CALCULATION

Surface Facility P_BENA23_P02_ADD &


P_BENA23_P03_ADD
Date Area Bangko
FAB & INSTALL STRUCTURE STEEL
SPK CCMSPHR/SPK/3700115638 Location BNK P45A LQR

No. Description Qty Unit Length Wide Hight Phi Dia Weight Total Remarks
Removal/Demolish SID 1 (Exist BO 45)
1 Pipe 1.5" 2 Join 1.15 4.40 10.13

2 Pipe 1.5" 3 Join 1.07 4.40 14.13

3 Pipe 1.5" 1 Join 0.55 4.40 2.42

4 Pipe 1.5" 1 Join 0.95 4.40 4.18

5 Pipe 1.5" 2 Join 0.85 4.40 7.49

6 Pipe 1.5" 2 Join 1.00 4.40 8.81

7 Pipe 1.5" 2 Join 1.30 4.40 11.45

8 Plate 6Mm (1/4") 1 Sheet 1.00 0.08 49.84 3.99

9 Plate 6Mm (1/4") 1 Sheet 1.30 0.08 49.84 5.18

10 Plate 6Mm (1/4") 2 Sheet 0.78 0.08 49.84 6.22

11 Plate 6Mm (1/4") 1 Sheet 0.82 0.08 49.84 3.27

12 Grating 1" x 3/16" 1 Sheet 0.75 0.86 35.64 22.99

13 Grating 1" x 3/16" 6 Sheet 0.75 0.25 35.64 40.10

14 Angle 50X50 12 Join 0.25 4.43 13.29

15 Angle 50X50 2 Join 0.77 4.43 6.82

16 Angle 50X50 2 Join 0.75 4.43 6.65

17 Angle 50X50 2 Join 0.85 4.43 7.53

18 Chanel 125 X 65 4 Join 1.37 13.40 73.43

19 Chanel 125 X 65 2 Join 0.75 13.40 20.10

20 Chanel 125 X 65 2 Join 0.95 13.40 25.46

21 Chanel 125 X 65 2 Join 1.90 13.40 50.92


Removal/Demolish SID 2 (Exist BO 45)
1 Pipe 3" 4 Join 1.37 11.27 61.73

2 Pipe 3" 2 Join 0.75 11.27 16.90

3 Pipe 3" 2 Join 0.95 11.27 21.40

4 Pipe 1.5" 4 Join 1.07 4.40 18.84

5 Pipe 1.5" 2 Join 0.80 4.40 7.04


6 Pipe 1.5" 2 Join 0.85 4.40 7.49

7 Pipe 1.5" 1 Join 0.95 4.40 4.18

8 Pipe 1.5" 4 Join 1.78 4.40 31.35

9 Pipe 1.5" 2 Join 1.15 4.40 10.13

10 Plate 6Mm (1/4") 2 Sheet 0.78 0.08 49.84 6.22

11 Plate 6Mm (1/4") 1 Sheet 0.82 0.08 49.84 3.27

12 Plate 6Mm (1/4") 2 Sheet 1.75 0.08 49.84 13.95

13 Grating 1" x 3/16" 1 Sheet 0.75 0.86 35.64 22.99

14 Grating 1" x 3/16" 3 Sheet 0.75 0.25 35.64 20.05

15 Angle 50X50 10 Join 0.25 4.43 11.08

16 Angle 50X50 2 Join 0.77 4.43 6.82

17 Angle 50X50 2 Join 0.75 4.43 6.65

18 Chanel 125 X 65 2 Join 0.63 13.40 16.88

19 Chanel 125 X 65 2 Join 1.90 13.40 50.92


Removal/Demolish SID 3 (Exist BO 45)
1 Pipe 3" 4 Join 1.34 11.27 60.38

