CHECKLIST

Guidelines for project directors for processing the proposal for laying of water supply
pipeline in land along National Highway vested with NHAI.

Relevant Circulars

1. Ministry Circular No. NH-41 (58)/68 Dated 31.01.1969


2. Ministry Circular No. NH-III/P/66/76 Dated 18/19.11.1976
2. Ministry Circular No. NH-III/P/66/76 Dated 11.5.1982
4. Ministry Circular No. RW/NH-11037/1/86-DOI (ii) Dated 28.07.1993
5. Ministry Circular No. RW/NH-11037/1/86/DOI Dated19.01.1995
6. Ministry Circular No. RW/NH-34066/2/95/ S&R Dated 25.10.1999
6. Ministry Circular No. RW/NH-34066/7/2003/ S&R (B)Dated 17.09.2003

Sl.No. Item Information/ Status Remarks


1 General Informations
1.1 Name and address of the applicants
Chordia Industrial Park LLP.
S No. 43/45, Plot No. 48A,
Parvati Industrial Estate, Pune
Satara Road Pune,
Maharashtra- 411009 India.

1.2 National High Way Number NH-4


1.3 State Maharashtra
1.4 Location Near Shirwal
1.5 Chianage in KM 788+800
1.6 Total width of crossing 50.4 meter
1.7 Width of available ROW
1.8 (a) Left side from center line towards increasing 25.2 meter
Chainage/KM
(b) Right Side direction
from center line towards increasing 25.2 meter
1.9 Chainage/KM
Propsal to lay direction
overhead electrical line
(a) Left side from center line towards increasing NA
Chainage/KM
(b) Right Side direction
from center line towards increasing NA
1.1 Chainage/KM direction
Proposal to acquire land NA
(a) Left side from center line NA
(b) Right Side from center line NA
1.11 Whether proposal is in the same side where land is NA
not
If towhere
not be acquired, if not then where to lay cable.
to lay cable NA
1.12 Details of already laid services, if any, along the NA
1.13 proposed
Number ofroute
lanes (2/4/6/8 lanes) existing 6 Lanes
1.14 Proposed number of lanes (2 lane with paved
NA
shoulders/4/6/8 lanes
1.15 Service Road existing or not, Existing
If yes then which side
(a) Left side from center line 16.2 meter 9 meter wide
(b) Right Side from center line 16.2 meter 9 meter wide
1.16 Proposed Serviec Road NA
(a) Left side from center line NA
(b) Right Side from center line NA
1.17 Whether proposal to lay water supply pipeline is after Pipe will be laid
the service road or between the service road and NA at farmers &
main carriage way.
MIDC land
The Permission for laying overhead electrical line
shall be considered for approval/rejection based on
1.18 NA
the Ministry Circulars mentioned above.

a) Carrying of sewage/Gas pipelines on highway


bridges shall not be permitted as fumes/gases pipes
can accelerate the process of corrosion or may
cause expolsions thus being much more injurious NA
than leakage of water.

b) Carrying of water pipelines on bridges shall also


be discouraged. However, if the water supply
authorities seem to have no other viable alternative
and approach the highway authority well in time
before the design of the bridge is finalised, they may
be permitted to carry the pipeline on independant
superstructure, suported on extended portions of NA
piers and abutments in such a manner that in the
final arrangement enough free space around the
superstructure of the bridge remains available for
inspections and repairs.

c) Cost of required extension of the substructure as


well as that of the supporting superstructure shall be
NA
borne by the agency incharge of the utilities.

d) Services are not being allowed indiscriminately on


the parpet/ any part of the bridges. Safety of the
bridges has to be kept in view while permitting
various services along the bridge. Approvals are to NA
be accorded in this regard with the cncurrence of the
Ministry's project chief engineers only.

