5 4 3 2 1 Owner:

‫ﺷﻣول‬
Shomoul
SHOMOUL HOLDING COMPANY W.L.L.
Project Management:

AECOM Arabia Ltd


STEEL BEAM LEGEND Riyadh-King Fahad Road
MOMENT 58729 Riyadh, 11414 Saudi Arabia

CONNECTION
MAIN TRUSS AT GRID JJ MAIN TRUSS AT GRID PP MAIN TRUSS AT GRID LL Prime Consultant:
MAIN TRUSS AT GRID MM BEAM FRAME AT GRID NN V BEAM SIZE V
Diagonal Members Diagonal Members Diagonal Members Al Zaid Engineering
Diagonal Members Beams P (REFER TO PLAN) P ‫ اﻟﺰﯾﺪ‬Consultants (ZEC)

E
MEMBER P V V' MEMBER P V V' MEMBER P V V' AL - ZAID
MEMBER P V V' MEMBER P V V' M M'

C
Z
M ENGINEERING P.O. Box 20179 Riyadh 11455, KSA
2L70X7/10/ ±30 1 1 2L90X9/10/ -30 OR +65 1 1 CONSULTANTS ‫ﻟﻺﺳﺗﺷﺎرات اﻟﮭﻧدﺳﯾﺔ‬
2L70X7/10/ ±18 1 1 2L90X9/10/ ±60 1 1 B1 ±3 3 1 ±3 ±1 Riyadh, KSA
V INDICATES FACTORED MAJOR VERTICAL SHEAR IN TONS
Lead Consultant:
2L80X8/10/ -5 OR +35 1 1 2L80X8/10/ ±40 1 1 2L100X10/10/ -40 OR +60 2 1 V' INDICATES FACTORED MINOR HORIZONTAL SHEAR IN TONS
2L100X10/10/ +60 1 1 SHAREKAT ALMOHANEDSOON
D D
P + INDICATES FACTORED AXIAL TENSION LOAD IN TONS ALISTESHAREYOON WE SHARIKOH
2L90X9/10/ +45 1 1 2L90X9/10/ +50 1 1 2L120X12/10/0 +110 1 1
2L120X12/10/ ±95 1 - LEISTESHARAT ALHANDASEYA
P - INDICATES FACTORED AXIAL COMPRESSION LOAD IN TONS
C O N S U L T I N G E N G I N E E R S Euro Marché center
2L120X12/10/ +75 1 1 2L150X15/10/ +115 2 1 M INDICATES FACTORED MAJOR END MOMENT IN TON.m. King Abdulla road & Osman Ibn Afan road junction
2L150X15/10/ +135 2 1 Riyadh, Saudi arabia
M' INDICATES FACTORED MINOR END MOMENT IN TON.m.
2L150X15/10/ +85 1 1 Vertical Members 2L180X18/10/ +205 2 1
2L180X18/10/ +150 1 1 Construction Supervision:
MEMBER P V V'
2L70X7/10/ ±20 1 1 Vertical Members
Vertical Members
2L80X8/10/ ±35 1 1 MEMBER P V V'
MEMBER P V V'
Vertical Members 2L90X9/10/ ±40 1 1
2L90X9/10/ -50 OR+20 1 1
MEMBER P V V'
Top Chord 2L100X10/10/ ±55 1 1
2L70X7/10/ ±20 1 1 2L100X10/10/ -45 1 1

2L80X8/10/ -35 OR +5 1 1 MEMBER P V V' 2L120X12/10/0 -90 1 1 Main Contractor:


