Zone-1 - Initial Construction NOC
Zone-1 - Initial Construction NOC
Default NOC 17 17 17
NOC Without Conditions 2
NOC With Conditions 12
Conditions to Issue NOC
Objection
In Progress 14 14
ADM
Aaehsa Abdulrahman Jasem
2. Conditions for Approval 7/20/20 6:10 PM 11-20201082532-01-3-01-00
Conditions Subject to Requester Approval
7/6/20 10:46
AM
Abu Dhabi For Action
ADDC Assets FP For Action
Distribution
Supervisor
Company B) NOC with
Conditions
7/5/20 1:35 PM
For Action
Municipality of Abu ADM Asset For Action
Dhabi City Coordination FP
B) NOC with
Conditions
7/13/20 7:53
AM
Abu Dhabi National For Action
Oil Company ADNOC HQ FP For Action
(ADNOC) B) NOC with
Conditions
8/24/20 1:13
PM
Abu Dhabi For Action
ADSSC Sewerage For Action
Sewerage Services
AD FP
Company B) NOC with
Conditions
6/29/20 9:57
AM
ADTCA Tourism For Action
Abu Dhabi Tourism For Action
and Culture FP -
and Culture Agency
AD and WR B) NOC with
Conditions
7/5/20 2:30 PM
For Action
Department of DoT Right-of-Way For Action
Transport FP - AD
A) NOC with No
Conditions
8/3/20 11:44
AM
Emirates Integrated For Action
Telecommunication Du Telecom FP For Action
Company - Du B) NOC with
Conditions
7/7/20 12:34
PM
For Action
Environment Agency For Action
EAD FP Supervisor
- Abu Dhabi
B) NOC with
Conditions
8/9/20 2:33 PM
For Action
Etihad Rail Etihad Rail FP For Action
B) NOC with
Conditions
8/18/20 9:38
Emirates AM
For Action
Telecommunication Etisalat Telecom For Action
Corporation - FP - Abu Dhabi
Etisalat B) NOC with
Conditions
7/22/20 2:15
PM
UAE Armed Forces GHQ Military For Action
General Works and For Action
Headquarters Telecom FP B) NOC with
Conditions
6/30/20 11:47
AM
For Action
Monitoring and MCC Monitor and For Action
Control Center Control FP
B) NOC with
Conditions
7/1/20 3:11 AM
Abu Dhabi Transco For Action
Transmission and Infrastructure For Action
Despatch Company Services FP B) NOC with
Conditions
6/29/20 1:55
ZonesCorp PM
Higher Corporation For Action
Industrial Customer For Action
for Specialized
Services FP
Economic Zones A) NOC with No
Supervisor
Conditions
ADDC Projects
Review and authorize
Saif Ali Al Shemeili Claim 21 - 06 - 2020 13:18:29 Representative -
request
Water
ADDC Projects
Review and authorize Requester Authorized By
Saif Ali Al Shemeili 21 - 06 - 2020 13:18:40 Representative -
request Requesting Entity
Water
ADM TP Infrastructure
Aaehsa Abdulrahman Jasem Review request and
Claim 21 - 06 - 2020 23:45:17 Permitting Eng -
Alnuaimi perform further analysis
Utilities - Area3
ADM TP Infrastructure
Aaehsa Abdulrahman Jasem Review request and
Claim 29 - 06 - 2020 09:49:31 Permitting Eng -
Alnuaimi perform further analysis
Utilities - Area3
Initiating NOC
ADM TP Infrastructure
Aaehsa Abdulrahman Jasem Review request and Transaction by the
29 - 06 - 2020 09:49:46 Permitting Eng -
Alnuaimi perform further analysis Permitting Body Project
Utilities - Area3
Representative
ADM TP Infrastructure
Aaehsa Abdulrahman Jasem View request and replies
Claim 20 - 07 - 2020 18:09:04 Permitting Eng -
Alnuaimi of Focal Points
Utilities - Area3
ADM TP Infrastructure
Aaehsa Abdulrahman Jasem
Conditions approved Claim 25 - 07 - 2020 22:46:27 Permitting Eng -
Alnuaimi
