Professional Documents
Culture Documents
20PG0064 - PDF Plans - E1-3
20PG0064 - PDF Plans - E1-3
PROJECT TITLE:
PROPOSED
PERMANENT EVACUATION CENTER/
MULTI-PURPOSE COVERED COURT
(STANDARD)
VARIOUS LOCATION
JOSEPHINE P. ISTURIS LEA N. DELFINADO, CESO IV EMIL K. SADAIN, CESO I MARCELINO P. ESCALADA, JR.
UNDERSECRETARY
CHIEF, BUILDINGS DIVISION, BOD DIRECTOR IV, BOD GENERAL MANAGER, NHA
FOR UPMO OPERATIONS & TECHNICAL SERVICES, DPWH
3' 2' 1' 1 2 3 4 5 6 7 7' 8' 9'
50.00
3.98 3.98 1.50 5.45 5.45 4.55 4.55 5.55 5.55 1.50 3.98 3.98
7.95 31.10 7.95
LAUNDRY AREA/ DRYING AREA LAUNDRY AREA/ DRYING AREA
C' C'
1.20
1.20
SHOWER STALL SHOWER STALL
C C
ROOF LINE
TOILET & BATH TOILET & BATH
(HE) CLINIC PRAYER ROOM (SHE)
3.85
3.85
SHOWER STALL
EXISTING STAGE /
9.65
1.35
TOILET
B (PWD)
B
TOILET
(PWD)
3.25
3.95
01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16
G'
DELIVERY H'
2.35
KITCHEN
CONJUGAL
2.50
BREAST ROOM-1
4.80
4.80
17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32
4.10
WET DRY FEEDING RM CONJUGAL
STO. STO. ROOM-2
2.45
1.60
28.90
33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48
F' F'
0.60 1.25
PLAY AREA
4.80
4.80
49 50 51 52 53 54 55 56 57 58 59 60 61 62
STORAGE
14.45
4.80
4.80
3.95 2.50 1.50
79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94
D' ELEC. RM
D'
REC.
ROOM
MDP
4.55
4.55
RECEPTION AREA ADMIN. OFFICE
95 96 97 98 99 100 101 102 103 104 105 106 CONSULT.
ROOM
A A
0.30
0.30
PREPARED:
REPUBLIC OF THE PHILIPPINES PROJECT AND LOCATION: SHEET CONTENTS: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: SET NO. SHEET NO.
MECHANICAL-ELECTRICAL SECTION
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS PROPOSED: MAIN FEEDER LINE LAYOUT
CADD: SEE COVER SHEET FOR SEE COVER SHEET FOR SIGNATURE &
C' C'
1.20
1.20
SHOWER STALL 7 SHOWER STALL
C LPA
C
ROOF LINE
TOILET & BATH TOILET & BATH
(HE) CLINIC PRAYER ROOM (SHE)
3.85
3.85
6
LPA
SHOWER STALL
EXISTING STAGE /
9.65
1.35
TOILET
B (PWD)
B
TOILET
(PWD)
3.25
3.95
01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 1
LPD
5
LPD
G'
DELIVERY
7 8
H'
2.35
LPB LPB
KITCHEN
2.50
CONJUGAL
4.80
4.80
17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32
4.10
WET DRY CONJUGAL ROOM-1
STO. STO. BREAST ROOM-2
2.45
5
6 2 LPC
1.60
LPB LPD FEEDING RM
6
28.90
LPD
33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48
F' F'
0.60 1.25
2.60 2.75
PLAY AREA
4.80
4.80
49 50 51 52 53 54 55 56 57 58 59 60 61 62
STORAGE
14.45
4.80
4.80
3.95 6
2.50 1.50
LPC
4
LPD
79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94
D' D'
8
LPD
REC.
ELEC. RM
2.35
ROOM 7
LPC
ADMIN. OFFICE
4.55
4.55
RECEPTION AREA
95 96 97 98 99 100 101 102 103 104 105 106 CONSULT.
2.50
9
ROOM 8
LPC LPC
0.30
A A
0.30
A' A'
1 POWER LAYOUT
E-2 SCALE 1:100 m
PREPARED:
REPUBLIC OF THE PHILIPPINES PROJECT AND LOCATION: SHEET CONTENTS: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: SET NO. SHEET NO.
MECHANICAL-ELECTRICAL SECTION
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS PROPOSED: POWER LAYOUT
CADD: SEE COVER SHEET FOR SEE COVER SHEET FOR SIGNATURE &
5
LPB
C' 5 C'
1.20
1.20
LPA 4
LPA
C C
3
LPA
3.85
3.85
9.65
B' B'
1.35
1.35
B B
3.25
3.95
LPA
1 2
LPB LPA
G' 2 1
LPC
4
LPB
LPB
H'
2.50
4.80
4.80
4.10
1.60
2
28.90
LPC
F' F'
3
LPB
4.80
4.80
E' E'
14.45
4.80
4.80
3
LPC
D' 4
LPC
D'
4.55
4.55
0.30
A A
0.30
A' A'
1 LIGHTING LAYOUT
E-3 SCALE 1:100 m
PREPARED:
REPUBLIC OF THE PHILIPPINES PROJECT AND LOCATION: SHEET CONTENTS: SUBMITTED: RECOMMENDING APPROVAL: APPROVED: SET NO. SHEET NO.
MECHANICAL-ELECTRICAL SECTION
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS PROPOSED: LIGHTING LAYOUT
CADD: SEE COVER SHEET FOR SEE COVER SHEET FOR SIGNATURE &