FOR SECTION REFER TO DWG:
350 SHOMOUL HOLDING COMPANY W.L.L.
SHO001-NAP-IFC-M2-05-XX-DR-SS-3004-04 450
Project Management:
HEA 200 HEA 200 HEA 200 HEB 400

AECOM Arabia Ltd

2L100x10x10
2L
Riyadh-King Fahad Road

0
2L
0

2L
0
2L

0
2L
2L
2L70x7x10

0
1

2L80x8x10

x1
1

x1

x1
10

HEA 140
x1
9x
90

80
58729 Riyadh, 11414 Saudi Arabia

9x
90

80
90

x9
x9

x8
0x

HEB 240
x8
x
x

x8
x

x8
x9
90

90
90

80
90

9x
9x

10

80
3479

3479
x1
x1
x1
2L

2L
10

2L

2L
2L
10

x1

2L
0
0
0

0
HEA 180 HEA 180 B4 Prime Consultant:
+33.000
C.L. Al Zaid Engineering
AL - ZAID ‫ﺍﻟﺰﻳﺪ‬

E
Consultants (ZEC)

C
Z
ENGINEERING P.O. Box 20179 Riyadh 11455, KSA
CONSULTANTS ‫ﻟﻺﺳﺗﺷﺎﺭﺍﺕ ﺍﻟﻬﻧﺩﺳﻳﺔ‬
Riyadh, KSA
Lead Consultant:
D D SHAREKAT ALMOHANEDSOON
ALISTESHAREYOON WE SHARIKOH
LEISTESHARAT ALHANDASEYA
C O N S U L T I N G E N G I N E E R S Euro Marché center
King Abdulla road & Osman Ibn Afan road junction
Riyadh, Saudi arabia

SECTION U-U Construction Supervision:


SCALE 1/100

FOR SECTION REFER TO DWG:


CC DD EE FF GG HH SHO001-NAP-IFC-M2-05-XX-DR-SS-3004-04 II JJ KK LL MM NN Main Contractor:
9250 9250 9250 9250 9250 9250 9250
450 350
9250 9250 9250 9250
Nesma
& Partners
‫ﻧﺳﻣﺎ‬
‫ﻭﺷﺭﻛﺎﻫﻡ‬
Nesma & Partners
Contracting Co. Ltd
PO Box 1498 Al Khobar, 31952
HEA 200 HEA 200 HEA 200 HEB 400 Saudi Arabia

Contractor Consultant:

2L
2L120x12x10

2L
10

10

2L
2L

2L

2L
0
x1

x1

2L90x9x10

0
10

2L80x8x10
10
x

x1
10
10

x1

HEA 140
10

10

90

90

HEB 400
10

10
0x

0x

x9
0
0

x9
Dar al Handasah (Shair

x
0x

0x

x1
0x

0x
x1
10

90
9x

9x
10

90
3222

3222
10

10

0x
10

10
0x
& Partners)

10

10
2L
x

2L
10

10
10

10

2L

2L
2L

2L
King Fahd Rd., Olaya, Al-
HEA 180 HEA 180 HEA 180 Mass Centre
+33.000 P.O. Box: 612, Riyadh 11421
C.L.
300

300
Notes/Legends:

1- FOR STRUCTURAL STEEL GENERAL NOTES, REFER TO DRAWING NO:


SHO001-NAP-IFC-XX-XX-XX-DR-SS-0001-00-00

2- ALL BUILT-UP & HOT ROLLED SECTIONS ARE TO BE ASTM A572 GR.50
WITH A MINIMUM YIELD STRESS OF 345 N/mm2.

3- FOR BASE PLATE DETAILS, REFER TO DRAWING NO:SHO001-NAP-IFC-


M2-06-RCM-DR-SS-5002-03-00.
SECTION V-V 4- SECONDARY STEEL NOT SHOWN ON THE STRUCTURAL DRAWINGS ARE
PART OF THE SKIN AND SHALL BE DESIGNED AND MANUFACTURED BY THE
SCALE 1/100 CONTRACTOR, FOR THE ENGINEER'S REVIEW AND APPROVAL.