Utilities - Area3
Organization Information
Department
Organization Contact
Comments
Contractor Information
License Number /
AD-All larsen.toubro Initiate request and Administrative (1) - Emirates ID Copy 17 - 06 - 2020
define data General
AD-All larsen.toubro Initiate request and Administrative (1) - Letter of Award or 17 - 06 - 2020
define data General Appointment
AD-All larsen.toubro Initiate request and Spatial Inputs / Site Plan 17 - 06 - 2020
define data Drawings
AD-All larsen.toubro Initiate request and Spatial Inputs / Project Location 17 - 06 - 2020
define data Drawings
AD-All larsen.toubro Initiate request and Spatial Inputs / Key Plan 17 - 06 - 2020
define data Drawings
Transaction Nature
New Project
Construction Phase
Permit Sub type
Treated-Water Trunk Line Phase 1
Expedited
Muncipality Name District Name Community Name Road Name Plot Number
ADM AL WATHBA
Project Information
Project Name
D-107604 ADDC Al ain TSE Project Package-B(Zone1)
Project Description
Construction of Recycle Water Pipe Line from Main Pump Station to Intermediate Pump Station Package B- Zone 1
06 - 02 - 2020 20 - 09 - 2021
Transaction Data
Granted on
6/21/20 1:18 PM
Etihad Rail
Etihad Rail FP Supervisor
Please find attached NOC conditions.
ADNOC HQ
ADNOC HQ FP
Kindly adhere to the conditions given by (ADNOC Upstream
Exploration),The area is covering three ADNOC wells (Coordinates:
Longitude: 54.6363784, Latitude: 24.2471454, Longitude: 54.6727848,
Latitude: 24.2493139, & Longitude: 54.6944881, Latitude: 24.2381432),
please be away at least 80 meter from the provided projection. The
Future Access route to the well location to be secured, specifications and
requirements to be advised by ADNOC HQ Drilling. This NOC is for
ADNOC assets protection only and you are requested to approach other
government sectors and utilities providers for their NOCs and Permits.
Any change to the proposed work needs to be referred back to us for our
review.
Du
Du Telecom FP
Please, be informed that E.I.T.C./du has a live fiber optic cable network
running as shown in the attached file. We request you to submit the
following:
1. Detail cross section and profile for the proposed development
mention all the levels and dimensions between our existing network and
the proposed development.
2. Du application form.
3. Method statement.
4. Inspection report sign from our inspector.
5. Protection detail to be confirmed by Du inspector as per the
site.
6. You have to have a copy of Du conditions, requirements and
drawing provided by Du when you visit the site.
For the above you may contact our Operations Team to arrange sending
a site engineer to be present while exposing our network. Mr. Enrico
Julao/ Senior Manager - Fiber Network Email: Enrico.Julao@du.ae;
Mob: + 971 55 2288426 Tel: + 971 4 3915046 Fax: + 971 4 3655885 or
Eng. Ibrahim Fauzi / Senior Engineer Infrastructure, Email: Ibrahim.
Fauzi@du.ae Mob: +971556426496.
This NOC will remain On Hold until we receive the required documents.
ADDC
ADDC Assets FP Supervisor
Kindly upload main ADDC requirements (copy attached) as THREE ZIP
Folders using WinZip, THREE separate folders for Water, Electricity and
Recycled Water Network.
