BHELSONIC- STEAM LEAK DETECTION SYSTEM

BHARAT HEAVY ELELCTRICALS LIMITED


HIGH PRESSURE BOILER PLANT
TIRUCHIRAPPALLI-620 014.

Operation & Maintenance Manual


of
BHELSONIC
STEAM LEAK DETECTION SYSTEM
(BS10)

BHARAT HEAVY ELELCTRICALS LIMITED, HIGH PRESSURE BOILER PLANT


Controls And Instrumentation / Fossil Boilers), Tiruchirapalli - 620 014, INDIA
Phone: 91 (0431) 520 242 , 520 236 Fax: 91 (0431) 552 356, E-MAIL :

Page 1 of 26
BHELSONIC- STEAM LEAK DETECTION SYSTEM

DANGEROUS VOLTAGES ARE PRESENT IN


THIS EQUIPMENT. GREAT CARE SHOULD
BE EXERCISED WHEN SERVICING THE
EQUIPMENT AND ANY WARNING NOTICES
OR PROCEDURES CONTAINED IN THIS
MANUAL OR ON THE EQUIPMENT SHOULD
BE STRICTLY OBSERVED.

Page 2 of 26
BHELSONIC- STEAM LEAK DETECTION SYSTEM

CONTENTS
PART-1

SECTION-1 INTRODUCTION

SECTION-2 SYSTEM DESCRIPTION WITH FUNCTIONAL BLOCK


SCHEMATIC DRAWING

SECTION-3 FIELD CALIBRATION PROCEDURE

SECTION-4 INSTALLATION

SECTION-5 MAINTENANCE& TROUBLESHOOTING

SECTION-6 DO’S & DON’TS

PART-2

SECTION-7 PROJECT INFORMATION

SECTION-8 CATALOGUES / DATA


SHEET/ REFERENCE DRAWINGS

Page 3 of 26
BHELSONIC- STEAM LEAK DETECTION SYSTEM

SECTION-1 INTRODUCTION

Page 4 of 26
BHELSONIC- STEAM LEAK DETECTION SYSTEM

1.0 GENERAL

Early detection of steam leakage in a boiler due to tube leakage in steam coils will avoid
secondary damage to great extent. Tube failure in a boiler is considered to be one of the major
causes for boiler shut down. This problem is more pronounced in pulverized coal fired boilers,
due to ash erosion and combustion being vigorous. Tube failures are bound to increase in
present day boilers, where steam generation at high temperature is attempted to maximize
combustion efficiency, outstripping the metallurgical developments. Sonic tube leak detection
system developed by BHEL, address this issue.

1.1 PRINCIPLE OF OPERATION

The Sonic tube leak detection system works on the principle of detecting the sound waves
emanating from the steam leak, process the same and indicate the quantum of steam leak and
the location, within approximately 5M radius in the boiler from where the steam leaks. Boiler is
divided into 18 number of zones for identifying the zone in which tube leakage likely to occurs.
However, facility exists in this system to cater up to 24 zones.

In each zone, a sonic tube is mounted on the stub provided in that zone. The sonic tube is
installed at an angle of 45 degree to the vertical axis of the water wall panel and is welded to the
seal box filled with refractory. Sonic tube houses the components required for air purging
arrangement, isolation valve, heat insulated spacer & heat insulated coupling. This coupling is
used to avoid heat conduction to the sensor assembly.

The BHELSONIC system consists of acoustic sensors mounted in sonic tubes that are
connected to field amplifier units at the boiler side, and further processed with signal processing
electronics, giving output to PC through decibel scanner in addition to 4-20mA DC output of each
channel. Signal processing modules and PC are installed in the control room.

Page 5 of 26
BHELSONIC- STEAM LEAK DETECTION SYSTEM

2.0 SYSTEM DESCRIPTION

Page 6 of 26
BHELSONIC- STEAM LEAK DETECTION SYSTEM

2.0 SYSTEM COMPONENTS:

2.1 SENSOR ASSEMBLY


The sensor assembly consists of a sonic transducer capsule and a test
sound source. They are protected from dust and heat by a special
arrangement in the sensor assembly. The sensor assembly also houses
a preamplifier circuit board. The acoustic sensor is located at one end of
Sonic tube assembly. The steam leak noise reaching the sensor is
converted into electric signal and is amplified in the pre-amplifier board
which is housed in the sensor assembly.

