Common NOC Report

Transaction Registry: 11-20201082532-01-3-01-00-111

Project Number: D-107604_0000

Plot Number: Abu Dhabi - AL WATHBA - - -

Generated By: Contractor/Nawas MK LNT ECC Division

Generated date: 24 - 08 - 2020 01:35:11 PM

Owner Name: Abu Dhabi Distribution Company

Permit Category: Utility and Infrastructure Lines Approvals

Permit Type: Utilities Underground Cables or Pipelines

Permit Sub type: Treated-Water Trunk Line

Project Stage: Construction

Construction Phase: Phase 1

Submission Date: 17 - 06 - 2020 05:25:40 PM

NOC Reply Summary


Role System Default Transaction Focal Point Reply
Distribution Coordinator
Intervention
Description

Default NOC 17 17 17
NOC Without Conditions 2
NOC With Conditions 12
Conditions to Issue NOC

Objection

In Progress 14 14

Page Number: 1 / 28 Transaction 11-20201082532-01-3-01-00 Report generated On:24-08-2020 01:35:


Municipal approval replies

ADM
Aaehsa Abdulrahman Jasem
2. Conditions for Approval 7/20/20 6:10 PM 11-20201082532-01-3-01-00
Conditions Subject to Requester Approval

Remaining required NOC(s) must be


completed (see NOC detailed report)

Issuing Entities Focal NOC Replies

System Default Focal Point


Entity Name Focal Point NOC Reply Reply Date
Action Action

7/6/20 10:46
AM
Abu Dhabi For Action
ADDC Assets FP For Action
Distribution
Supervisor
Company B) NOC with
Conditions
7/5/20 1:35 PM
For Action
Municipality of Abu ADM Asset For Action
Dhabi City Coordination FP
B) NOC with
Conditions
7/13/20 7:53
AM
Abu Dhabi National For Action
Oil Company ADNOC HQ FP For Action
(ADNOC) B) NOC with
Conditions
8/24/20 1:13
PM
Abu Dhabi For Action
ADSSC Sewerage For Action
Sewerage Services
AD FP
Company B) NOC with
Conditions
6/29/20 9:57
AM
ADTCA Tourism For Action
Abu Dhabi Tourism For Action
and Culture FP -
and Culture Agency
AD and WR B) NOC with
Conditions

Page Number: 2 / 28 Transaction 11-20201082532-01-3-01-00 Report generated On:24-08-2020 01:35:


System Default Focal Point
Entity Name Focal Point NOC Reply Reply Date
Action Action

7/5/20 2:30 PM
For Action
Department of DoT Right-of-Way For Action
Transport FP - AD
A) NOC with No
Conditions
8/3/20 11:44
AM
Emirates Integrated For Action
Telecommunication Du Telecom FP For Action
Company - Du B) NOC with
Conditions
7/7/20 12:34
PM
For Action
Environment Agency For Action
EAD FP Supervisor
- Abu Dhabi
B) NOC with
Conditions
8/9/20 2:33 PM
For Action
Etihad Rail Etihad Rail FP For Action
B) NOC with
Conditions
8/18/20 9:38
Emirates AM
For Action
Telecommunication Etisalat Telecom For Action
Corporation - FP - Abu Dhabi
Etisalat B) NOC with
Conditions
7/22/20 2:15
PM
UAE Armed Forces GHQ Military For Action
General Works and For Action
Headquarters Telecom FP B) NOC with
Conditions
6/30/20 11:47
AM
For Action
Monitoring and MCC Monitor and For Action
Control Center Control FP
B) NOC with
Conditions
7/1/20 3:11 AM
Abu Dhabi Transco For Action
Transmission and Infrastructure For Action
Despatch Company Services FP B) NOC with
Conditions
6/29/20 1:55
ZonesCorp PM
Higher Corporation For Action
Industrial Customer For Action
for Specialized
Services FP
Economic Zones A) NOC with No
Supervisor
Conditions

Page Number: 3 / 28 Transaction 11-20201082532-01-3-01-00 Report generated On:24-08-2020 01:35:


System Default Focal Point
Entity Name Focal Point NOC Reply Reply Date
Action Action

Not for Action


General Directorate AD Police Telecom Not for Action
of Abu Dhabi Police FP
Default NOC

Not for Action


General Directorate AD Police Traffic Not for Action
of Abu Dhabi Police Safety FP
Default NOC

ADAC Air Not for Action


Abu Dhabi Airports Not for Action
Navigation
Company
Services FP Default NOC

Abu Dhabi Not for Action


ADDC Customer Not for Action
Distribution
Services FP
Company Default NOC

Abu Dhabi Not for Action


ADDC Plot-Related Not for Action
Distribution
FP - Electrical
Company Default NOC