2L120X12/10/ -80 OR +50 1 1
Nesma & Partners
2L90X9/10/ -35 1 1 HEA240
-25 OR
+1
2 1 2L150X15/10/ -85 1 1
2L150X15/10/ -115 1 1
Nesma
& Partners
‫ﻧﺳﻣﺎ‬
‫وﺷرﻛﺎھم‬
Contracting Co. Ltd
PO Box 1498 Al Khobar, 31952
2L120X12/10/ -65 1 1 Saudi Arabia
2L180X18/10/ -165 2 1
2L180X18/10/ -120 1 1 NOTES:
a. The connections design shall include any stiffening or strengthening required locally to the Contractor Consultant:
Bottom Chord
2L150X15/10/ -70 1 1 HEA140 -75 OR+15 1 1 members at the joint due to connection configuration or design forces in the connection zone such as
MEMBER P V V' Top Chord
HEB140 -100 1 1 Dar al Handasah (Shair
-30 OR flange thickening, web thickening, doubler plates, stiffeners, member local thickening,…etc.
HEA180 1 1 MEMBER P V V' & Partners)
+2 b. Connection straining actions shall be read from drawings or analysis models provided by the King Fahd Rd., Olaya, Al-
HEA180 ±10 1 1 Engineer. Submit a summary of the straining actions used in the design of each connection along with Mass Centre
Top Chord
Top Chord
any related assumption for the Engineer’s approval before. P.O. Box: 612, Riyadh 11421
HEA260 -35 OR +120 2 1
MEMBER P V V' c. Respect the architectural design intent and choose details consistent with the architectural wall
MEMBER P V V' B6 +130 2 1 sections and elevations. Submit preliminary dimensions and configuration of the connections for the
HEA140 -10 OR +75 2 1
HEA140 -10 OR +50 1 1
approval of each typical connection for the Engineer before starting the bulk structural design. The
HEA280 -40 OR +70 3 1
Bottom Chord Engineer reserves the right to modify/confirm the shape of the connections. In any case, fabrication of Notes/Legends:
HEA260 ±25 2 1 MEMBER P V V' any detail shall not take place prior to the end of the review task and granting the Engineer’s approval.
Bottom Chord
B11 -215 3 1 d. All moment connections are fully restrained (Rigid connections); in the event that software such as
MEMBER P V V' 1- FOR STRUCTURAL STEEL GENERAL NOTES, REFER TO DRAWING NO:
HEA260 ±60 1 1
HEA240 ±50 1 1
Idea statica is used, for cases not covered under AISC design guides 4 and 16 as prequalified SHO001-NAP-IFC-XX-XX-XX-DR-SS-0001-00-00
B19 -125 2 1
moment connections, stiffness analysis shall be performed in addition to strength checks.
Bottom Chord HEA300 -160 OR+5 3 1
e. Submit clear, self-explanatory, easy to follow, and well-documented calculation notes supporting 2- ALL BUILT-UP & HOT ROLLED SECTIONS ARE TO BE ASTM A572 GR.50
MEMBER P V V' each of the tasks stated above along with a softcopy of computer models conducted for the WITH A MINIMUM YIELD STRESS OF 345 N/mm2.
HEA160 ±35 1 1 analysis/design process. The contractor is to be ready to submit a softcopy of the used programs with 3- FOR BASE PLATE DETAILS, REFER TO DRAWING NO: SHO001-NAP-IFC-
HEA180 ±40 1 1 licensed copies and supporting manuals when requested. The Contractor shall as well ready to M2-05-RCM-DR-SS-5002-04-00.
FRAME/SECONDARY TRUSS BETWEEN GRIDS 5 AND 6
HEA240 -100 1 1 validate any software, spreadsheets, or homemade tools used in the analysis/design against the
B10 -40 1 1 codes, and standards indicated in this Section when requested and before using it in any design 4- SECONDARY STEEL NOT SHOWN ON THE STRUCTURAL DRAWINGS ARE
Beams
B21 -65 1 1 tasks. PART OF THE SKIN AND SHALL BE DESIGNED AND MANUFACTURED BY THE
MEMBER P V V' M M' CONTRACTOR, FOR THE ENGINEER'S REVIEW AND APPROVAL.
HEB400 ±13 18 1 -40 OR +2 ±1
HEB400 ±10 14 1 0 0 5- APPLY A CORROSION PROTECTION SYSTEM TO GIVE A LIFE BEFORE
FIRST MAJOR MAINTENANCE OF 20 YEARS UNDER PREVAILING WEATHER
* ALL VALUES ARE FACTORED AND IN TONS CONDITIONS.REFER TO SPEC SECTION 099600 CORROSION-RESISTANT
PAINTING SYSTEM TO STRUCTURAL STEEL

6- STEEL WORK CONNECTION DESIGN IS TO BE DONE BY A SPECIALIST


STEEL CONTRACTOR AND TO BE SUBMITTED FOR ENGINEER'S APPROVAL.

7- FOR FIRE RATING REQUIREMENTS REFER TO SPEC SECTION 078100


"APPLIED FIRE PROOFING" TO UNEXPOSED APPLICATIONS AND TO
C C SECTION 099646 "INTUMESCENT PAINTING" FOR EXPOSED APPLICATIONS.

8- LEVELS AND DIMENSIONS ARE TO BE CONFIRMED BY THE CONTRACTOR


PRIOR TO ANY FABRICATION. FURTHERMORE, CONCRETE SUPPORT
LEVELS SHOULD BE COORDINATED WITH RELEVANT CONCRETE
DRAWINGS.

9- FOR MAIN TRUSSES CAMBERING SCHEME REFER TO DRAWING NO:


SHO001-NAP-IFC-M2-05-RCM-DR-SS-3004-04-00.

10- SPLICE LOCATIONS FOR THE CHORDS OF THE MAIN TRUSSES ARE
TENTATIVE, AND TO BE AS PER FABRICATOR PREFERENCE.

