Professional Documents
Culture Documents
Download
Download
Airside
Ensure Cones and LOC chain are placed
Before aligning the Equipment
Welcome mat to be removed after Boarding is complete
Ensure all airside personnel have deplaned before informing crew to close door
Re-verify Final passenger count during LMC with Gate manager and provide
updated manifest to the lead crew
Ensure Safe gap is maintained and all Lock and Jacks are secured
when equipment is aligned to the aircraft
Verify with gate staff about No. of Coach and validate with Coach slip
Verify Trolley slip and Baggage count with BMA
Personal Safety
Ensure to secure trolley by placing tow handle
perpendicular and use locking mechanism
Terminal