Abu Dhabi Not for Action


ADDC Plot-Related Not for Action
Distribution
FP - Water
Company Default NOC

Not for Action


Municipality of Abu ADM Services Not for Action
Dhabi City Corridor FP
Default NOC

Not for Action


Municipality of Abu Not for Action
ADM Traffic FP
Dhabi City
Default NOC

Not for Action


Abu Dhabi Ports Not for Action
ADPC Marine FP
Company
Default NOC

Page Number: 4 / 28 Transaction 11-20201082532-01-3-01-00 Report generated On:24-08-2020 01:35:


System Default Focal Point
Entity Name Focal Point NOC Reply Reply Date
Action Action

Not for Action


Abu Dhabi Ports Not for Action
ADPC Ports FP
Company
Default NOC

Abu Dhabi Water Not for Action


ADWEA Not for Action
and Electricity
Generation FP
Authority Default NOC

Not for Action


Dolphin Energy Not for Action
Dolphin Energy FP
Limited
Default NOC

Not for Action


Emirates Nuclear Not for Action
ENEC FP
Energy Corporation
Default NOC

Emirates Not for Action


Etisalat Telecom
Telecommunication Not for Action
FP - Western
Corporation -
Region Default NOC
Etisalat

Kizad Industrial Not for Action


Khalifa Industrial Not for Action
Customer Service
Zones Abu Dhabi
FP Default NOC

National Central Not for Action


Tabreed Cooling Not for Action
Cooling Company
FP
PJSC Default NOC

Abu Dhabi Transco Plot- Not for Action


Transmission and Related Services Not for Action
Despatch Company FP Default NOC

Observations Comments and Attachments

Page Number: 5 / 28 Transaction 11-20201082532-01-3-01-00 Report generated On:24-08-2020 01:35:


ADM
ADM TP Infrastructure Permitting Eng -
WHERE IS YOUR SHOP DRAWING ??? PDF AND CAD FILE PLZ

Some attachements are missing or not uploaded

Page Number: 6 / 28 Transaction 11-20201082532-01-3-01-00 Report generated On:24-08-2020 01:35:


Transaction History

User Name Workflow Step Reply Reply Date Solution Role

Initiate request and define


Nawas MK LNT ECC Division Request Submitted 17 - 06 - 2020 17:58:11 Contractor
data

ADDC Projects
Review and authorize
Saif Ali Al Shemeili Claim 21 - 06 - 2020 13:18:29 Representative -
request
Water

ADDC Projects
Review and authorize Requester Authorized By
Saif Ali Al Shemeili 21 - 06 - 2020 13:18:40 Representative -
request Requesting Entity
Water

Submit transaction after


Nawas MK LNT ECC Division working on authorized Request Submitted 21 - 06 - 2020 17:29:25 Contractor
data

ADM TP Infrastructure
Aaehsa Abdulrahman Jasem Review request and
Claim 21 - 06 - 2020 23:45:17 Permitting Eng -
Alnuaimi perform further analysis
Utilities - Area3

Request Rejected By ADM TP Infrastructure


Aaehsa Abdulrahman Jasem Review request and
Permitting Body and Sent 21 - 06 - 2020 23:46:32 Permitting Eng -
Alnuaimi perform further analysis
Back to Applicant Utilities - Area3

Rejected from Permitting


Body Project
Nawas MK LNT ECC Division Request Submitted 23 - 06 - 2020 13:06:56 Contractor
Representative - Submit
transaction after working

ADM TP Infrastructure
Aaehsa Abdulrahman Jasem Review request and
Claim 29 - 06 - 2020 09:49:31 Permitting Eng -
Alnuaimi perform further analysis
Utilities - Area3

Initiating NOC
ADM TP Infrastructure
Aaehsa Abdulrahman Jasem Review request and Transaction by the
29 - 06 - 2020 09:49:46 Permitting Eng -
Alnuaimi perform further analysis Permitting Body Project
Utilities - Area3
Representative

Applicant Reissue For


Nawas MK LNT ECC Division 05 - 07 - 2020 17:11:22 Contractor
Information Transaction

Applicant Reissue For


Nawas MK LNT ECC Division 05 - 07 - 2020 21:46:38 Contractor
Information Transaction

Applicant Reissue For


Nawas MK LNT ECC Division 06 - 07 - 2020 16:47:43 Contractor
Information Transaction

Applicant Reissue For


Nawas MK LNT ECC Division 09 - 07 - 2020 19:21:39 Contractor
Information Transaction

Page Number: 7 / 28 Transaction 11-20201082532-01-3-01-00 Report generated On:24-08-2020 01:35:


User Name Workflow Step Reply Reply Date Solution Role

Applicant Reissue For


Nawas MK LNT ECC Division 15 - 07 - 2020 19:23:06 Contractor
Information Transaction