5- APPLY A CORROSION PROTECTION SYSTEM TO GIVE A LIFE BEFORE


FIRST MAJOR MAINTENANCE OF 20 YEARS UNDER PREVAILING WEATHER
CONDITIONS.REFER TO SPEC SECTION 099600 CORROSION-RESISTANT
PAINTING SYSTEM TO STRUCTURAL STEEL

6- FOR ULTIMATE STRAINING ACTIONS/END FORCES OF THE STEEL


MEMBERS, REFER TO DRAWINGS NO: SHO001-NAP-IFC-M2-06-RCM-DR-
SS-5001-03. THE CONTRACTOR TO USE THESE STRAINING ACTIONS IN
ORDER TO DESIGN THE STEEL CONNECTIONS.
9250 9250 9250 9250 9250 FOR SECTION REFER9250
TO DWG: 9250 9250 9250 9250 9250
C C 7- STEEL WORK CONNECTION DESIGN IS TO BE DONE BY A SPECIALIST
CC DD EE FF GG HH SHO001-NAP-IFC-M2-05-XX-DR-SS-3004-04
II JJ KK LL MM NN STEEL CONTRACTOR AND TO BE SUBMITTED FOR ENGINEER'S APPROVAL.

8- FOR FIRE RATING REQUIREMENTS REFER TO SPEC SECTION 078100


450 350 "APPLIED FIRE PROOFING" TO UNEXPOSED APPLICATIONS AND TO
SECTION 099646 "INTUMESCENT PAINTING" FOR EXPOSED APPLICATIONS
HEA 240 HEA 240 HEB 200 HEB 400
9- LEVELS AND DIMENSIONS ARE TO BE CONFIRMED BY THE CONTRACTOR
PRIOR TO ANY FABRICATION. FURTHERMORE, CONCRETE SUPPORT
2L 2L 2L

2L
10

10
0 10 0 LEVELS SHOULD BE COORDINATED WITH RELEVANT CONCRETE

2L
8 x1 8

10
9 x1

12

2L
x

2L90x9x10
0x 0x x

x
0x

2L70x7x10
12

HEA 140
8

12

12
x8 x9

9x
0x

90
DRAWINGS.
8x 0x 8x 9

0x

HEB 400
HEB 360
80

0x

0x
x1 0

x
12

x9
10 8 10

90
9

12
2L 2L

12
12
0
2980

2980
2L

x1

x1

2L
2L

2L
x1

0
10- FOR MAIN TRUSSES CAMBERING SCHEME REFER TO DRAWING NO:

0
HEA 240 HEA 240 HEA 240 SHO001-NAP-IFC-M2-06-RCM-DR-SS-3003-03-00.
+33.000
C.L. 11- SPLICE LOCATIONS FOR THE CHORDS OF THE MAIN TRUSSES ARE
TENTATIVE, AND TO BE AS PER FABRICATOR PREFERENCE.

12- PARAPET HEIGHT AND ALL SECONDARY STEEL REQUIREMENTS ARE


TO BE COORDINATED WITH AR. DWGS.

SECTION W-W
SCALE 1/100

Contractor ( Nesma & Partners):


CHECKED BY:
APPROVED BY:
CC DD EE FF GG HH FOR SECTION REFER TO DWG:
II JJ KK LL MM NN
SHO001-NAP-IFC-M2-05-XX-DR-SS-3004-04 RFI REF:
9250 9250 9250 9250 9250 9250 9250 9250 9250 9250 9250

450 350 General Key Plan:


NORTH
HEA 180 HEA 180 HEA 180 HEB 400
MECCA
2L 2L 2L 0 2L 2L
10 10
2L 10

2L150x15x10
80 10 x1 10 0 10 0

2L70x7x10
0x 80 x1 80 0x x1

2L80x8x10
8x 10 0x

HEA 140
x8 0x 0x 8

HEB 300
1 x x x8 x8 1
x1 0x 10 0 8x 0 x 10 0x 10 0x
10 x1 L8 10 10 x 10 80 x1
10 x1 8
0 0 2L
2728

2728
2L 0 2 2L 2L 2L 0
HEA 240 HEA 240 B4
+33.000
MALL

C.L.
300

300
B B Project Name:

SECTION X-X THE AVENUES MALL,


SCALE 1/100 RIYADH

Project Number SHO001

CC DD EE FF GG HH FOR SECTION REFER TO DWG: II JJ KK LL MM NN ISSUED FOR CONSTRUCTION


SHO001-NAP-IFC-M2-05-XX-DR-SS-3004-04
9250 9250 9250 9250 9250 9250 9250 9250 9250 9250 9250
June 2023
450 350

HEA 320 HEA 320 HEA 320 HEA 320

HEA 300

HEA 240

HEA 300

HEA 300

HEB 220
2482

2482
+33.000
C.L.