If crossing of road involved


If yes it shall be either encased in pipes or through
1.19 structure or conduits specially built for that purpose Duct
at the expenses of the agency owing the line.

a) Existing drainage structures shall not be allowed


Noted
to carry the lines
b) Is it on a line normal to NH Yes
c) Crossing shall not be too near the existing crossing is
structure on the national highway, the minimum
distance being 15 meter. What is the distance from
There will be No drilling through existing
existing structure. duct
d) The casing pipe (or conduit pipe in the case of
electric cable) carrying the utility line shall be of
steel, cast iron or reinforced cement concrete and
have adequate strenght and be large enough to Metal Casing
permit withdrawal of the carrier pipe/cable.

e) Ends of the casing/conduit pipe shall be sealed


Pipe will be rested on steel
from the outside, so that it does not act as a
structure in air.
drainage path.
f) The casing/conduit pipe should, as minimum
extend from drain to drain in cuts and toe of slope Noted
toe of slope in the fills.
g) The top of the casing/conduit pipe should be at
least 1.2 meter below the surface of the road subject
Using Duct
to being at least 0.3 meter below the drain inverts.

h) Crossing shall be by boring method (HDD)


specially where the existing road pavement is of
Using duct
cement concrete or dense bituminous concrete type.

i) The casing/conduit pipe shall be installed with an


even bearing throughout it's length and in such a
manner as to prevent the formation of a waterway
along it.
2 Document/Drawing enclosed with the proposal
2.1 Cross section showing the size of the trench for open
trenching method (is it normal size of 1.2 m deep x
0.3 m wide)
(i) Should be greater than 60 cm wider than the
outer diameter of the pipe.
(ii) Located as close to the extreme edge of the
ROW as possible but not less than 15 m from the
center-lines of the nearest carriage way
(iii) Shall not be permitted to run along the National Using duct
Highways when the road formation situated in double
cutting nor shall be laid over the existing culverts and
bridges
(iv) These should be so laid that their top is atleast
0.6 m below the ground level so as not to obstruct
drainage of the raod land.

2.2 Cross Section showing the size of the pit and


No drilling
location of cable for HDD method
Strip plan / Route plan showing overhead electrical
2.3 line, chainage, width of ROW, Important mile stone, Yes
Inter section etc.
2.4 Methodology for laying of overhead electrical line
NA
Open trenching method (May be allowed in utility
corridor only where cement is neither cement
2.4.1 concrete nor dense bituminous conctrete type). If NA
yes, Methodology of refilling of trench
(a) The drench Width should be atleast 30cm, but
not more tha 60 cm wider than the outer diameter of NA
the pipe.
(b) For fillings of the trough beds will be a depth of
not less thar 30 cm. The granular material, free of
lumps, clods and cobles and graded tc produce a
firm Surface without any change in bearing value
Unsuitable soil and rock edged should be NA
excavated and replaced fry selected material

(c) The backfill will be completed in two stages.


(i) Sidefill to the level of the top of the pipe and 1
(ii) Overkill to the bottom of the road crust
NA

(d) The side fill is consist of granular material laid in


15 cm layers each Consolidated | by mechanical
tampering and controlling addition of moisture to
95% of the procter's | Density overfill will be
compacted to the same density as the material that
has been removed [removed consolidation by NA
saturation of ponding
will not be allowed.

(e) The road crust will be built on the same strength


as the current crust. Care will be taken to avoid the
formation of a dip at the trench. NA

(f) The excavation will be protected by flagman,


Signs and barricaded and red lights during night
NA
hours.

(g) If required, a diversion will be constructed at the


expenditur of agency owning the pipelines.
Yes

2.4.2 Horrizontal direction drilling (HDD) method Using duct


Laying of water supply pipeline through CD works
2.4.3 NA
and method of laying.
3 Draft Licence agreement signed by two witnesses Yes
C/W
Performane bank guarantee in favour of NHAI has to
be obtained @ 50/- per running meter (parallel to
NH) and Rs. 1,00,000/- per crossing of NH, for a
period of one year initially (extendable if required till
satisfactory completion of work) as a security for
ensuing / making good the excavated trench for
laying the cables / ducts by proper filling and
4 compaction, clearing debris /loose earth producted C/W Enclosed
due to ececution of trenching atleast 50 m any from
the edge of the right of way. No payment shall be
payable by the NHAI to the licensee for clearing
debris / loose earth.