ADM TP Infrastructure
Aaehsa Abdulrahman Jasem View request and replies
Claim 20 - 07 - 2020 18:09:04 Permitting Eng -
Alnuaimi of Focal Points
Utilities - Area3

Conditions Sent From


ADM TP Infrastructure
Aaehsa Abdulrahman Jasem View request and replies Permitting Body Project
20 - 07 - 2020 18:10:35 Permitting Eng -
Alnuaimi of Focal Points Representative to
Utilities - Area3
Applicant for Approval or

Review conditions entered


Applicant Reissue For
Nawas MK LNT ECC Division by Permitting body project 22 - 07 - 2020 13:36:05 Contractor
Action Transaction
representative

Applicant Reissue For


Nawas MK LNT ECC Division 22 - 07 - 2020 20:23:07 Contractor
Information Transaction

Review conditions entered Applicant's Agreement to


Nawas MK LNT ECC Division by Permitting body project Permitting Body 23 - 07 - 2020 08:52:49 Contractor
representative Conditions

ADM TP Infrastructure
Aaehsa Abdulrahman Jasem
Conditions approved Claim 25 - 07 - 2020 22:46:27 Permitting Eng -
Alnuaimi
Utilities - Area3

Conditions Sent From


ADM TP Infrastructure
Aaehsa Abdulrahman Jasem Permitting Body Project
Conditions approved 25 - 07 - 2020 22:47:46 Permitting Eng -
Alnuaimi Representative to
Utilities - Area3
Applicant for Approval or

Applicant Reissue For


Nawas MK LNT ECC Division 04 - 08 - 2020 11:25:22 Contractor
Information Transaction

Review conditions entered


Applicant Reissue For
Nawas MK LNT ECC Division by Permitting body project 09 - 08 - 2020 14:59:34 Contractor
Action Transaction
representative

Review conditions entered


Applicant Reissue For
Nawas MK LNT ECC Division by Permitting body project 15 - 08 - 2020 09:51:41 Contractor
Action Transaction
representative

Page Number: 8 / 28 Transaction 11-20201082532-01-3-01-00 Report generated On:24-08-2020 01:35:


Transaction Details
Administrative Information

Contact Person Information

First Name Middle Name Third Name


Nawas MK LNT
Family Name
ECC Division

Emirate Phone Number Email


0558429314 nawasmk@lntecc.com

Organization Information

Organization Organization Name Organization Phone


CN-1001544 Larsen & Toubro 037670225

Department

Requester Information (Project Owner)


Owner Type Email
Entity customerservice@addc.ae

Entity Name Phone Number


Abu Dhabi Distribution Company +971 2 416 6000

Organization Contact

Comments

Contractor Information
License Number /

Name Phone Number Email

Page Number: 9 / 28 Transaction 11-20201082532-01-3-01-00 Report generated On:24-08-2020 01:35:


Attachments

Entity Name User Name Workflow Step Attachment Attachment Date

AD-All larsen.toubro Initiate request and Administrative (1) - Emirates ID Copy 17 - 06 - 2020
define data General

AD-All larsen.toubro Initiate request and Administrative (1) - Letter of Award or 17 - 06 - 2020
define data General Appointment

AD-All larsen.toubro Initiate request and Administrative (1) - Commercial 17 - 06 - 2020


define data General Registration Copy

AD-All larsen.toubro Initiate request and Spatial Inputs / Site Plan 17 - 06 - 2020
define data Drawings

AD-All larsen.toubro Initiate request and Spatial Inputs / Project Location 17 - 06 - 2020
define data Drawings

AD-All larsen.toubro Initiate request and Spatial Inputs / Key Plan 17 - 06 - 2020
define data Drawings

Page Number: 10 / 28 Transaction 11-20201082532-01-3-01-00 Report generated On:24-08-2020 01:35:


Basic Transaction Information

Transaction Nature
New Project

Permit Category Permit Type Project Stage


Utility and Infrastructure Lines Approvals Utilities Underground Cables or Pipelines Construction

Construction Phase
Permit Sub type
Treated-Water Trunk Line Phase 1

Expedited

Muncipality Name District Name Community Name Road Name Plot Number

ADM AL WATHBA

Project Information

Project Number Project ID


D-107604_0000 148123

Project Name
D-107604 ADDC Al ain TSE Project Package-B(Zone1)

Project Description

Construction of Recycle Water Pipe Line from Main Pump Station to Intermediate Pump Station Package B- Zone 1

Project Start Date Closure Date

06 - 02 - 2020 20 - 09 - 2021

Transaction Data

Date Owner Corresponding Number


17 - Jun - 2020

Municipal Corresponding Number

Page Number: 11 / 28 Transaction 11-20201082532-01-3-01-00 Report generated On:24-08-2020 01:35:


