 30 Amp.
#43
ATR
Supply and Erection transpower auto circuit breaker
4.2.44 15-70-c Each 1.00 5238.94 5,238.94 BOQ Item
3-phase, 400V fungus moisture proofing : 100 Amp
#44
ATR
Supply and Erection single core PVC insulated copper
4.2.45 15-05-e R. M 10.00 164.83 1,648.30 BOQ Item
conductor 250/440 V grade cable : 7/0.044"
#45
ATR
Supply and Erection single core PVC insulated copper
4.2.46 15-05-c R. M 100.00 69.5 6,950.00 BOQ Item
conductor 250/440 V grade cable : 7/0.029"
#46
ATR
Supply and Erection single core PVC insulated copper
4.2.47 15-05-a R. M 125.00 42.14 5,267.50 BOQ Item
conductor 250/440 V grade cable : 3/0.029"
#47
ATR
Supply and Erection white round globe with holder,
4.2.48 15-56-c Each 1.00 221.43 221.43 BOQ Item
gallery & 100 Watt bulb complete : 10" dia.
#48
ATR
Supply and Erection PVC pipe for wiring purpose
4.2.49 15-02-b-03 R. M 40.00 275.83 11,033.20 BOQ Item
complete Recessed in walls including chase etc : 1" i/d
#49
ATR
Supply and Erection PVC pipe for wiring purpose
4.2.50 15-02-b-02 R. M 40.00 302.02 12,080.80 BOQ Item
complete Recessed in walls including chase etc : 3/4" i/d
#50
ATR
Floor S/E cubical type factory fabricated floor / wall
4.2.51 15-75-b No 1.00 38157.65 38,157.65 BOQ Item
mounted main board steel complete recessed.
#51
ATR
S/E best quality ceilling fan complete with G-I rod
4.2.53 15-68-c No 5.00 3845.53 19,227.65 BOQ Item
conopy blade & regulator 56" sweep.
#53
ATR
Supply and Erection girder clamp hook, 5/8" dia.for
4.2.54 15-25 Each 3.00 318.11 954.33 BOQ Item
hanging ceiling fans
#54
ATR
4.2.56 15-24-b S/E tube light rod and choke complete 40 watt. No 4.00 454.14 1,816.56 BOQ Item
#56
ATR
4.2.57 15-82 Supply and Fixing Asia porcelin power plug 30 Amp Each 10.00 151.88 1,518.80 BOQ Item
#57
ATR
Wiring of 2/3 pin 5 AMP plug point in 3/029 pvc insulated
4.2.58 15-51 No 10.00 368.80 3,688.00 BOQ Item
cable in pvc pipe recessed.
#58
ATR
Wiring of light / fan / call bell point in 3-29 pvc insulated
4.2.59 15-50 No 30.00 850.55 25,516.50 BOQ Item
cable in pvc pipe recessed.
#59
ATR
Making and fixing grating in opening, including fixing at
4.2.60 25-32 M2 20.00 2344.44 46,888.80 BOQ Item
site with flat iron 2"x3/8" and 3/4" sq. bars
#61
Construction of Siran Right Bank Canal
District Mansehra
BILL OF QUANTITIES
Bill No. 4: BUILDING-II (CHOWKIDAR HUT)
MRS 2016
Sr. No. Description of Items Unit Qty Rate Amount Remarks
Item Code
ATR
Filling, watering and ramming earth under floor with
4.2.61 03-16-a M3 25.47 103.3 2,631.20 BOQ Item
surplus earth from foundation, etc
#62
ATR
Shoes, bends or offsets for cast iron ran water down
4.2.62 09-21 Each 8.00 1747.97 13,983.76 BOQ Item
pipe, including fixing & painting
#63
ATR
Heads for cast iron rain water down pipe fixed in place
4.2.63 09-20 Each 8.00 1832.34 14,658.72 BOQ Item
including cost of clamp holdfast and painting
#64
ATR
Cast iron rain water down pipe fixed in position excluding
4.2.64 09-19-a R. M 18.29 2212.05 40,464.33 BOQ Item
heads & shoes : 4" dia
#65
ATR
Plain Cement Concrete including placing, compacting,
4.2.65 06-05-h M3 36.16 5861.65 211,958.86 BOQ Item
finishing & curing (Ratio 1:3:6)
#66 & #131
ATR
Preparing surface & painting with snowcem /
4.2.66 13-38-b M2 122.49 85.56 10,480.30 BOQ Item
weathershield paint : 2nd & subsequent coats
#67
ATR
Preparing surface & painting with snowcem /
4.2.67 13-38-a M2 137.10 166.86 22,876.57 BOQ Item
weathershield paint : First coat
#68
ATR
4.2.68 11-23-a-03 Distember New surface: three coats. M² 609.59 79.31 48,346.58 BOQ Item
#69
ATR
4.2.69 11-25-a-03 White washing: New surface : Three coats M2 609.59 40.16 24,481.13 BOQ Item
#70
ATR
4.2.70 11-22 Priming coat of chalk under distemper M2 609.59 19.34 11,789.47 BOQ Item
#71
Providing and Fixing terrace railing of 2" i/d conduit pipe ATR
4.2.71 25-33 16 SWG welded with 5/8"x5/8" sq bar 2.75' high M2 20.00 3368.16 67,363.20 BOQ Item
complete #72
ATR
MS flat 1/2"x1/8" grill in windows of approved design
4.2.72 12-50 M2 18.40 3073.3 56,553.29 BOQ Item
including painting 3 coats, complete
#73
ATR
4.2.73 13-08-a French polishing complete : on new work . M² 121.00 671.13 81,206.73 BOQ Item
#74
ATR
Varnishing wood work, including cleaning & preparing
4.2.74 13-09-c M2 121.00 53.44 6,466.24 BOQ Item
surface : Third coat
#75
ATR
Varnishing wood work, including cleaning & preparing
4.2.75 13-09-b M2 121.00 61.53 7,445.13 BOQ Item
surface : Second coat
#76
ATR
Varnishing wood work, including cleaning & preparing
4.2.76 13-09-a M2 121.00 93.65 11,331.65 BOQ Item
surface : First coat
#77
ATR
4.2.77 12-17-b P/F hydraulic Door Closer (Best Quality) Each 6.00 1682.5 10,095.00 BOQ Item
#78
Construction of Siran Right Bank Canal
District Mansehra
BILL OF QUANTITIES
Bill No. 4: BUILDING-II (CHOWKIDAR HUT)
MRS 2016
Sr. No. Description of Items Unit Qty Rate Amount Remarks
Item Code
ATR
Providing and fixing sliding bolt to doors Brass sliding
4.2.78 12-18-c-01 Each 6.00 1121.05 6,726.30 BOQ Item
bolts : 10" long
#79
ATR
Providing and fixing sliding bolt to doors Brass sliding
4.2.79 12-18-c-02 Each 6.00 1426.05 8,556.30 BOQ Item
bolts : 12" long
#80
ATR
Provide & fix wooden box type wardrobe 22" deep
4.2.80 12-23-b M2 11.15 10896.4 121,521.19 BOQ Item
Deodar wood boxing & deodar shelves etc
#81
ATR
Supply and Fixing aluminium door/window, Economy
4.2.81 12-53-a-01 M2 18.40 7334.76 134,970.49 BOQ Item
model Sliding window
#82
ATR
Deodar wood framed, braced & battened doors &
4.2.82 12-08-b M2 11.71 8858.29 103,730.91 BOQ Item
windows: 1.75" thick, 1" battens & 3/4" planks
#83
ATR
Provide & fix chowkat for doors, windows & CS windows,
4.2.83 12-24-c M2 14.31 2758.6 39,481.82 BOQ Item
including holdfast etc : Deodar wood
#84
ATR
Providing and fixing glazed tile colour printed border 3"
4.2.84 10-26-g R. M 24.47 636.89 15,581.90 BOQ Item
wide
#85
ATR
Glazed tile 1/4" thick dado jointed in white cement
4.2.85 10-38-c M2 59.20 1542.43 91,313.00 BOQ Item
complete : Printed tiles
#86
ATR
Cement pointing struck joints, on walls, upto 20' height :
4.2.86 11-18-b M2 213.38 225.48 48,113.58 BOQ Item
Ratio 1:3
#87
ATR
1.375" thick mosaic flooring, including rubbing and
4.2.87 10-21-a M2 117.00 1117.03 130,692.51 BOQ Item
polishing complete : Using grey cement
#88
ATR
Pacca brick work in ground floor Cement, sand mortar
4.2.91 07-05-a-05 M3 64.66 8003.98 517,539.95 BOQ Item
1:6
#92
ATR
Pacca brick work in foundation and plinth in Cement,
4.2.93 07-04-a-05 M3 21.81 7433.74 162,164.90 BOQ Item
sand mortar 1:6
#94
Single layer of tiles 10"x5"x1.25" laid over 4" earth and Required as
4.2.94 09-05 M2 127.01 1261.92 160,278.87
1" mud plaster on top of RC roof slab per site
Construction of Siran Right Bank Canal
District Mansehra
BILL OF QUANTITIES
Bill No. 4: BUILDING-II (CHOWKIDAR HUT)
MRS 2016
Sr. No. Description of Items Unit Qty Rate Amount Remarks
Item Code
ATR
Supply fabricate M.S reinforcement for cement concrete
4.2.95 06-07-c TON 2.39 103529.94 246,959.59 BOQ Item
( hot rolled deformed bars Grad 40)
#96 & #127
ATR
RCC in roof slab , beam , column and other structural
4.2.96 06-06-a-03 M³ 12.57 8710.19 109,527.59 BOQ Item
member , in sithu or precast.type C 1:2:4.
#97 & #129
ATR
RCC in raft foundation slab, base slab of column & ret.
4.2.97 06-06-b-03 M3 2.62 7830.79 20,489.06 BOQ Item
wall etc, not including in 06-06. Type C(1:2:4)
#98 & #128
ATR
Plain Cement Concrete including placing, compacting,
4.2.98 06-05-i M 3
24.36 5090.88 124,038.91
finishing & curing (Ratio 1:4:8) BOQ Item #99
& #133
ATR
Excavation in foundation of building bridges etc
4.2.99 03-23-d M³ 153.25 273.34 41,889.53 BOQ Item
complete in Shingle gravel.
#100
Required as
4.2.100 14-69-a-01 P/F Fiber glass Water Tank 300 gallons. No. 1.00 7884.51 7,884.51
per site
Supply and fixing of 2.0 HP Monoblock water pump
Required as
4.2.101 14-80-a 1.5"x1.25" 3 stage model DE-S3 (Deen Pump) single No. 1.00 22790.62 22,790.62
per site
phase for 150 ft head with all accessories.
Making and fixing steel grated doors, complete with Required as
4.2.102 25-30 M2 5.00 8,088.33 40,441.65
locking arrangements & angle iron frame per site
Project Office
Allocation as
S. No Name of item/Particular requirements for 5 Remarks
per PC-I
Years
Project Office
Allocation as
S. No Name of item/Particular requirements for 5 Remarks
per PC-I
Years
Provide , Place & compact shoulder material (sandy / silty gravel) in Dam Embankment, of specified grading, leveling/dressing i/c haulage for
1.2
obtaining of 95% modified AASHTHO dry density.
1.3 Supply & fill new synthetic fibre/plastic bags 4-5 cft capacity with sand or earth,sewing, stacking : in dry
Sand bags
Total Length (ft) Slope Width (ft) Depth (ft) Volume (cft)
1533.23 36.06 3 165864.821
No. of bags 165864.821 / 5.000
33173 bags
16587 Take 50%
1.4 Supply & fill new synthetic fibre/plastic bags 4-5cft capacity with sand or earth,sewing, stacking : Under water
1.5 Supplying clean and screened river or pit sand within 150m including removal of loose earth or overburden.
Excavation for core trench of Dam Embankment /Spillway/Intake & Outlet Structure and Irrigation System upto a minimum depth of 35 ft in shingle
1.6
gravel including removing of excavated material by machinery in 1 KM radius
Start 0
0+100 134.93 67.465 100 6746.5
0+200 111.9 123.415 100 12341.5
0+300 213.12 162.51 100 16251
0+400 233.81 223.465 100 22346.5
0+434.77 0 116.905 34.77 4064.78685
Total Quantity (cft) 61750.28685
Total Quantity (m3) 1748.572
Total Quantity of earth work for Diversion Weir and Marginal Bund (m3) 47028.342
Take 85% of the total excavation qty 39974.090883
1.7 Rock Excavation, dressing & disposal up to 50m Medium hard rock, requiring occasional blasting
cub. M.
Take 15% of total excavation (Item 1.6) = 47028.342 x 0.150 = 7054.251 cub. M.
1.8 Plain Cement Concrete including placing, compacting, finishing & curing (Ratio 1:4:8)
1.9 Provide & weave GI wire netting for wire crates 6"x9" mesh : 8 SWG wire
Description Length
Gabion R/Wall Left & Right Upstream of Weir 598 ft
Gabion R/Wall Left & RightDownstream of Weir 215 ft
Total Length of Gabion Retaining Wall 813 ft
1.10 Supply & fill bricks in wire crates including sewing crates, excl cost of crates: Stone orboulders
Reinforced cement concrete work as in dams, spillways, weirs, barrages, cross drainage works and other hydraulic
structures using crushed stone aggregate(screening & washing) and coarse sand i/c costof all labour and material
1.11 and all kinds of form works, moulds, shuttering lifting/pumping, curing, rendering and finishing the exposed surface,
cast in situ/precast excluding the cost of steel reinforcement and labour for bending binding also excludig cost of
additives which have to be paid separately. Type C (1:2:4)
1.12 Supply & fabricate M.S. reinforcement for cement concrete (Hot rolled deformed bars Grade 60)
= 1031674.56651 lbs
OR 468.09 tonnes
1.14 PCC 1:3:6 in mass concrete less formwork using 40% boulders
1.15 Plain Cement Concrete including placing, compacting, finishing & curing (Ratio 1:3:6)
Area Length Volume
Description Length Width Thickness Qty
(ft) (ft) (ft) (cft)
1.16 Providing & Laying precast PCC blocks of ratio 1:2:4 having size 2' x 2' x 1'.
Block size i/c space for filling bajri = 2 +0.25 = 2.25ft square
1.17 Providing and Laying expansion joint of neoprene strip 4"x1/4" and plastic bitumen
Weir Joints (20'x20') Length Width Along length Along Width Total
171.5 210 1801 1801 3602 In R. ft.
1098 In R. m.
Construction of Siran Right Bank Canal
District Mansehra
Off-take Structure & Head Regulator
BOQ Item Description Calculations
1.18 Supply & fabricate M.S. reinforcement for cement concrete (Hot rolled deformed bars Grade 40)
1.19 Providing and Laying cut, joint, test & disinfect GI pipe line Using light quality GI Pipe : 1" i/d
1.21 Levelling and dressing stone filling under blocks and grouting with shingle
1.22 Boring for Cast-in-place RCC Piles in Alluvial Soils : Dia up to 760mm
Form Work for Mass Concrete in under sluice 8 1.5 32 384.000 Below undersluice
Form Work for Mass Concrete in Wier 8 1.5 182 2184.000 Below weir
Marginal Retaining wall 2 434.77 17 14782.180 sq. ft
Total 17350.180 sft
Total 1614.570 sq. m
1.25 P/I gates for head regulator & Under Sluice i/c hoisting device complete in all respect.
1.26 Providing and fixing MS steel grated trash rack as per drawings and instructions of Engineer.
Trashrack (8'x3') 1 8 3 24
1.27 Plain woodwork for regulation karries or needles etc. complete as per specs : Deodar wood
1.28 Filling and Compacting Soil, Earth and Boulders behind retaining walls (Available material)
Start 0
0+100 127.73 63.865 100 6386.5
0+200 207.18 167.455 100 16745.5
0+300 148.89 178.035 100 17803.5
0+400 141.91 145.4 100 14540
0+434.77 0 70.955 34.77 2467.105
Total Quantity (cft) 57942.605
Total Quantity (m3) 1640.750
1.29 Supplying and Fixing PVC Water Stopper 8" wide 3/8" thick
1.30 Supply & fill bricks in wire crates including sewing crates, excl cost of crates: Stone orboulders
Excavation for core trench of Dam Embankment/Spillway/Intake & Outlet Structure and Irrigation System
2.2 upto design depth in Soft Rock/Shale requiring 20% blasting including removing of excavated material from
outside of the structure area
Total excavation (in cub. M.) 1136820.482
Excavation for core trench of Dam Embankment/Spillway/Intake & Outlet Structure and Irrigation System
2.3 upto a minimum depth of 35 ft in shingle gravel including removing of excavated material by machinery in
1 km radius
Total excavation (in cub. M.) 1136820.482
Excavation for core trench of Dam Embankment/Spillway/Intake & Outlet Structure and Irrigation System
2.4 upto design depth in Medium Hard Rock requiring 50% blasting including removing of material outside of
the structure area
Total excavation (in cub. M.) 1136820.482
Take 11.25% excavation in medium hard rock 127892.304 SRBC Irrigation Canal
Cut & Fill Quantities
Excavation for core trench of Dam Embankment/Spillway/Intake & Outlet Structure and Irrigation System
2.5 upto design depth in Hard Rock requiring 75% blasting including removing of material outside of the
structure area
2.9 Formation of Embankment from Roadway Excavation in Common Material including compaction by power
roller
Total fill (in cub. M.) 116600.893
54699.89 cub. M
2.12 PCC 1:3:6 in mass concrete less formwork using 40% boulders
2.13 Plain Cement Concrete including placing, compacting, finishing & curing (Ratio 1:3:6)
2.14 Plain Cement Concrete including placing, compacting,finishing & curing (Ratio 1:2:4)
Sewerage Drain 0
PCC (1:2:4) in canal bed 5,987.30 Cub. M.
SRBC Irrigation Canal
Concrete Quantities
2.15 Plain Cement Concrete including placing, compacting, finishing & curing (Ratio 1:4:8)
PCC (1:4:8) under canal RCC sections 961.377 SIRAN RBC RCC
Sewerage Drain 30.33 Quantities
Total PCC (1:4:8) 7,033.14 Cub. M.
2.16 RCC in roof slab , beam , column and other structural member , in situ or precast. Type C 1:2:4.
2.17 RCC in raft foundation slab, base slab of column & ret. wall etc, not including in 06-06. Type C (1:2:4)
Construction of Siran Right Bank Canal
District Mansehra
Irrigation Canal
BOQ Item Description Measurement
No. Sheet Reference
Total RCC in canal conduit (Bottom slab and side walls) 7,789.31 Cub. M.
Construction of Siran Right Bank Canal
District Mansehra
Irrigation Canal
BOQ Item Description Measurement
No. Sheet Reference
2.18 Supply & fabricate M.S. reinforcement for cement concrete (Hot rolled deformed bars Grade 60)
2.20 P/I gates for head regulator & Under Sluice i/c hoisting device complete in all respect.
2.23 Providing and Laying stone pitching for top layer only : On slope
2.24 Erecting & removing formwork for RCC or plain concrete Vertical
Formwork in canal plum concrete sections 127,260.70 sq. m SRBC Irrigation Canal
Concrete Quantities
Formwork in RRM retaining walls for band & coping 8800.244 sq. m
2.25 Providing and Laying cut, joint, test, disinfect PVC pipeline BSS Class 'B' working pressure : 3" i/d
Total 18,273.88 m
Filter granular backfill behind retaining wall (stone/boulder filling upto one meter to prevent choking of
2.26
weep holes)
Construction of Siran Right Bank Canal
District Mansehra
Irrigation Canal
BOQ Item Description Measurement
No. Sheet Reference
RRM Walls 394.323 Cub. M.