MCC
MCC Monitor and Control FP
ﻳﺮﺟﻰ ﺍﻟﺘﻔﻀﻞ ﺑﺎﻟﻌﻠﻢ ﺑﺄﻧﻪ ﻻﻣﺎﻧﻊ ﻟﺪﻳﻨﺎ ﻣﻦ ﺍﻟﺒﺪﺀ ﻓﻲ ﺍﻟﻤﻮﻗﻊ ﺍﻟﻤﺸﺎﺭ ﺇﻟﻴﻬﺎ ﻓﻲ ﺍﻟﻜﺘﺎﺏ ﺃﻋﻼﻩ ﺇﻻ ﺇﻧﻨﺎ ﻧﻮﺩ
ﺍﻟﺘﻨﻮﻳﻪ ﻋﻠﻰ ﺿﺮﻭﺭﺓ ﺇﺗﺒﺎﻉ ﺍﻟﺸﺮﻭﻁ ﻭﺍﻟﺘﻌﻠﻴﻤﺎﺕ ﻭﺗﻮﻓﻴﺮ ﺍﻟﻤﺘﻄﻠﺒﺎﺕ ﺍﻟﺘﺎﻟﻴﺔ:
1. ﺍﻻﺑﺘﻌﺎﺩ ﻋﻦ ﺃﺻﻮﻝ ﻭﺧﺪﻣﺎﺕ ﻣﺸﺮﻭﻉ ﻋﻴﻦ ﺍﻟﺼﻘﺮ ﺩﻭﻥ ﺍﺧﺬ ﻣﻮﺍﻓﻘﺔ ﻣﺮﻛﺰ ﺍﻟﻤﺘﺎﺑﻌﺔ ﻭﺍﻟﺘﺤﻜﻢ.
2. ﺗﻮﻓﻴﺮ ﺍﻟﺤﻤﺎﻳﺔ ﺍﻟﻤﻨﺎﺳﺒﺔ ﻋﻨﺪ ﺍﻟﻄﻠﺐ ﻟﺠﻤﻴﻊ ﺃﺻﻮﻝ ﻭﺧﺪﻣﺎﺕ ﻣﺸﺮﻭﻉ ﻋﻴﻦ ﺍﻟﺼﻘﺮ ﺧﻼﻝ ﻣﺮﺍﺣﻞ
ﺍﻟﻤﺸﺮﻭﻉ ﺍﻹﻧﺸﺎﺋﻴﺔ ﻭﺗﺤﻤﻞ ﺍﻟﻤﺴﺆﻭﻟﻴﺔ ﺍﻟﻜﺎﻣﻠﺔ ﻋﻦ ﺃﻱ ﺃﺿﺮﺍﺭ ﻧﺎﺟﻤﺔ ﻭ ﺗﺼﺤﻴﺤﻬﺎ ﻓﻮﺭﺍً ﻭﺩﻓﻊ ﺍﻟﺘﻜﺎﻟﻴﻒ.
3. ﺗﻮﻓﻴﺮ ﺣﻤﺎﻳﺔ ﺑﺎﻟﺨﺮﺳﺎﻧﺔ ﺍﻷﺳﻤﻨﺘﻴﺔ ﻟﻜﺎﺑﻼﺕ ﻋﻴﻦ ﺍﻟﺼﻘﺮ.
4. ﺗﻘﺪﻳﻢ ﺟﺪﻭﻝ ﺯﻣﻨﻲ ﻣﺤﺪﺙ ﻭﻣﻔﺼﻞ ﻟﻤﺸﺮﻭﻋﻜﻢ ﻓﻲ ﺃﻗﺮﺏ ﻭﻗﺖ ﻣﻤﻜﻦ.
5. ﺍﻟﺘﻌﻬﺪ ﺑﺎﻟﺴﻤﺎﺡ ﻟﻤﻬﻨﺪﺱ ﻣﺮﻛﺰ ﺍﻟﻤﺘﺎﺑﻌﺔ ﻭﺍﻟﺘﺤﻜﻢ ﺑﺎﻟﺪﺧﻮﻝ ﻟﻠﻤﻮﻗﻊ ﺧﻼﻝ ﺍﻻﻋﻤﺎﻝ ﻟﻺﺷﺮﺍﻑ.
6. ﻳﺤﻖ ﻟﻤﻬﻨﺪﺱ ﻣﺮﻛﺰ ﺍﻟﻤﺘﺎﺑﻌﺔ ﻭﺍﻟﺘﺤﻜﻢ ﺇﻳﻘﺎﻑ ﺃﻱ ﺃﻋﻤﺎﻝ ﻓﻲ ﻧﻄﺎﻕ ﺍﻟﻤﺸﺮﻭﻉ ﻗﺪ ﺗﻀﺮ ﺑﺄﺻﻮﻝ ﻭﺧﺪﻣﺎﺕ
ﺍﻟﻤﺮﻛﺰ.