Authorization
Authorization entity Authorizing project representative name
ADDC Saif Ali Al Shemeili

Granted on
6/21/20 1:18 PM

Additional Transaction Information

Transaction Specific Information


Purpose/Activity Abnormal Load (tons) Install/Move Parking Machines/Signs
0 ● No ○ Yes
Typology (Building Usage) No. of Personal NDRC
0 ● No ○ Yes
Typology (Crane) No. of Blocks Distance (from Plot)
0 10
Typology (Land Usage) No. of Cranes Length of Network (km)
0
Typology (Onshore Projects) Period (days) No. of Floors
0 0
Typology (Public Realm) Event Period (days) Date Of Completion Certificate
0
Typology (Urban Road) Population (capita) Guarantee Period (months)
0 1
Typology (Utility) Surface Area (square meters) Partial Demolition
0 0
Voltage (kV) Master Plan
Developement Type
0
Land Allocation Navigation Capacity (dwt)
Allocation 0
Date of Event Noise Absorbtion Parameter
0
Diameter (meters) Include Removal of Towers
1 ● No ○ Yes
Estimated Time for Containment Install Parking Shades

Page Number: 12 / 28 Transaction 11-20201082532-01-3-01-00 Report generated On:24-08-2020 01:35:


48 ● No ○ Yes
Level of Backfill (meters) Install Shelters
● No ○ Yes

Transaction comments and attachments

Etihad Rail
Etihad Rail FP Supervisor
Please find attached NOC conditions.

ADNOC HQ
ADNOC HQ FP
Kindly adhere to the conditions given by (ADNOC Upstream
Exploration),The area is covering three ADNOC wells (Coordinates:
Longitude: 54.6363784, Latitude: 24.2471454, Longitude: 54.6727848,
Latitude: 24.2493139, & Longitude: 54.6944881, Latitude: 24.2381432),
please be away at least 80 meter from the provided projection. The
Future Access route to the well location to be secured, specifications and
requirements to be advised by ADNOC HQ Drilling. This NOC is for
ADNOC assets protection only and you are requested to approach other
government sectors and utilities providers for their NOCs and Permits.
Any change to the proposed work needs to be referred back to us for our
review.

Du
Du Telecom FP
Please, be informed that E.I.T.C./du has a live fiber optic cable network
running as shown in the attached file. We request you to submit the
following:
1. Detail cross section and profile for the proposed development
mention all the levels and dimensions between our existing network and
the proposed development.
2. Du application form.
3. Method statement.
4. Inspection report sign from our inspector.
5. Protection detail to be confirmed by Du inspector as per the
site.
6. You have to have a copy of Du conditions, requirements and
drawing provided by Du when you visit the site.
For the above you may contact our Operations Team to arrange sending
a site engineer to be present while exposing our network. Mr. Enrico
Julao/ Senior Manager - Fiber Network Email: Enrico.Julao@du.ae;
Mob: + 971 55 2288426 Tel: + 971 4 3915046 Fax: + 971 4 3655885 or
Eng. Ibrahim Fauzi / Senior Engineer Infrastructure, Email: Ibrahim.
Fauzi@du.ae Mob: +971556426496.
This NOC will remain On Hold until we receive the required documents.

Page Number: 13 / 28 Transaction 11-20201082532-01-3-01-00 Report generated On:24-08-2020 01:35:


ADTCA
ADTCA Tourism and Culture FP - AD and WR
The Department of Culture and Tourism (DCT - Abu Dhabi) gives a No
Objection with Conditions.The following conditions therefore apply: (1)
Please notify DCT Abu Dhabi in case of the accidental discovery of
pottery, animal bones/fossils, shells, and other archaeological material.
(2) Please provide GPS coordinates for any accidental finds discovered
during the course of construction. (3) Please feel free to notify DCT Abu
Dhabi with photographs and descriptions if you are unsure about any
finds encountered.

ADDC
ADDC Assets FP Supervisor
Kindly upload main ADDC requirements (copy attached) as THREE ZIP
Folders using WinZip, THREE separate folders for Water, Electricity and
Recycled Water Network.

