PLUMBING NOTES

1. ALL MATERIALS, FIXTURES & EQUIPMENT TO BE USED IN THE


PLUMBING INSTALLATION SHALL BE NEW, OF THE APPROVED TYPE
700
(5) - 10 mm Ø BARS Bothways & SIZE AS TO ITS INTENDED USAGE.
(5) - 10 mm Ø BARS Bothways

500

Counter sunk 2. ALL INSTALLATION SHALL BE IN CONFORMANCE WITH THE PLUMBING


Floor Cleanout Soil Pipe CODE OF THE PHILIPPINES, ITS RULES & REGULATIONS.
3. DRAINAGE PIPING SHALL BE PROVIDED WITH APPROVED INLET

INLET
500
700
OUTLET INLET FITTINGS FOR FIXTURE CONNECTIONS, CORRECTLY LOCATED
ACCORDING TO THE SIZE & TYPE OF FIXTURE PROPOSED TO BE

4. CHANGE IN DIRECTION OF DRAINAGE PIPING SHALL BE MADE WITH


APPROPRIATE USE OF APPROVED FITTINGS & SHALL BE OF THE
PLAN 6 BEND OR
75 75 120
CL CL
OTHER APPROVED FITTINGS OR EQUIVALENT SWEEP.

LAV
5. PROVIDE CLEAN OUT FOR EACH CHANGE IN DIRECTION IF THE TOTAL

SHOWER VALVE
Ceiling Cleanout Fin Flr Level AGGREGATE CHANGE EXCEEDS 135 DEGREES.

6. EACH CLEAN OUT SHALL BE INSTALLED SO THAT IT OPENS IN A

900

800
Slab Soffit Hanger Rod DIRECTION OPPOSITE TO THE FLOW OF SOIL OR WASTE OR AT RIGHT

600
loose fit lifting 190
50 50

530
600
handle 12mmØ
(5) - 10 mm Ø BARS Bothways

ANGLES THERETO. ADDITIONAL CLEAN OUTS SHALL BE INSTALLED AT


INTERVALS NOT TO EXCEED 100 FT (0.5 m.)IN STRAIGHT RUNS.

50

150
100 mm (4") CHB

CO

WC
SD

FD
Lateral/ Branch with (3) - 10 mmØ INLET

INLET
OUTLET
100 mm (4") CHB

450
Horizontal Bars 7. HORIZONTAL DRAINAGE PIPING SHALL RUN IN PRACTICAL ALIGNMENT

INLET

725
Soil Pipe with (3) - 10 mmØ

& (2) - 10 mm Ø
4 OF AN INCH PER FOOT
Horizontal Bars

Vertical Bars & (2) - 10 mm Ø

2"Ø PVC P TRAP


mt.) OR 2% TOWARD THE POINT OF DISPOSAL.

2"Ø PVC P TRAP


100
Vertical Bars
4"Ø PVC PIPES SLOPE 1:20 8. UNLESS PROHIBITED BY STRUCTURAL CONDITIONS, EACH VENT
SECTION CEILING CLEANOUT
4"Ø PVC PIPES SLOPE 1:20

(3) - 12 mmØ Temp Bars Bothways


SHALL RISE VERTICALLY TO A POINT NOT LESS THAN 6" (52.4 mm
(3) - 12 mmØ Temp Bars Bothways