7. ﻣﺮﺍﻋﺎﺓ ﺭﺑﻂ ﺟﻤﻴﻊ ﺍﻟﻤﻤﺮﺍﺕ ﻣﻊ ﻣﺸﺮﻭﻉ ﻋﻴﻦ ﺍﻟﺼﻘﺮ ﻓﻲ ﺣﺎﻝ ﻧﻘﻞ ﺍﻻﺻﻮﻝ.
8. ﺃﺣﻤﺪ ﺍﻟﻌﺒﻴﺪﻱ ﻋﻠﻰ ﺍﻟﺒﺮﻳﺪ ﺍﻻﻛﺘﺮﻭﻧﻲ/ ﺍﻟﺘﻮﺍﺻﻞ ﻭﺍﻟﺘﻨﺴﻴﻖ ﻣﻊ ﺍﻟﻤﻬﻨﺪﺱaalobaidi@admcc.ae
ﺷﻴﺪ ﻋﺰﻳﺰ ﻋﻠﻰ ﺍﻟﺒﺮﻳﺪ ﺍﻻﻟﻜﺘﺮﻭﻧﻲ/ ﻭﺍﻟﻤﻬﻨﺪﺱsheed@admcc.ae ﻗﺒﻞ ﺑﺪﺀ ﺍﻟﻌﻤﻞ ﻓﻲ ﺍﻟﻤﻮﻗﻊ
ﺑﻴﻮﻣﻴﻦ.
ADSSC
ADSSC Sewerage AD FP
Reviewed by: Eng.Mohammed AlBalooshi
Incomplete Documents, Please Submit:
- New ADSSC undertaking letter (Showing Date, Scope of work for this
transaction, the exact location, land base ,Signature & Stamp, written by
hand is not acceptable ) (Attached)
- Clear and colored proposed drawing (show your proposed work,
legends, coordinates ?in zone 40 for Al Dhafrah Region? and contractor
information as PDF) (CAD WGS84 2010, the CAD should be single lines
for the proposed work only)
EAD
EAD FP Supervisor
ﻳﺮﺟﻰ ﺗﻘﺪﻳﻢ ﻃﻠﺐ ﺗﺮﺧﻴﺺ ﺑﻴﺌﻲ ﻟﻠﻤﺸﺮﻭﻉ ﻋﻦ ﻃﺮﻳﻖ ﻣﻮﻗﻊ ﺍﻟﻠﻬﻴﺌﺔwww.eservices.ead.ae
ﻭﺗﺤﻤﻴﻞ ﺍﻟﺮﺩ ﺍﻟﺼﺎﺩﺭ ﻣﻦ ﺍﻟﻬﻴﺌﺔ
GHQ
GHQ Military Works and Telecom FP
ﺗﻮﺟﺪ ﺧﺪﻣﺎﺕ ﺗﺎﺑﻌﺔ ﻟﻠﻘﻮﺍﺕ ﺍﻟﻤﺴﻠﺤﺔ ﻓﻲ ﻣﻮﻗﻊ ﺍﻟﻌﻤﻞ ﻣﻄﻠﻮﺏ ﺍﻟﺘﻮﺍﺻﻞ ﻭ ﺍﻟﺘﻨﺴﻴﻖ ﻣﻊ ﻗﻴﺎﺩﺓ ﺳﻼﺡ ﺍﻻﺷﺎﺭﻩ
1. (ﺍﻟﺮﺟﺎﺀ ﺍﻟﺘﻮﺍﺻﻞ ﻭﺍﻟﺘﻨﺴﻴﻖ ﻣﻊ ( ﻗﻴﺎﺩﺓ ﺳﻼﺡ ﺍﻻﺷﺎﺭﺓ
2. ﻇﻬﺮﺍ12 ﺹ ﺍﻟﻰ9 ﺍﺳﺘﻼﻡ ﺍﻟﻄﻠﺒﺎﺕ ﻣﻦ ﺍﻻﺣﺪ ? ﺍﻻﺭﺑﻌﺎﺀ ﻣﻦ
3. 025045252 ﺍﻭ0503733317 ﻋﻠﻲ ﺍﻟﺸﺤﻲ-: ﻟﻼﺳﺘﻔﺴﺎﺭ ﻋﻦ ﺍﻟﻤﻌﺎﻣﻼﺕ ﺍﻟﺘﻮﺍﺻﻞ
4. ﺑﻌﺪ ﺇﺳﺘﻼﻡ ﺷﻬﺎﺩﺓ ﻋﺪﻡ ﺍﻟﻤﻤﺎﻧﻌﺔ ﻳﺠﺐ ﺗﺤﻤﻴﻞ ﺍﻟﺸﻬﺎﺩﺓ ﻋﻠﻰ ﻧﻈﺎﻡ ﺍﻝNOC ﺑﺮﻧﺎﻣﺞ ﺷﻬﺎﺩﺍﺕ
ﻋﺪﻡ ﺍﻟﻤﻤﺎﻧﻌﺔ ﻟﻠﻤﺮﺍﻓﻖ ﻭﺍﻟﺒﻨﻰ ﺍﻟﺘﺤﺘﻴﺔ ﻹﻣﺎﺭﺓ ﺃﺑﻮﻇﺒﻲ ﻟﻴﺘﻢ ﺇﺗﺨﺎﺫ ﺍﻹﺟﺮﺍﺀ ﺍﻟﻠﺰﺍﻡ ﻭﺍﻟﺮﺩ ﻋﻠﻰ ﺍﻟﻤﻌﺎﻣﻠﺔ ﻋﻦ
ﻃﺮﻳﻖ ﺍﻟﻨﻈﺎﻡ.
5. )ﻣﻮﺍﻓﺎﺗﻨﺎ )ﺷﻬﺎﺩﺓ ﺍﻧﺠﺎﺯ( ﺃﻭ) ﺗﻌﻬﺪ ﻭ ﺍﺗﻔﺎﻕ ﺑﺎﻧﺠﺎﺯ ﺍﻟﻤﺸﺮﻭﻉ ﺣﺴﺐ ﺍﻟﺸﺮﻭﻁ ﺍﻟﻤﺘﻔﻖ ﻋﻠﻴﻬﺎ