MCC
MCC Monitor and Control FP
‫ﻳﺮﺟﻰ ﺍﻟﺘﻔﻀﻞ ﺑﺎﻟﻌﻠﻢ ﺑﺄﻧﻪ ﻻﻣﺎﻧﻊ ﻟﺪﻳﻨﺎ ﻣﻦ ﺍﻟﺒﺪﺀ ﻓﻲ ﺍﻟﻤﻮﻗﻊ ﺍﻟﻤﺸﺎﺭ ﺇﻟﻴﻬﺎ ﻓﻲ ﺍﻟﻜﺘﺎﺏ ﺃﻋﻼﻩ ﺇﻻ ﺇﻧﻨﺎ ﻧﻮﺩ‬
‫ﺍﻟﺘﻨﻮﻳﻪ ﻋﻠﻰ ﺿﺮﻭﺭﺓ ﺇﺗﺒﺎﻉ ﺍﻟﺸﺮﻭﻁ ﻭﺍﻟﺘﻌﻠﻴﻤﺎﺕ ﻭﺗﻮﻓﻴﺮ ﺍﻟﻤﺘﻄﻠﺒﺎﺕ ﺍﻟﺘﺎﻟﻴﺔ‬:

1. ‫ﺍﻻﺑﺘﻌﺎﺩ ﻋﻦ ﺃﺻﻮﻝ ﻭﺧﺪﻣﺎﺕ ﻣﺸﺮﻭﻉ ﻋﻴﻦ ﺍﻟﺼﻘﺮ ﺩﻭﻥ ﺍﺧﺬ ﻣﻮﺍﻓﻘﺔ ﻣﺮﻛﺰ ﺍﻟﻤﺘﺎﺑﻌﺔ ﻭﺍﻟﺘﺤﻜﻢ‬.
2. ‫ﺗﻮﻓﻴﺮ ﺍﻟﺤﻤﺎﻳﺔ ﺍﻟﻤﻨﺎﺳﺒﺔ ﻋﻨﺪ ﺍﻟﻄﻠﺐ ﻟﺠﻤﻴﻊ ﺃﺻﻮﻝ ﻭﺧﺪﻣﺎﺕ ﻣﺸﺮﻭﻉ ﻋﻴﻦ ﺍﻟﺼﻘﺮ ﺧﻼﻝ ﻣﺮﺍﺣﻞ‬
‫ﺍﻟﻤﺸﺮﻭﻉ ﺍﻹﻧﺸﺎﺋﻴﺔ ﻭﺗﺤﻤﻞ ﺍﻟﻤﺴﺆﻭﻟﻴﺔ ﺍﻟﻜﺎﻣﻠﺔ ﻋﻦ ﺃﻱ ﺃﺿﺮﺍﺭ ﻧﺎﺟﻤﺔ ﻭ ﺗﺼﺤﻴﺤﻬﺎ ﻓﻮﺭﺍً ﻭﺩﻓﻊ ﺍﻟﺘﻜﺎﻟﻴﻒ‬.
3. ‫ﺗﻮﻓﻴﺮ ﺣﻤﺎﻳﺔ ﺑﺎﻟﺨﺮﺳﺎﻧﺔ ﺍﻷﺳﻤﻨﺘﻴﺔ ﻟﻜﺎﺑﻼﺕ ﻋﻴﻦ ﺍﻟﺼﻘﺮ‬.
4. ‫ﺗﻘﺪﻳﻢ ﺟﺪﻭﻝ ﺯﻣﻨﻲ ﻣﺤﺪﺙ ﻭﻣﻔﺼﻞ ﻟﻤﺸﺮﻭﻋﻜﻢ ﻓﻲ ﺃﻗﺮﺏ ﻭﻗﺖ ﻣﻤﻜﻦ‬.
5. ‫ﺍﻟﺘﻌﻬﺪ ﺑﺎﻟﺴﻤﺎﺡ ﻟﻤﻬﻨﺪﺱ ﻣﺮﻛﺰ ﺍﻟﻤﺘﺎﺑﻌﺔ ﻭﺍﻟﺘﺤﻜﻢ ﺑﺎﻟﺪﺧﻮﻝ ﻟﻠﻤﻮﻗﻊ ﺧﻼﻝ ﺍﻻﻋﻤﺎﻝ ﻟﻺﺷﺮﺍﻑ‬.
6. ‫ﻳﺤﻖ ﻟﻤﻬﻨﺪﺱ ﻣﺮﻛﺰ ﺍﻟﻤﺘﺎﺑﻌﺔ ﻭﺍﻟﺘﺤﻜﻢ ﺇﻳﻘﺎﻑ ﺃﻱ ﺃﻋﻤﺎﻝ ﻓﻲ ﻧﻄﺎﻕ ﺍﻟﻤﺸﺮﻭﻉ ﻗﺪ ﺗﻀﺮ ﺑﺄﺻﻮﻝ ﻭﺧﺪﻣﺎﺕ‬
‫ﺍﻟﻤﺮﻛﺰ‬.
7. ‫ﻣﺮﺍﻋﺎﺓ ﺭﺑﻂ ﺟﻤﻴﻊ ﺍﻟﻤﻤﺮﺍﺕ ﻣﻊ ﻣﺸﺮﻭﻉ ﻋﻴﻦ ﺍﻟﺼﻘﺮ ﻓﻲ ﺣﺎﻝ ﻧﻘﻞ ﺍﻻﺻﻮﻝ‬.
8. ‫ ﺃﺣﻤﺪ ﺍﻟﻌﺒﻴﺪﻱ ﻋﻠﻰ ﺍﻟﺒﺮﻳﺪ ﺍﻻﻛﺘﺮﻭﻧﻲ‬/ ‫ ﺍﻟﺘﻮﺍﺻﻞ ﻭﺍﻟﺘﻨﺴﻴﻖ ﻣﻊ ﺍﻟﻤﻬﻨﺪﺱ‬aalobaidi@admcc.ae
‫ ﺷﻴﺪ ﻋﺰﻳﺰ ﻋﻠﻰ ﺍﻟﺒﺮﻳﺪ ﺍﻻﻟﻜﺘﺮﻭﻧﻲ‬/ ‫ ﻭﺍﻟﻤﻬﻨﺪﺱ‬sheed@admcc.ae ‫ﻗﺒﻞ ﺑﺪﺀ ﺍﻟﻌﻤﻞ ﻓﻲ ﺍﻟﻤﻮﻗﻊ‬
‫ﺑﻴﻮﻣﻴﻦ‬.