2.2 SONIC TUBE AND SENSOR ASSEMBLY:


Sensor assembly indicated in the above picture, is fitted to the sonic tube assembly. Sonic tube
is mounted to the water wall at an angle of 45 degrees upwards. The sensor assembly must be
mounted atleast 1.5meters away form the side of the boiler.
For isolation purpose, ball valve is provided as part of tube assembly, such that during
maintenance, the sensor assembly is to be taken out. Teflon coupling is used to protect the
sensor from the high temperature environment.
Manual purging is provided in order to evacuate the residues available in the stub pipe. Customer
must do periodical purging in order to avoid any fly ash/ dust particles entry to the sonic tube.
2.3 FIELD AMPLIFIER UNIT

Page 7 of 26
BHELSONIC- STEAM LEAK DETECTION SYSTEM

Field amplifier unit further amplifies the signal received from


sensor assembly and filters the low frequency combustion
noise. The filtered signal is converted into 0-20mA, AC signal
(Adjust Coarse potentiometer P1 & Fine potentiometer P2 to
achieve 20mA AC) for transmission up to control room. This
field amplifier also contains a test push button to energize a
sound source in the sensor assembly, to quickly test the function of the system. Circuit has been
built in the field amplifier to indicate the healthiness of DC supply from main panel at control room
to sensor assembly. The healthiness can be identified from main panel by the indication provided
in the Alarm Processing module.

The field amplifier PCB is mounted in the field amplifier box of size 300(B) x 200 (H)x 155(D)
protected to IP55. cable entries via gland plate are provided where the sensor connector lead is
connected. To protect the electronics, the door must be kept closed all the times.

Field amplifier box must be mounted very near to the sensor assembly. For calibration and site
tuning, approach platform for each sensor is provided.

2.4 MAIN PANEL


Main panel is located in the control room. This panel houses the following equipments.
A) Electronics module rack
B) Power supply unit
C) Decibel scanner
D) Personal computer and monitor
E) Audio channel selector

A) ELECTRONICS MODULE RACK: It consists of the following:


1) Mother board
2) Signal processing module
3) Alarm processing module
1) MOTHER BOARD:
Motherboard is provided with connectors to hold alarm processing module and signal processor
modules. 25 pin D connector provided for field interconnection, 15 pin for Audio channel selector,

Page 8 of 26
BHELSONIC- STEAM LEAK DETECTION SYSTEM

37 pin for decibel scanner are also mounted in the motherboard of size 426 mm x 355mm. This
mother board and modules are assembled in 19” double euro rack. Unused modules are covered
with dummy blank plates. Mother board accommodates the signal processing modules which are
interchangeable and an alarm processing module.

2) SIGNAL PROCESSOR MODULE:

DECIBEL
ABSOLUTE VALUE
CIRCUIT

One signal processor module caters to three channels. The number of


signal processor modules required is dependant on the number of
channels for which the system is configured. The AC current signal from
the field amplifier unit is converted into AC voltage and is passed through
a band pass filter whose mid frequency is tuned for characteristic steam
leakage frequency.

The band pass filter output is precision rectified and a DC voltage


proportional to the sound level in the required band is generated. This is converted into decibel in
the dB converter circuit. The background noise is subtracted from the decibel output and signal
above the background noise is taken for further processing like alarm generation, 4-20 mA
current output generation and 0-5V DC generation for feeding to dB scanner.

Page 9 of 26
BHELSONIC- STEAM LEAK DETECTION SYSTEM

NOTE: All the potentiometers are factory setting expect background suppressor
potentiometer. Don’t disturb the factory settings.

3). ALARM PROCESSING MODULE:

VR1

VR2

In this module, alarm delay value in time and alarm value in dB are set. Alarm delay is set by
adjusting VR1. Alarm set value is set by adjusting VR2. If any channel receives steam leak sound
more than the alarm set value for a time greater than the alarm delay set, alarm relay contact is
generated. This is normally wired to Plant annunciator. This module has a special provision. If a
contact input is given to this panel from soot blower control system to indicate any soot blower is
in operation, then the steam leak alarm contact will be inhibited during the duration of any soot
blower is in operation.