SRBC RRM & Plum
Concrete Retaining
Wall Quantities
Plum Walls (Main canal) 112.571 Cub. M.
2.32 17-02 Stabilized layer of cement, sand mortar 1:30 2" thick
134974.71 sq.m
4" thick PCC lining, using washed screened &
2.33 17-10-a-01 graded/curshed stone aggregate : in bed : Ratio 1:2:4
3836.12 Cub. M.
4" thick PCC lining, using washed screened &
2.34 17-10-b-01 graded/curshed stone aggregate : On slope : Ratio 1:2:4
9055.14 Cub. M.
Carriage of surplus materials i/c loading/unloading to specified disposal site as per instructions of Engineer
2.35 ATR
0.36 Job
2.36 07-30 Supplying and filling sand under floor or plugging in wells
670.05 Cub. M.
2.37 17-11-a Providing and Laying segments in Precast lining (Parabola type) Type A
4268.82 M.
2.38 06-03-e Cement Concrete (brick/stone ballast, 1.5" to 2"/nullah
shingle well graded and cleaned) in foundation & plinth
(Ratio 1:6:18) 7638.08041
Construction of Siran Right Bank Canal
District Mansehra
Main Canal & Minor Concrete Quantities
Reach Length Deductions Net length
Syphons Aqueducts Conduits
06+920 to 20+000 13080 3500 1724 0 7856
20+000 to 24+235 4235 0 0 4235
24+235 to 27+445 3210 155 100 2955
27+445 to 30+020 2575 0 255 2320
30+020 to 31+000 980 100 0 880
31+000 to 44+100 13100 1514 820 10766
44+100 to 65+200 +195 new aligen 21295 350 279.71 785 19880.29
65+200 to 68+835 3635 0 3635
68+835 to 70+315 1480 0 100 1380
70+315 to 73+050 2735 0 0 2735
73+050 to 82+700 9650 1005 0 550 8095
82+700 to 87+050 4350 169.23 0 4180.77
87+050 to 91+642 4592 0 250 4342
91+642 to 98+500 6858 77 1089 5692
98+500 to 110+000 11500 2010 0 268 9222
110+000 to 128+150 18150 431 600 17119
128+150 to 136+600 8450 96 930 7424
136+600 to 143+750 7150 2631 0 4519
143+750 to 150+200 6450 257 184 6009
150+200 to 156+300 6100 91 250 5759
156+300 to 161+400 5100 794 50 4256
161+400 to 172+600 11200 1074 200 9926
172+600 to 174+400 1800 1048 100 652
174+400 to 176+000 1600 0 0 1600
176+000 to 179+150 3150 437 618 2095
179+150 to 180+650 1500 0 0 1500
180+650 to 182+350 1700 0 0 1700
182+350 to 183+150 800 0 30 770
183+150 to 185+322 2172 162 0 2010
BOQ Item No. Description
4 Erection and removal of steel Form work for RCC or Plain Concrete
vertical
Reach No. Faces Length Depth Volume
(ft) (ft) (sft)
4 Supply & fabricate M.S. reinforcement for cement concrete (Hot rolled
deformed bars Grade 40)
11+475
242 Aqueduct
12+049
243
244 12+050 0.00 60.02 30.01 0.00
245 12+200 150.00 60.02 60.02 9003.30
246 12+300 100.00 60.02 60.02 6002.20
247 12+540 240.00 60.02 60.02 14405.28
248 12+583 43.00 64.97 62.50 2687.33
249 12+640 57.00 29.94 47.45 2704.82
250 12+695 55.00 58.79 44.36 2439.86
251 12+735 40.00 71.46 65.12 2604.96
252 12+760 25.00 57.93 64.70 1617.38
253 12+810 50.00 114.88 86.40 4320.23
254 12+860 50.00 219.69 167.29 8364.25
255 12+900 40.00 111.76 165.72 6628.90
256 12+925 25.00 142.22 126.99 3174.69
257 12+960 35.00 81.78 112.00 3919.90
258 12+990 30.00 121.32 101.55 3046.38
259 13+027 37.00 78.08 99.70 3688.83
260 13+040 13.00 62.55 70.32 914.10
261 13+090 50.00 54.97 58.76 2937.93
262 13+120 30.00 247.66 151.31 4539.42
263 13+160 40.00 263.63 255.64 10225.78
264 13+172 12.00 154.60 209.11 2509.37
265 13+206 34.00 182.14 168.37 5724.67
266 13+234 28.00 341.34 261.74 7328.83
267 13+284 50.00 409.26 375.30 18765.13
268 13+314 30.00 403.17 406.22 12186.53
269 13+364 50.00 391.17 397.17 19858.60
270 13+394 30.00 465.59 428.38 12851.36
271 13+422 28.00 602.90 534.24 14958.75
272 13+437 15.00 507.89 555.39 8330.87
273 13+473 36.00 349.90 428.89 15440.09
274 13+560 87.00 295.83 322.86 28088.91
Total X-Section
S.No Chainage Length
Area (Sft)
Average Area Total Qty
Aqueduct
583
584 27+430 0 0.00 0.00 0.00
585 27+445 15 58.90 29.45 427.03
586 27+465 18 94.61 76.76 1416.90
587 27+500 64 116.64 105.63 6710.36
588 27+550 48 174.50 145.57 6932.04
589 27+580 28 93.83 134.17 3752.60
590 27+600 20 138.62 116.23 2267.55
591 27+625 24 141.41 140.01 3374.33
592 27+650 24 224.66 183.03 4347.05
593 27+675 23 239.47 232.07 5288.76
594 27+750 55 47.84 143.66 7946.99
595 27+780 31 59.70 53.77 1679.77
596 27+805 26 94.24 76.97 2018.92
597 27+825 26 108.07 101.16 2584.51
598 27+850 22 105.95 107.01 2376.69
599 27+880 33 58.85 82.40 2711.78
600 27+925 52 61.52 60.19 3107.95
601 27+975 50 85.72 73.62 3706.77
602 28+000 25 139.28 112.50 2862.00
603 28+025 25 121.67 130.48 3261.88
604 28+050 25 164.71 143.19 3579.75
605 28+075 25 178.71 171.71 4292.75
606 28+115 40 186.67 182.69 7307.60
607 28+140 25 128.89 157.78 3944.50
608 28+155 15 71.58 100.24 1503.53
Total X-Section
S.No Chainage Length
Area (Sft)
Average Area Total Qty
Aqueduct
729 32+525
730 32+575 50 91.99 46.00 2299.75
731 32+625 50 83.63 87.81 4390.50
732 32+640 15 109.57 96.60 1449.00
733 32+665 25 143.46 126.52 3162.88
734 32+690 25 127.76 135.61 3390.25
735 32+715 25 297.23 212.50 5312.38
736 32+750 35 175.59 236.41 8274.35
737 32+780 30 182.61 179.10 5373.00
738 32+800 20 258.95 220.78 4415.60
739 32+825 25 174.71 216.83 5420.75
740 32+875 25 224.51 199.61 4890.45
741 32+900 50 229.84 227.18 11431.45
742 32+925 25 467.24 348.54 8863.37
743 32+950 25 256.69 361.97 8915.20
744 32+980 25 382.51 319.60 7874.94
745 32+995 15 151.84 267.18 0.00
0.00 0.00
746 33+004 75.92
Aqueduct
Total X-Section
S.No Chainage Length
Area (Sft)
Average Area Total Qty
Aqueduct
0.00 0.00
747 33+260 0.00
748 33+265 5 55.16 27.58 142.59
749 33+280 15 50.01 52.59 788.78
750 33+300 20 70.88 60.45 1208.90
751 33+375 150 129.72 100.30 15045.00
752 33+425 50 90.80 110.26 5517.41
753 33+475 50 89.33 90.07 4473.53
754 33+525 50 167.12 128.23 6407.40
755 33+575 50 168.73 167.93 8419.76
756 33+625 51 268.25 218.49 11075.26
757 33+650 26 42.87 155.56 4094.34
758 33+675 24 21.44 518.08
759 33+725 50 183.61 91.81 4590.25
760 33+775 58 183.53 183.57 10705.80
761 33+825 50 168.26 175.90 8754.29
762 33+875 49 223.78 196.02 9685.35
763 33+925 50 450.30 337.04 16872.22
764 34+000 77 556.44 503.37 38598.41
765 34+015 14 281.87 419.16 6006.49
766 34+050 36 125.80 203.84 7380.87
767 34+100 48 149.18 137.49 6606.39
768 34+150 50 155.98 152.58 7644.26
769 34+200 51 199.51 177.75 8997.45
770 34+250 51 211.96 205.74 10397.85
771 34+260 13 116.62 164.29 2135.77
772 34+275 12 220.47 168.55 2105.13
773 34+300 24 202.92 211.70 5148.42
774 34+325 25 173.39 188.16 4762.20
775 34+350 25 189.34 181.37 4474.27
776 34+375 24 132.53 160.94 3867.27
777 34+450 75 76.79 104.66 7865.20
778 34+475 25 60.51 68.65 1724.49
779 34+490 16 57.17 58.84 912.61
780 34+550 60 81.96 69.57 4194.77
781 34+625 75 125.22 103.59 7766.14
782 34+675 64 139.49 132.36 8532.93
783 34+725 56 216.35 177.92 9975.97
784 34+775 48 101.58 158.97 7631.91
785 34+825 50 203.19 152.39 7593.34
786 34+875 50 176.24 189.72 9491.44
787 34+925 49 160.42 168.33 8211.14
788 34+975 52 61.74 111.08 5732.84
789 35+025 51 98.74 80.24 4098.66
790 35+075 49 141.87 120.31 5887.73
791 35+125 50 246.61 194.24 9776.10
792 35+175 53 89.78 168.20 8947.97
793 35+200 25 146.37 118.08 2921.18
Total X-Section
S.No Chainage Length
Area (Sft)
Average Area Total Qty
Aqueduct
896 38+958
897 38+966 7.87 108.09 54.05 425.33
898 38+980 12 337.78 222.94 2612.80
899 39+000 21 476.95 407.37 8599.48
900 39+025 24 381.39 429.17 10252.87
901 39+050 25 406.71 394.05 10032.51
902 39+090 41 138.14 272.43 11275.67
903 39+110 20 30.65 84.40 1668.49
904 39+120 9 25.70 28.18 248.79
905 39+145 24 258.36 142.03 3447.49
906 39+180 39 326.97 292.67 11523.10
907 39+200 20 300.65 313.81 6178.92
908 39+225 25 230.75 265.70 6562.79
909 39+250 25 165.30 198.03 4978.35
910 39+300 50 106.62 135.96 6762.65
911 39+350 52 131.73 119.18 6218.55
912 39+425 75 163.44 147.59 11057.07
913 39+475 52 129.32 146.38 7545.89
914 39+525 52 208.99 169.16 8714.87
915 39+575 48 124.20 166.60 7933.25
916 39+625 50 80.98 102.59 5129.50
917 39+650 25 67.00 73.99 1849.75
918 39+675 25 73.79 70.40 1759.88
919 39+700 25 89.15 81.47 2036.75
920 39+730 30 77.10 83.13 2493.75
921 39+755 25 87.91 82.51 2062.63
922 39+780 25 117.41 102.66 2566.50
923 39+805 25 239.83 178.62 4465.50
924 39+830 25 119.19 179.51 4487.75
925 39+875 45 150.28 134.74 6063.08
926 39+900 25 205.64 177.96 4449.00
927 39+925 24 330.86 268.25 6545.30
928 39+950 25 296.52 313.69 7986.55
929 39+975 25 133.75 215.14 5449.37
930 40+000 25 177.68 155.72 3846.21
931 40+050 47 293.50 235.59 11103.45
932 40+100 49 271.30 282.40 13905.38
933 40+185 84 234.84 253.07 21179.43
934 40+235 49 315.82 275.33 13514.57
935 40+260 26 294.79 305.31 7837.18
Total X-Section
S.No Chainage Length
Area (Sft)
Average Area Total Qty
Aqueduct 1560.80
962 41+289 104.05
963 41+394 105 0.00 0.00 0.00
964 41+400 3 222.82 111.41 0.00
965 41+425 24 533.70 378.26 8934.51
966 41+510 85 254.10 393.90 33418.48
967 41+550 40 142.97 198.54 8006.92
968 41+575 24 288.90 215.94 5167.32
969 41+625 50 507.57 398.24 19919.71
970 41+675 47 371.13 439.35 20614.30
971 41+725 51 259.53 315.33 15949.39
972 41+777 52 212.85 236.19 12229.92
973 41+800 22 351.41 282.13 6342.28
974 41+850 49 218.98 285.20 13911.81
975 41+900 51 106.77 162.88 8353.86
976 41+950 50 190.43 148.60 7455.26
977 41+975 24 175.26 182.85 4459.59
978 41+995 19 167.31 171.29 3184.19
979 42+075 79 209.78 188.55 14972.36
980 42+125 49 207.61 208.70 10305.36
981 42+175 50 285.55 246.58 12333.93
Total X-Section
S.No Chainage Length
Area (Sft)
Average Area Total Qty
Aqueduct
1010 43+825
1011 43+883 57.92 25.14 12.57 728.05
1012 43+900 18.48 88.76 56.95 1052.43
1013 44+000 87 216.18 152.47 13278.57
1014 44+050 50 180.50 198.34 9974.54
1015 44+100 50 165.50 173.00 8563.48
1016 44+150 51 175.43 170.47 8611.92
1017 44+200 50 70.14 122.79 6080.36
1018 44+250 48 147.18 108.66 5261.34
1019 44+270 20 228.29 187.74 3707.77
1020 44+283 13 0.00 114.14 1497.57
Aqueduct 0.00
1021 44+367 0.00
1022 44+380 13 305.89 152.94 2038.75
1023 44+400 14 251.78 278.83 4040.29
1024 44+450 50 190.52 221.15 11108.31
1025 44+500 49 258.21 224.36 11103.75
Total X-Section
S.No Chainage Length
Area (Sft)
Average Area Total Qty
AQUEDUCT
Abutments 1 11 11 8 968
RD: 41+300 Bridge Abutments 2 21 9 6 2268
Centre pier bridge 1 21 8.5 6 1071
Abutments 1 11 11 8 968
RD: 44+300 Bridge Abutments 2 21 9 6 2268
Centre pier bridge 1 21 8.5 6 1071
B-3 Plain Cement Concrete including placing, compacting, finishing & curing (Ratio 1:4:8)
RD Description No. Length Width Depth Volume (cft)
(ft) (ft) (ft)
B-4 Plain Cement Concrete including placing, compacting, finishing & curing (Ratio 1:2:4)
B-5 RCC in roof slab, beam, column & other structural members, insitu or precast. Type C (1:2:4)
RD Description No. Length Width Depth Volume (cft)
(ft) (ft) (ft)
RD: 7+093
Abutments 2 9.63 3.38 1 65.0988
0
RD: 31+500 0 Plum Abutments
0
Pedestal 2 2 4 6.0 96
Piers Footing 4 12 14 1.5 1008
Pier Columns 2 7.069 sft 30 424.14
RD: 32+275 Transom Beam 2 3 8.560 sft 51.36
Wing Waal AB 02 L/S 1st Step 30* 1 12.65 1.50 12.84 243.64
Wing Waal AB 02 L/S 2nd Step 30* 1 5.35 1.50 10.34 82.98
Wing Waal AB 02 R/S 1st Step 90* 1 12.33 1.50 12.84 237.48
Wing Waal AB 02 R/S 2nd Step 90* 1 5.67 1.50 10.34 87.94
Bridge Abutment top 1 5.770 sft 12.01 69.30
Aqueduct Abutment top 1 4.330 sft 12.01 52.00
None-Shrink concrete block 4 1.75 1.50 0.75 7.88
Retaining Block 4 4.25 2.50 1.00 42.50
Girder With parapet wall and Slab 1 135.00 5.770 sft 778.95
RD: 114+250
Construction of Siran Right Bank Canal
District Mansehra
Aqueducts
Reinforced cement concrete work as in dams, spillways, weirs, barrages, cross drainage works and other hydraulic
structures using crushed stone aggregate(screening & washing) and coarse sand i/c costof all labour and material and all
B-6 kinds of form works, moulds, shuttering lifting/pumping, curing, rendering and finishing the exposed surface, cast in
situ/precast excluding the cost of steel reinforcement and labour for bending binding also excluding cost of additives which
have to be paid separately. Type C (1:2:4)
B-7 Extra labour for laying concrete (plain or reinforced) From 20' upto 40' height
Taking 15% of item B-4 & B-5 = 15% x 240614.87 = 36092.23 Cft
OR 1022.02 Cum
B-8 Extra labour for laying concrete (plain or reinforced) For every extra 10' height (upto 60' height)
Taking 10% of item B-4 & B-5 = 10% x 240614.87 = 24061.49 Cft
OR 681.34 Cum
B-9 Supply & fabricate M.S. reinforcement for cement concrete (Hot rolled deformed bars Grade 40)
Taking 2.00% of RCC as steel quantity
B-10 Supplying and Fixing PVC Water Stopper 8" wide 3/8" thick
RD Description No. Length Total Length
(ft) (ft)
OR 5862.22 Cum
B-12 PCC 1:3:6 in mass concrete less formwork using 40% boulders
Bridge abutments
Step 1 2 18 6 3 648
Step 2 2 18 5 2 360
RD: 41+300
Construction of Siran Right Bank Canal
District Mansehra
Aqueducts
Bridge abutments
Step 1 2 18 6 3 648
Step 2 2 18 5 2 360
RD: 44+300
Step 3 2 18 4 2 288
Step 4 2 18 3 2 216
Step 5 2 18 2 2 144
Bridge abutments
Step 1 2 18 6 3 648
RD: 120+136 Step 2 2 18 5 2 360
Step 3 2 18 4 2 288
Step 4 2 18 3 2 216
Step 5 2 18 2 2 144
Bridge abutments
Step 1 2 18 6 3 648
RD: 140+370 Step 2 2 18 5 2 360
Step 3 2 18 4 2 288
Step 4 2 18 3 2 216
Step 5 2 18 2 2 144
RD: 161+089
Construction of Siran Right Bank Canal
District Mansehra
Aqueducts
B-13 Erecting & removing formwork to concrete in any shape / position (Vertical)
Trugh 2 14 8 224
RD: 30+600
Bridge abutments
Front & Back 4 18 11 792
Sides of Step 1 4 6 3 72
RD: 41+300 Sides of Step 2 4 5 2 40
Sides of Step 3 4 4 2 32
Sides of Step 4 4 3 2 24
Sides of Step 5 4 2 2 16
Bridge abutments
RD: 44+300
Construction of Siran Right Bank Canal
District Mansehra
Aqueducts
RD: 147+515
Construction of Siran Right Bank Canal
District Mansehra
Aqueducts
B-14
Construction of Siran Right Bank Canal
District Mansehra
Aqueducts
B-17 Providing and Laying stone pitching/filling, dry hand packed in pitching & aprons
B-18 Provide & weave GI wire netting for wire crates 6"x9" mesh : 8 SWG wire
B-19 Supplying stone and stone filling in GI wire crate and its sewing, excluding cost of crates
No. of aqueducts 38
No of sides 2
Length of paint 5
Total in M 115.818
200000 cm3
Construction of Siran Right Bank Canal
District Mansehra
Syphons
Outlet structure
Cutoff wall 9 0.75 2 13.500
D/S slab 9 1.5 0.667 9.005
Bottom slab 13.25 9 0.667 79.540
Long wall L/S 13.25 0.75 10.5 104.344
Long wall R/S 13.25 0.75 10.5 104.344
Shortwall U/S 7.5 0.75 10.5 59.063
Shortwall U/S 7.5 1.5 10.5 118.125
D/d siphon tube exit π/4 x 3.25^2 1.5 -8.296
D/d D/S opening 6.75 4.5 0.75 -22.781
Syphon-2
Inlet structure
Cutoff wall 9 0.75 2 13.500
U/S slab 9 1.5 0.667 9.005
Bottom slab 13.25 9 0.667 79.540
Long wall L/S 13.25 0.75 10.5 104.344
Long wall R/S 13.25 0.75 10.5 104.344
Shortwall U/S 7.5 0.75 10.5 59.063
Shortwall U/S 7.5 1.5 10.5 118.125
Construction of Siran Right Bank Canal
District Mansehra
Syphons
Outlet structure
Cutoff wall 9 0.75 2 13.500
D/S slab 9 1.5 0.667 9.005
Bottom slab 13.25 9 0.667 79.540
Long wall L/S 13.25 0.75 10.5 104.344
Long wall R/S 13.25 0.75 10.5 104.344
Shortwall U/S 7.5 0.75 10.5 59.063
Shortwall U/S 7.5 1.5 10.5 118.125
D/d siphon tube exit π/4 x 3^2 1.5 -7.069
D/d D/S opening 6.5 4.5 0.75 -21.938
Syphon-3
Inlet structure
Cutoff wall 9 0.75 2 13.500
U/S slab 9 1.5 0.667 9.005
Bottom slab 13.25 9 0.667 79.540
Long wall L/S 13.25 0.75 10.5 104.344
Long wall R/S 13.25 0.75 10.5 104.344
Shortwall U/S 7.5 0.75 10.5 59.063
Shortwall U/S 7.5 1.5 10.5 118.125
D/d U/S opening 6.3 4.5 0.75 -21.263
D/d siphon tube entry π/4 x 2.75^2 1.5 -5.940
Outlet structure
Cutoff wall 9 0.75 2 13.500
D/S slab 9 1.5 0.667 9.005
Bottom slab 13.25 9 0.667 79.540
Long wall L/S 13.25 0.75 10.5 104.344
Long wall R/S 13.25 0.75 10.5 104.344
Shortwall U/S 7.5 0.75 10.5 59.063
Shortwall U/S 7.5 1.5 10.5 118.125
D/d siphon tube exit π/4 x 2.75^2 1.5 -5.940
D/d D/S opening 6.3 4.5 0.75 -21.263
Syphon-4
Construction of Siran Right Bank Canal
District Mansehra
Syphons
Outlet structure
Cutoff wall 9 0.75 2 13.500
D/S slab 9 1.5 0.667 9.005
Bottom slab 13.25 9 0.667 79.540
Long wall L/S 13.25 0.75 10.5 104.344
Long wall R/S 13.25 0.75 10.5 104.344
Shortwall U/S 7.5 0.75 10.5 59.063
Shortwall U/S 7.5 1.5 10.5 118.125
D/d siphon tube exit π/4 x 2.16^2 1.5 -3.664
D/d D/S opening 5 4.5 0.75 -16.875
Syphon-5
Inlet structure
Cutoff wall u/d 7.83 2 0.5 7.830 2
Shortwall U/S front Site 7.83 1 6.25 48.938
Bottom slab 6 7.83 0.75 35.235
Long wall L/S 9 6.25 0.75 42.188
Long wall R/S 9 6.25 0.75 42.188
Shortwall U/S 0.75 7.83 1.5 8.809
Shortwall U/S 3 7.83 0.75 17.618
top opening wall 0.75 7.83 2 11.745
Quantity
D/d siphon tube entry π/4 x 1.83^2 1.5 -3.9458414
Net QTY
Siphon tube encasement
421 2.83 2.83 3371.75
D/d pipe 421 π/4 x 1.83^2 -1107.4662
Net QTY
Outlet structure
Cutoff wall u/d 7.83 2 0.5 7.830
Shortwall U/S front Site 7.83 1 6.25 48.938
Construction of Siran Right Bank Canal
District Mansehra
Syphons
A-4 Supply & fabricate M.S. reinforcement for cement concrete (Hot rolled
deformed bars Grade 40)
A-6 Providing and fixing MS steel grated trash rack as per drawings and
instructions of Engineer.