ABOVE THE FLOOD LEVEL RIM OF THE FIXTURE SERVED BEFORE


OFFSETTING HORIZONTALLY.
Counter sunk 9. EACH VENT PIPE OR STACK SHALL EXTEND THROUGH ITS FLASHING
Floor Cleanout
Fin Flr Level & SHALL TERMINATE VERTICALLY NOT LESS THAN 6" (52.4 mm)ABOVE
THE ROOF & ONE FOOT (.30 m.)FROM ANY VERTICAL SURFACE.
02 CONCRETE CATCH BASIN DETAIL 1:20 03 TYPICAL PLUMBING LAYOUT 1:30
10. PIPING SHALL BE LAID ON A FIRM BED THROUGHOUT ITS ENTIRE
LENGTH. IF ANY SUCH PIPING IS LAID IN MADE OR FILLED GROUND, IT
Slab Soffit 00
30 SHALL BE LAID ON A BED OF APPROVED MATERIALS & SHALL BE
ADEQUATELY SUPPORTED.
00
Lateral/ Branch 30
Soil Pipe 05 PLUMBING NOTES NTS
00 0
150 230 DS
00 VTR
VC
30 Ø EPR
m
m I S LEGEND:
410
0 00 S R 212
2-1PIPE 20
00 PR DS
30 ØP
m mR
DS
5
2 RIS E
CB
SECTION FLOOR CLEANOUT 0 00 00 CO S
D FD FLOOR DRAIN DWV DRAINAGE WASTE VENT.
1 5 2 3 INE WC FD V C
TYL OV
LA CP WMD WASHING MACHINE DRAIN CO
ER Ø R CLEAN OUT
OP mmRISE
PR 0
0 S BATHTUB DRAIN
0 DS 2-1PIPE 212 CCO CEILING CLEAN OUT
410 KS
K 20
VTR
DS Ø PP
R
CB CB ST SEPTIC TANK VTR VENT THRU ROOF
mR
Soil Stock 25RmISE DS CB CATCH BASIN
271
3 00 VTW VENT THRU WALL
Wall Cleanout
20
IPE
S CB S CO CLEAN OUT
CP CO IPE
PV WC P
VC KS KITCHEN SINK
To be filled w/ Ø CO SD ØP
mm FD AV PR
m F FAUCET
100 DS
0 0m
non combustible 410 L
ØP
10
WC WATER CLOSET
matirials VTW m R LIN
E
HB HOSE BIBB
CHB Wall 25RmISE
70 ER
34 50
CB 26 EW
ES
PIP70 VC
ST
S
ST CV CHECK VALVE LAV LAVATORY
Ø EPR
RE
Pipe Sleeve V2C02
330
0 A
Fin Flr Level 00 Ø P
m
m IS
NE
TO
WCO WALL CLEAN OUT
00 S R
20 m m
100 2-1PIPE WM WARM METER
SD V
LA
410
0 E GV CB 0 0 FD AV PR GV GATE VALVE
GV ØP
LIN 34 L
WT mR
CB
Y
RT CV P m
Hanger Rod OPE M E
LIN 25RISE
R P
DC CB 00 ER R REDUCER
20 VC
W
SE
Beam 270
Ø EPR 4" Ø G.I. PIPE (OLD SUPPLY PIPE
T
LC
20 0 TS
330 m
m IS
S E
00 00 S R
AR
NE U UNION
20 2-1PIPE TO
00
150 4" Ø G.I. PIPE (OT SUPPLY PIPE
E
Soil Collector LIN

Pipe 00
34
CB ER
SE
W
T
MH MAN HOLE
TS
AR
ES GT GRESE TRAP 2" Ø G.I. PIPE (ETURN
NE
TO
00
20 SD SHOWER DRAIN
GV R
00
20 M
TE LY
WSAUPP
CWL COLD WATER LINE
R
TE
ME
ER
SECTION BASE CLEANOUT WA
T

01
01 TYPICAL CLEANOUT DETAIL NTS 04 ISOMETRIC VIEW 1:80 06 PLUMBING LEGENDS NTS

MKMDI R.A. 9266 SECTION 33.


MASTER PLUMBER PROJECT OWNER DESIGNED BY: ALSOR REVISIONS DATE: SHEET CONTENTS SHEET NO
Ownership of Plans, Specifications and other Contract Documents. - Drawings
CONSTRUCTION and specifications and other contract documents duly signed, stamped or
PROPOSED TWO (2) STOREY CADD BY: AO A 04/19/2023
01
02
TYPICAL CLEANOUT DETAIL
CONCRETE CANAL DETAIL

P12
sealed, as instruments of service, are the intellectual property and documents
03 TYPICAL CLEANOUT DETAIL
Blk 7, LOT 2, Guava St. Greenwoods Subd. of the architect, whether the object for which they are made is executed or not. RESIDENTIAL 04 ISOMETRIC LAYOUT
Bayanihan, Gapan City, Nueva Ecija
It shall be unlawful for any person to duplicate or to make copies of said MRS PERPETUA N. GASKIN CHECKED BY: ALSOR
05 PLUMBING NOTES
documents for use in the repetition of and for other projects or buildings, PRC NO.: ISSUED AT: TIN NO:
CONSTRUCTION email: asoreta8@yahoo.com
whether executed partly or in whole, without the written consent of architect or LOCATION: LOT 10, BLOCK 4 PUROK 6, SAN AGUSTIN SUR,
19APRIL2023
06 PLUMBING LEGENDS
cell nos 09062008372 PTR NO.: ISSUED ON: DATE CREATED: PNG2023_PLUMB_012_A