During soot blower operation, the channels near by will pick up sound from soot
blower steam spray and show sound level in dB. In case, if this sound exceeds the
alarm set value for the duration of alarm delay, the contact output will be initiated,
leading to alarm. To avoid this, the above facility is given. If wired, alarm will be
inhibited during any soot blower is in service. Alarm set value can be adjusted
from 0 to 40dB. Recommended set value is 20dB. Alarm delay range is 1 min.,
(nominal) to 10min.( nominal). This timing will not be accurate. Alarm set value and
alarm delay set time can be seen in PC in Set up screen. Adjustment can be

Page 10 of 26
BHELSONIC- STEAM LEAK DETECTION SYSTEM

carried out by watching this screen.

B). POWER SUPPLY UNIT

Power supply unit is provided to derive +12V DC , -12V DC from the incoming 230V AC supply.
Power supply redundancy is envisaged with diode auctioneering circuit so that when one power
supply fails, another will take over automatically, without affecting the system performance.

1. Type of POWER SUPPLY Linear power supply. Two nos. of ±12V


power supply with diode auctioneering built
internally
2. Input voltage 230 V, +/- 10%, 1 Ph, 50 Hz
3. Output voltage DC ±12V (± 10% voltage adjustable)
4. Output current 3 Amps maximum on each rail.
5. Load regulation Better than ±0.2%
6. Line regulation Better than ±0.1 %
7. Residual ripple < 10 mV (peak to peak)
8. Over voltage protection 13.8 V DC
9. Short circuit protection Fold back current limiting with automatic
recovery.
10. Ambient temperature Above 55° C
11. Input/ Output Connector Terminal blocks suitable for 1.5 sq. mm
copper conductors with screw type
connections.

C) DECIBEL SCANNER.
From the signal processor modules 5V DC is fed to decibel scanner. From decibel scanner, the
signals are sent to PC through serial port. In the front facia of scanner, channel number and
sound level in dB are displayed channel by channel automatically. This facility will be quite useful,
in case of PC failure. The hardware & software customisation details are given in section-6.

D). PERSONAL COMPUTER AND MONITOR

Page 11 of 26
BHELSONIC- STEAM LEAK DETECTION SYSTEM

Personal computer is provided in the panel. Data from decibel scanner is used to generate
different types of monitoring displays like, Bargraph, mimic, Trend, Group trend and History. The
display modes are user selectable. The hardware & software customisation details are given in
section-5.

E). AUDIO CHANNEL SELECTOR:

By pressing the ‘Test’ button in the audio channel selector, the sound generators kept in all
sensor assemblies get activated and produce sound above 20dB, as long as the Test push
button is kept pressed. These sounds are processed in the system and in PC display, it can be
seen that all channels show more than 20dB sound. This can be easily visualized in “Bargraph”
mode or “Mimic display” mode of display.

By this, functioning of entire system right from sensor assemblies can be quickly checked in one
go. This test may be performed as and when needed to crosscheck the healthiness of the
system. During this test, 4-20mA output of all channels will be more than 12mA. ( Exact output is
not important but it should be more than 12mA).

Since alarm contact is initiated after a set time delay, Test push button is to be pressed
preferably for a short period say 3 to 5 seconds.

Sometimes, it may become necessary to hear the actual sound picked up by the sonic sensor
corresponding to a particular channel (after removal of combustion noise). This helps the
operator to ascertain whether steam leak is present in that location. To get the sound from a
particular sensor, switch on ‘ON& VOL’ switch, set the 3 position rotary switch “SELECTOR” in
the appropriate position (Position-1 for channels 1 to 8, Position 2 for channels 9-16, Position3 for
17 to 24).

Depress the Push button corresponding to the channel needed. LED, corresponding to that
channel goes ‘ON’ now. Increase or decrease volume control to hear the sound from the location
selected in the boiler in the speaker.

To hear another location, keep the selector switch in appropriate position and depress the
corresponding push button. Only one switch at a time in a group ( Ch 1-8, Ch 9-16, Ch 17-24)
should be pressed. When another switch in the same group is depressed, the earlier switch gets
Page 12 of 26
BHELSONIC- STEAM LEAK DETECTION SYSTEM

released through mechanical interlock. Pressing more than one switch at a time is to be avoided,
as this may damage the switch assembly.