C-2 Plain Cement Concrete including placing, compacting, finishing & curing (Ratio 1:4:8)
Under drainage waterway section
R.D Length Width Thickness Volume
6+000 to 20+000 282.880 20No's 8.750 0.250 618.8
20+100 12 8.750 0.250 26.25
20+350 42 8.750 0.250 91.875
20+935 12 8.750 0.250 26.25
22+750 7 8.750 0.250 15.3125
24+500 12 8.750 0.250 26.25
25+765 42 8.750 0.250 91.875
26+500 12 8.750 0.250 26.25
26+835 12 8.750 0.250 26.25
28+175 12 8.750 0.250 26.25
28+650 42 8.750 0.250 91.875
29+400 12 8.750 0.250 26.25
29+800 12 8.750 0.250 26.25
29+925 12 8.750 0.250 26.25
31+060 12 8.750 0.250 26.25
31+460 12 8.750 0.250 26.25
31+500 12 8.750 0.250 26.25
31+525 12 8.750 0.250 26.25
31+855 12 8.750 0.250 26.25
33+000 82 8.750 0.250 179.375
33+600 82 8.750 0.250 179.375
33+612 12 8.750 0.250 26.25
34+235 12 8.750 0.250 26.25
34+950 12 8.750 0.250 26.25
39+725 12 8.750 0.250 26.25
39+950 12 8.750 0.250 26.25
40+925 12 8.750 0.250 26.25
41+125 12 8.750 0.250 26.25
42+575 12 8.750 0.250 26.25
44+590 22 8.500 0.250 46.75
46+220 22 8.500 0.250 46.75
47+400 22 8.500 0.250 46.75
48+575 22 8.500 0.250 46.75
49+730 12 8.500 0.250 25.5
49+850 12 8.500 0.250 25.5
51+425 12 8.500 0.250 25.5
52+075 12 8.500 0.250 25.5
52+200 12 8.500 0.250 25.5
52+450 12 8.500 0.250 25.5
52+600 12 8.500 0.250 25.5
52+935 12 8.500 0.250 25.5
54+505 42 8.500 0.250 89.25
54+775 12 8.500 0.250 25.5
55+150 22 8.500 0.250 46.75
57+115 42 8.500 0.250 89.25
58+150 42 8.500 0.250 89.25
58+750 42 8.500 0.250 89.25
Construction of Siran Right Bank Canal
District Mansehra
Superpassages
BOQ Item No. Description
59+033 12 8.500 0.250 25.5
59+190 12 8.500 0.250 25.5
59+325 12 8.500 0.250 25.5
59+790 12 8.500 0.250 25.5
60+025 12 8.500 0.250 25.5
60+100 12 8.500 0.250 25.5
60+410 12 8.500 0.250 25.5
61+200 12 8.500 0.250 25.5
61+250 12 8.500 0.250 25.5
61+715 12 8.500 0.250 25.5
62+323 32 8.500 0.250 68
63+750 227 8.500 0.250 482.375
64+750 17 8.500 0.250 36.125
65+035 12 8.500 0.250 25.5
65+850 22 8.500 0.250 46.75
67+425 22 8.500 0.250 46.75
67+825 32 8.500 0.250 68
68+145 42 8.500 0.250 89.25
68+450 32 8.500 0.250 68
68+750 42 8.500 0.250 89.25
69+495 22 8.500 0.250 46.75
70+300 32 8.500 0.250 68
70+575 42 8.500 0.250 89.25
71+528 32 8.500 0.250 68
72+055 32 8.500 0.250 68
72+695 32 8.500 0.250 68
74+715 32 8.300 0.250 66.4
75+610 32 8.300 0.250 66.4
76+418 82 8.300 0.250 170.15
77+750 62 8.300 0.250 128.65
78+000 32 8.300 0.250 66.4
78+190 32 8.300 0.250 66.4
78+645 12 8.300 0.250 24.9
78+850 32 8.300 0.250 66.4
79+480 32 8.300 0.250 66.4
80+250 32 8.300 0.250 66.4
80+600 32 8.300 0.250 66.4
80+825 12 8.300 0.250 24.9
81+325 12 8.300 0.250 24.9
82+060 32 8.300 0.250 66.4
82+229 12 8.300 0.250 24.9
83+625 12 8.300 0.250 24.9
84+150 12 8.300 0.250 24.9
84+361 12 8.300 0.250 24.9
85+265 32 8.300 0.250 66.4
85+811 32 8.300 0.250 66.4
86+197 32 8.300 0.250 66.4
87+148 32 8.200 0.250 65.6
87+829 32 8.200 0.250 65.6
88+914 12 8.200 0.250 24.6
89+296 12 8.200 0.250 24.6
89+606 12 8.200 0.250 24.6
89+995 12 8.200 0.250 24.6
92+953 12 7.000 0.250 21
93+085 12 7.000 0.250 21
93+577 12 7.000 0.250 21
94+097 12 7.000 0.250 21
94+901 12 7.000 0.250 21
95+318 12 7.000 0.250 21
95+715 12 7.000 0.250 21
97+263 32 7.000 0.250 56
97+581 12 7.000 0.250 21
97+722 32 7.000 0.250 56
98+040 12 7.000 0.250 21
98+746 32 7.000 0.250 56
98+990 12 7.000 0.250 21
99+372 12 7.000 0.250 21
99+548 32 7.000 0.250 56
Construction of Siran Right Bank Canal
District Mansehra
Superpassages
BOQ Item No. Description
100+491 32 7.000 0.250 56
100+596 32 7.000 0.250 56
103+451 32 7.000 0.250 56
103+871 22 7.000 0.250 38.5
104+647 32 7.000 0.250 56
105+862 12 7.000 0.250 21
106+602 12 7.000 0.250 21
107+480 12 7.000 0.250 21
108+180 32 7.000 0.250 56
108+223 12 7.000 0.250 21
108+853 12 7.000 0.250 21
109+093 32 7.000 0.250 56
109+226 12 7.000 0.250 21
110+116 32 7.000 0.250 56
111+268 12 7.000 0.250 21
111+420 12 7.000 0.250 21
113+763 14 7.000 0.250 24.5
114+301 32 7.000 0.250 56
116+742 12 7.000 0.250 21
117+773 12 7.000 0.250 21
117+982 12 7.000 0.250 21
118+204 12 7.000 0.250 21
119+349 12 7.000 0.250 21
120+228 12 7.000 0.250 21
120+611 32 7.000 0.250 56
120+956 32 7.000 0.250 56
122+397 12 7.000 0.250 21
123+125 12 7.000 0.250 21
125+804 12 7.000 0.250 21
126+298 12 7.000 0.250 21
127+529 32 7.000 0.250 56
127+663 32 7.000 0.250 56
128+217 32 6.750 0.250 54
129+307 32 6.750 0.250 54
130+954 32 6.750 0.250 54
131+319 32 6.750 0.250 54
131+636 12 6.750 0.250 20.25
131+781 32 6.750 0.250 54
132+594 32 6.750 0.250 54
132+710 32 6.750 0.250 54
133+674 12 6.750 0.250 20.25
143+988 12 6.500 0.250 19.5
145+182 12 6.500 0.250 19.5
145+400 12 6.500 0.250 19.5
146+798 12 6.500 0.250 19.5
146+872 32 6.500 0.250 52
148+655 12 6.500 0.250 19.5
150+396 12 6.300 0.250 18.9
151+123 32 6.300 0.250 50.4
152+924 12 6.300 0.250 18.9
155+398 12 6.300 0.250 18.9
155+907 12 6.300 0.250 18.9
157+151 12 6.300 0.250 18.9
159+055 12 6.000 0.250 18
159+568 12 6.000 0.250 18
163+805 12 5.700 0.250 17.1
171+472 12 5.700 0.250 17.1
174+790 12 5.000 0.250 15
175+608 12 5.000 0.250 15
175+705 32 5.000 0.250 40
180+458 5 4.500 0.250 5.625
Total excavation 8275.463 cub. Ft.
OR 234.300 cub. M
Under guide walls Length of
Length of both U/S guide both D/S Total length
R.D Width Thickness Volume
walls guide (U/S + D/S)
walls
Construction of Siran Right Bank Canal
District Mansehra
Superpassages
BOQ Item No. Description
Total quantity of PCC 1:4:8 under drainage waterway and guide walls 290.594 cub. M
C-3 RCC in roof slab, beam, column & other structural members, insitu or precast. Type C (1:2:4)
RCC in top slab
R.D Length Width Thickness Volume
6+000 to 20+000 200.000 20No's 6.750 1.000 1767.5
20+100 10 6.750 1.000 105
20+350 40 6.750 1.000 367.5
20+935 10 6.750 1.000 105
22+750 5 6.750 1.000 61.25
24+500 10 6.750 1.000 105
25+765 40 6.750 1.000 367.5
26+500 10 6.750 1.000 105
26+835 10 6.750 1.000 105
28+175 10 6.750 1.000 105
28+650 40 6.750 1.000 367.5
29+400 10 6.750 1.000 105
29+800 10 6.750 1.000 105
Construction of Siran Right Bank Canal
District Mansehra
Superpassages
BOQ Item No. Description
29+925 10 6.750 1.000 105
31+060 10 6.750 1.000 105
31+460 10 6.750 1.000 105
31+500 10 6.750 1.000 105
31+525 10 6.750 1.000 105
31+855 10 6.750 1.000 105
33+000 80 6.750 1.000 717.5
33+600 80 6.750 1.000 717.5
33+612 10 6.750 1.000 105
34+235 10 6.750 1.000 105
34+950 10 6.750 1.000 105
39+725 10 6.750 1.000 105
39+950 10 6.750 1.000 105
40+925 10 6.750 1.000 105
41+125 10 6.750 1.000 105
42+575 10 6.750 1.000 105
44+590 20 6.500 1.000 187
46+220 20 6.500 1.000 187
47+400 20 6.500 1.000 187
48+575 20 6.500 1.000 187
49+730 10 6.500 1.000 102
49+850 10 6.500 1.000 102
51+425 10 6.500 1.000 102
52+075 10 6.500 1.000 102
52+200 10 6.500 1.000 102
52+450 10 6.500 1.000 102
52+600 10 6.500 1.000 102
52+935 10 6.500 1.000 102
54+505 40 6.500 1.000 357
54+775 10 6.500 1.000 102
55+150 20 6.500 1.000 187
57+115 40 6.500 1.000 357
58+150 40 6.500 1.000 357
58+750 40 6.500 1.000 357
59+033 10 6.500 1.000 102
59+190 10 6.500 1.000 102
59+325 10 6.500 1.000 102
59+790 10 6.500 1.000 102
60+025 10 6.500 1.000 102
60+100 10 6.500 1.000 102
60+410 10 6.500 1.000 102
61+200 10 6.500 1.000 102
61+250 10 6.500 1.000 102
61+715 10 6.500 1.000 102
62+323 30 6.500 1.000 272
63+750 225 6.500 1.000 1929.5
64+750 15 6.500 1.000 144.5
65+035 10 6.500 1.000 102
65+850 20 6.500 1.000 187
67+425 20 6.500 1.000 187
67+825 30 6.500 1.000 272
68+145 40 6.500 1.000 357
68+450 30 6.500 1.000 272
68+750 40 6.500 1.000 357
69+495 20 6.500 1.000 187
70+300 30 6.500 1.000 272
70+575 40 6.500 1.000 357
71+528 30 6.500 1.000 272
72+055 30 6.500 1.000 272
72+695 30 6.500 1.000 272
74+715 30 6.300 1.000 265.6
75+610 30 6.300 1.000 265.6
76+418 80 6.300 1.000 680.6
77+750 60 6.300 1.000 514.6
78+000 30 6.300 1.000 265.6
78+190 30 6.300 1.000 265.6
78+645 10 6.300 1.000 99.6
78+850 30 6.300 1.000 265.6
Construction of Siran Right Bank Canal
District Mansehra
Superpassages
BOQ Item No. Description
79+480 30 6.300 1.000 265.6
80+250 30 6.300 1.000 265.6
80+600 30 6.300 1.000 265.6
80+825 10 6.300 1.000 99.6
81+325 10 6.300 1.000 99.6
82+060 30 6.300 1.000 265.6
82+229 10 6.300 1.000 99.6
83+625 10 6.300 1.000 99.6
84+150 10 6.300 1.000 99.6
84+361 10 6.300 1.000 99.6
85+265 30 6.300 1.000 265.6
85+811 30 6.300 1.000 265.6
86+197 30 6.300 1.000 265.6
87+148 30 6.200 1.000 262.4
87+829 30 6.200 1.000 262.4
88+914 10 6.200 1.000 98.4
89+296 10 6.200 1.000 98.4
89+606 10 6.200 1.000 98.4
89+995 10 6.200 1.000 98.4
92+953 10 5.000 1.000 84
93+085 10 5.000 1.000 84
93+577 10 5.000 1.000 84
94+097 10 5.000 1.000 84
94+901 10 5.000 1.000 84
95+318 10 5.000 1.000 84
95+715 10 5.000 1.000 84
97+263 30 5.000 1.000 224
97+581 10 5.000 1.000 84
97+722 30 5.000 1.000 224
98+040 10 5.000 1.000 84
98+746 30 5.000 1.000 224
98+990 10 5.000 1.000 84
99+372 10 5.000 1.000 84
99+548 30 5.000 1.000 224
100+491 30 5.000 1.000 224
100+596 30 5.000 1.000 224
103+451 30 5.000 1.000 224
103+871 20 5.000 1.000 154
104+647 30 5.000 1.000 224
105+862 10 5.000 1.000 84
106+602 10 5.000 1.000 84
107+480 10 5.000 1.000 84
108+180 30 5.000 1.000 224
108+223 10 5.000 1.000 84
108+853 10 5.000 1.000 84
109+093 30 5.000 1.000 224
109+226 10 5.000 1.000 84
110+116 30 5.000 1.000 224
111+268 10 5.000 1.000 84
111+420 10 5.000 1.000 84
113+763 12 5.000 1.000 98
114+301 30 5.000 1.000 224
116+742 10 5.000 1.000 84
117+773 10 5.000 1.000 84
117+982 10 5.000 1.000 84
118+204 10 5.000 1.000 84
119+349 10 5.000 1.000 84
120+228 10 5.000 1.000 84
120+611 30 5.000 1.000 224
120+956 30 5.000 1.000 224
122+397 10 5.000 1.000 84
123+125 10 5.000 1.000 84
125+804 10 5.000 1.000 84
126+298 10 5.000 1.000 84
127+529 30 5.000 1.000 224
127+663 30 5.000 1.000 224
128+217 30 4.750 1.000 216
129+307 30 4.750 1.000 216
Construction of Siran Right Bank Canal
District Mansehra
Superpassages
BOQ Item No. Description
130+954 30 4.750 1.000 216
131+319 30 4.750 1.000 216
131+636 10 4.750 1.000 81
131+781 30 4.750 1.000 216
132+594 30 4.750 1.000 216
132+710 30 4.750 1.000 216
133+674 10 4.750 1.000 81
143+988 10 4.500 1.000 78
145+182 10 4.500 1.000 78
145+400 10 4.500 1.000 78
146+798 10 4.500 1.000 78
146+872 30 4.500 1.000 208
148+655 10 4.500 1.000 78
150+396 10 4.300 1.000 75.6
151+123 30 4.300 1.000 201.6
152+924 10 4.300 1.000 75.6
155+398 10 4.300 1.000 75.6
155+907 10 4.300 1.000 75.6
157+151 10 4.300 1.000 75.6
159+055 10 4.000 1.000 72
159+568 10 4.000 1.000 72
163+805 10 3.700 1.000 68.4
171+472 10 3.700 1.000 68.4
174+790 10 3.000 1.000 60
175+608 10 3.000 1.000 60
175+705 30 3.000 1.000 160
180+458 30 2.500 1.000 144
Total RCC in top slab 32515.650 cub. Ft.