Diagonal Members
FRAME/SECONDARY TRUSS BETWEEN GRIDS 4 AND 5 MEMBER P V V'

Beams 2L90X9/10/ -25 OR +35 1 1


MEMBER P V V' M M'
FRAME/SECONDARY TRUSS AT GRID 3 HEB400 ±10 20 1 ±40 ±2 2L100X10/10/ ±50 1 1
HEB400 ±10 13 1 0 0
Beams FRAME/SECONDARY TRUSS BETWEEN GRIDS 6 AND 7
MEMBER P V V' M M' T
Top Chord
HEA300 ±13 10 3 ±20 ±5 ±2 Beams
Diagonal Members MEMBER P V V'
MEMBER P V V' M M'
MEMBER P V V' HEA200 -57 OR +5 6 1 HEB400 ±10 20 3 -36 ±4
2L90X9/10/ -20 or +35 1 1 HEB400 ±10 14 2 0 0
FRAME/SECONDARY TRUSS BETWEEN GRIDS
3 AND 4 2L110X10/10/ ±80 1 1
Bottom Chord
Diagonal Members Contractor ( Nesma & Partners):
MEMBER P V V' 2L120X12/10/ -65 1 1 MEMBER P V V'
Diagonal Members CHECKED BY:
HEA180 -33 OR +75 8 1 MEMBER P V V'
2L80X8/10/ +45 - -
Top Chord APPROVED BY:
2L80X8/10/ 30 1 1
MEMBER P V V' FRAME/SECONDARY TRUSS AT GRID 6
2L90X9/10/ ±45 1 1
HEA240 -100 OR +15 7 1 2L100X10/10/ ±20 1 1 RFI REF:
2L100X10/10/ ±65 1 1 Beams
MEMBER P V V' M M'
Top Chord Bottom Chord HEB400 -15 OR +2 18 3 -40 ±3
MEMBER P V V' HEB400 -15 OR +2 14 1 0 0 General Key Plan:
MEMBER P V V' NORTH
HEB240 -50 OR +120 8 1
HEA200 -65 OR +20 6 1 Top Chord MECCA
Diagonal Members
MEMBER P V V'
Bottom Chord MEMBER P V V' HEA180 -40 7 1
FRAME/SECONDARY TRUSS AT GRID 5
MEMBER P V V' 2L80X8/10/ ±30 1 1
HEB240 ±65 8 1 Beams 2L90X9/10/ ±35 1 1
MEMBER P V V' M M'
2L120X12/10/ ±55 1 1
MALL

Frame Beams HEB400 ±10 20 1 -30 OR +5 ±2


MEMBER P V V' M M' HEB400 ±10 13 1 0 0
Bottom Chord
HEB400 -15 OR +2 15 1 ±13 ±2 MEMBER P V V'
HEB400 -15 OR +2 13 1 0 0 Top Chord B4 ±20 5 1
Diagonal Members MEMBER P V V' HEA240 -1 OR +40 5 1
MEMBER P V V' HEA240 -110 6 1
B FRAME/SECONDARY TRUSS AT GRID 4 FRAME/SECONDARY TRUSS AT GRID 7 B Project Name:
2L80X8/10/ ±20 1 1 HEB200 -45 7 1
Beams 2L90X9/10/ ±40 1 1
Beams
MEMBER P V V' M M' 2L100X10/10/ -30 OR +1 1 1
Bottom Chord MEMBER P V V' M M' T THE AVENUES MALL,
MEMBER P V V'
HEB400
HEB400
±13
±14
13
16
2
1
0
-30 OR +15
0
2
HEA240 -45 OR +75 7 1 HEA320 -10 OR+40 10 10 ±20 ±15 1.5
RIYADH
Top Chord
MEMBER P V V'
HEA200 -55 OR +5 4 1
Project Number SHO001
BOTTOM CHORD LEVEL
Bottom Chord
Horizontal Bracings
MEMBER P V V'
MEMBER P V V'
HEA180 +70 6 1
B4 ±25 5 1
PIPE168.3X8 ±20 1 1 ISSUED FOR CONSTRUCTION
-15 OR
PIPE139.7X8 1 1
+40

TOP CHORD LEVEL June 2023


Horizontal Bracings Secondaries
MEMBER P V V' MEMBER P V V'
PIPE139.7X8 ±50 2 1 HEA160 ±25 5 1
-55 OR
PIPE168.3X6.3 ±56 1 1 HEA200 5 1
+15
-70 OR
HEB200 5 1
+1
HEA180 -35 5 1

01 14-06-2023 ONLY FOR UPLOADING ON G.M.


ACONEX
00 05-05-2023 APPROVED ISSUE G.M.
EI#19-EI#12
Rev Date Description Appr

Issue:

FILE NAME : SHO001-NAP-IFC-M2-06-RCM-DR-SS-5001-03-01

MODEL NAME : SHO001-NAP-IFC-XX-XX-ZZ-M3D-SS-0001-00-00


SCALE: As indicated

SHEET FORMAT: A0

DRAWN BY: H.A.

DESIGN BY: S.C.

CHECKED BY: I.G.

A A APPROVED BY: G.M.

Sheet Title

PLOT 06
CINEMA ROOF
ULTIMATE STRAINING ACTIONS

Sheet No.
Design Plot /
Project Originator Module Level Type Discipline Number Partial No. REV
Phase Zone

SHO001 NAP IFC M2 06 RCMDR SS 5001 03 01

5 4 3 2 1