Box details:

1. Colour :Light grey.


2. Mounting :Panel mounting
3. Box Material :2mm thick CRCA sheet steel
4. Overall Dimension :L 180mm x H 135mm x D 100mm

F). CALIBRATOR:

One no. hand held calibrator is provided with the system. Calibrator contains a power supply and
a sound source. This calibrator is pre-calibrated for a particular dB. See the value in the calibrator
name plate.

Calibrator will be useful during commissioning of the system. If the sensor or field amplifier or
signal processor module is changed due to any reason, then also, re-calibration is
recommended. Periodic calibration, say once in 3 months is recommended for all channels.

Page 13 of 26
BHELSONIC- STEAM LEAK DETECTION SYSTEM

SECTION-3: FIELD CALIBRATION


PROCEDURE

Page 14 of 26
BHELSONIC- STEAM LEAK DETECTION SYSTEM

CALIBRATION PROCEDURE
1. Keep the PC display mode to “BARGRAPH display”
2. Close the isolation valve in the sonic tube corresponding to the channel to be calibrated.
3. Now, gently remove the sensor by unscrewing. Ensure the cable connection is in tact.
4. Connect the AC mains supply to calibrator.
5. Switch on the calibrator.
6. Now press the push button “PS” for a while. Now the sound from the calibrator will be
heard. When you leave the push button, sound stops. This is a calibrated sound.
7. Now insert the sensor into the socket portion of the calibrator.
8. Now press the push button.
9. The sound value in dB shown in MIMIC drawing corresponding to this channel should be
the calibrated value indicated in the calibrator +/- 1dB.
10. If this is O.K., the selected channel’s calibration is O.K.
11. If not, tuning has to be done in field amplifier unit corresponding to the selected channel.
Open the field amplifier box, so that field amplifier electronic module is visible. Locate
potentiometers P1(fine adjustment) and P2( coarse adjustment).
12. Keep pressing the push button in calibrator. Adjust P2(coarse) and P1(Fine), till the dB
reading in PC MIMIC display comes within +/- 1dB of the calibrator dB.
13. With this, calibration of one channel is over.
14. Switch off power supply to the calibrator and connect back to sonic tube by screwing
gently.
15. Open the isolation valve.
16. Now this channel is through for use.

Note:
1. You may need walkie-Talkie or any other plant communication mechanism to get the dB
value read from the PC display in the panel located in control room/ control equipment
room.
2. If the calibration could not be achieved by the above procedure, the owner may contact,
BHEL/Trichy for calibration/ servicing.
3. The calibrator itself may need recalibration say once in 2 years. BHEL/ Trichy may be
contacted for details.

Page 15 of 26
BHELSONIC- STEAM LEAK DETECTION SYSTEM

SECTION – 4: INSTALLATION

Page 16 of 26
BHELSONIC- STEAM LEAK DETECTION SYSTEM

4.1 Installation Of Sonic Tube

NOTE: Follow the instructions

The sonic tube assembly is required to be mounted in identified locations of the boiler which are
already provided with seal box arrangement with the opening for guiding the sound waves from
the zone into the sonic tube and finally to the sensor mounted at the end of sonic tube.
Before drawing the Sonic Tube from the stores, the following points must be checked.

• Ensure that access to work on this part of the plant is clear.


• The sonic tube along with isIolating valves, flanges ,Teflon flange, mounting bolts, and 45 deg.
bend with heat resistance coupling all have been fitted to the assembly and ready to have
the Stub pipe welded to tube.
• It should be noted that all joints in pipe work must be welded, tested and inspected in
accordance with the standard welding procedure.
The Sonic tube, one end having flange is to be welded to the stub pipe provided at the location .
The heat resistance spacer is to be placed over the flange. The sonic tube is to be mounted on
the heat resistance flange using proper bolts ,nuts and washers. Please ensure that the sonic
tube system shall be mounted at an angle of 45 degrees to the vertical and also ensure that the
other end of the hear resistance coupling is mounted upward.

When the installation of the sonic tube has been completed, precautions must be taken to protect
it against damage during the installation of adjacent plant equipment / pipe work etc.

