Test Report

Date: 5-Jul-22

For Model N° : FTA560E-AA005B


Serial N° : FZ1239085
Project :

Customer : Baustelle, S.A.

P.O. : BAU-017-IMP-22

Reference :

Options: -D,-F,-S,

Line Voltage: 440-480


Rating Type: HP
Rating: 5
Enclosure TYPE 4X (NEMA 4X)
Phase: 3
Frequency: 50-60
Control Voltage: 24
FLA / Total: 7.60 / 7.72
Identification

Identification
I/O Board Serial Number 2205i0516c1634
I/O Board Hardware Revision 222
I/O Board Software Revision 121
Pressure Transducer PT1 Serial Number 2022-w21
UL Label Number E05610562
Last modified by Nimesh Patel
Visual Inspection and Mechanical Adjustment

Verify Exterior Labels


Made in Canada (On top)

Danger hazardous voltage (On door outside)

Verify Inside Labels


Torque label on disconnect switch (Inside)

Torque label on contactor or terminals (Inside)

Fuse rating on primary (Inside)

Rating label (On door inside)

Verify Parts and Wiring


Disconnect switch

Overload Adjustment 7.6 (A)


Contactor Model Number BF… lc1d09
Contactor Coil Voltage BF … 24 (V)
Verify the power wiring size (AWG) according to the 14 (AWG)
Engineering Data page.
Verify the control wiring size (Min 18 AWG/0.8 mm2)

Ground Lug Usage (SLU35) 3


IP enclosure 4X
Verify Control Transformers and Fuses
Primary Voltage (XTR1) 460 (V)
Secondary Voltage (XTR1) 24 (V)
Power (XTR1) 56 (VA)
Fuse primary (XTR1) 0.5 (A)
Fuse secondary (XTR1) 1.6 (A)
Last modified by Nimesh Patel
High Pot Test

High Pot Test


Remove green terminal blocks on DPI1 board, (except
transducer wires) and primary fuses.
Adjust High Voltage Unit to 2304 Volts

Power : Apply 2304 V for 1 sec. on each power wire


between ground and wire
Control : Apply 500 V for 1 sec. between ground and control
wires (24V)
Reconnect the ground wire and replace primary fuses.

If Transformer is 100VA, verify that the fuse is a 3A glass


fuse.
Reconnect the ground wire and switch DS1 in ON position.

Last modified by Nimesh Patel


Setup

Setup
Apply 85% of nominal voltage (391V)

Verify continuity from the top of the disconnect switch to the


top of the contactor (L1-L2-L3)
Turn the disconnect switch ON

Verify revision number is the same as the label on the CPU


(Appears on membrane during bootup - If you didn't notice,
press on Reset button)
At this point, do not press on Reset button again. If you do
after a config change, all the config will be erased!
Pressure Calibration
With no pressure applied to the pressure transducer, use a 0.5 (Vdc)
multimeter to measure the DC voltage of the pressure
transducer (between black and white wires). If the value is
not between 0.42 and 0.58 Vdc, change the sensor and
redo this verification.
Press on OK button until you see Cu.Ou on the screen
(Config Mode)
Press on UP and DOWN button at the same time until you
see C.LO on the screen
Press OK button to calibrate the pressure,

Make sure that air pressure hose is not connected to the


pressure sensor
Enter 0 as value (by using UP/DOWN buttons)

Press OK button

Press on RIGHT button (You must see C.Hi on the screen)

Press OK button

Connect air pressure hose to the pressure sensor


Apply maximum pressure on pressure line (Over 100 PSI)

Press on OK button

Cut-In and Cut-Out


Press on RIGHT button (You must see Cu.Ou on the
screen)
Press OK button to set the Cut-Out

Verify Cut-Out is 100 PSI (If not, change the value by using
UP/DOWN button)
Press OK button

Press the RIGHT button (You must see Cu.In on the


screen)
Press OK button to set the Cut-In

Verify Cut-In is 80 PSI (If not, change the value by using


UP/DOWN button)
Press OK button

Final setup
Press the power on the membrane until the power light
becomes green
Turn OFF the power on the testbench to save calibration
and config
Disconnect the air hose from the transducer

Record pressure on gauge 117 (PSI)


Turn ON the power on the test bench

Wait 10 seconds until the power is back on the Jockey


Pump
Record pressure on display 117 (PSI)
Verify if the Jockey's display reads 0 PSI and reconnect the
air hose
Last modified by Nimesh Patel
Control Test

Control Test
Raise the pressure above cut-out (Default: 100 PSI)

Note the Motor Start Count by pressing RIGHT and UP


buttons at the same time
Drop the pressure below cut-in (Default: 80 PSI)
During the test, verify LEDs functionality depending on the
pressure (Above Cut-Out: Green, between Cut-Out and
Cut-In: Orange and below Cut-In: Red)
Verify if the contactor activates

Verify if Auto light on the membrane is activated

Verify if Relay light on the board is activated

Verify if the Motor Start Count increased (By pressing


RIGHT and UP buttons at the same time)
Verify voltage between T1-T3 on bottom of contactor

Verify continuity between L2-T2 (L2 on top of disconnect


switch and T2 on bottom of contactor)
Trip the overload

Verify if the contactor de-activates

Reset the overload

Raise the pressure above cut-out (Default: 100 PSI)

Press on the green button of the membrane (START


button), the contactor activates
Verify if Hand light on the membrane is activated

Press on the red button of the membrane (STOP button)

Put a jumper on the input 2 (IN2)

Verify if Auto light on the membrane is activated

Verify if the contactor activates

Remove the jumper

Verify if the contactor de-activates

Last modified by Nimesh Patel


Options

Options
-S: Electronic parts need to be treated against moisture and
fungus.
-F: Enclosure, NEMA Type 4X (IP66) #304 Stainless Steel,
Brushed Finish
-D: Wetted Parts Including Pressure Sensor, 600 psi (42
bar) Sea Water
Last modified by Nimesh Patel
Final

Final
Press POWER button until you see OFF on the screen

Turn the disconnect switch OFF

Turn OFF the power on the testbench

Disconnect all testing cables

Reconnect all disconnected production cables and terminals

Turn OFF the power on the testbench