"‫ﻋﺪﻡ ﺍﻻﻟﺘﺰﺍﻡ ﺑﺎﻟﺸﺮﻭﻁ ﺍﻟﻤﺬﻛﻮﺭﺓ ﺃﻋﻼﻩ ﺳﻴﺒﻄﻞ ﻫﺬﻩ ﺍﻟﻤﻮﺍﻓﻘﺔ ﺍﻟﻤﺸﺮﻭﻃﺔ‬."


‫ ﻭﺗﻔﻀﻠﻮﺍ ﺑﻘﺒﻮﻝ ﻓﺎﺋﻖ ﺍﻹﺣﺘﺮﺍﻡ‬،،،

ADSSC
ADSSC Sewerage AD FP
Reviewed by: Eng.Mohammed AlBalooshi
Incomplete Documents, Please Submit:
- New ADSSC undertaking letter (Showing Date, Scope of work for this
transaction, the exact location, land base ,Signature & Stamp, written by
hand is not acceptable ) (Attached)
- Clear and colored proposed drawing (show your proposed work,
legends, coordinates ?in zone 40 for Al Dhafrah Region? and contractor
information as PDF) (CAD WGS84 2010, the CAD should be single lines
for the proposed work only)

Note: Submit all ADSSC requirements (undertaking letter + proposed

Page Number: 14 / 28 Transaction 11-20201082532-01-3-01-00 Report generated On:24-08-2020 01:35:


drawings) in compressed file name it ADSSC.
- Please fill the undertaking letter form as described, and if the form is
not filled completely, it will not be accepted

EAD
EAD FP Supervisor
‫ ﻳﺮﺟﻰ ﺗﻘﺪﻳﻢ ﻃﻠﺐ ﺗﺮﺧﻴﺺ ﺑﻴﺌﻲ ﻟﻠﻤﺸﺮﻭﻉ ﻋﻦ ﻃﺮﻳﻖ ﻣﻮﻗﻊ ﺍﻟﻠﻬﻴﺌﺔ‬www.eservices.ead.ae
‫ﻭﺗﺤﻤﻴﻞ ﺍﻟﺮﺩ ﺍﻟﺼﺎﺩﺭ ﻣﻦ ﺍﻟﻬﻴﺌﺔ‬