SENSOR ASSEMBLY FIELD AMPLIFIER UNIT

Page 17 of 26
BHELSONIC- STEAM LEAK DETECTION SYSTEM

4.2 Installation of Field amplifier Unit

Before drawing Field Amplifier Unit from store, the following points should be checked:

• That the exact position for installation has been determined.


• Access to work on that part of the plant is clear.

The field amplifier Unit is to be placed nearer to the Sonic sensor. Ensure by examining the
internals that the correct unit is drawn from store, and that it is undamaged and in a suitable
condition for installation to start.

The field amplifier unit is provided with fixing holes in the rear vertical fac e for bolting it to the wall
or suitable support structure. Transport sonic amplifier unit to location. Bolt and position carefully
on prepared surface. Fix using bolts, nuts and washers or equivalent fastenings. When the unit
has been positioned and bolted in place, adequate precautions must be taken to ensure that it is
protected against accidental damage during the installation of adjacent plant / equipment and pipe
work or the completion of any local building work. The unit is to be wired to the respected sensors
and is to be positioned so that the length of any cabling connecting the unit to sensors does not
exceed 10 meters.

4.3 Installation of Junction boxes.

The junction boxes are provided with fixing holes in the rear vertical face for bolting them to the
wall or suitable support structure. Transport junction boxes unit to the location. Position carefully
on prepared surface. Fix using bolts, nuts and washers or equivalent fastenings. When the unit
has been positioned and bolted in place, adequate precautions must be taken to ensure that it is
protected against accidental damage during the installation of adjacent plant / equipment and pipe
work or the completion of any local construction or repair work.

4.4 Installation of System Cabinet

Before drawing System cabinet from store, the following points should be checked:

• The exact position for installation has been determined.

Page 18 of 26
BHELSONIC- STEAM LEAK DETECTION SYSTEM

• Access to work on that part of the plant is clear


• Lifting tackle and adequate facilities are available to raise the unit to its position at control
room.

Ensure by examining the internals that the correct unit is drawn from store that it is undamaged
and in a suitable condition for installation to start.

The System Cabinet is provided with fixing holes in the bottom face for bolting it to the floor.
Transport the system Cabinet to the identified location and position carefully on prepared
surface. Fix the cabinet to the surface using bolts, nuts and washers or equivalent fastenings.
When the unit has been pos itioned and bolted in place, adequate precautions must be taken to
ensure that it is protected against accidental damage during the installation of adjacent panel /
equipment or any local construction and repair work.

4.5 CABLING

Before commencing this work check: the following:


• That access to work on this part of the plant is clear.

• That the system cabinet and junction boxes ready for cabling.

• That all the materials to be erected are available.

All the above works, if carried out by an Electrical Contractor shall be subjected to inspection for
workmanship and accuracy by an appropriate authority.

4.5.1 Cabling of Sensor to Field amplifier

WARNING: Mains voltages are present on this Equipment when power is


connected. Be cautious when the front door is open and power is 'ON'

Page 19 of 26
BHELSONIC- STEAM LEAK DETECTION SYSTEM

This wiring is to be carried out using pre fabricated cable supplied with the system. These are
terminated with 6 pin connectors at sensor end and provided with crimp pins at the sonic
amplifier unit end. The conductors should be identified with suitably marked ferrules at each end.

The cables from the sensor, where it enters the base of the field amplifier unit, must pass through
glands provided. The wiring within the enclosure is to be run neatly and terminated as prescribed
above (crimp pins).

4.5.2 Cabling System cabinet to junction boxes

WARNING: Mains voltages are present on this Equipment when power is


connected. Be cautious when the front door is open and power is 'ON'

This wiring is to be carried out using 8 pair 0.5sq.mm shielded cables supplied with the system.
These are terminated with crimp pins. The conductors should be identified with suitably marked
ferrules at each end.

The cables from the system cabinet where it enters the base of the respective junction boxes,
must pass through glands provided. The wiring within the enclosure is to be run neatly and
terminated as prescribed above (crimp pins).

The cables from the system cabinet, where they enter the base of the junction boxes, must pass
through the cable glands provided at the base of junction boxes. The wiring within the enclosure
is to be run neatly and terminated as prescribed above (crimp pins).

All the above works, if carried out by an Electrical Contractor shall be subjected to inspection for
workmanship and accuracy by an appropriate authority.