OR 920.602 cub. M
C-4 RCC in raft foundation slab, base slab of column & ret. wall etc, not including in 06-06. Type C (1:2:4)
Total RCC in raft foundation slab, base slab of column & ret. wall etc 218879.938 cub. Ft.
Total RCC in raft foundation slab, base slab of column & ret. wall etc 6197.054 cub. M
C-5 Supply & fabricate M.S. reinforcement for cement concrete (Hot rolled deformed bars Grade 40)
Total RCC in roof slab, beam, column & other structural members, insitu or precast 920.602
Total RCC in raft foundation slab, base slab of column & ret. wall etc 6197.054
C-6 Erecting & removing formwork to concrete in any shape / position (Vertical)
Along
Total
R.D Length Width Height length both Face & back formwork
sides
6+000 to 20+000 800.000 20No's 1.500 5.000 8000.000 15.000 8015.000
C-7
Construction of Siran Right Bank Canal
District Mansehra
Superpassages
BOQ Item No. Description
C-8 PCC 1:3:6 in mass concrete less formwork using 40% boulders
C-9 Provide & weave GI wire netting for wire crates 6"x9" mesh : 8 SWG wire
Gabions
Width of superpasages 1352.00 ft.
4 apron steps of 5' width 20.00 ft.
GI Wire Netting Area (sft) No. of crates No. of faces Qty (sft)
Step 2 (10x5x3)
Construction of Siran Right Bank Canal
District Mansehra
Superpassages
BOQ Item No. Description
Top & Bottom (10x5) 50 135.2 2 13520
Ends (10x3) 30 135.2 2 8112
Sides (5x3) 15 135.2 2 4056
Step 3 (10x5x3)
Top & Bottom (10x5) 50 135.2 2 13520
Ends (10x3) 30 135.2 2 8112
Sides (5x3) 15 135.2 2 4056
Step 4 (10x5x3)
Top & Bottom (10x5) 50 135.2 2 13520
Ends (10x3) 30 135.2 2 8112
Sides (5x3) 15 135.2 2 4056
C-10 Supplying stone and stone filling in GI wire crate and its sewing, excluding cost of crates
Stone filling
Volume of
Length Width Depth Nos. U/S and D/S
steps
D/S
1352.00 5 3 4 81120
U/S 1352.00 10 2 1 27040
Total volume of stone filling 108160 cub. Ft..
OR 3062.288 cub. M.
C-11 Providing and Laying stone pitching/filling, dry hand packed in pitching & aprons
OR 1386.820 cub. M.
cub. Ft
1237.25 3.00 1.50 2.00 11135.25
315.27 cub. M
D/S guide wall
Backfill
Length Backfill depth width Sides Volume
cub. Ft
2723.00 3.00 1.50 2.00 24507.00
693.86 cub. M
Construction of Siran Right Bank Canal
District Mansehra
Superpassages
BOQ Item No. Description
cub. Ft
7000.00 3.00 1.50 2.00 63000.00
1783.69 cub. M
11+475 0.00
242 Aqueduct
12+049 0.00
243
244 12+050 0.00 22.00 0.00
245 12+200 150.00 22.00 3300.00
246 12+300 100.00 22.00 2200.00
247 12+540 240.00 22.00 5280.00
248 12+583 43.00 22.00 946.00
249 12+640 57.00 22.00 1254.00
250 12+695 55.00 22.00 1210.00
251 12+735 40.00 22.00 880.00
252 12+760 25.00 22.00 550.00
253 12+810 50.00 22.00 1100.00
254 12+860 50.00 22.00 1100.00
255 12+900 40.00 22.00 880.00
256 12+925 25.00 22.00 550.00
257 12+960 35.00 22.00 770.00
258 12+990 30.00 22.00 660.00
259 13+027 37.00 22.00 814.00
260 13+040 13.00 22.00 286.00
261 13+090 50.00 22.00 1100.00
262 13+120 30.00 22.00 660.00
263 13+160 40.00 22.00 880.00
264 13+172 12.00 22.00 264.00
265 13+206 34.00 22.00 748.00
266 13+234 28.00 22.00 616.00
267 13+284 50.00 22.00 1100.00
268 13+314 30.00 22.00 660.00
269 13+364 50.00 22.00 1100.00
270 13+394 30.00 22.00 660.00
271 13+422 28.00 22.00 616.00
272 13+437 15.00 22.00 330.00
273 13+473 36.00 22.00 792.00
274 13+560 87.00 22.00 1914.00
275 13+620 60.00 22.00 1320.00
276 13+690 70.00 22.00 1540.00
277 13+720 30.00 22.00 660.00
278 13+770 50.00 22.00 1100.00
279 13+800 30.00 22.00 660.00
280 13+830 30.00 22.00 660.00
281 13+880 50.00 22.00 1100.00
282 13+890 10.00 22.00 220.00
283 13+920 30.00 22.00 660.00
284 13+960 40.00 22.00 880.00
285 13+960 0.00 0.00
286 13+980 0.00
287 14+000 0.00
S.No Chainage Length Area Total Qty
Aqueduct 0.00
583
584 27+430 0 20.40 0.00
585 27+445 15 20.40 295.80
586 27+465 18 20.40 376.58
587 27+500 64 20.40 1296.01
588 27+550 48 20.40 971.45
589 27+580 28 20.40 570.59
590 27+600 20 20.40 398.00
591 27+625 24 20.40 491.64
592 27+650 24 20.40 484.50
593 27+675 23 20.40 464.92
594 27+750 55 20.40 1128.53
595 27+780 31 20.40 637.30
596 27+805 26 20.40 535.09
597 27+825 26 20.40 521.22
598 27+850 22 20.40 453.08
599 27+880 33 20.40 671.36
600 27+925 52 20.40 1053.46
601 27+975 50 20.40 1027.14
602 28+000 25 20.40 518.98
603 28+025 25 20.40 510.00
604 28+050 25 20.40 510.00
605 28+075 25 20.40 510.00
606 28+115 40 20.40 816.00
607 28+140 25 20.40 510.00
608 28+155 15 20.40 306.00
609 28+175 20 20.40 408.00
610 28+195 20 20.40 408.00
611 28+230 35 20.40 714.00
612 28+250 20 20.40 408.00
613 28+275 25 20.40 510.00
614 28+300 25 20.40 510.00
615 28+325 25 20.40 510.00
616 28+400 75 20.40 1530.00
617 28+425 25 20.40 510.00
618 28+450 25 20.40 510.00
619 28+475 25 20.40 510.00
620 28+486 11 20.40 224.40
621 28+500 14 20.40 285.60
622 28+550 50 20.40 1020.00
623 28+600 50 20.40 1020.00
624 28+625 25 20.40 510.00
625 28+650 25 20.40 510.00
626 28+675 25 20.40 510.00
627 28+725 50 20.40 1020.00
628 28+750 25 20.40 510.00
629 28+825 75 20.40 1533.47
S.No Chainage Length Area Total Qty
Aqueduct 0.00
729 32+525
730 32+575 50 20.40 1020.00
731 32+625 50 20.40 1020.00
732 32+640 15 20.40 306.00
733 32+665 25 20.40 510.00
734 32+690 25 20.40 510.00
735 32+715 25 20.40 510.00
736 32+750 35 20.40 714.00
737 32+780 30 20.40 612.00
738 32+800 20 20.40 408.00
739 32+825 25 20.40 510.00
740 32+875 25 20.40 499.80
741 32+900 50 20.40 1026.53
742 32+925 25 20.40 518.77
743 32+950 25 20.40 502.45
744 32+980 25 20.40 502.66
745 32+995 15 20.40 306.00
0.00
746 33+004
Aqueduct
0.00
747 33+260
748 33+265 5 24.03 124.24
749 33+280 15 24.03 360.45
750 33+300 20 24.03 480.60
751 33+375 150 24.03 3604.50
752 33+425 50 24.03 1202.46
753 33+475 50 24.03 1193.57
754 33+525 50 24.03 1200.78
755 33+575 50 24.03 1204.86
756 33+625 51 24.03 1218.08
757 33+650 26 24.03 632.47
758 33+675 24 24.03 580.81
759 33+725 50 24.03 1201.50
760 33+775 58 24.03 1401.43
761 33+825 50 24.03 1195.97
762 33+875 49 24.03 1187.32
763 33+925 50 24.03 1202.94
764 34+000 77 24.03 1842.62
765 34+015 14 24.03 344.35
766 34+050 36 24.03 870.13
767 34+100 48 24.03 1154.64
768 34+150 50 24.03 1203.90
769 34+200 51 24.03 1216.40
770 34+250 51 24.03 1214.48
771 34+260 13 24.03 312.39
772 34+275 12 24.03 300.13
S.No Chainage Length Area Total Qty
Aqueduct 0.00
896 38+958
897 38+966 7.87 42.62 335.42
898 38+980 12 42.62 499.51
899 39+000 21 42.62 899.71
900 39+025 24 42.62 1018.19
901 39+050 25 42.62 1085.11
902 39+090 41 42.62 1764.04
903 39+110 20 42.62 842.60
904 39+120 9 42.62 376.33
905 39+145 24 42.62 1034.52
906 39+180 39 42.62 1678.08
907 39+200 20 42.62 839.19
908 39+225 25 42.62 1052.71
909 39+250 25 42.62 1071.47
910 39+300 50 42.62 2119.92
911 39+350 52 42.62 2223.91
912 39+425 75 42.62 3193.09
913 39+475 52 42.62 2197.06
914 39+525 52 42.62 2195.78
915 39+575 48 42.62 2029.56
916 39+625 50 42.62 2131.00
917 39+650 25 42.62 1065.50
918 39+675 25 42.62 1065.50
S.No Chainage Length Area Total Qty
Aqueduct 0.00
962 41+289
963 41+394 105 35.29 3705.45
964 41+400 3 35.29 105.87
965 41+425 24 35.29 833.55
S.No Chainage Length Area Total Qty
Aqueduct 0.00
1010 43+825
1011 43+883 57.92 28.37 1643.19
1012 43+900 18.48 28.37 524.28
S.No Chainage Length Area Total Qty
Aqueduct 0.00
1021 44+367
1022 44+380 13 38.91 518.67
1023 44+400 14 38.91 563.81
1024 44+450 50 38.91 1954.45
1025 44+500 49 38.91 1925.66
1026 44+550 49 38.91 1890.64
1027 44+578 26 38.91 1007.77
1028 44+596 18 38.91 689.49
1029 44+620 22 38.91 856.02
1030 44+670 45 38.91 1761.07
1031 44+720 45 38.91 1739.28
1032 44+800 80 38.91 3112.80
1033 44+850 50 38.91 1933.05
1034 44+900 52 38.91 2037.83
1035 44+950 50 38.91 1938.11
1036 45+025 71 38.91 2780.90
1037 45+075 49 38.91 1912.82
1038 45+100 24 38.91 944.35
1039 45+150 50 38.91 1933.83
1040 45+200 49 38.91 1917.10
1041 45+250 50 38.91 1936.94
1042 45+290 40 38.91 1540.45
1043 45+320 30 38.91 1182.09
1044 45+370 48 38.91 1857.56
1045 45+420 50 38.91 1945.50
1046 45+470 53 38.91 2045.89
1047 45+520 50 38.91 1945.50
1048 45+570 50 38.91 1942.93
1049 45+630 60 38.91 2334.60
1050 45+655 25 38.91 972.75
1051 45+680 23 38.91 894.93
1052 45+730 49 38.91 1906.59
1053 45+755 27 38.91 1050.57
1054 45+785 25 38.91 972.75
1055 45+801 16 38.91 622.56
Aqueduct 0.00
1056 45+813
1057 45+845 32 38.91 1245.12
1058 45+852 9 38.91 350.19
S.No Chainage Length Area Total Qty
Aqueduct 0.00
1100 47+510
1101 47+618 108 30.00 3240.00
1102 47+619 1 30.00 30.00
1103 47+650 28.76 30.00 862.80
1104 47+700 53 30.00 1590.00
1105 47+750 44 30.00 1320.00
S.No Chainage Length Area Total Qty
Aqueduct 0.00
1499 64+475
1500 64+500 25 33.18 829.50
S.No Chainage Length Area Total Qty
Design of Mino
Balance
Offtakes Reach
Off-take Discharg
Wise
GCA CCA Discharg e in
Discharg
Sr. No e Parent
Descripti e
Location RDs Channel
ons
Reach
ft Acre Acre ft3/Sec ft3/Sec ft3/Sec
14.543 ft
Minor-1
1 Outlet-1 L 11+300 565.000 427.114 0.000 0.000 14.5430+000 to 11+300
2 Outlet-2 L 14+950 529.000 399.899 0.000 0.000 14.543
11+300 to 14+950
85.000 0.018 0.001 1:1 6.750 3.400 23.440 16.367 1.432 3.704
73.805 0.018 0.001 1:1 3.650 3.055 20.484 12.291 1.667 3.603
71.282 0.018 0.001 1:1 3.650 2.970 19.661 12.050 1.632 3.625
68.787 0.018 0.001 1:1 3.650 2.900 18.995 11.852 1.603 3.621
66.330 0.018 0.001 1:1 3.650 2.850 18.525 11.711 1.582 3.581
66.330 0.018 0.001 1:1 3.650 2.850 18.525 11.711 1.582 3.581
64.067 0.018 0.001 1:1 3.650 2.810 18.153 11.598 1.565 3.529
64.067 0.018 0.001 1:1 3.650 2.810 18.153 11.598 1.565 3.529
61.662 0.018 0.001 1:1 3.650 2.780 17.875 11.513 1.553 3.450
59.380 0.018 0.001 1:1 3.650 2.700 17.145 11.287 1.519 3.463
56.834 0.018 0.001 1:1 3.650 2.615 16.383 11.046 1.483 3.469
54.339 0.018 0.001 1:1 3.700 2.530 15.762 10.856 1.452 3.447
52.090 0.018 0.001 1:1 3.700 2.525 15.718 10.842 1.450 3.314
50.238 0.018 0.001 1:1 3.700 2.460 15.154 10.658 1.422 3.315
48.126 0.018 0.001 1:1 3.700 2.420 14.810 10.545 1.405 3.249
33.583 0.018 0.001 1:1 2.600 2.285 11.162 9.063 1.232 3.009
31.221 0.018 0.001 1:1 2.700 2.170 10.568 8.838 1.196 2.954
29.052 0.018 0.001 1:1 2.850 2.050 10.045 8.648 1.162 2.892
26.454 0.018 0.001 1:1 2.700 2.010 9.467 8.385 1.129 2.794
24.517 0.018 0.001 1:1 2.400 2.010 8.864 8.085 1.096 2.766
22.329 0.018 0.001 1:1 2.100 2.010 8.261 7.785 1.061 2.703
19.858 0.018 0.001 1:1 1.700 2.010 7.457 7.385 1.010 2.663
17.576 0.018 0.001 1:1 1.400 2.010 6.854 7.085 0.967 2.564
15.133 0.018 0.001 1:1 1.100 2.010 6.251 6.785 0.921 2.421
12.629 0.018 0.001 1:1 1.000 2.010 6.050 6.685 0.905 2.087
10.134 0.018 0.001 1:1 1.000 2.010 6.050 6.685 0.905 1.675
Design of Parabolic Section
Calculate
Wetted Hydraulic
d Manning' Bed Side Top Flow Velocity
Area 'A' Perimete Radius
Discharg s 'n' Slope 'S' Slope Width 'T' Depth 'Y' 'V'
r 'P' 'R'
e 'Q'
Design of Minor-1
Calculate
Wetted Hydraulic
d Manning' Bed Side Top Flow Velocity
Area 'A' Perimete Radius
Discharg s 'n' Slope 'S' Slope Width 'T' Depth 'Y' 'V'
r 'P' 'R'
e 'Q'
ft3/Sec ft/ft ft ft ft2 ft ft ft/Sec
Minor-1
14.543 0.018 0.001 1:1 1.000 2.010 6.050 6.685 0.905 2.404
14.543 0.018 0.001 1:1 1.000 2.010 6.050 6.685 0.905 2.404
Design of Parabolic Section
14.543 0.012 0.001 Varies 3.200 1.600 3.41 5.333 0.640 4.261
14.543 0.012 0.001 Varies 2.700 1.520 2.74 4.982 0.549 5.315
14.543 0.012 0.001 Varies 2.300 1.458 2.24 4.765 0.469 6.505
Designed
Discharg
e 'Q'
ft3/Sec
77.958
75.372
71.330
68.094
65.834
65.834
64.056
64.056
62.740
59.306
55.773
52.903
52.705
50.156
48.622
33.573
31.165
29.054
26.870
24.671
22.497
19.647
17.550
15.493
14.818
14.818
Designed
Discharg
e 'Q'
ft3/Sec
7.952
5.835
3.941
Designed
Discharg
e 'Q'
ft3/Sec
14.818
14.818
9.953
7.204
5.300
Subgrade Preparation 4'' Thick Cement Concrete Lining
Cross
Length
Area Bed Slope Sectional Slope Cross
Reach after Bed
Total Bed Reach including Length Area Area Length Slope Sectional Volume Volume
deductio Bed Thicknes FSD+FB
width Length 1' top Both Slope (bed) Both Thicknes Area (In bed) (on
n for Width (ft) s (ft)
ft ft lining Sides (ft²) including Sides s (ft) (slope) M³ slope) M³
Structure (ft)
(ft²) ft. 1' top ft. (ft²)
s ft.