2 Pipe 3" 2 Join 0.75 11.27 16.90

3 Pipe 3" 2 Join 0.95 11.27 21.40

4 Pipe 1.5" 4 Join 1.07 4.40 18.84

5 Pipe 1.5" 2 Join 0.80 4.40 7.04

6 Pipe 1.5" 2 Join 0.85 4.40 7.49

7 Pipe 1.5" 1 Join 0.95 4.40 4.18

8 Pipe 1.5" 4 Join 1.78 4.40 31.35

9 Pipe 1.5" 2 Join 1.15 4.40 10.13

10 Plate 6Mm (1/4") 2 Sheet 0.78 0.08 49.84 6.22

11 Plate 6Mm (1/4") 1 Sheet 0.82 0.08 49.84 3.27

12 Plate 6Mm (1/4") 2 Sheet 1.75 0.08 49.84 13.95

13 Grating 1" x 3/16" 1 Sheet 0.75 0.86 35.64 22.99

14 Grating 1" x 3/16" 6 Sheet 0.75 0.25 35.64 40.10

15 Angle 50X50 12 Join 0.25 4.43 13.29

16 Chanel 125 X 65 2 Join 0.63 13.40 16.88

17 Chanel 125 X 65 2 Join 1.90 13.40 50.92

18 Chanel 125 X 65 2 Join 0.77 13.40 20.64

19 Chanel 125 X 65 2 Join 0.75 13.40 20.10


Removal/Demolish SID 4 (Exist BO 45)
1 Pipe 3" 4 Join 1.34 11.27 60.38

2 Pipe 3" 2 Join 0.75 11.27 16.90

3 Pipe 3" 2 Join 0.95 11.27 21.40

4 Pipe 1.5" 4 Join 1.07 4.40 18.84

5 Pipe 1.5" 2 Join 0.80 4.40 7.04

6 Pipe 1.5" 2 Join 0.85 4.40 7.49

7 Pipe 1.5" 1 Join 0.95 4.40 4.18


8 Pipe 1.5" 4 Join 1.78 4.40 31.35

9 Pipe 1.5" 2 Join 1.15 4.40 10.13

10 Plate 6Mm (1/4") 2 Sheet 0.78 0.08 49.84 6.22

11 Plate 6Mm (1/4") 1 Sheet 0.82 0.08 49.84 3.27

12 Plate 6Mm (1/4") 2 Sheet 1.75 0.08 49.84 13.95

13 Grating 1" x 3/16" 1 Sheet 0.75 0.86 35.64 22.99

14 Grating 1" x 3/16" 6 Sheet 0.75 0.25 35.64 40.10

15 Angle 50X50 2 Join 0.85 4.43 7.53

16 Angle 50X50 12 Join 0.25 4.43 13.29

17 Chanel 125 X 65 2 Join 1.90 13.40 50.92

18 Chanel 125 X 65 2 Join 0.77 13.40 20.64

19 Chanel 125 X 65 2 Join 0.75 13.40 20.10

TOTAL 1,445.23 Kilo Gram

Prepared by, PT.EFK Reviewed By, PT.TPE

Nama : Nama :
Date : Date :
CALCULATION

[WDT] Production Facility BNK_P280D_LQR


Date Area BANGKO
COATING & PAINTING
SPK CCMSPHR/SPK/3700097986 Location BNK_P280D_LQR

Surface Total Sq. Meter to Luas/ Sq.


No. Description Qty Unit Length Hight Phi Dia Unit
Area Luas/M Sq. Feet Feet
FENCING
1 Pipe 3" (Pipe Post) 22 Join 2.30 0.28 3.14 0.09 14.17 Sq.Meter 10.76 152.52