4.5.3 Cabling of Junction boxes to field amplifier

This wiring is to be carried out using 4 pair 0.5 sq.mm cable supplied with the system. These are
terminated with crimp pins. The conductors should be identified with suitably marked ferrules at
each end.

Page 20 of 26
BHELSONIC- STEAM LEAK DETECTION SYSTEM

The cables from the junction boxes, where they enter the base of the field amplifier unit, must
pass through the cable glands provided with the unit. The wiring within the enclosure is to be
made neatly and terminated as prescribed above (crimp pins).

4.5.4 Cabling of System cabinet to Plant UPS / supply

Power supply wiring of System cabinet to plant UPS is to be carried out using the 3-core
1.5sq.mm cables supplied with the system. These are terminated with crimp pins. The
conductors should be identified with suitably marked ferrules at each end.

The cables from the system cabinet, where it enters the base of the plant UPS, must pass
through the cable glands provided. The wiring within the enclosure is to be run neatly and
terminated as prescribed above (crimp pins).

4.5.5 Cabling of System cabinet to Annunciator panel

This wiring is to be carried out using the 2-pair 0.5 sq.mm cables supplied with the system.
These are terminated with crimp pins. The conductors should be identified with suitably marked
ferrules at each end. The wiring within the Enclosure is to be run neatly and terminated as
prescribed above (crimp pins).

The cables from the system cabinet, where it enters the base of the plant UPS, must pass
through the cable glands provided.

Page 21 of 26
BHELSONIC- STEAM LEAK DETECTION SYSTEM

SECTION-5

TROUBLESHOOTING &
MAINTENANCE

Page 22 of 26
BHELSONIC- STEAM LEAK DETECTION SYSTEM

A. MAINTENANCE.

1. Press the test push button in the panel periodically, say once in a week or as and when
required for 3 to 5 seconds and observe that all channels show more 20 db ( Go to MIMIC
screen on BAR graph screen to view this.

2. Periodically, say once in a week or as and when required, based on experience purge the
sonic tube by opening the valve in the pneumatic purge line for 5 to 10 seconds or as
required after getting experience. Make sure ball valve is kept closed during purging
operation, in order protect the sensor microphone. Sufficient air pressure is also to be
ensured. Ball valve should be kept opened, after purging completion. Follow this purging
procedure for all sensor locations. If this is not done regularly for a long time and sonic tube
clogging becomes acute, poking may be needed.
3. Personal computer supplied is similar to other personal computers available in the plant,
except for a special SCADA software . Follow the same maintenance procedure for this
personal computer also, similar to maintenance of other personal computers in the plant.

Page 23 of 26
BHELSONIC- STEAM LEAK DETECTION SYSTEM

B.TROUBLE SHOOTING

PROBLEM PROBABLE SOLUTION


1. Total system out 1. Check the AC input to the panel and ensure
availability.

2. Indication lamps in power supply (For 1. Check & replace the DC fuses. To be checked for
+12v and –12v ) not glowing. availability.
2. If problem still persists, power supply needs
servicing (system will function properly, even if one
power supply is all right )

3. While pressing ‘Test’ push button, dB 1. Check ± 12V indicating LED lamps are
indication is not coming in any channel. glowing in field amplifier. To see this, open the door.
Check and ensure cable connection is intact.

2. Press the test push button in field amplifier PCB


in the box for 3 to 5 seconds and observe dB
reading in panel. If this is not coming, sensor
replacement may be needed. If not solved, replace
the signal processing modules, corresponding to
this channel.

4. RP light is not glowing in Alarm


processing modules. ± 12V power supply may not be made available in all
field amplifier boxes. Check one by one by observing
the ± 12V indication LEDs provided in the field
amplifier box inside, on the PCBs. Ensure cable is
not cut and connections are intact.
5. PC not working
1. Follow procedures similar to other PCs in the
plant. During this period, dB level in each channel
shown by the dB scanner (Auto scanning ) may be
manually recorded and observed for leak detection.
Alarm processing and contact output will continue ,
even without PC working.

6. PC working but data not getting 1. Observe dB scanner is showing the channel
updated. number and dB value sequentially from first channel
to last channel automatically. Press the test PB in
alarm procuring modules and watch this new dB
values in all channels. If the scanning or updating is
not taking place, dB scanner needs servicing.