lining (ft²)
92+538 to 98+500 3.594 5962 4796 26828.82 12.572 60297.03 2.600 0.33 1.736 3.785 11.639 0.33 3.841 8324.897 18420.78
98+500 to 110+000 3.694 11500 9222 52510.07 12.247 112942.7 2.700 0.33 1.769 3.67 11.314 0.33 3.734 16311.87 34430.56
110+000 to 128+150 3.844 18150 17119 100043.4 11.908 203847.5 2.850 0.33 1.818 3.55 10.974 0.33 3.622 31127.48 61996.77
128+150 to 136+600 3.694 8450 7424 42272.26 11.795 87562.67 2.700 0.33 1.769 3.51 10.861 0.33 3.584 13131.57 26608.97
136+600 to 143+750 3.394 7150 4519 24375.49 11.795 53299.53 2.400 0.33 1.670 3.51 10.861 0.33 3.584 7545.826 16196.92
143+750 to 150+200 3.094 6450 6009 30609.85 11.795 70873.4 2.100 0.33 1.571 3.51 10.861 0.33 3.584 9438.937 21537.35
150+200 to 156+300 2.694 6100 5759 27032.75 11.795 67924.76 1.700 0.33 1.439 3.51 10.861 0.33 3.584 8286.049 20641.31
156+300 to 161+400 2.394 5100 4256 18700.86 11.795 50197.57 1.400 0.33 1.340 3.51 10.861 0.33 3.584 5702.189 15254.28
161+400 to 172+600 2.094 11200 9926 40637.04 11.795 117072.6 1.100 0.33 1.241 3.51 10.861 0.33 3.584 12316.18 35576.6
172+600 to 174+400 1.994 1800 652 2604.088 11.795 7690.041 1.000 0.33 1.208 3.51 10.861 0.33 3.584 787.4856 2336.887
174+400 to 179+150 1.994 4750 3695 14757.83 11.795 43580.83 1.000 0.33 1.208 3.51 10.861 0.33 3.584 4462.821 13243.56
Minor-1
0+000 to 11+300 1.994 11300 11300 45132.2 11.795 133278.3 1.000 0.33 1.208 3.51 10.861 0.33 3.584 13648.14 40501.27
11+300 to 14+950 1.994 3650 3650 14578.1 11.795 43050.08 1.000 0.33 1.208 3.51 10.861 0.33 3.584 4408.47 13082.27
440082.8 1051617 135491.9 319827.5
40899.89 97733.93 3836.125 9055.139
sq. m sq. m cub m cub m
17-01-a 17-01-b 17-10-a-0117-10-b-01
2'' Thick Stabilized Layer of Plain Cement Concrete including placing,
Re fill concrete (1:6:18)
Cement Sand compacting,finishing & curing (Ratio 1:2:4)
Cross
Cross
Reach Sectional
Sectional Volume
Thicknes Area (bed) No. of Expansio Total
Area Length (Area Length Area volume
s (ft.) (ft²) inluding profiles n joints length
(slope) (ft²) 0.75*.5*L)
1' top lining X
x Length
Length
92+538 to 98+500 0.167 26828.824 58085.914 480.6 16.899 3045.618 96 16.899 1620.95 3.575 4 19184
98+500 to 110+000 0.167 52510.068 108691.007 923.2 16.674 5772.438 184 16.674 3075.299 3.46 3 27666
110+000 to 128+150 0.167 100043.436 195955.108 1712.9 16.484 10588.482 342 16.484 5643.894 3.34 3 51357
128+150 to 136+600 0.167 42272.256 84139.960 743.4 16.221 4522.054 148 16.221 2408.518 3.3 3 22272
136+600 to 143+750 0.167 24375.486 51216.120 452.9 15.921 2704.010 90 15.921 1438.954 3.3 3 13557
143+750 to 150+200 0.167 30609.846 68103.047 601.9 15.621 3525.891 120 15.621 1877.351 3.3 3 18027
150+200 to 156+300 0.167 27032.746 65269.670 576.9 15.221 3292.908 115 15.221 1753.173 3.3 3 17277
156+300 to 161+400 0.167 18700.864 48235.408 426.6 14.921 2387.013 85 14.921 1270.089 3.3 3 12768
161+400 to 172+600 0.167 40637.044 112496.395 993.6 14.621 5447.844 199 14.621 2902.593 3.3 3 29778
172+600 to 174+400 0.167 2604.088 7389.447 66.2 14.521 360.488 13 14.521 189.3559 3.3 3 1956
174+400 to 179+150 0.167 14757.83 41877.310 370.5 14.521 2017.534 74 14.521 1073.114 3.3 3 11085
Minor-1 0
0+000 to 11+300 0.167 45132.2 128068.635 1131 14.521 6158.787 226 14.521 3281.782 3.3 3 33900
11+300 to 14+950 0.167 14578.1 41367.302 366 14.521 1993.029 73 14.521 1060.045 3.3 3 10950
40937.933767 94036.7742 51816.096 27595.12 269777
134974.708 1467.04688 8410.581 7638.08
sq. m cub m M
17-10-b-01 17-02 06-05-f 06-21 06-03-e
Quantities parabola
Length after
Reach Discharge Length 3" Sand bed
Deductions
a = FSD+FB b = top width L Thickness Volume
179+150 to180+650 7.564 1500 1500 3 2.9 7.150 0.250 2681.20067463
180+650 to 182+350 4.947 1700 1670 2.9 2.5 6.686 0.250 2791.34978348
182+350 to 185+322 2.462 2972 2810 2.5 2.5 5.981 0.250 4201.87963922
Minor-1
14+950 to 17+050 19.858 2100 2100 3.1 3.2 7.558 0.250 3968.04443859
17+050 to 18+700 17.576 1650 1650 3.02 2.7 7.038 0.250 2903.13576011
18+700 to 22+976 15.133 4276 4276 2.958 2.3 6.661 0.250 7120.65639838
14006 23666.2666944
4268.820 670.053
cub. m
m.
07-30
17-11-a
GOVERNMENT OF KHYBER PAKHTUNKHWA
IRRAGATION DEPARTMENT
CONSTRUCTION OF SIRAN RIGHT BANK CANAL DISTRICT MANSEHRA
Measurement Sheet :-
Erecting & removing formwork to concrete in any shape /position (Vertical)
BOQ Item Code
SEWEARG NALLA 0+500 TO 7+000
06-39-b
S-no Qty
RD DESCRIPTION Nos. Sides Hight(ft) Length Remarks
(Sq.ft)
1 01+310 01+595 NALLA BED 1.00 1.00 0.50 285.00 142.50
2 01+310 01+595 NALLA WALL 1.00 2.00 2.50 285.00 1425.00
1+110 & 1+593 PIPE CULVERT 2.00 2.00 2.90 16.00 185.60
1+110 & 1+593 MAIN HOLE BED 2.00 4.00 0.50 3.84 15.36
MAIN HOLE WALL 2.00 2.00 3.00 2.50
1+110 & 1+593 30.00
INNER SITE
MAIN HOLE WALL 2.00 2.00 3.00 3.84
1+110 & 1+593 46.08
3 OUTER SITE
01+845 & 4+963 PIPE CULVERT 2.00 2.00 2.90 16.00 185.60
4 03+525 PIPE CULVERT 1.00 2.00 2.90 80.00 464.00
5 03+525 NALLA BED 1.00 2.00 0.50 60.00 60.00
6 03+525 NALLA WALL 2.00 2.00 1.50 60.00 360.00
29 03+860 04+963 NALLA BED 1.00 1.00 0.50 1103.00 551.50
30 03+860 04+963 NALLA WALL 1.00 2.00 2.50 1103.00 5515.00
Sructural Excavation
Measurement Sheet :- Structural Excavation in Common Material
00+600 to 7+00 SEWERAGE NALLA
Qty
S-no RD DESCRIPTION Sides Width (ft) Hight (ft) Length (FT) Remarks
1 00+600 00+850 NALLA 1.00 1.00 3.00 250.00 750.00
2 00+850 01+110 NALLA 1.00 1.50 3.00 260.00 1170.00
3 01+110 01+310 NALLA 1.00 1.00 3.00 200.00 600.00
4 01+310 01+595 NALLA 1.00 3.17 3.00 285.00 2710.35
6 1+110 & 1+593 PIPE CULVERT (area) 2.00 4.90 2.90 16.00 156.80
7 1+110 & 1+593 MAIN HOLE BED 2.00 5.17 3.00 5.17 160.37
10 01+845&4+963 PIPE CULVERT (area) 2.00 4.90 2.90 16.00 92.80
11 03+525 PIPE CULVERT (area) 1.00 4.90 2.90 80.00 392.00
12 03+525 NALLA BED 1.00 4.84 3.00 60.00 871.20
14 03+860 04+450 NALLA BED 1.00 2.67 3.00 590.00 4725.90
15 04+450 04+963 NALLA BED 1.00 3.19 3.00 513.00 4909.41
TOTAL QTY in Cu.ft: 16538.83
TOTAL QTY in Cu.m: 468.26 Paid in Drainage culvert
IRRAGATION DEPARTMENT
CONSTRUCTION OF SIRAN RIGHT BANK CANAL DISTRICT MANSEHRA
Measurement Sheet :-
Plain Cement Concrete including placing, compacting, finishing & curing (Ratio 1:3:6)
SEWERAG NALLA 1:3:6 BOQ Item Code (06-05-h)
00+500 TO 07+000
Qty
S-no RD DESCRIPTION Sides Width (ft) Hight (ft) Length (FT) Remarks
1 00+600 00+850 NALLA BED 1.00 1.00 0.50 250.00 125.00
2 00+850 01+110 NALLA BED 1.00 1.50 0.50 260.00 195.00
3 01+110 01+310 NALLA BED 1.00 1.00 0.50 200.00 100.00
4 01+310 01+595 NALLA BED 1.00 2.17 0.50 285.00 309.23
5 01+310 01+595 NALLA WALL 1.00 0.67 2.50 285.00 477.38
6 1+110 & 1+593 PIPE CULVERT (area) 2.00 5.57 16.00 178.24
7 1+110 & 1+593 MAIN HOLE BED 2.00 3.17 0.50 3.17 10.05
MAIN HOLE WALL INNER
8 1+110 & 1+593 SITE 4.00 0.67 3.00 3.17 25.49
MAIN HOLE WALL
9 1+110 & 1+593 OUTER SITE 4.00 0.67 3.00 0.50 4.02
10 01+845&4+963 PIPE CULVERT (area) 2.00 5.57 16.00 178.24
11 03+525 PIPE CULVERT (area) 1.00 5.57 80.00 445.60
12 03+525 NALLA BED 1.00 2.84 0.50 60.00 85.20
13 03+525 NALLA WALL 1.00 0.67 1.50 60.00 60.30
14 03+860 04+450 NALLA BED 1.00 1.67 0.50 590.00 492.65
15 04+450 04+963 NALLA BED 1.00 2.19 0.50 513.00 561.74
16 03+860 04+963 NALLA WALL 1.00 0.67 2.50 1103.00 1847.53
TOTAL QTY in Cu.ft: 5095.65
TOTAL QTY in Cu.m: 144.27 Paid in Irrigation canal
Width Qty
R.D Length (ft)
(ft) (sft)
Width Qty
Length (ft)
(ft) (sft)
5468 20 109360
10173.023 Sq.M
5468 20 1 109360
cub. Ft.
3096.263 Cub.M
Qty
Length (ft) Thickness (ft.) Nos.
(sq ft.)
6
Construction of Siran Right Bank Canal
District Mansehra
SRBC Irrigation Canal RRM Retaining Wall Quantities
RD Wall Area (ft2) Reach Volume of No. of Weep Length of Total length Width of PCC Thickness of Volume of Volume of filter Width of 3" Volume of PCC No. of PCC Formwork
height Length (ft.) RRM (ft3) holes (5' c/c) weep hole of weep holes (1:3:6) PCC (1:3:6) concrete band material behind PCC (1:3:6) (1:3:6) 3" Coping Band layers (ft)
(ft.) Concrete Concrete PCC (1:3:6) weep holes Coping
band band (1.5'x1'x1')
RRM
ft ft ft ft ft3 ft3 ft ft3 No. Total
7+500 5.5 8.82 32 282.240 6 1.65 9.9 1.65 0.50 26.4 9.000 1.00 8.000 1 48.00
7+532 7.5 24.31 240 5834.400 48 6.63 318.24 6.63 0.50 795.6 72.000 1.50 90.000 2
7+772 6.5 12.15 378 4592.700 75 1.65 123.75 1.65 0.50 311.85 112.500 1.00 94.500 1 567.00
8+150 5.5 8.82 75 661.500 15 1.65 24.75 1.65 0.50 61.875 22.500 1.00 18.750 1
8+225
8+565 5.5 8.82 790 6967.800 158 1.65 260.7 1.65 0.50 651.75 237.000 1.00 197.500 1 1185.00
9+355 7.5 24.31 1065 25890.150 213 6.63 1412.19 6.63 0.50 3530.475 319.500 1.50 399.375 2 2662.50
10+420
10+492 5.5 8.82 1248 11007.360 249 1.65 410.85 1.65 0.50 1029.6 373.500 1.00 312.000 1 1872.00
11+740
12+010 8.5 37.31 1870 69769.700 374 8.630 3227.62 8.63 0.50 8069.05 561.000 2.50 1168.750 2 4675.00
13+880
20+250 5.5 8.82 250 2205.000 50 1.650 82.5 1.65 0.50 206.25 75.000 1.00 62.500 1 375.00
20+500
20+750 7.5 24.31 250 6077.500 50 6.630 331.5 6.63 0.50 828.75 75.000 1.50 93.750 2 625.00
21+250 6.5 12.15 250 3037.500 50 1.650 82.5 1.65 0.50 206.25 75.000 1.00 62.500 1 375.00
22+000 7.5 24.31 250 6077.500 50 6.630 331.5 6.63 0.50 828.75 75.000 1.50 93.750 2 625.00
22+500 5.5 8.82 250 2205.000 50 1.650 82.5 1.65 0.50 206.25 75.000 1.00 62.500 1 375.00
23+250 8.5 37.31 250 9327.500 50 8.630 431.5 8.63 0.50 1078.75 75.000 2.50 156.250 2 625.00
24+250 5.5 8.82 250 2205.000 50 1.650 82.5 1.65 0.50 206.25 75.000 1.00 62.500 1 375.00
29+500 5.5 8.82 250 2205.000 50 1.650 82.5 1.65 0.50 206.25 75.000 1.00 62.500 1 375.00
30+000 5.5 8.82 250 2205.000 50 1.650 82.5 1.65 0.50 206.25 75.000 1.00 62.500 1 375.00
30+500 5.5 8.82 250 2205.000 50 1.650 82.5 1.65 0.50 206.25 75.000 1.00 62.500 1 375.00
30+750 6.5 12.15 250 3037.500 50 1.650 82.5 1.65 0.50 206.25 75.000 1.00 62.500 1 375.00
31+500 6.5 12.15 250 3037.500 50 1.650 82.5 1.65 0.50 206.25 75.000 1.00 62.500 1 375.00
31+750 6.5 12.15 250 3037.500 50 1.650 82.5 1.65 0.50 206.25 75.000 1.00 62.500 1 375.00
32+500 7.5 24.31 250 6077.500 50 6.630 331.5 6.63 0.50 828.75 75.000 1.50 93.750 2 625.00
32+750 5.5 8.82 250 2205.000 50 1.650 82.5 1.65 0.50 206.25 75.000 1.00 62.500 1 375.00
33+250 5.5 8.82 250 2205.000 50 1.650 82.5 1.65 0.50 206.25 75.000 1.00 62.500 1 375.00
33+750 5.5 8.82 250 2205.000 50 1.650 82.5 1.65 0.50 206.25 75.000 1.00 62.500 1 375.00
34+250 5.5 8.82 250 2205.000 50 1.650 82.5 1.65 0.50 206.25 75.000 1.00 62.500 1 375.00
35+500 7.5 24.31 250 6077.500 50 6.630 331.5 6.63 0.50 828.75 75.000 1.50 93.750 2 625.00
36+000 7.5 24.31 250 6077.500 50 6.630 331.5 6.63 0.50 828.75 75.000 1.50 93.750 2 625.00
36+750 6.5 12.15 250 3037.500 50 1.650 82.5 1.65 0.50 206.25 75.000 1.00 62.500 1 375.00
37+750 7.5 24.31 250 6077.500 50 6.630 331.5 6.63 0.50 828.75 75.000 1.50 93.750 2 625.00
39+250 8.5 37.31 250 9327.500 50 8.630 431.5 8.63 0.50 1078.75 75.000 2.50 156.250 2 625.00
39+750 5.5 8.82 250 2205.000 50 1.650 82.5 1.65 0.50 206.25 75.000 1.00 62.500 1 375.00
40+500 8.5 37.31 250 9327.500 50 8.630 431.5 8.63 0.50 1078.75 75.000 2.50 156.250 2 625.00
42+750 8.5 37.31 250 9327.500 50 8.630 431.5 8.63 0.50 1078.75 75.000 2.50 156.250 2 625.00
43+000 5.5 8.82 250 2205.000 50 1.650 82.5 1.65 0.50 206.25 75.000 1.00 62.500 1 375.00
Construction of Siran Right Bank Canal
District Mansehra
SRBC Irrigation Canal RRM Retaining Wall Quantities
RD Wall Area (ft2) Reach Volume of No. of Weep Length of Total length Width of PCC Thickness of Volume of Volume of filter Width of 3" Volume of PCC No. of PCC Formwork
height Length (ft.) RRM (ft3) holes (5' c/c) weep hole of weep holes (1:3:6) PCC (1:3:6) concrete band material behind PCC (1:3:6) (1:3:6) 3" Coping Band layers (ft)
(ft.) Concrete Concrete PCC (1:3:6) weep holes Coping
band band (1.5'x1'x1')
RRM
ft ft ft ft ft3 ft3 ft ft3 No. Total
43+250 5.5 8.82 250 2205.000 50 1.650 82.5 1.65 0.50 206.25 75.000 1.00 62.500 1 375.00
44+000 5.5 8.82 250 2205.000 50 1.650 82.5 1.65 0.50 206.25 75.000 1.00 62.500 1 375.00
44+250 7.5 24.31 250 6077.500 50 6.630 331.5 6.63 0.50 828.75 75.000 1.50 93.750 2 625.00
45+000 7.5 24.31 250 6077.500 50 6.630 331.5 6.63 0.50 828.75 75.000 1.50 93.750 2 625.00
45+500 6.5 12.15 250 3037.500 50 1.650 82.5 1.65 0.50 206.25 75.000 1.00 62.500 1 375.00
46+250 6.5 12.15 250 3037.500 50 1.650 82.5 1.65 0.50 206.25 75.000 1.00 62.500 1 375.00
46+500 8.5 37.31 250 9327.500 50 8.630 431.5 8.63 0.50 1078.75 75.000 2.50 156.250 2 625.00
47+000 6.5 12.15 250 3037.500 50 1.650 82.5 1.65 0.50 206.25 75.000 1.00 62.500 1 375.00
47+500 8.5 37.31 250 9327.500 50 8.630 431.5 8.63 0.50 1078.75 75.000 2.50 156.250 2 625.00
48+250 8.5 37.31 250 9327.500 50 8.630 431.5 8.63 0.50 1078.75 75.000 2.50 156.250 2 625.00
49+750 6.5 12.15 250 3037.500 50 1.650 82.5 1.65 0.50 206.25 75.000 1.00 62.500 1 375.00
50+000 5.5 8.82 250 2205.000 50 1.650 82.5 1.65 0.50 206.25 75.000 1.00 62.500 1 375.00
50+750 5.5 8.82 250 2205.000 50 1.650 82.5 1.65 0.50 206.25 75.000 1.00 62.500 1 375.00
51+250 8.5 37.31 250 9327.500 50 8.630 431.5 8.63 0.50 1078.75 75.000 2.50 156.250 2 625.00
56+500 8.5 37.31 250 9327.500 50 8.630 431.5 8.63 0.50 1078.75 75.000 2.50 156.250 2 625.00
56+750 8.5 37.31 250 9327.500 50 8.630 431.5 8.63 0.50 1078.75 75.000 2.50 156.250 2 625.00
57+000 6.5 12.15 250 3037.500 50 1.650 82.5 1.65 0.50 206.25 75.000 1.00 62.500 1 375.00
58+250 5.5 8.82 250 2205.000 50 1.650 82.5 1.65 0.50 206.25 75.000 1.00 62.500 1 375.00
