Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

QUOTATION PRICE

TRUCKING INBOUND OFFERING PRICE 2020

Re-Counter Price
45MT
1 Picked Up Original Document dari dan ke Karawang dan atau tempat lain -
2 Biaya PNBP dan ADM Bank -
3 Biaya PIB / EDI Per Dokumen 75,000
Add 11 item onwards charge per item
4 Biaya Pengurusan Submit Dok. Form AK, kelengkapan kepabeanan , LOI pembukaan akun shipping liner, pengurusan reddress, dan atau
- informasi lainnya
5 Biaya Striping Kontainer (Tonase > 15MT/Coil)/shift/8 jam -
6 Biaya Handling Import Material
6.1 Bulk (Jalur Hijau)
- 10 MT Pertama 200,000
- Biaya Tonnase berikutnya 5,000
6.2 Bulk (Jalur Merah)
- 10 MT Pertama 375,000
- Biaya Tonnase berikutnya 5,000
6.3 Bulk (Jalur Kuning)
- 10 MT Pertama 350,000
- Biaya Tonnase berikutnya 5,000
6.4 Container 20 Feet (Jalur Hijau)
- Biaya Container Pertama 175,000
- Biaya Container Berikutnya 50,000
6.5 Container 20 Feet (Jalur Merah)
- Biaya Container Pertama 535,500
- Biaya Container Berikutnya 350,000
6.6 Container 20 Feet (Jalur Kuning)
- Biaya Container Pertama 250,000
- Biaya Container Berikutnya 50,000

7 Trucking
7.1 Trailer from Tg. Priok to IJPC (Bulk) per MT min …….. Please fill????..... MT 44,000
> additional per ton
7.2 From Tg. Priok to IJPC per 20' Container ( Dry Container & Open Top Container), Qty<26 Ton 1,600,000
7.3 From Tg. Priok to IJPC per 20' Container ( Dry Container & Open Top Container), Qty>26 Ton 1,800,000
7.4 From Tg. Priok to IJPC per 40' Container ( Dry Container & Open Top Container), Qty<26 Ton 1,950,000
7.5 From Tg. Priok to IJPC per 40' Container ( Dry Container & Open Top Container), Qty>26 Ton 2,000,000

8 Extra Charges
8.1 Overtime / Unit Truck (Trailer from Tg. Priok to IJPC (Bulk)) 320,000
Overtime / Unit Truck (Trailer from Tg. Priok to IJPC (Bulk)) for the 2nd night and onward -
8.2 Trucking inap/ Overnight (Trailer (Bulk)) 50% from normal tariff
Trucking inap/ Overnight (Trailer (Bulk)) for the 2nd night and onward -
8.3 Trucking inap/ Overnight per 20 Container ( Dry Container & Open Top Container), Qty<26 Ton 50% from normal tariff
Trucking inap/ Overnight per 20 Container ( Dry Container & Open Top Container), Qty<26 Ton Trucking inap/ Overnight (Trailer (Bulk))for
- the 2nd night and onward
8.4 Trucking inap/ Overnight per 20 Container ( Dry Container & Open Top Container), Qty>26 Ton 50% from normal tariff
Trucking inap/ Overnight per 20 Container ( Dry Container & Open Top Container), Qty>26 Ton for the 1st night for the 2nd night andonward
-
*overnight count start from truck come to IJPC until finish loading at IJPC warehouse
8.5 OB Cancellation 300,000
8.6 Biaya Lain - lain (others)*please mentioned what others from PPJK side As per receipt
-
-
9 Truck Lossing Scheme -
9.1 Additional Cost/MT (Including Overtime and Truck Waiting at Port) 3,000
-
-
10 Export Charges
10.1 Biaya PEB / EDI Per Dokumen 50,000
Add 11 item onwards charge per item -
10.2 Trucking from Depo to Tg Priok warehouse port 20' 1,500,000
Trucking from Depo to Tg Priok warehouse port 40' 2,400,000
10.3 Handling export 20" 250,000
Handling export 40" 600,000
Trucking Cont 20" 1,950,000
Trucking Cont 40" 2,100,000
Stuffing ( Stuffing area, buruh, alat, etc) per container 2,750,000
Fumigasi ( If Any ) 1,850,000
10.4 Biaya Lain - lain (others) As per receipt