GHQ
GHQ Military Works and Telecom FP
‫ﺗﻮﺟﺪ ﺧﺪﻣﺎﺕ ﺗﺎﺑﻌﺔ ﻟﻠﻘﻮﺍﺕ ﺍﻟﻤﺴﻠﺤﺔ ﻓﻲ ﻣﻮﻗﻊ ﺍﻟﻌﻤﻞ ﻣﻄﻠﻮﺏ ﺍﻟﺘﻮﺍﺻﻞ ﻭ ﺍﻟﺘﻨﺴﻴﻖ ﻣﻊ ﻗﻴﺎﺩﺓ ﺳﻼﺡ ﺍﻻﺷﺎﺭﻩ‬
1. ‫(ﺍﻟﺮﺟﺎﺀ ﺍﻟﺘﻮﺍﺻﻞ ﻭﺍﻟﺘﻨﺴﻴﻖ ﻣﻊ ( ﻗﻴﺎﺩﺓ ﺳﻼﺡ ﺍﻻﺷﺎﺭﺓ‬
2. ‫ ﻇﻬﺮﺍ‬12 ‫ ﺹ ﺍﻟﻰ‬9 ‫ﺍﺳﺘﻼﻡ ﺍﻟﻄﻠﺒﺎﺕ ﻣﻦ ﺍﻻﺣﺪ ? ﺍﻻﺭﺑﻌﺎﺀ ﻣﻦ‬
3. 025045252 ‫ ﺍﻭ‬0503733317 ‫ ﻋﻠﻲ ﺍﻟﺸﺤﻲ‬-: ‫ﻟﻼﺳﺘﻔﺴﺎﺭ ﻋﻦ ﺍﻟﻤﻌﺎﻣﻼﺕ ﺍﻟﺘﻮﺍﺻﻞ‬
4. ‫ ﺑﻌﺪ ﺇﺳﺘﻼﻡ ﺷﻬﺎﺩﺓ ﻋﺪﻡ ﺍﻟﻤﻤﺎﻧﻌﺔ ﻳﺠﺐ ﺗﺤﻤﻴﻞ ﺍﻟﺸﻬﺎﺩﺓ ﻋﻠﻰ ﻧﻈﺎﻡ ﺍﻝ‬NOC ‫ﺑﺮﻧﺎﻣﺞ ﺷﻬﺎﺩﺍﺕ‬
‫ﻋﺪﻡ ﺍﻟﻤﻤﺎﻧﻌﺔ ﻟﻠﻤﺮﺍﻓﻖ ﻭﺍﻟﺒﻨﻰ ﺍﻟﺘﺤﺘﻴﺔ ﻹﻣﺎﺭﺓ ﺃﺑﻮﻇﺒﻲ ﻟﻴﺘﻢ ﺇﺗﺨﺎﺫ ﺍﻹﺟﺮﺍﺀ ﺍﻟﻠﺰﺍﻡ ﻭﺍﻟﺮﺩ ﻋﻠﻰ ﺍﻟﻤﻌﺎﻣﻠﺔ ﻋﻦ‬
‫ ﻃﺮﻳﻖ ﺍﻟﻨﻈﺎﻡ‬.
5. ‫)ﻣﻮﺍﻓﺎﺗﻨﺎ )ﺷﻬﺎﺩﺓ ﺍﻧﺠﺎﺯ( ﺃﻭ) ﺗﻌﻬﺪ ﻭ ﺍﺗﻔﺎﻕ ﺑﺎﻧﺠﺎﺯ ﺍﻟﻤﺸﺮﻭﻉ ﺣﺴﺐ ﺍﻟﺸﺮﻭﻁ ﺍﻟﻤﺘﻔﻖ ﻋﻠﻴﻬﺎ‬
‫ﻣﺨﺘﻮﻣﺔ ﻣﻦ ﻗﺒﻞ ﻗﻴﺎﺩﺓ ﺳﻼﺡ‬
‫ ) ﺍﻻﺷﺎﺭﺓ ﻭﺇﺭﻓﺎﻗﻬﺎ ﻓﻲ ﻧﻈﺎﻡ ) ﻣﻮﻗﻊ ﺷﻬﺎﺩﺓ ﻋﺪﻡ ﺍﻟﻤﻤﺎﻧﻌﺔ‬.

ADM
ADM Asset Coordination FP
1- This approval is valid for 6 months only.
2- Any minor or major changes during the construction will cancel
this NOC and you should obtain new NOC request.
3- This NOC issued depending on GIS layers and ADM Makani
program and any observed line or conflict with ADM Assets on the field
you should inform ADM and the owner should take the responsibility to
Relocate or protect the lines/Assets under his cost.
4- Submit a permits in the IPS System for the Following (Asphalt
cutting, Tile Lifting, NDRC, Soft/ Hard Landscape, Storm Water,
Installing Temporary Container, Temporary Sign Board, Temporary
Hump, SCADA integration, Loading And Offloading of Excavation
Material, Loading And Offloading of Quaries Material, street Light, Mobile
Crane, General Bank Guarantee Release, Earthwork Clearance
Certificate) throw this link: https://ips.adm.gov.ae/.
5- Approve any required relocation/protection/Connection for
storm water/street light or lines VIA IDAS SYSTEM.(forgit VIA External
Centers)
6- Coordinating with ADM Consultant if there any conflicts with
ADM Musanada projects.
7- Any required detours/ramps should be approved online by
DOT.
8- All ADM Specifications and Quality directory should applied.
9- Safety assurance should applied during the work.
10- GET A FINAL APPROVAL FROM THE DEVELOPER IT THE
AREA STILL UNDER HIS CUSTODY.
11- The Consultant should fill UP the attached form and upload it in
the system.

Page Number: 15 / 28 Transaction 11-20201082532-01-3-01-00 Report generated On:24-08-2020 01:35:


Your enclosed drawings have being reviewed and we regret to issue
objection against your transaction. The applicant kindly requested to
provide Undertaking letter submitted by the contractor pledge to
preserve the integrity of ADM assets and to compensate unconditionally
in case of any damaging occur to ADM asset (Storm Water & irrigation
lines) at the proposed project / services route. (attached example)
Send a confirmation E-mail to Mohamed.Alhashemi@adm.gov.ae when
complied with ADM mentioned Comments in order to re-check
/comment or approve your transaction.