2. If the above is working all right, switch off the PC,


wait for 5 minutes , switch on & go the program.

Page 24 of 26
BHELSONIC- STEAM LEAK DETECTION SYSTEM

SECTION-6:

DO’S AND DON’TS

Page 25 of 26
BHELSONIC- STEAM LEAK DETECTION SYSTEM

Dos

SWITCH OFF THE POWER SUPPLY BEFORE REPLACING ANY MODULE

ENSURE PROPER CONNECTOR SEATING AND SCREWS FIXED AT TOP & BOTTOM OF
THE RACK AFTER INSERTING ANY MODULE

FOLLOW JUMPERING GUIDE BEFORE INSERTING ANY MODULE

Don’ts
KEEP THE FIELD AMPLIFIER BOX OPEN CONTINUOUSLY

KEEP THE CABINET DOOR OPEN CONTINUOUSLY

USE A BLOWER FOR CLEANING THE PANEL

ATTEMPT FIELD SERVICING.

USE THE PC FOR ANY OTHER PURPOSE, OTHER THAN THIS INTENDED PURPOSE,
BY LOADING ANY OTHER SOFTWARE THROUGH MEANS LIKE FLOPPY DISK, CD,
THUMBNAIL DRIVE ETC., WHICH MAY RESULT IN VIRUS ATTACK/ DISTURB THE
SOFTWARE AND COLLAPSE THE FUNCTIONING OF PC OR CITECT HMI/ SCADA.

* RETURN FAULTY MODULE TO BHEL (T) FOR SERVICING.

Page 26 of 26
ANNEXURE-A

SECTION-7

PROJECT INFORMATION
PROJECT NAME : MAHARASHTRA STATE ELECTRICITY BOARD-
NEW PARLI THERMAL POWER PROJECT-EXTN.
CUST. NO. : 0361
UNIT : 1 X 250MW, UNIT 1

BHELSONIC SYSTEM DESCRIPTION:


Description Quantity in no.
Acoustic sensors/ no. of channels 18 set
Sonic tube assembly 18 set
Purge accessories 18set
Field amplifier box 18 set
Field amplifier module 18 set
Panel 1 set
Signal processing modules 6, each one for 3 channels
Alarm processing module 1 no.
Hand held Calibrator 1 no.
Audio channel selector 1 no.
Motherboard 1 no.
Power supply unit 2 nos.

LIST OF DRAWINGS ENCLOSED


BHELSONIC - STEAM LEAK DETECTION SYSTEM (BHELSONIC) - LIST OF
3-97-585-13249 01 DRAWINGS
3-97-585-13250 01 BHELSONIC INTERCONNECTION DIAGRAM NOTES
3-97-585-13251 01 BHELSONIC INTERCONNECTION DIAGRAM ERECTION NOTES
3-97-585-13252 01 BHELSONIC INTERCONNECTION DIAGRAM
3-97-585-13253 01 BHELSONIC INTERCONNECTION DIAGRAM
3-97-585-13254 01 BHELSONIC INTERCONNECTION DIAGRAM
3-97-585-13255 01 BHELSONIC INTERCONNECTION DIAGRAM
3-97-585-13256 01 BHELSONIC INTERCONNECTION DIAGRAM
3-97-585-13257 01 BHELSONIC INTERCONNECTION DIAGRAM
3-97-585-13258 01 BHELSONIC INTERCONNECTION DIAGRAM
3-97-585-13775 00 BHELSONIC INTERCONNECTION DIAGRAM
3-97-585-12318 01 BASIC SCOPE DIAGRAM FOR STLD SYSTEM
1-97-585-01288 02 PANEL GENERAL ARRANGEMENT DRAWING OF BHELSONIC SYSTEM
SECTION-8

CATALOGUES / DATA SHEET/ REFERENCE DRAWINGS

PROJECT NAME : MAHARASHTRA STATE ELECTRICITY BOARD-


NEW PARLI THERMAL POWER PROJECT-EXTN.
CUST. NO. : 0361
UNIT : 1 X 250MW, UNIT 1

Ø Decibel scanner technical catalogue

Ø Software customization details as furnished by M/s. Masibus, Gandhinagar.