59+750 7.5 24.31 250 6077.500 50 6.630 331.5 6.63 0.50 828.75 75.000 1.50 93.750 2 625.00
60+500 5.5 8.82 250 2205.000 50 1.650 82.5 1.65 0.50 206.25 75.000 1.00 62.500 1 375.00
61+750 7.5 24.31 250 6077.500 50 6.630 331.5 6.63 0.50 828.75 75.000 1.50 93.750 2 625.00
62+000 5.5 8.82 250 2205.000 50 1.650 82.5 1.65 0.50 206.25 75.000 1.00 62.500 1 375.00
62+250 8.5 37.31 250 9327.500 50 8.630 431.5 8.63 0.50 1078.75 75.000 2.50 156.250 2 625.00
63+000 7.5 24.31 250 6077.500 50 6.630 331.5 6.63 0.50 828.75 75.000 1.50 93.750 2 625.00
63+750 8.5 37.31 250 9327.500 50 8.630 431.5 8.63 0.50 1078.75 75.000 2.50 156.250 2 625.00
65+250 8.5 37.31 250 9327.500 50 8.630 431.5 8.63 0.50 1078.75 75.000 2.50 156.250 2 625.00
66+000 5.5 8.82 250 2205.000 50 1.650 82.5 1.65 0.50 206.25 75.000 1.00 62.500 1 375.00
66+750 7.5 24.31 250 6077.500 50 6.630 331.5 6.63 0.50 828.75 75.000 1.50 93.750 2 625.00
67+750 8.5 37.31 250 9327.500 50 8.630 431.5 8.63 0.50 1078.75 75.000 2.50 156.250 2 625.00
68+000 7.5 24.31 250 6077.500 50 6.630 331.5 6.63 0.50 828.75 75.000 1.50 93.750 2 625.00
68+750 7.5 24.31 250 6077.500 50 6.630 331.5 6.63 0.50 828.75 75.000 1.50 93.750 2 625.00
69+250 8.5 37.31 250 9327.500 50 8.630 431.5 8.63 0.50 1078.75 75.000 2.50 156.250 2 625.00
69+500 5.5 8.82 250 2205.000 50 1.650 82.5 1.65 0.50 206.25 75.000 1.00 62.500 1 375.00
70+500 8.5 37.31 250 9327.500 50 8.630 431.5 8.63 0.50 1078.75 75.000 2.50 156.250 2 625.00
71+250 7.5 24.31 250 6077.500 50 6.630 331.5 6.63 0.50 828.75 75.000 1.50 93.750 2 625.00
71+750 5.5 8.82 250 2205.000 50 1.650 82.5 1.65 0.50 206.25 75.000 1.00 62.500 1 375.00
72+250 7.5 24.31 250 6077.500 50 6.630 331.5 6.63 0.50 828.75 75.000 1.50 93.750 2 625.00
72+750 8.5 37.31 250 9327.500 50 8.630 431.5 8.63 0.50 1078.75 75.000 2.50 156.250 2 625.00
73+250 5.5 8.82 250 2205.000 50 1.650 82.5 1.65 0.50 206.25 75.000 1.00 62.500 1 375.00
74+000 8.5 37.31 250 9327.500 50 8.630 431.5 8.63 0.50 1078.75 75.000 2.50 156.250 2 625.00
Construction of Siran Right Bank Canal
District Mansehra
SRBC Irrigation Canal RRM Retaining Wall Quantities
RD Wall Area (ft2) Reach Volume of No. of Weep Length of Total length Width of PCC Thickness of Volume of Volume of filter Width of 3" Volume of PCC No. of PCC Formwork
height Length (ft.) RRM (ft3) holes (5' c/c) weep hole of weep holes (1:3:6) PCC (1:3:6) concrete band material behind PCC (1:3:6) (1:3:6) 3" Coping Band layers (ft)
(ft.) Concrete Concrete PCC (1:3:6) weep holes Coping
band band (1.5'x1'x1')
RRM
ft ft ft ft ft3 ft3 ft ft3 No. Total
74+250 7.5 24.31 250 6077.500 50 6.630 331.5 6.63 0.50 828.75 75.000 1.50 93.750 2 625.00
74+500 5.5 8.82 250 2205.000 50 1.650 82.5 1.65 0.50 206.25 75.000 1.00 62.500 1 375.00
74+750 5.5 8.82 250 2205.000 50 1.650 82.5 1.65 0.50 206.25 75.000 1.00 62.500 1 375.00
75+750 7.5 24.31 250 6077.500 50 6.630 331.5 6.63 0.50 828.75 75.000 1.50 93.750 2 625.00
76+250 6.5 12.15 250 3037.500 50 1.650 82.5 1.65 0.50 206.25 75.000 1.00 62.500 1 375.00
76+500 5.5 8.82 250 2205.000 50 1.650 82.5 1.65 0.50 206.25 75.000 1.00 62.500 1 375.00
77+250 5.5 8.82 250 2205.000 50 1.650 82.5 1.65 0.50 206.25 75.000 1.00 62.500 1 375.00
77+500 8.5 37.31 250 9327.500 50 8.630 431.5 8.63 0.50 1078.75 75.000 2.50 156.250 2 625.00
77+750 6.5 12.15 250 3037.500 50 1.650 82.5 1.65 0.50 206.25 75.000 1.00 62.500 1 375.00
78+000 7.5 24.31 250 6077.500 50 6.630 331.5 6.63 0.50 828.75 75.000 1.50 93.750 2 625.00
78+250 6.5 12.15 250 3037.500 50 1.650 82.5 1.65 0.50 206.25 75.000 1.00 62.500 1 375.00
78+750 8.5 37.31 250 9327.500 50 8.630 431.5 8.63 0.50 1078.75 75.000 2.50 156.250 2 625.00
79+250 6.5 12.15 250 3037.500 50 1.650 82.5 1.65 0.50 206.25 75.000 1.00 62.500 1 375.00
79+500 5.5 8.82 250 2205.000 50 1.650 82.5 1.65 0.50 206.25 75.000 1.00 62.500 1 375.00
80+000 6.5 12.15 250 3037.500 50 1.650 82.5 1.65 0.50 206.25 75.000 1.00 62.500 1 375.00
80+250 7.5 24.31 250 6077.500 50 6.630 331.5 6.63 0.50 828.75 75.000 1.50 93.750 2 625.00
80+500 5.5 8.82 250 2205.000 50 1.650 82.5 1.65 0.50 206.25 75.000 1.00 62.500 1 375.00
81+000 5.5 8.82 250 2205.000 50 1.650 82.5 1.65 0.50 206.25 75.000 1.00 62.500 1 375.00
81+250 8.5 37.31 250 9327.500 50 8.630 431.5 8.63 0.50 1078.75 75.000 2.50 156.250 2 625.00
83+000 5.5 8.82 250 2205.000 50 1.650 82.5 1.65 0.50 206.25 75.000 1.00 62.500 1 375.00
83+750 6.5 12.15 250 3037.500 50 1.650 82.5 1.65 0.50 206.25 75.000 1.00 62.500 1 375.00
84+000 5.5 8.82 250 2205.000 50 1.650 82.5 1.65 0.50 206.25 75.000 1.00 62.500 1 375.00
86+000 8.5 37.31 250 9327.500 50 8.630 431.5 8.63 0.50 1078.75 75.000 2.50 156.250 2 625.00
86+250 7.5 24.31 250 6077.500 50 6.630 331.5 6.63 0.50 828.75 75.000 1.50 93.750 2 625.00
86+750 6.5 12.15 250 3037.500 50 1.650 82.5 1.65 0.50 206.25 75.000 1.00 62.500 1 375.00
87+250 5.5 8.82 250 2205.000 50 1.650 82.5 1.65 0.50 206.25 75.000 1.00 62.500 1 375.00
87+750 6.5 12.15 250 3037.500 50 1.650 82.5 1.65 0.50 206.25 75.000 1.00 62.500 1 375.00
88+750 8.5 37.31 250 9327.500 50 8.630 431.5 8.63 0.50 1078.75 75.000 2.50 156.250 2 625.00
89+500 8.5 37.31 250 9327.500 50 8.630 431.5 8.63 0.50 1078.75 75.000 2.50 156.250 2 625.00
93+250 6.5 12.15 250 3037.500 50 1.650 82.5 1.65 0.50 206.25 75.000 1.00 62.500 1 375.00
93+500 8.5 37.31 250 9327.500 50 8.630 431.5 8.63 0.50 1078.75 75.000 2.50 156.250 2 625.00
94+000 7.5 24.31 250 6077.500 50 6.630 331.5 6.63 0.50 828.75 75.000 1.50 93.750 2 625.00
94+250 7.5 24.31 250 6077.500 50 6.630 331.5 6.63 0.50 828.75 75.000 1.50 93.750 2 625.00
95+500 5.5 8.82 250 2205.000 50 1.650 82.5 1.65 0.50 206.25 75.000 1.00 62.500 1 375.00
95+750 8.5 37.31 250 9327.500 50 8.630 431.5 8.63 0.50 1078.75 75.000 2.50 156.250 2 625.00
96+000 7.5 24.31 250 6077.500 50 6.630 331.5 6.63 0.50 828.75 75.000 1.50 93.750 2 625.00
96+250 7.5 24.31 250 6077.500 50 6.630 331.5 6.63 0.50 828.75 75.000 1.50 93.750 2 625.00
96+500 5.5 8.82 250 2205.000 50 1.650 82.5 1.65 0.50 206.25 75.000 1.00 62.500 1 375.00
97+250 7.5 24.31 250 6077.500 50 6.630 331.5 6.63 0.50 828.75 75.000 1.50 93.750 2 625.00
97+500 6.5 12.15 250 3037.500 50 1.650 82.5 1.65 0.50 206.25 75.000 1.00 62.500 1 375.00
Construction of Siran Right Bank Canal
District Mansehra
SRBC Irrigation Canal RRM Retaining Wall Quantities
RD Wall Area (ft2) Reach Volume of No. of Weep Length of Total length Width of PCC Thickness of Volume of Volume of filter Width of 3" Volume of PCC No. of PCC Formwork
height Length (ft.) RRM (ft3) holes (5' c/c) weep hole of weep holes (1:3:6) PCC (1:3:6) concrete band material behind PCC (1:3:6) (1:3:6) 3" Coping Band layers (ft)
(ft.) Concrete Concrete PCC (1:3:6) weep holes Coping
band band (1.5'x1'x1')
RRM
ft ft ft ft ft3 ft3 ft ft3 No. Total
97+750 6.5 12.15 250 3037.500 50 1.650 82.5 1.65 0.50 206.25 75.000 1.00 62.500 1 375.00
98+500 7.5 24.31 250 6077.500 50 6.630 331.5 6.63 0.50 828.75 75.000 1.50 93.750 2 625.00
99+500 8.5 37.31 250 9327.500 50 8.630 431.5 8.63 0.50 1078.75 75.000 2.50 156.250 2 625.00
99+750 8.5 37.31 250 9327.500 50 8.630 431.5 8.63 0.50 1078.75 75.000 2.50 156.250 2 625.00
100+000 5.5 8.82 250 2205.000 50 1.650 82.5 1.65 0.50 206.25 75.000 1.00 62.500 1 375.00
100+750 6.5 12.15 250 3037.500 50 1.650 82.5 1.65 0.50 206.25 75.000 1.00 62.500 1 375.00
103+500 7.5 24.31 250 6077.500 50 6.630 331.5 6.63 0.50 828.75 75.000 1.50 93.750 2 625.00
103+750 8.5 37.31 250 9327.500 50 8.630 431.5 8.63 0.50 1078.75 75.000 2.50 156.250 2 625.00
104+500 6.5 12.15 250 3037.500 50 1.650 82.5 1.65 0.50 206.25 75.000 1.00 62.500 1 375.00
105+000 8.5 37.31 250 9327.500 50 8.630 431.5 8.63 0.50 1078.75 75.000 2.50 156.250 2 625.00
105+750 6.5 12.15 250 3037.500 50 1.650 82.5 1.65 0.50 206.25 75.000 1.00 62.500 1 375.00
106+500 8.5 37.31 250 9327.500 50 8.630 431.5 8.63 0.50 1078.75 75.000 2.50 156.250 2 625.00
107+000 7.5 24.31 250 6077.500 50 6.630 331.5 6.63 0.50 828.75 75.000 1.50 93.750 2 625.00
107+250 8.5 37.31 250 9327.500 50 8.630 431.5 8.63 0.50 1078.75 75.000 2.50 156.250 2 625.00
107+500 8.5 37.31 250 9327.500 50 8.630 431.5 8.63 0.50 1078.75 75.000 2.50 156.250 2 625.00
108+000 6.5 12.15 250 3037.500 50 1.650 82.5 1.65 0.50 206.25 75.000 1.00 62.500 1 375.00
108+500 8.5 37.31 250 9327.500 50 8.630 431.5 8.63 0.50 1078.75 75.000 2.50 156.250 2 625.00
108+750 8.5 37.31 250 9327.500 50 8.630 431.5 8.63 0.50 1078.75 75.000 2.50 156.250 2 625.00
109+000 7.5 24.31 250 6077.500 50 6.630 331.5 6.63 0.50 828.75 75.000 1.50 93.750 2 625.00
110+250 5.5 8.82 250 2205.000 50 1.650 82.5 1.65 0.50 206.25 75.000 1.00 62.500 1 375.00
111+500 7.5 24.31 250 6077.500 50 6.630 331.5 6.63 0.50 828.75 75.000 1.50 93.750 2 625.00
114+750 6.5 12.15 250 3037.500 50 1.650 82.5 1.65 0.50 206.25 75.000 1.00 62.500 1 375.00
115+000 5.5 8.82 250 2205.000 50 1.650 82.5 1.65 0.50 206.25 75.000 1.00 62.500 1 375.00
115+250 6.5 12.15 250 3037.500 50 1.650 82.5 1.65 0.50 206.25 75.000 1.00 62.500 1 375.00
115+500 6.5 12.15 250 3037.500 50 1.650 82.5 1.65 0.50 206.25 75.000 1.00 62.500 1 375.00
116+250 8.5 37.31 250 9327.500 50 8.630 431.5 8.63 0.50 1078.75 75.000 2.50 156.250 2 625.00
119+250 7.5 24.31 250 6077.500 50 6.630 331.5 6.63 0.50 828.75 75.000 1.50 93.750 2 625.00
119+500 8.5 37.31 250 9327.500 50 8.630 431.5 8.63 0.50 1078.75 75.000 2.50 156.250 2 625.00
121+000 6.5 12.15 250 3037.500 50 1.650 82.5 1.65 0.50 206.25 75.000 1.00 62.500 1 375.00
125+500 8.5 37.31 250 9327.500 50 8.630 431.5 8.63 0.50 1078.75 75.000 2.50 156.250 2 625.00
127+250 7.5 24.31 250 6077.500 50 6.630 331.5 6.63 0.50 828.75 75.000 1.50 93.750 2 625.00
127+750 7.5 24.31 250 6077.500 50 6.630 331.5 6.63 0.50 828.75 75.000 1.50 93.750 2 625.00
130+750 6.5 12.15 250 3037.500 50 1.650 82.5 1.65 0.50 206.25 75.000 1.00 62.500 1 375.00
131+500 7.5 24.31 250 6077.500 50 6.630 331.5 6.63 0.50 828.75 75.000 1.50 93.750 2 625.00
132+000 5.5 8.82 250 2205.000 50 1.650 82.5 1.65 0.50 206.25 75.000 1.00 62.500 1 375.00
133+000 7.5 24.31 250 6077.500 50 6.630 331.5 6.63 0.50 828.75 75.000 1.50 93.750 2 625.00
133+500 7.5 24.31 250 6077.500 50 6.630 331.5 6.63 0.50 828.75 75.000 1.50 93.750 2 625.00
133+750 6.5 12.15 250 3037.500 50 1.650 82.5 1.65 0.50 206.25 75.000 1.00 62.500 1 375.00
145+250 7.5 24.31 250 6077.500 50 6.630 331.5 6.63 0.50 828.75 75.000 1.50 93.750 2 625.00
149+500 7.5 24.31 250 6077.500 50 6.630 331.5 6.63 0.50 828.75 75.000 1.50 93.750 2 625.00
Construction of Siran Right Bank Canal
District Mansehra
SRBC Irrigation Canal RRM Retaining Wall Quantities
RD Wall Area (ft2) Reach Volume of No. of Weep Length of Total length Width of PCC Thickness of Volume of Volume of filter Width of 3" Volume of PCC No. of PCC Formwork
height Length (ft.) RRM (ft3) holes (5' c/c) weep hole of weep holes (1:3:6) PCC (1:3:6) concrete band material behind PCC (1:3:6) (1:3:6) 3" Coping Band layers (ft)
(ft.) Concrete Concrete PCC (1:3:6) weep holes Coping
band band (1.5'x1'x1')
RRM
ft ft ft ft ft3 ft3 ft ft3 No. Total
150+500 5.5 8.82 250 2205.000 50 1.650 82.5 1.65 0.50 206.25 75.000 1.00 62.500 1 375.00
161+750 7.5 24.31 250 6077.500 50 6.630 331.5 6.63 0.50 828.75 75.000 1.50 93.750 2 625.00
164+500 7.5 24.31 250 6077.500 50 6.630 331.5 6.63 0.50 828.75 75.000 1.50 93.750 2 625.00
165+000 6.5 12.15 250 3037.500 50 1.650 82.5 1.65 0.50 206.25 75.000 1.00 62.500 1 375.00
168+000 8.5 37.31 250 9327.500 50 8.630 431.5 8.63 0.50 1078.75 75.000 2.50 156.250 2 625.00
168+250 7.5 24.31 250 6077.500 50 6.630 331.5 6.63 0.50 828.75 75.000 1.50 93.750 2 625.00
168+750 8.5 37.31 250 9327.500 50 8.630 431.5 8.63 0.50 1078.75 75.000 2.50 156.250 2 625.00
169+000 8.5 37.31 250 9327.500 50 8.630 431.5 8.63 0.50 1078.75 75.000 2.50 156.250 2 625.00
171+000 6.5 12.15 250 3037.500 50 1.650 82.5 1.65 0.50 206.25 75.000 1.00 62.500 1 375.00
172+000 8.5 37.31 250 9327.500 50 8.630 431.5 8.63 0.50 1078.75 75.000 2.50 156.250 2 625.00
172+250 7.5 24.31 250 6077.500 50 6.630 331.5 6.63 0.50 828.75 75.000 1.50 93.750 2 625.00
174+250 8.5 37.31 250 9327.500 50 8.630 431.5 8.63 0.50 1078.75 75.000 2.50 156.250 2 625.00
175+000 8.5 37.31 250 9327.500 50 8.630 431.5 8.63 0.50 1078.75 75.000 2.50 156.250 2 625.00
175+500 7.5 24.31 250 6077.500 50 6.630 331.5 6.63 0.50 828.75 75.000 1.50 93.750 2 625.00
177+750 7.5 24.31 125 3038.750 25 6.630 165.75 6.63 0.50 414.375 37.500 1.50 46.875 2 312.50
179+000 8.5 37.31 125 4663.750 25 8.630 215.75 8.63 0.50 539.375 37.500 2.50 78.125 2 312.50
182+750 8.5 37.31 125 4663.750 25 8.630 215.75 8.63 0.50 539.375 37.500 2.50 78.125 2 312.50
185+250 8.5 37.31 112.25 4188.048 22 8.630 189.86 8.63 0.50 484.35875 33.000 2.50 70.156 2 280.63
185+522
Total Volume in Cub. Ft. 1,007,817.65 46,169.61 115,440.33 13,927.50 18,124.66 94,602.63
Total Volume in Cub. m. 28,533.91 14,071.81 3,268.413 394.323 513.156 8,800.244
Construction of Siran Right Bank Canal
District Mansehra
SRBC Irrigation Canal Plum Concrete Retaining Wall Quantities (Main Canal)
RD Wall height (ft.) Area (ft2) Reach Length (ft.) Volume of PCC No. of weep Length of weep Total length of Volume of filter Formwork
(1:3:6) 40% holes (5' c/c) pipe weep pipe material behind (ft)
Boulders (ft3) weep holes (1cft)
Plain Cement Concrete including placing, compacting, finishing & curing (Ratio
D-2
1:4:8)
RCC in roof slab, beam, column & other structural members, insitu or
D-4 precast. Type C (1:2:4)
D-5 Supply & fabricate M.S. reinforcement for cement concrete (Hot rolled deformed
bars Grade 40).