4.1 Performance BG as per above is to be obtained


Yes
4.2 Confirmation of BG has been obtained as per NHAI
Yes
guidelines
5 Affidavit / Undertaking from the applicant for Enclosed
5.1 Not to damage to other utility, if damaged then to pay
Yes
the losses either to NHAI or to the concerned agency
C/W
5.2 Renewal of Bank Guarantee YES
5.3 Confirming all standard condition of NHAI's guideline
NA
5.4 Shifting of overhead electrical line as and when Yes
required at their own cost C/W
5.5 Shifting due to 6 lanning / widening of NH Yes
C/W
5.6 Indemnity against all damages and claims clause Yes
(xxiv) C/W
5.7 Traffic movement during laying of overhead electricla
Yes
line to be managed by the applicant.
5.8 If any claim is raised by the concessionaire then the
Undertaking
same has to be paid by the applicant.
submitted
5.9 Prior approval of the NHAI shall be obtained before
undertaking any work of installation, shifting or
Undertaking
repairs, or alteration to the overhead electrical line Noted
located in the National Highway right-of-ways submitted

5.10 Expenditure, if any, icurred by NHAI for reparing any


damage caused to the National Highways by the
Undertaking
laying, maintenance or shifting of the overhead Noted
electrical line will be borne by the agency owning the submitted
line.
If the NHAI considers it necessary in future to move
the utility line for any work of improvement or repairs
to the raod, it will be carried out as desired by the Undertaking
5.11 NHAI at the cost of the agency owing the utility line Noted
submitted
within a reasonable time of the itimation given..
5.12 Certificate from the applicant in the following format
(i) laying of OH electricals line will not have any
deleterious effects on any of the bridge components
and raodway safety for traffic.
(ii) For 6- lanning ''We do undertake that I will Certificate
relocate service road/utilities at my own cost Enclosed
notwithstanding the permission granted within such
time as will be stipulated by NHAI'' for future six
lanning or any othe development.''

6 Who will sign the agreement on behalf of water


Samir Kulkarni
supply pipeline agency.
7 Cerificate from the project director
7.1 Certificate for confirming of all standard condition
issued vide Ministry Circular Not Applicable NH-
111/P/66/76 dtaed 19.11.1796, Ministry Circular Not
Applicable RW/NH-111/P/66/76 dated 11.05.1982 Certificate of P.D is enclosed
and Ministry Circular Not Applicable RW/NH-
11037/1/86/DOI dated 19.01.1995

7.2 Certifiacte from PD in the following format


(a) "it is cerified that any other locaton of the Electric
Cable would be ectremely difficult and unreasonable
costly and the installation of electric cable within
ROS will not adversely affect the design, stability &
traffic safety of the highway nor the likely future
improvement such as widening of the carriage way,
easing of curve etc., Certificate of P.D is enclosed
(b) For 6-lanning
(i) Where feasibility is available " I do certify that
there will be no hindrance to proposed structure as
the said location
(ii) In case feasibility report is not available " I do
cerify that suffient ROW is available at site for
accomodating proposed 6-Lanning.
8 If NH Section proposed to be taken up by NHAI on
BOT basis a clause is to inserted in the agreement.
"The permitted Highway on which Licensee has been
granted the right to lay cable/duct has also been
granted as a right of way to the concessionarie under
the concession agreement for up-gradation of (NH Clause is inserted in the
205 Section at POWERGRID crossing section of NH agreement as Sr. No. 5
Not applicable build, Operate and Tranfer Basis) and
therefore, the licensee shall honour the same"

9 Who will supervise the work of Laying of Over Head


NHAI/M/s Arvee Associates
electrical line.
Who will ensure that the defects in the road portion
after laying of OH electrical line are corrected and if
10 NHAI/M/s Arvee Associates
not corrected then action will be taken

11 Who will pay the claims for the damages done /


disrupted in working of concessionare if asked by the Applicant
concessionare
A Certificate from PD that he will enter the proposed
permission in the register of records of the
12 Certificate of P.D is enclosed
permissions in the prescribed preforma (copy
enclosed)
If any previous approval is accorded for laying of OH
electrical line then photocopy of register of record of
13 the permissions accorded as maintained by OD may NA NA
be enclosed.