Fire Strategy Drawings Example

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

notes

All plans, sections & elevations are based on measured readings


and any scaled dimension should not be relied upon to give an
accurate measurement.
Any discrepancies be reported immediately.
cupboard doors 4 / ROF/02
SVP To be read in conjunction with Structural Engineers' drawings
SVP 04 SS RWP HW
RWP
TANK SHW. and Mechanical and Electrical drawings
UTILITY 4 / ROF/01
LG/R12 SERVICE ROOM
CUPBOARD 1/R05 4 / ROF/03
1/R04 FD30
BATHROOM Terrace below 1 / ROF/01 FD30 symbol key
SHOWER SHOWER
ROOM LG/R11 1 / W05 1 FD30
/ D05 ROOM
LG/R10 FD30
LG / D09 LG / D08FD30
MH03
1 /FD30
D04 4 / D04 4 / D05 4/R03
FLUE FLUE VENT KEY
SVP 03
SVP 02
RWP SVP03 SVP 02 HALL 4 / D03FD30
LG / D10 4/R04
4 / D02
SVP Fire resisting construction (30mins)
1 / W04 4 / D01 Fire resisting construction (60mins)
17 HALL SVP 01
RISER
SVP 01 COMMON 1/R03 FD30 FD30 Fire curtain (30mins)
1 / D06
PARTS
01
13 1/R06 1 / D01 Existing construction ( Assumed 30mins)
02
HALL
SHOWER SC KITCHEN Existing construction (Upgraded to 60mins)
03
LG/R08
ROOM FD30S FLAT 2 1 / D03
FD30 Existing construction ( Assumed 60mins)
DRSSSING
FD30 LG / D07 LG/R07 up
Escape route
LG/R09 LG / D06
13 12 11 10 09 08 07 06 05
04

10
1 / D02
BEDROOM KITCHEN/LIVING KITCHEN
FD30 30 minute fire door
4/R01 4/R02
LG / D05 FD30 FD30S 30 minute fire door with smoke seal
FD30 SC Self closing
Riser
below
KITCHEN/ 1/PRO/FP02 SCA Self closing automatic release
LIVING VP Vision Panel
FLAT 1 1/R02
4 / W01 4 / W02 4 / W03 FRG Fire resisting glazing
30 minutes insulation/30 minutes integrity
BEDROOM 3 BEDROOM 2
LG/R05 LG/R06 GENERAL NOTE
BEDROOM 1. Emergency Lighting to conform with BS 5266 Part 1 & BS EN 50172
1/R01 2. Fire Alarm System to conform with BS 5839.
RISER FIRE PLANS FOURTH FLOOR LAYOUT 3. Fire signage to BS 5499 & LFB guidance notes
4. Information on Emergency lighting & smoke/heat detectors is provided
LG / W02 1 / W01 1 / W02
LG / W01 by the Services consultant.
1 / W03
LG / D01 5. For occupation phase to be read in conjuncion with RRR drawings
6. Any penetrations thru fire rated walls and floor elements require
commensurate fire protection equal of greater element fire rating.
G SERVICES UNDER SLAB
LIGHTWELL LG / D11 7. All fire stopping refer to P12.

ELEC SERVICES
G
G/R04 MH02 FIRE PLAN (pre occupation)
MH01
These plans are not complete Fire Plans. They indicate works that are to
LG / D02
4 1 LG / D03 LG / D04 be carried out during the construction phase of the project only and
SE

how the project will comply with Part B of the Approved Documents.
RV

FIRE PLANS FIRST FLOOR LAYOUT


IC
ES

FD30 FD30 FD30 The main principles indicated are;


UN
DE

GAS
a) Means of escape and their associated fire protection, including
R
SL

position and type of fire doors, including proposed exit door furniture
AB

FIBRE
VAULT 3 SVP 02 and ironmongery.
VAULT 1 VAULT 2 RWP SVP03
b) Structural fire precautions and lines of compartmentation.
CYCLE REFUSE METERS c) Access and facilities for the fire service
LG/R01 LG/R02 LG/R03 SVP 01
2 / W04 HW 2 / W05 d) Fire detection and alarm system or other means of giving warning.
CLOAKS TANK
2/R05 SERVICES e) Emergency lighting.
2/R06
COMMON DT KIT 05
f) Fire exit signage and notices.
2 / D06 DT KIT 05 2 / D05
PARTS FD30 FD30 SHOWER g) Smoke control and venting measures, where applicable.
2/R07
SC
2 / D01 FLAT 3 FD30
2 / D04
ROOM
2/R03
up
up
HALL For the avoidance of doubt these drawings do not show information on
FD30S 2/R04 a) Fire extinguishers
2 / D02 2 / D03 b) All required Fire signage
FD30 FD30
AFD
KITCHEN Fire alarm will be L1 standard - to M&E Specification
90
FIRE PLANS LOWER GROUND FLOOR LAYOUT 0M
IN WHEELCHAIR REFUGE
Each wheelchair refuge to have EVC

BEDROOM KITCHEN/LIVING
2/R01 2/R02

RWP
SVP 04 2 / W01 2 / W02 2 / W03

G / D07
TERRACE KITCHEN
G/R07
G/R08
SVP03 215
G FLUE WC CLOAKS SVP 02
RWP
G/R05 G/R06
FD30
G / D05 FD30
G / D06 Revisions Drawn By Checked By
G / W03 SVP01
HALL
G/R04
FLAT 1 G /FD30
D03 FIRE PLANS SECOND FLOOR LAYOUT First Iss 19/08/21 OL JB
G / D04
14 15
Rev A 04/11/21 GF JB
400
SC Rev B 10/06/22 NB JB
FD30S
850

900

13 12 11 10 09

FD30
G / D08
03 02 01

RWP 3 / W04

3 / W05 SVP 01
G/PRO/FP01 COMMON HW
LIVING ROOM SC SERVICESTANK
G / D02 PARTS 3 /FD30S
D02 3/R05
G/R03 3/R06 DT KIT 05
2xFD30S FD30
3 / D06 SHOWER
BEDROOM 1 3 / D01 FLAT 4 3 FD30
/ D05 ROOM
G/R01 COMMON SC HALL 3/R03
FD30S 3/R04 DT BAT 07
FAP

PARTS
G/R02 3 / D03 3 / D04 status
FD30 FD30
DT JNR 05
CONSTRUCTION
KITCHEN
G / D01 DT KIT 04
G / W02 drawing no rev
G / W01

up
B
BEDROOM KITCHEN/LIVING dwg name
3/R01 3/R02
12 10 4 FIRE PLANS
14

up
3 / W01 3 / W02 3 / W03 project

FIRE PLANS GROUND FLOOR LAYOUT


scale
NTS @A3

FIRE PLANS THIRD FLOOR LAYOUT FIRE PLANS SECTION


FIRE PLANS