ﻣﺨﺘﻮﻣﺔ ﻣﻦ ﻗﺒﻞ ﻗﻴﺎﺩﺓ ﺳﻼﺡ
) ﺍﻻﺷﺎﺭﺓ ﻭﺇﺭﻓﺎﻗﻬﺎ ﻓﻲ ﻧﻈﺎﻡ ) ﻣﻮﻗﻊ ﺷﻬﺎﺩﺓ ﻋﺪﻡ ﺍﻟﻤﻤﺎﻧﻌﺔ.
ADM
ADM Asset Coordination FP
1- This approval is valid for 6 months only.
2- Any minor or major changes during the construction will cancel
this NOC and you should obtain new NOC request.
3- This NOC issued depending on GIS layers and ADM Makani
program and any observed line or conflict with ADM Assets on the field
you should inform ADM and the owner should take the responsibility to
Relocate or protect the lines/Assets under his cost.
4- Submit a permits in the IPS System for the Following (Asphalt
cutting, Tile Lifting, NDRC, Soft/ Hard Landscape, Storm Water,
Installing Temporary Container, Temporary Sign Board, Temporary
Hump, SCADA integration, Loading And Offloading of Excavation
Material, Loading And Offloading of Quaries Material, street Light, Mobile
Crane, General Bank Guarantee Release, Earthwork Clearance
Certificate) throw this link: https://ips.adm.gov.ae/.
5- Approve any required relocation/protection/Connection for
storm water/street light or lines VIA IDAS SYSTEM.(forgit VIA External
Centers)
6- Coordinating with ADM Consultant if there any conflicts with
ADM Musanada projects.
7- Any required detours/ramps should be approved online by
DOT.
8- All ADM Specifications and Quality directory should applied.
9- Safety assurance should applied during the work.
10- GET A FINAL APPROVAL FROM THE DEVELOPER IT THE
AREA STILL UNDER HIS CUSTODY.