2 A' Bracing Atas Pipe 3" 1 Join 4.50 0.28 3.14 0.09 1.26 Sq.Meter 10.76 13.56

3 A' Bracing Bawah Pipe 3" 1 Join 3.00 0.28 3.14 0.09 0.84 Sq.Meter 10.76 9.04

4 B' Bracing Atas Pipe 3" 1 Join 6.05 0.28 3.14 0.09 1.69 Sq.Meter 10.76 18.24

5 B' Bracing Bawah Pipe 3" 1 Join 1.43 0.28 3.14 0.09 0.40 Sq.Meter 10.76 4.31

6 B' Bracing Bawah Pipe 3" 1 Join 1.30 0.28 3.14 0.09 0.36 Sq.Meter 10.76 3.92

7 B' Bracing Bawah Pipe 3" 1 Join 3.00 0.28 3.14 0.09 0.84 Sq.Meter 10.76 9.04

8 B' Bracing Atas Pipe 3" 1 Join 9.10 0.28 3.14 0.09 2.55 Sq.Meter 10.76 27.43

9 B' Bracing Bawah Pipe 3" 1 Join 3.10 0.28 3.14 0.09 0.87 Sq.Meter 10.76 9.34

10 B' Bracing Bawah Pipe 3" 1 Join 2.90 0.28 3.14 0.09 0.81 Sq.Meter 10.76 8.74

11 B' Bracing Bawah Pipe 3" 1 Join 3.00 0.28 3.14 0.09 0.84 Sq.Meter 10.76 9.04

12 C' Bracing Atas Pipe 3" 1 Join 4.17 0.28 3.14 0.09 1.17 Sq.Meter 10.76 12.57

13 C' Bracing Bawah Pipe 3" 2 Join 0.55 0.28 3.14 0.09 0.31 Sq.Meter 10.76 3.32

14 D' Bracing Atas Pipe 3" 1 Join 6.05 0.28 3.14 0.09 1.69 Sq.Meter 10.76 18.24

15 D' Bracing Bawah Pipe 3" 1 Join 1.43 0.28 3.14 0.09 0.40 Sq.Meter 10.76 4.31

16 D' Bracing Bawah Pipe 3" 1 Join 1.30 0.28 3.14 0.09 0.36 Sq.Meter 10.76 3.92

17 D' Bracing Bawah Pipe 3" 1 Join 3.00 0.28 3.14 0.09 0.84 Sq.Meter 10.76 9.04

18 D' Bracing Atas Pipe 3" 1 Join 9.10 0.28 3.14 0.09 2.55 Sq.Meter 10.76 27.43

19 D' Bracing Bawah Pipe 3" 1 Join 3.10 0.28 3.14 0.09 0.87 Sq.Meter 10.76 9.34

20 D' Bracing Bawah Pipe 3" 1 Join 2.90 0.28 3.14 0.09 0.81 Sq.Meter 10.76 8.74

21 D' Bracing Bawah Pipe 3" 1 Join 3.00 0.28 3.14 0.09 0.84 Sq.Meter 10.76 9.04

22 Single Gate Pipe 3" 2 Join 1.97 0.28 3.14 0.09 1.10 Sq.Meter 10.76 11.88

23 Single Gate Pipe 3" 2 Join 1.15 0.28 3.14 0.09 0.64 Sq.Meter 10.76 6.93

24 Doble Gate Pipe 3" 4 Join 1.94 0.28 3.14 0.09 2.17 Sq.Meter 10.76 23.39

25 Doble Gate Pipe 3" 2 Join 1.25 0.28 3.14 0.09 0.70 Sq.Meter 10.76 7.54

26 Doble Gate Pipe 3" 2 Join 1.20 0.28 3.14 0.09 0.67 Sq.Meter 10.76 7.23
PUMP UNIT BASE TYPE C160
15 Pipe 4" 0 Join 1.05 0.36 3.14 0.11 - Sq.Meter 10.76 -

16 Pipe 4" 0 Join 2.15 0.36 3.14 0.11 - Sq.Meter 10.76 -

17 Pipe 4" 0 Join 1.65 0.36 3.14 0.11 - Sq.Meter 10.76 -

18 Pipe 8" 0 Join 0.75 0.68 3.14 0.22 - Sq.Meter 10.76 -

19 Plate 12Mm 0 Sheet 0.30 0.30 - Sq.Meter 10.76 -

20 H.Beam 200X200 0 Join 1.15 0.80 - Sq.Meter 10.76 -


TOTAL 428.10

Prepared by, PT EFK Reviewed By, PT TPE

Nama : Nama :
Date : Date :
CALCULATION
Surface Facility P_BENA23_P02_ADD &
P_BENA23_P03_ADD
Date Area Bangko
FAB & INSTALL STRUCTURE STEEL
SPK CCMSPHR/SPK/3700115638 Location BNK P45A LQR

No. Description Qty Unit Length Wide Hight Phi Dia Weight Total Remarks
Single Gate Fencing
1 Pipe 3" 2 Join 1.98 11.27 44.61

2 Pipe 3" 2 Join 1.15 11.27 25.91


Double Gate Fencing
3 Pipe 3" 4 Join 1.98 11.27 89.22

4 Pipe 3" 2 Join 1.25 11.27 28.16

5 Pipe 3" 2 Join 1.20 11.27 27.04

6 Plate 6Mm (1/4") 0 Sheet 1.98 1.98 49.84 -

TOTAL 214.94 Kilo Gram

Prepared by, PT.EFK Reviewed By, PT.TPE


Nama : Nama :
Date : Date :
PT. ELNUSA FABRIKASI KONSTRUKSI
CONSTRUCTION SERVICES - WORK UNIT RATE
Project Name : (WDT) Production Facility BNK 280D LQR
Location : BNK 280D LQR
SPK Number : CCMSPHR/SPK/3700097986