01 14-06-2023 ONLY FOR UPLOADING ON G.M.


ACONEX
00 05-05-2023 APPROVED ISSUE G.M.
EI#19-EI#12
Rev Date Description Appr
SECTION Y-Y
SCALE 1/100 Issue:
BEAM SCHEDULE
FILE NAME : SHO001-NAP-IFC-M2-06-RCM-DR-SS-3003-03-01
B1 2FLGS 160x8.5 - WEB 116x5.5
MODEL NAME : SHO001-NAP-IFC-XX-XX-ZZ-M3D-SS-0002-00-00
B2 2FLGS 180x8.5 - WEB 116x5.5
SCALE: 1 : 100
B3 2FLGS 180x9 - WEB 134x6
SHEET FORMAT: A0
B4 2FLGS 220x9.5 - WEB 152x6
DRAWN BY: H.A.
5mm 10mm 16mm 21mm 26mm 30mm 34mm 36mm 38mm 38mm 38mm 36mm 31mm 26mm 20mm 14mm 7mm B5 2FLGS 240x9.5 - WEB 152x6
5mm 9mm 14mm 17mm 19mm 21mm 20mm 18mm 15mm 10mm 6mm 4mm 9mm 13mm 17mm 19mm 22mm 24mm 25mm 26mm 28mm 30mm 32mm 33mm 34mm 34mm 33mm 31mm 29mm 26mm 23mm 18mm 13mm 6mm DESIGN BY: H.J.
B6 2FLGS 280x9.5 - WEB 152x6
CHECKED BY: I.G.
B7 2FLGS 200x12 - WEB 206x7.5
A A APPROVED BY: G.M.
B8 2FLGS 280x12 - WEB 206x7.5

B9 2FLGS 300x12.5 - WEB 225x7.5

B10 2FLGS 200x9 - WEB 134x6


5mm 10mm 16mm 21mm 26mm 30mm 34mm 36mm 38mm 38mm 38mm 36mm 31mm 26mm 20mm 14mm 7mm
5mm 9mm 14mm 17mm 19mm 21mm 20mm 18mm 15mm 10mm 6mm B11 2FLGS 320x12.5 - WEB 225x7.5 Sheet Title
4mm 9mm 13mm 17mm 19mm 22mm 24mm 25mm 26mm 28mm 30mm 32mm 33mm 34mm 34mm 33mm 31mm 29mm 26mm 23mm 18mm 13mm 6mm
B12 2FLGS 240x13 - WEB 244x8

CAMBERING SCHEME FOR TRUSSES "19 & 20" CAMBERING SCHEME FOR TRUSSE "18" B13 2FLGS 320x13 - WEB 244x8 PLOT 06
CAMBERING SCHEME FOR TRUSSE "17" B14 2FLGS 300x13 - WEB 244x8 CINEMA ROOF
SCALE 1/100 SCALE 1/100
SCALE 1/100 B15 2FLGS 340x13 - WEB 244x8 SECTION 3 OF 3
B16 2FLGS 340x16 - WEB 238x10

B17 2FLGS 340x14- WEB 262x8.5

B18 2FLGS 240x14 - WEB 262x8.5


Sheet No.
B19 2FLGS 300x12 - WEB 206x7.5
Design Plot /
Project Originator Module Level Type Discipline Number Partial No. REV
B20 2FLGS 140x9.5 - WEB 152x6 Phase Zone

B21 2FLGS 300x9.5 - WEB 152x6

B22 2FLGS 220x10 - WEB 170x6.5 SHO001 NAP IFC M2 06 RCMDR SS 3003 03 01