D-9 Providing and Laying stone pitching for top layer only : On Slope
D-11 Plain Cement Concrete including placing, compacting, finishing & curing (Ratio
1:3:6)
D-12 PCC 1:3:6 in mass concrete less formwork using 40% boulders
Construction of Siran Right Bank Canal
District Mansehra
Drainage Culverts
D-12 Erecting & removing formwork to concrete in any shape / position (Vertical)
BOQ
Description
Item No.
E-1 Structural Excavation in Common Material
BOQ
Description
Item No.
RD: 30+650 1 9.1 16 0.333 48.48
RD: 31+855 1 9.1 16 0.333 48.48
RD: 100+116 1 7.5 16 0.333 39.96
RD: 152+476 1 6.8 16 0.333 36.23
RD: 153+283 1 6.8 16 0.333 36.23
RD: 163+260 1 6.2 16 0.333 33.03
RD: 165+245 1 6.2 16 0.333 33.03
RD: 165+733 1 6.2 16 0.333 33.03
RD: 181+501 1 4.5 16 0.333 23.98
RD: 184+681 1 4.2 16 0.333 22.38
Total Quantity (Cft) 601.26
Total Quantity (CuM) 17.03
RCC in raft foundation slab, base slab of column & ret. wall etc, not including in 06-
E-3
06. Type C(1:2:4)
Description No. Length Width Depth Volume (cft)
(ft) (ft) (ft)
BOQ
Description
Item No.
Sides 2 16 1 4.5 144.00
RD: 100+116 Base 1 7 16 1.5 168.00
Sides 2 16 1 4 128.00
RD: 152+476 Base 1 6.3 16 1.5 151.20
Sides 2 16 1 4 128.00
RD: 153+283 Base 1 6.3 16 1.5 151.20
Sides 2 16 1 4 128.00
RD: 163+260 Base 1 5.7 16 1.5 136.80
Sides 2 16 1 4 128.00
RD: 165+245 Base 1 5.7 16 1.5 136.80
Sides 2 16 1 4 128.00
RD: 165+733 Base 1 5.7 16 1.5 136.80
Sides 2 16 1 4 128.00
RD: 181+501 Base 1 4 16 1.5 96.00
Sides 2 16 1 4 128.00
RD: 184+681 Base 1 3.7 16 1.5 88.80
Sides 2 16 1 4 128.00
Total Quantity (Cft) 4560.40
Total Quantity (CuM) 129.14
RCC in roof slab, beam, column & other structural members, insitu or precast. Type
E-4
C (1:2:4)
Description No. Length Width Depth Volume (cft)
(ft) (ft) (ft)
BOQ
Description
Item No.
` Parapet 2 8.75 0.5 2 17.50
RD: 28+000 Top Slab 1 8.75 16 1.333 186.62
Parapet 2 8.75 0.5 2 17.50
RD: 30+650 Top Slab 1 8.6 16 1.333 183.42
Parapet 2 8.6 0.5 2 17.20
RD: 31+855 Top Slab 1 8.6 16 1.333 183.42
Parapet 2 8.6 0.5 2 17.20
RD: 100+116 Top Slab 1 7 16 1.333 149.30
Parapet 2 7 0.5 2 14.00
RD: 152+476 Top Slab 1 6.3 16 1.333 134.37
Parapet 2 6.3 0.5 2 12.60
RD: 153+283 Top Slab 1 6.3 16 1.333 134.37
Parapet 2 6.3 0.5 2 12.60
RD: 163+260 Top Slab 1 5.7 16 1.333 121.57
Parapet 2 5.7 0.5 2 11.40
RD: 165+245 Top Slab 1 5.7 16 1.333 121.57
Parapet 2 5.7 0.5 2 11.40
RD: 165+733 Top Slab 1 5.7 16 1.333 121.57
Parapet 2 5.7 0.5 2 11.40
RD: 181+501 Top Slab 1 4 16 1.333 85.31
Parapet 2 4 0.5 2 8.00
RD: 184+681 Top Slab 1 3.7 16 1.333 78.91
Parapet 2 3.7 0.5 2 7.40
Total Quantity (Cft) 2413.88
Total Quantity (CuM 68.35
Supply & fabricate M.S. reinforcement for cement concrete (Hot rolled deformed
E-5 bars Grade 40).
BOQ
Description
Item No.
OR 27.13 tonnes
BOQ
Description
Item No.
RD: 7+000 2 16 1.5 7.666 367.97
RD: 8+000 2 16 1.5 7.666 367.97
RD: 28+000 2 16 1.5 7.666 367.97
RD: 30+650 2 16 1.5 7.666 367.97
RD: 31+855 2 16 1.5 7.666 367.97
RD: 100+116 2 16 1.5 7.166 343.97
RD: 152+476 2 16 1.5 7.166 343.97
RD: 153+283 2 16 1.5 7.166 343.97
RD: 163+260 2 16 1.5 7.166 343.97
RD: 165+245 2 16 1.5 7.166 343.97
RD: 165+733 2 16 1.5 7.166 343.97
RD: 181+501 2 16 1.5 7.166 343.97
RD: 184+681 2 16 1.5 7.166 343.97
Total Quantity (Cft) 5327.52
Total Quantity (CuM 150.86
Construction of Siran Right Bank Canal
District Mansehra
Pipe Outlets
BOQ Description
Item No.
Plain Cement Concrete including placing, compacting, finishing & curing (Ratio
F-2
1:4:8)
RCC in chamber
Outlet No. Pipe dia Length Width Height Thickness Volume
Main canal Outlet-1 0.625 3.000 3.000 3.625 1.000 108.750
Outlet-2 0.417 3.000 3.000 3.417 1.000 102.500
Outlet-3 0.375 3.000 3.000 3.375 1.000 101.250
Outlet-4 0.667 3.000 3.000 3.667 1.000 110.000
Outlet-5 0.417 3.000 3.000 3.417 1.000 102.500
Outlet-6 0.542 3.000 3.000 3.542 1.000 106.250
Outlet-7 0.542 3.000 3.000 3.542 1.000 106.250
Outlet-8 0.708 3.000 3.000 3.708 1.000 111.250
Outlet-9 0.583 3.000 3.000 3.583 1.000 107.500
Outlet-10 0.542 3.000 3.000 3.542 1.000 106.250
Outlet-11 0.500 3.000 3.000 3.500 1.000 105.000
Outlet-12 0.417 3.000 3.000 3.417 1.000 102.500
Outlet-13 0.500 3.000 3.000 3.500 1.000 105.000
Outlet-14 0.333 3.000 3.000 3.333 1.000 100.000
Outlet-15 0.417 3.000 3.000 3.417 1.000 102.500
Outlet-16 0.458 3.000 3.000 3.458 1.000 103.750
Outlet-17 0.542 3.000 3.000 3.542 1.000 106.250
Outlet-18 0.625 3.000 3.000 3.625 1.000 108.750
Outlet-19 0.667 3.000 3.000 3.667 1.000 110.000
Outlet-20 0.583 3.000 3.000 3.583 1.000 107.500
Outlet-21 0.875 3.000 3.000 3.875 1.000 116.250
Outlet-22 0.625 3.000 3.000 3.625 1.000 108.750
Outlet-23 0.542 3.000 3.000 3.542 1.000 106.250
Outlet-24 0.500 3.000 3.000 3.500 1.000 105.000
Outlet-25 0.458 3.000 3.000 3.458 1.000 103.750
Outlet-26 0.333 3.000 3.000 3.333 1.000 100.000
Outlet-27 0.792 3.000 3.000 3.792 1.000 113.750
Outlet-28 0.583 3.000 3.000 3.583 1.000 107.500
Outlet-29 0.667 3.000 3.000 3.667 1.000 110.000
Outlet-30 0.417 3.000 3.000 3.417 1.000 102.500
Outlet-31 0.667 3.000 3.000 3.667 1.000 110.000
Outlet-32 0.292 3.000 3.000 3.292 1.000 98.750
Outlet-33 0.667 3.000 3.000 3.667 1.000 110.000
Outlet-34 0.500 3.000 3.000 3.500 1.000 105.000
Outlet-35 0.792 3.000 3.000 3.792 1.000 113.750
Outlet-36 0.625 3.000 3.000 3.625 1.000 108.750
Outlet-37 0.542 3.000 3.000 3.542 1.000 106.250
Outlet-38 0.625 3.000 3.000 3.625 1.000 108.750
Outlet-39 0.625 3.000 3.000 3.625 1.000 108.750
Outlet-40 0.625 3.000 3.000 3.625 1.000 108.750
Outlet-41 0.583 3.000 3.000 3.583 1.000 107.500
Outlet-42 0.667 3.000 3.000 3.667 1.000 110.000
Outlet-43 0.583 3.000 3.000 3.583 1.000 107.500
Outlet-44 0.667 3.000 3.000 3.667 1.000 110.000
Outlet-45 0.583 3.000 3.000 3.583 1.000 107.500
Outlet-46 0.583 3.000 3.000 3.583 1.000 107.500
Outlet-47 0.625 3.000 3.000 3.625 1.000 108.750
Outlet-48 0.583 3.000 3.000 3.583 1.000 107.500
Outlet-49 0.667 3.000 3.000 3.667 1.000 110.000
Outlet-50 0.625 3.000 3.000 3.625 1.000 108.750
Outlet-51 0.667 3.000 3.000 3.667 1.000 110.000
Outlet-52 0.458 3.000 3.000 3.458 1.000 103.750
Outlet-53 0.542 3.000 3.000 3.542 1.000 106.250
Outlet-54 0.833 3.000 3.000 3.833 1.000 115.000
Outlet-55 0.583 3.000 3.000 3.583 1.000 107.500
Minor Canal Outlet-1 0.917 3.000 3.000 3.917 1.000 117.500
Outlet-2 0.875 3.000 3.000 3.875 1.000 116.250
Outlet-3 0.875 3.000 3.000 3.875 1.000 116.250
Outlet-4 0.875 3.000 3.000 3.875 1.000 116.250
Outlet-5 0.792 3.000 3.000 3.792 1.000 113.750
Outlet-6 0.875 3.000 3.000 3.875 1.000 116.250
RCC in chamber 6590.000 Cub. ft.
OR 186.580 Cub. M.
Supply & fabricate M.S. reinforcement for cement concrete (Hot rolled
F-4
deformed bars Grade 40).
Depth at
Outlet No. Pipe dia Length Width Depth at top Volume
sides
Main canal Outlet-1 0.625 20.00 1.500 3.000 2.000 194.000
Outlet-2 0.417 20.00 1.500 3.000 2.000 185.667
Outlet-3 0.375 20.00 1.500 3.000 2.000 184.000
Outlet-4 0.667 20.00 1.500 3.000 2.000 195.667
Outlet-5 0.417 20.00 1.500 3.000 2.000 185.667
Outlet-6 0.542 20.00 1.500 3.000 2.000 190.667
Outlet-7 0.542 20.00 1.500 3.000 2.000 190.667
Outlet-8 0.708 20.00 1.500 3.000 2.000 197.333
Outlet-9 0.583 20.00 1.500 3.000 2.000 192.333
Outlet-10 0.542 20.00 1.500 3.000 2.000 190.667
Outlet-11 0.500 20.00 1.500 3.000 2.000 189.000
Outlet-12 0.417 20.00 1.500 3.000 2.000 185.667
Outlet-13 0.500 20.00 1.500 3.000 2.000 189.000
Outlet-14 0.333 20.00 1.500 3.000 2.000 182.333
Outlet-15 0.417 20.00 1.500 3.000 2.000 185.667
Outlet-16 0.458 20.00 1.500 3.000 2.000 187.333
Outlet-17 0.542 20.00 1.500 3.000 2.000 190.667
Outlet-18 0.625 20.00 1.500 3.000 2.000 194.000
Outlet-19 0.667 20.00 1.500 3.000 2.000 195.667
Outlet-20 0.583 20.00 1.500 3.000 2.000 192.333
Outlet-21 0.875 20.00 1.500 3.000 2.000 204.000
Outlet-22 0.625 20.00 1.500 3.000 2.000 194.000
Outlet-23 0.542 20.00 1.500 3.000 2.000 190.667
Outlet-24 0.500 20.00 1.500 3.000 2.000 189.000
Outlet-25 0.458 20.00 1.500 3.000 2.000 187.333
Outlet-26 0.333 20.00 1.500 3.000 2.000 182.333
Outlet-27 0.792 20.00 1.500 3.000 2.000 200.667
Outlet-28 0.583 20.00 1.500 3.000 2.000 192.333
Outlet-29 0.667 20.00 1.500 3.000 2.000 195.667
Outlet-30 0.417 20.00 1.500 3.000 2.000 185.667
Outlet-31 0.667 20.00 1.500 3.000 2.000 195.667
Outlet-32 0.292 20.00 1.500 3.000 2.000 180.667
Outlet-33 0.667 20.00 1.500 3.000 2.000 195.667
Outlet-34 0.500 20.00 1.500 3.000 2.000 189.000
Outlet-35 0.792 20.00 1.500 3.000 2.000 200.667
Outlet-36 0.625 20.00 1.500 3.000 2.000 194.000
Outlet-37 0.542 20.00 1.500 3.000 2.000 190.667
Outlet-38 0.625 20.00 1.500 3.000 2.000 194.000
Outlet-39 0.625 20.00 1.500 3.000 2.000 194.000
Outlet-40 0.625 20.00 1.500 3.000 2.000 194.000
Outlet-41 0.583 20.00 1.500 3.000 2.000 192.333
Outlet-42 0.667 20.00 1.500 3.000 2.000 195.667
Outlet-43 0.583 20.00 1.500 3.000 2.000 192.333
Outlet-44 0.667 20.00 1.500 3.000 2.000 195.667
Outlet-45 0.583 20.00 1.500 3.000 2.000 192.333
Outlet-46 0.583 20.00 1.500 3.000 2.000 192.333
Outlet-47 0.625 20.00 1.500 3.000 2.000 194.000
Outlet-48 0.583 20.00 1.500 3.000 2.000 192.333
Outlet-49 0.667 20.00 1.500 3.000 2.000 195.667
Outlet-50 0.625 20.00 1.500 3.000 2.000 194.000
Outlet-51 0.667 20.00 1.500 3.000 2.000 195.667
Outlet-52 0.458 20.00 1.500 3.000 2.000 187.333
Outlet-53 0.542 20.00 1.500 3.000 2.000 190.667
Outlet-54 0.833 20.00 1.500 3.000 2.000 202.333
Outlet-55 0.583 20.00 1.500 3.000 2.000 192.333
Minor Canal Outlet-1 0.917 20.00 1.500 3.000 2.000 205.667
Outlet-2 0.875 20.00 1.500 3.000 2.000 204.000
Outlet-3 0.875 20.00 1.500 3.000 2.000 204.000
Outlet-4 0.875 20.00 1.500 3.000 2.000 204.000
Outlet-5 0.792 20.00 1.500 3.000 2.000 200.667
Outlet-6 0.875 20.00 1.500 3.000 2.000 204.000
Total backfill 11775.667 Cub. ft.
OR 333.399 Cub. M.
Construction of Siran Right Bank Canal
District Mansehra
Head Regulator (Minor Canal)
BOQ
Item No. Description
Plain Cement Concrete including placing, compacting, finishing & curing (Ratio
G-2
1:4:8)
Supply & fabricate M.S. reinforcement for cement concrete (Hot rolled
G-4
deformed bars Grade 40).
Take Steel @ 2.00% of RCC Qty = 2.00% x 349.70 x 490 = 2998.671 lbs
OR 1.360 Tonnes
G-5 P/I gates for head regulator i/c hoisting device complete in all respect.
Description No. Length Width Volume (sft)
(ft) (ft)
Providing and fixing MS steel grated trash rack as per drawings and instructions
G-6
of Engineer.
Plain woodwork for regulation karries or needles etc. complete as per specs :
G-7
Deodar wood
BOQ
Item No. Description
Plain Cement Concrete including placing, compacting, finishing & curing (Ratio
H-2 1:4:8)
Supply & fabricate M.S. reinforcement for cement concrete (Hot rolled
H-4 deformed bars Grade 40).
BOQ
Item No. Description
H-5 Supplying stone and stone filling in GI wire crate and its sewing, excluding cost of crates
H-6 Provide & weave GI wire netting for wire crates 6"x9" mesh : 8 SWG wire
H-6 P/I gates for head regulator i/c hoisting device complete in all respect.
H-7 Plain woodwork for regulation karries or needles etc. complete as per specs :
Deodar wood
3 5 5 0.416667 31.25
Total Quantity (Cft) 31.25
Total Quantity (CuM) 0.88
Item
Description Unit Nos Length Width Depth Volume
No
Total 4.0
Providing and installing PVC tees BSS Class 'B'working
4.1.4 Each 20
pressure : 3" i/d
Total 20.0
Providing and installing PVC bends BSS Class 'D'working
4.1.5 Each 15
pressure : 3" i/d
Total 15.0
Total 5.0
Providing and installing PVC bends BSS Class 'B'working
4.1.11 Each 5
pressure : 6" i/d
Total 5.0
Providing and Laying cut, joint, test, disinfect PVC pipe
4.1.12 R.M 110
line BSS Class 'B'working pressure : 6" i/d
Total 110.0
Total 115.0
Total 100.0
Supply and Fixing CI manhole cover with frame etc
4.1.15 Each 7
complete 18" dia
Total 7.0
Providing and fixing CI main hole cover with frame etc
4.1.16 No 7
complete 12" dia
Construction of Siran Right Bank Canal
District Mansehra
MEASUREMENT SHEET OF SUB-ENGINEER OFFICE CUM RESIDENCE
Item
Description Unit Nos Length Width Depth Volume
No
7.0
Providing and Fixing CI floor trap including CI grating &
4.1.17 Each 4
concrete chamber all round : 4"x3"
Total 4.0
Total 3.0
Providing and fixing gun metal peet / gate valve
4.1.19 No 2
(screwed ) 1" dia.