A Fencing With Wire Without Wire


Length Length
Legend
Meter Meter Supply and Install Sand Bedding -
1 0.65 Supply and Install Lean Concrete -
2 0.65 Supply and Pouring Concrete - K225 -
3 15.40 Supply, Fabricate and Install Concrete Reinforcement Steel Bar -
4 3.00 Supply and Apply Cured cold applied elastomeric joint sealant -
5 15.40 Supply, Fabricate, Install and remove Concrete Formwork -
6 Fabricate & Install Fencing - Galvanized Chain Link Standard 2.1 Meter Fence Height with galvanized barbed wire -
7 Fabricate & Install Fencing - Galvanized Chain Link Standard 2.1 Meter Fence Height without galvanized barbed wire 35.10
8 Fabricate and Install Structural Steel -
9 - Supply and Apply Painting for Mechanical Equipment, External Painting, without abrasive blasting -
10 Removal/Demolish Unreinforced concrete -
11 Removal/Demolish Fencing -
Total - 35.10

Prepared by, Review by,


QS - PT.EFK QS - PT.Tri Patra Engineering

Name: Name:
Date: Date:
CALCULATION

Fasilitas Produksi pada Sumur Persiapan Jalan dan


Lokasi Sumur MNO-P22, MNO-P23, MNO-P24, MNO-P25
& MNO-P26
Date Area Menggala North
FAB & INSTALL STRUCTURE STEEL
SPK CCMSPHR/SPK/3700115081 Location MNO P23

No. Description Qty Unit Length Wide Hight Phi Dia Weight Total Remarks
Install Cellar Box
1 Pipe 3" (Pipe Post) 8 Join 1.98 11.27 178.44

2 Pipe 3" (Bracing Atas) 4 Join 1.98 11.27 89.22

3 Pipe 3" (Bracing Tengah) 8 Join 0.99 11.27 89.22

4 Pipe 3" (Bracing Bawah) 4 Join 1.98 11.27 89.22

5 Plate 6Mm (1/4") 4 Sheet 1.98 1.98 49.84 781.52

TOTAL - Kilo Gram

Prepared by, PT.EFK Reviewed By, PT.TPE

Nama : Nama :
Date : Date :
CALCULATION

Fasilitas Produksi pada Sumur Persiapan Jalan dan


Lokasi Sumur MNO-P22, MNO-P23, MNO-P24, MNO-P25
& MNO-P26
Date Area Menggala North
Fabricate and Install Rig Substructure Foundation
SPK CCMSPHR/SPK/3700115081 Location MNO P23

No. Description Qty Unit Length Wide Hight Phi Dia Weight Total Remarks
Install RSS
Fabricate and Install Rig
1 1 Each 1.00
Substructure Foundation

TOTAL - Each

Prepared by, PT.EFK Reviewed By, PT.TPE

Nama : Nama :
Date : Date :
CALCULATION

Fasilitas Produksi pada Sumur Persiapan Jalan dan


Lokasi Sumur MNO-P22, MNO-P23, MNO-P24, MNO-P25
& MNO-P26
Date Area Menggala North
INSTALL STRUCTURE STEEL
SPK CCMSPHR/SPK/3700115081 Location MNO P24

No. Description Qty Unit Length Wide Hight Phi Dia Weight Total Remarks
FAB.RSS
1 Pipe 6" (Pipe Post) 10 Join 0.30 28.23 84.69

2 Plate 6Mm (1/4") 4 Sheet 1.98 1.98 49.84 781.52

3 H.Beam 200X200X8X12 2 Each 4.47 49.90 446.11

4 H.Beam 200X200X8X12 2 Each 22.15 49.90 2,210.57

5 H.Beam 200X200X8X12 2 Each 1.05 49.90 104.79

6 H.Beam 200X200X8X12 13 Each 2.70 49.90 1,751.49

TOTAL - Kilo Gram

Prepared by, PT.EFK Reviewed By, PT.TPE

Nama : Nama :
Date : Date :