Expense Tracking

You might also like

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 3

Kitchen Refurb.

Expense Tracking
Budget 20,000 65,000 65,000 150,000
% Spent 37.5% 86.4% 84.0% - -
Remaining 31,708
C040110896 [42]
Payment Transport & Construct/service
Date PO Date Type Description Freight Material incl. Painting Subtotal
Tiling 18,800.00 45,625.00 64,425.00
Tiling consumables 2,417.00 2,417.00
Alu Doors 3,515.00 3,515.00
-
6/1/2020 Kitchen SS Equipment 7,500.00 21,320.00 28,820.00
Ceiling Material 6,515.00 6,000.00 12,515.00
-
Ceiling & Extraction fans 3,600.00 3,600.00
Electrical works Incl consumables 3,000.00 3,000.00
-
-
-
Expense Total 7,500.00 56,167.00 54,625.00 - - 118,292.00
Budget vs. Spent
Budget Expense Total

$70,000

$60,000

$50,000

$40,000

$30,000

$20,000

$10,000

37.5% 86.4% 84.0%


$-
Transport & Freight Material Construct/service
incl. Painting