11- The Consultant should fill UP the attached form and upload it in
the system.
Etisalat
Etisalat Telecom FP - Abu Dhabi
Your proposed work should be carried out in compliance with the notes
given below and the attached Guidelines Annexure 1 & 2, stating safety
precautions, Contractors responsibilities to be followed from your side
prior to and during the proposed work at site.
During the construction period contractor need to submit all required
detailed drawing to Etisalat Plant Protection Office for site verification.
Moreover, your works program/schedule of proposed works should be
submitted to Etisalat Plant Protection office (Telephone 02 ?
6162728,0505794949) well in advance of commencement of any for
their information & co-ordination.
Warning signboard to be installed on existing Etisalat network to take
precautionary measures to avoid any damage while execution. In this
regard, please find attached standard drawing no. ETC/PPO/1001/18
showing the specifications of warning sign board.
Trial pits are necessary before commencement of any excavation activity
in the project vicinity & take precautionary measures to protect existing
network Etisalat network, if any.
The works shall be carried out only under Etisalat technical supervision.
Your program of works should be submitted to us well in advance of
commencement of work at site and design and supervision charges will
be advice accordingly.
Etisalat network must be identified/located at site before commencing
any excavation work and adequate protection for Etisalat network as per
normal standard procedure are to be provided.
Mechanical excavation near to Etisalat network is not allowed, and all
excavations works in the project area are to be carried out manually.
Existing telecom ducts that falls under the proposed Roads / paved
surfaces are to be encased with 10CM thick concrete surround.
Protection and method statement should be submitted to Plant
Protection Office before starting works activities.
Our existing telephone plant found nearest your works activity make trial
pit excavation (copy attached) and submit accordingly for approval.
Etisalat service corridor shall be not be affected due to any type of
activities and the contractor/consultant shall hold full responsibility in
case of Etisalat service disturbance.
Likewise, any damage inflicted on existing Telephone plant during the
course of your works will be dealt as per prevailing damage claims
procedures.
Existing Telephone duct that falls under newly paved area or areas
disturbed by your works are to be tested and if any damage/blockage
noticed, should be rectified.
Etisalat requirement to take precautionary measures for existing
Telecom line plant at junction/road crossing points while executing the
work at site.
Contractor will be liable to pay any damage caused during the
construction works in this area.
Please note that, the contractor shall be held liable for any accidental
ADDC
ADDC Assets FP Supervisor
Kindly find attached ADDC letter no. 297260 and you have to consider
Water/electricity relocation & protection guidelines that already submitted
to you within NOI application.
ADSSC
ADSSC Sewerage AD FP
EAD
EAD FP Supervisor
ﻳﺮﺟﻰ ﺍﺗﺒﺎﻉ ﺍﻟﺸﺮﻭﻁ ﺍﻟﺒﻴﺌﻴﺔ ﻛﻤﺎ ﺗﻢ ﺗﻮﺿﻴﺤﻪ ﻓﻲ ﺍﻟﺮﺧﺼﺔ ﺍﻟﺒﻴﺌﻴﺔ ﻟﻠﻤﺸﺮﻭﻉ
ADSSC
ADSSC Sewerage AD FP
Reviewed by: Eng. Mohammed AlBalooshi
use the uploaded ADSSC drawings and submit:
- Clear & colored proposed drawings showing land base with all ADSSC
assets & manholes information and piplines diameter, cross/parallel
section drawings with showing pipe diameter, clear distances to the edge
of ADSSC manholes & lines.(Contractor should submit Each Crossing &
each Parallel distance to all ADSSC assets)
- Method Statement of protection ADSSC existing Asset.
In case of ADSSC manhole adjustment:
- submit All Manholes Adjustment Details and method of statement (if
any) for each ADSSC manholes and show the type of manhole cover will
be used.
- Works should be as per ADSSC standard specifications for the
manholes works & covers (separate detail drawing for each ADSSC
manhole modification, type of cover and any other works).