Total 2.0
4.1.20 Providing and Fixing CP mixing valve for WHB, sink or shower No 3
Total 3.0
Providing and Fixing CP or brass oxidized swan-neck cock
4.1.21 Each 3
1/2" dia : Double way
Total 3.0
Total 6.0
Providing and Fixing glazed earthen ware soap dish
4.1.23 Each 4
Coloured
Total 4.0
Providing and fixing best quality 5mm glass mirror 22"x16"
4.1.24 No 3
size
Total 3.0
Total 3.0
Total 3.0
Total 3.0
Total 3.0
Providing and Fixing glazed earthen ware WC European type
4.1.29 Each 3
excluding cost of seat & cover : Coloured
Total 3.0
4.1.30 Supply and Fixing low level plastic flushing cistern Each 3
Total 3.0
Item
Description Unit Nos Length Width Depth Volume
No
Total 3.0
Energy saver 32 Watts (Phillips or eq) with down light / simple
4.1.34 Each 10
holder and extra accessories etc as specified
Total 10.0
Total 15.0
Total 15.0
Total 6.0
Total 1.0
Total 2.0
Total 2.0
Total 5.0
Total 4.0
Total 2.0
Total 20.0
Total 200.0
Total 225.0
Supply and Erection white round globe with holder, gallery &
4.1.48 Each 2
100 Watt bulb complete : 10" dia
Total 2.0
Construction of Siran Right Bank Canal
District Mansehra
MEASUREMENT SHEET OF SUB-ENGINEER OFFICE CUM RESIDENCE
Item
Description Unit Nos Length Width Depth Volume
No
Total 90.0
Floor S/E cubical type factory fabricated floor / wall mounted
4.1.51 No. 1
main board steel complete recessed.
Total 1.0
Total 2.0
S/E best quality ceilling fan complete with G-I rod conopy
4.1.53 No. 10
blade & regulator 56" sweep.
Total 10.0
Total 6.0
Total 10.0
4.1.56 S/E tube light rod and choke complete 40 watt. No. 10
Total 10.0
4.1.57 Supply and Fixing Asia porcelin power plug 30 Amp Each 20
Total 20.0
Total 20.0
Wiring of light / fan / call bell point in 3-29 pvc insulated cable
4.1.59 No. 60
in pvc pipe recessed.
Total 60.0
Making and fixing grating in opening, including fixing at
4.1.60 m2 40
site with flat iron 2"x3/8" and 3/4" sq. bars
Total 40.0
Filling, watering and ramming earth under floor with
4.1.61 m3
surplus earth from foundation, etc
Item
Description Unit Nos Length Width Depth Volume
No
Toilet 1 6 4 1.75 42
Shoes, bends or offsets for cast iron ran water down pipe,
4.1.62 Each 9
including fixing & painting
Total 9.00
Heads for cast iron rain water down pipe fixed in place
4.1.63 Each 9
including cost of clamp holdfast and painting
Total 9.00
Cast iron rain water down pipe fixed in position excluding
4.1.64 R. M 10 12
heads & shoes : 4" dia
Total 36.59
Total 19.62
Preparing surface & painting with snowcem / weathershield
4.1.66 m2 293.73
paint : 2nd & subsequent coats
Total 293.73
Preparing surface & painting with snowcem / weathershield
4.1.67 m2
paint : First coat
External Surface 290 12 323.42
Doors 1 7 49
Windows
W-1 2 8 6 96
W-2 4 6 6 144
W-3 1 6 3.5 21
W-4 2 4 4.5 36
W-5 2 2.5 4.5 22.5
29.69
Total 293.73
Total 1,378.36
Total 1,378.36
Total 1,378.36
Providing and Fixing terrace railing of 2" i/d conduit pipe
4.1.71 m2 38
16 SWG welded with 5/8"x5/8" sq bar 2.75' high complete
Total 35.00
MS flat 1/2"x1/8" grill in windows of approved design
4.1.72 m2
including painting 3 coats, complete
W-1 2 8 6 96
Construction of Siran Right Bank Canal
District Mansehra
MEASUREMENT SHEET OF SUB-ENGINEER OFFICE CUM RESIDENCE
Item
Description Unit Nos Length Width Depth Volume
No
W-2 4 6 6 144
W-3 1 6 3.5 21
W-4 2 4 4.5 36
Total 237.12
Varnishing wood work, including cleaning & preparing
4.1.74 m2 237.12
surface : Third coat
Total 237.12
Varnishing wood work, including cleaning & preparing
4.1.75 m2 237.12
surface : Second Coat
Total 237.12
Varnishing wood work, including cleaning & preparing
4.1.76 m2 237.12
surface : First coat
Total 237.12
Total 12.00
Providing and fixing sliding bolt to doors Brass sliding
4.1.78 No 12
bolts : 10" long
Total 12.00
Providing and fixing sliding bolt to doors Brass sliding
4.1.79 No 12
bolts : 12" long
Total 12.00
Provide & fix wooden box type wardrobe 22" deep Deodar
4.1.80 m2
wood boxing & deodar shelves etc
2 8 10 14.87
Total 14.87
Supply and Fixing aluminium door/window, Economy
4.1.81 m2
model Sliding window
W-1 2 8 6 96
W-2 4 6 6 144
W-3 2 6 3.5 42
W-4 2 4 4.5 36
Total 31.64
WD-1 1 7 7 49
D-1 2 5 7 70
D-2 2 3.5 7 49
Construction of Siran Right Bank Canal
District Mansehra
MEASUREMENT SHEET OF SUB-ENGINEER OFFICE CUM RESIDENCE
Item
Description Unit Nos Length Width Depth Volume
No
D-4 2 3 7 42
D-5 3 2 7 42
Total 27.65
Provide & fix chowkat for doors, windows & CS windows,
4.1.83 m2
including holdfast etc : Deodar wood
WD-1 1 7 7 49
D-1 2 5 7 70
D-2 2 3.5 7 49
D-4 2 3 7 42
D-5 3 2 7 42
Total 27.65
Providing and fixing glazed tile colour printed border 3"
4.1.84 R.M
wide
330.65 330.65
Total 30.73
Glazed tile 1/4" thick dado jointed in white cement
4.1.85 m2
complete : Printed tiles
1 170 7 1190
Kitchen 1 14 10 140
Lounge 1 14 18 252
Construction of Siran Right Bank Canal
District Mansehra
MEASUREMENT SHEET OF SUB-ENGINEER OFFICE CUM RESIDENCE
Item
Description Unit Nos Length Width Depth Volume
No
Toilet 1 6 4 24
D1 4 4 7 112.00
D2 4 3.5 7 98.00
D3 4 3.25 7 91.00
Construction of Siran Right Bank Canal
District Mansehra
MEASUREMENT SHEET OF SUB-ENGINEER OFFICE CUM RESIDENCE
Item
Description Unit Nos Length Width Depth Volume
No
D4 4 3 7 84.00
DW1 2 7 7 98.00
W1 4 8 6 192.00
W2 8 6 6 288.00
W3 2 6 3.5 42.00
W4 4 4 4.5 72.00
4.1.91 Pacca brick work in ground floor Cement, sand mortar 1:6 m3
Kitchin Long Wall remaining with Dining 1 4.8 0.75 10.500 37.80
Item
Description Unit Nos Length Width Depth Volume
No
D1 2 4 7 0.75 42.00
D4 2 3 7 0.75 31.50
W1 2 8 6 0.75 72.00
W2 4 6 6 0.75 108.00
Item
Description Unit Nos Length Width Depth Volume
No
Kitchin Long Wall remaining with Dining 1 4.8 0.75 0.125 0.45
Lounge & Dinning Long Wall Step 1 4 20.25 1.5 0.5 60.75
Lounge & Dinning Long Wall Step 2 4 19.875 1.125 0.5 44.72
Lounge & Dinning Long Wall Step 3 4 19.5 0.75 1.75 102.38
Lounge & Dinning Short Wall Step 1 4 13.25 1.5 0.5 39.75
Lounge & Dinning Short Wall Step 2 4 13.625 1.125 0.5 30.66
Item
Description Unit Nos Length Width Depth Volume
No
Kitchin Long Wall remaining with Dining Step 1 1 5.55 1.5 0.5 4.16
Kitchin Long Wall remaining with Dining Step 2 1 5.175 1.125 0.5 2.91
Kitchin Long Wall remaining with Dining Step 3 1 4.8 0.75 1.75 6.30
Bath Short Wall having door Step 2 2 4.375 1.125 0.5 4.92
Bath Short Wall having door Step 3 2 4.75 0.75 1.75 12.47
Servant Long Wall having door Step 1 1 5.55 1.5 0.5 4.16
Servant Long Wall having door Step 2 1 5.175 1.125 0.5 2.91
Servant Long Wall having door Step 3 1 4.8 0.75 1.75 6.30
Item
Description Unit Nos Length Width Depth Volume
No
Bed Interior Wall near reception Step 1 1 19.25 1.5 0.5 14.44
Bed Interior Wall near reception Step 2 1 19.625 1.125 0.5 11.04
Single layer of tiles 10"x5"x1.25" laid over 4" earth and 1"
4.1.94 m2
mud plaster on top of RC roof slab
Item
Description Unit Nos Length Width Depth Volume
No
RCC in roof slab , beam , column and other structural member
4.1.96 m3
, in sithu or precast.type C 1:2:4.
RCC in Plinth Beams
Kitchin Long Wall remaining with Dining 1 4.8 0.75 0.750 2.70
Item
Description Unit Nos Length Width Depth Volume
No
Kitchin Long Wall remaining with Dining 1 6.3 2.25 0.5 7.09
Item
Description Unit Nos Length Width Depth Volume
No
Item
Description Unit Nos Length Width Depth Volume
No
Total 1.00
Total 1.00
Total 8.75
Construction of Siran Right Bank Canal
District Mansehra
MEASUREMENT SHEET OF CHOWKIDAR HUT
Item
Description Unit Nos Length Width Depth Volume
No
Civil and Electrical Works
Providing and fixing stainless steel sink with drain board size
4.2.1 18"x36" including set of brackets, waste pipe etc Each 1
Total 1.0
Providing & Fixing Steel manhole cover with frame
4.2.2 18"x18" full heavy duty Each 2
Total 2.0
Total 2.0
Providing and installing PVC tees BSS Class 'B'working
4.2.4 pressure : 3" i/d Each 10
Total 10.0
Providing and installing PVC bends BSS Class 'D'working
4.2.5 pressure : 3" i/d Each 7
Total 7.0
Providing and Laying cut, joint, test, disinfect PVC pipe
4.2.6 line BSS Class 'D' working pressure : 3" i/d R.M 10
Total 10.0
Providing and installing PVC tees BSS Class 'B'working
4.2.7 pressure : 4" i/d Each 5
Total 5.0
Providing and installing PVC bends BSS Class 'D'working
4.2.8 pressure : 4" i/d Each 5
Total 5.0
Providing and Laying cut, joint, test, disinfect PVC pipe
4.2.9 line BSS Class 'D' working pressure : 4" i/d R.M 30
Total 30.0
Providing and installing PVC sockets BSS Class
4.2.10 'B'working pressure : 6" i/d Each 5
Total 5.0
Providing and installing PVC bends BSS Class 'B'working
4.2.11 pressure : 6" i/d Each 4
Total 4.0
Providing and Laying cut, joint, test, disinfect PVC pipe
4.2.12 line BSS Class 'B'working pressure : 6" i/d R.M 50
Total 50.0
Total 70.0
Total 60.0
Supply and Fixing CI manhole cover with frame etc
4.2.15 complete 18" dia Each 3
Total 3.0
Construction of Siran Right Bank Canal
District Mansehra
MEASUREMENT SHEET OF CHOWKIDAR HUT
Item
Description Unit Nos Length Width Depth Volume
No
Providing and fixing CI main hole cover with frame etc
4.2.16 complete 12" dia No 3
3.0
Providing and Fixing CI floor trap including CI grating &
4.2.17 concrete chamber all round : 4"x3" Each 2
Total 2.0
Total 2.0
Providing and fixing gun metal peet / gate valve
4.2.19 (screwed ) 1" dia. No 2
Total 2.0
4.2.20 Providing and Fixing CP mixing valve for WHB, sink or shower No 1
Total 1.0
Providing and Fixing CP or brass oxidized swan-neck cock
4.2.21 1/2" dia : Double way Each 2
Total 2.0
Total 5.0
Providing and Fixing glazed earthen ware soap dish
4.2.23 Coloured Each 2
Total 2.0
Providing and fixing best quality 5mm glass mirror 22"x16"
4.2.24 size No 2
Total 2.0
Total 2.0
Total 2.0
Total 2.0
Providing and Fixing glazed earthen ware low down
4.2.28 flushing cistern 3 gallons capacity : Coloured Each 2
Total 2.0
Providing and Fixing glazed earthen ware WC European type
4.2.29 excluding cost of seat & cover : Coloured Each 2
Total 2.0
4.2.30 Supply and Fixing low level plastic flushing cistern Each 2
Total 2.0
Providing and Fixing glazed earthen ware WC squatting
4.2.31 type with built-in foot rests : Coloured Each 2
Total 2.0
Providing and Fixing angle iron brackets for : WHB and
4.2.32 cistern Each 2
Construction of Siran Right Bank Canal
District Mansehra
MEASUREMENT SHEET OF CHOWKIDAR HUT
Item
Description Unit Nos Length Width Depth Volume
No
Total 2.0
Providing and Fixing glazed earthen ware WHB complete Size
4.2.33 22"x16" : Coloured with pedestal Each 2
Total 2.0
Total 5.0
Total 7.0
Total 7.0
Total 6.0
Total 1.0
Supply and Erection 2'x2'x1/8" copper plate including
4.2.39 rivetting to copper tape & placing in mixture of salt and Each 1
charcol etc
Total 1.0
Supply and Erection single phase imported auto circuit
4.2.40 breaker 30 Amp. Each 1
Total 1.0
Supply and Erection single phase imported auto circuit
4.2.41 breaker 20 Amp Each 3
Total 3.0
Total 4.0
Supply and Erection transpower auto circuit breaker
4.2.43 3-phase, 400V fungus moisture proofing : 30 Amp. Each 2
Total 2.0
Total 1.0
Supply and Erection single core PVC insulated copper
4.2.45 conductor 250/440 V grade cable : 7/0.044" R.M 10
Total 10.0
Supply and Erection single core PVC insulated copper
4.2.46 conductor 250/440 V grade cable : 7/0.029" R.M 100
Total 100.0
Supply and Erection single core PVC insulated copper
4.2.47 conductor 250/440 V grade cable : 3/0.029" R.M 125
Construction of Siran Right Bank Canal
District Mansehra
MEASUREMENT SHEET OF CHOWKIDAR HUT
Item
Description Unit Nos Length Width Depth Volume
No
Total 125.0
Supply and Erection white round globe with holder, gallery &
4.2.48 100 Watt bulb complete : 10" dia Each 1
Total 1.0
Total 40.0
Total 40.0
Total 1.0
Total 1.0
S/E best quality ceilling fan complete with G-I rod conopy
4.2.53 blade & regulator 56" sweep. No. 5
Total 5.0
Total 3.0
Total 4.0
4.2.56 S/E tube light rod and choke complete 40 watt. No. 4
Total 4.0
4.2.57 Supply and Fixing Asia porcelin power plug 30 Amp Each 10
Total 10.0
Wiring of 2/3 pin 5 AMP plug point in 3/029 pvc insulated cable
4.2.58 in pvc pipe recessed. No. 10
Total 10.0
Wiring of light / fan / call bell point in 3-29 pvc insulated cable
4.2.59 in pvc pipe recessed. No. 30
Total 30.0
Making and fixing grating in opening, including fixing at
4.2.60 site with flat iron 2"x3/8" and 3/4" sq. bars m2 20
Total 20.0
Filling, watering and ramming earth under floor with
4.2.61 surplus earth from foundation, etc m3 0.5 1799.05 899.525
Total 25.47
Shoes, bends or offsets for cast iron ran water down pipe,
4.2.62 including fixing & painting Each 8
Construction of Siran Right Bank Canal
District Mansehra
MEASUREMENT SHEET OF CHOWKIDAR HUT
Item
Description Unit Nos Length Width Depth Volume
No
Total 8.00
Heads for cast iron rain water down pipe fixed in place
4.2.63 including cost of clamp holdfast and painting Each 8
Total 8.00
Construction of Siran Right Bank Canal
District Mansehra
MEASUREMENT SHEET OF CHOWKIDAR HUT
Item
Description Unit Nos Length Width Depth Volume
No
Cast iron rain water down pipe fixed in position excluding
4.2.64 heads & shoes : 4" dia R. M 6 10
Total 18.29
Total 36.16
Total 122.49
Doors 2 7 56
Windows
W1 3 6 54
W2 3 6 72
W3 2 6 72
23.61
Total 137.10
Total 609.59
Total 609.59
Total 609.59
Providing and Fixing terrace railing of 2" i/d conduit pipe
4.2.71 16 SWG welded with 5/8"x5/8" sq bar 2.75' high complete m2 20
Total 20.00
MS flat 1/2"x1/8" grill in windows of approved design
4.2.72 including painting 3 coats, complete m2
3 6 54
3 6 72
2 6 72
Total 18.40
Total 121.00
Total 121.00
Varnishing wood work, including cleaning & preparing
4.2.75 surface : Second Coat m2 121.00
Construction of Siran Right Bank Canal
District Mansehra
MEASUREMENT SHEET OF CHOWKIDAR HUT
Item
Description Unit Nos Length Width Depth Volume
No
Total 121.00
Total 121.00
Total 6.00
Total 6.00
Providing and fixing sliding bolt to doors Brass sliding
4.2.79 bolts : 12" long No 6
Total 6.00
Provide & fix wooden box type wardrobe 22" deep Deodar
4.2.80 wood boxing & deodar shelves etc m2
2 6 10 11.15
Total 11.15
Supply and Fixing aluminium door/window, Economy
4.2.81 model Sliding window m2
3 3 6 54
3 4 6 72
2 6 6 72
Total 18.40
2 56
4 70
Total 11.71
2 70
4 84
Total 14.31
Providing and fixing glazed tile colour printed border 3"
4.2.84 wide R.M
263.25 263.25
Total 24.47
2 45.5 7 637
Total 59.20
Cement pointing struck joints, on walls, upto 20' height :
4.2.86 Ratio 1:3 m2
Total 213.38
Construction of Siran Right Bank Canal
District Mansehra
MEASUREMENT SHEET OF CHOWKIDAR HUT
Item
Description Unit Nos Length Width Depth Volume
No
1.375" thick mosaic flooring, including rubbing and
4.2.87 polishing complete : Using grey cement m2
2 58.5 117
Total 117.00
Columns 8 1 9.5 76
4.2.91 Pacca brick work in ground floor Cement, sand mortar 1:6 m3
Single layer of tiles 10"x5"x1.25" laid over 4" earth and 1"
4.1.94 mud plaster on top of RC roof slab m2
Column C2 2 6 6 0.5 36
Column C1 12 6 6 3 1296.00
Column C2 2 7 7 3 294.00
Total 1.00
Total 5.00
Construction of Siran Right Bank Canal
District Mansehra
Rate Analysis of NSI
Description of item
LABOUR
Plumber 0.07 Day 1200 84