Note: Submit all ADSSC requirements in compressed (.zip) file name it
ADSSC
GHQ
GHQ Military Works and Telecom FP
ﻣﻦ ﻗﻴﺎﺩﺓ ﺳﻼﺡ ﺍﻻﺷﺎﺭﺓ ﻣﻜﺘﺐ2020/07/15 ﻭﺍﻟﺼﺎﺩﺭﺓ ﺑﺘﺎﺭﻳﺦ1080/1079 ﺣﺴﺐ ﺍﻟﻤﻌﺎﻣﻠﺔ ﺭﻗﻢ
ﻋﺪﻡ ﺍﻟﻤﻤﺎﻧﻌﻪ ﻳﺠﺐ ﺗﻨﻔﻴﺬ ﺍﻟﻤﻼﺣﻈﺎﺕ ﺍﻟﻤﺘﻔﻖ ﻋﻠﻴﻬﺎ ﻣﻦ ﻗﺒﻞ ﺍﻓﺮﺍﺩ ﻣﻜﺘﺐ ﻋﺪﻡ ﺍﻟﻤﻤﺎﻧﻌﻪ ﻭﻳﺠﺐ ﺍﺧﺬ ﺍﻟﺤﻴﻄﻪ
. ﻭﺍﻟﺤﺬﺭ ﺍﺛﻨﺎﺀ ﺍﻟﻌﻤﻞ ﻭﺗﺘﺤﻤﻞ ﺍﻟﺸﺮﻛﺔ ﺍﻱ ﺿﺮﺭ ﻳﺤﺪﺙ ﻟﺨﺪﻣﺎﺕ ﺍﻟﻘﻮﺍﺕ ﺍﻟﻤﺴﻠﺤﺔ ﺍﺛﻨﺎﺀ ﺍﻟﻌﻤﻞ
Du
Du Telecom FP
1. Please be informed that this NOC given refer to drawing
(Proposed Tse Line Crossing With Existing Du Cable Layout Zone-1)
ONLY.
2. Please be informed that any work close to our network,
crossings or protection should be under our supervision, you may
contact Mr. Enrico Julao/ Senior Manager ? Fiber Network Email: Enrico.
Julao@du.ae; Mob: + 971 55 2288426 Tel: + 971 4 3915046 Fax: + 971
4 3655885 or Eng. Ibrahim Fauzi / Senior Engineer Infrastructure, Email:
Ibrahim.Fauzi@du.ae Mob: +971556426496 to arrange sending a site
engineer to be present in site.
ADSSC
ADSSC Sewerage AD FP
follow the previous comment please
Nothing Updated
Submit authorized
Spatial Inputs / Drawings Electrical zip files Nawas MK LNT
transaction
Submit authorized
Spatial Inputs / Drawings Water zip files Nawas MK LNT
transaction
AD-All
Contractor
For ADSSC - Please find the revised drawings and other documents 8/4/20 12:00 AM
attached for review and approvals.
Attachment Attachment Type Uploaded By Upload Step
Submit authorized
Detailed Layout Plans Nawas MK LNT
transaction
Submit authorized
Detailed Layout Plans Nawas MK LNT
transaction
Location
Long, Lat DEM Elevation Sharing Duct
24.24600918 , 54.67184616 False
Region
Ground Level Length (Meter)
14681.02
Buffer (Meters)
20 Width (Maximum)
Shape Area
551018.86
○
Changes in permitting requirements
NOC Reply
Conditions
Implementation Conditions
Other Conditions
Conditions
Implementation Conditions
Other Conditions
Conditions
Other Conditions
Conditions
Other Conditions
Conditions
Other Conditions
Conditions
Not Relevant Project
Other notes that may enhance the business
rules as specified in the comments /
attachments
Entity Name Du
NOC Reply B) NOC with Conditions
Valid 6 Months Starting from:03 - 08 - 2020 11:44:57 till 02 - 02 - 2021 11:44:57
Conditions
Other Conditions
Conditions
Other Conditions
Conditions
Other Conditions
Conditions
Implementation Conditions
Other Conditions
Conditions
Other Conditions
Conditions
Other Conditions
Conditions
Implementation Conditions
Other Conditions
Conditions
Not Relevant Project