Etisalat
Etisalat Telecom FP - Abu Dhabi
Your proposed work should be carried out in compliance with the notes
given below and the attached Guidelines Annexure 1 & 2, stating safety
precautions, Contractors responsibilities to be followed from your side
prior to and during the proposed work at site.
During the construction period contractor need to submit all required
detailed drawing to Etisalat Plant Protection Office for site verification.
Moreover, your works program/schedule of proposed works should be
submitted to Etisalat Plant Protection office (Telephone 02 ?
6162728,0505794949) well in advance of commencement of any for
their information & co-ordination.
Warning signboard to be installed on existing Etisalat network to take
precautionary measures to avoid any damage while execution. In this
regard, please find attached standard drawing no. ETC/PPO/1001/18
showing the specifications of warning sign board.
Trial pits are necessary before commencement of any excavation activity
in the project vicinity & take precautionary measures to protect existing
network Etisalat network, if any.
The works shall be carried out only under Etisalat technical supervision.
Your program of works should be submitted to us well in advance of
commencement of work at site and design and supervision charges will
be advice accordingly.
Etisalat network must be identified/located at site before commencing
any excavation work and adequate protection for Etisalat network as per
normal standard procedure are to be provided.
Mechanical excavation near to Etisalat network is not allowed, and all
excavations works in the project area are to be carried out manually.
Existing telecom ducts that falls under the proposed Roads / paved
surfaces are to be encased with 10CM thick concrete surround.
Protection and method statement should be submitted to Plant
Protection Office before starting works activities.
Our existing telephone plant found nearest your works activity make trial
pit excavation (copy attached) and submit accordingly for approval.
Etisalat service corridor shall be not be affected due to any type of
activities and the contractor/consultant shall hold full responsibility in
case of Etisalat service disturbance.
Likewise, any damage inflicted on existing Telephone plant during the
course of your works will be dealt as per prevailing damage claims
procedures.
Existing Telephone duct that falls under newly paved area or areas
disturbed by your works are to be tested and if any damage/blockage
noticed, should be rectified.
Etisalat requirement to take precautionary measures for existing
Telecom line plant at junction/road crossing points while executing the
work at site.
Contractor will be liable to pay any damage caused during the
construction works in this area.
Please note that, the contractor shall be held liable for any accidental

Page Number: 16 / 28 Transaction 11-20201082532-01-3-01-00 Report generated On:24-08-2020 01:35:


damage happens to the existing telephone plant during the course of
works and any damage claims will be dealt as per the prevailing
procedures and it?s to be ?Deliberate category? case.

ADDC
ADDC Assets FP Supervisor
Kindly find attached ADDC letter no. 297260 and you have to consider
Water/electricity relocation & protection guidelines that already submitted
to you within NOI application.

ADSSC
ADSSC Sewerage AD FP

Reviewed by: Eng. Mohammed Al Balooshi


Incomplete Documents, Please Submit:

- Clear and colored proposed drawing (show your proposed work,


legends, coordinates ?in zone 40 for Al Dhafrah Region? and Consultant
information as PDF) (CAD WGS84 2010, the CAD should be single lines
for the proposed work only)

Note: Submit all ADSSC requirements in compressed file name it


ADSSC.
Please show the land base in your drawing
Please show all the proposed work, you have 4 proposed in the drawing
and you are drawing only one

EAD
EAD FP Supervisor
‫ﻳﺮﺟﻰ ﺍﺗﺒﺎﻉ ﺍﻟﺸﺮﻭﻁ ﺍﻟﺒﻴﺌﻴﺔ ﻛﻤﺎ ﺗﻢ ﺗﻮﺿﻴﺤﻪ ﻓﻲ ﺍﻟﺮﺧﺼﺔ ﺍﻟﺒﻴﺌﻴﺔ ﻟﻠﻤﺸﺮﻭﻉ‬

ADSSC
ADSSC Sewerage AD FP
Reviewed by: Eng. Mohammed AlBalooshi
use the uploaded ADSSC drawings and submit:
- Clear & colored proposed drawings showing land base with all ADSSC
assets & manholes information and piplines diameter, cross/parallel
section drawings with showing pipe diameter, clear distances to the edge
of ADSSC manholes & lines.(Contractor should submit Each Crossing &
each Parallel distance to all ADSSC assets)
- Method Statement of protection ADSSC existing Asset.
In case of ADSSC manhole adjustment:
- submit All Manholes Adjustment Details and method of statement (if
any) for each ADSSC manholes and show the type of manhole cover will
be used.
- Works should be as per ADSSC standard specifications for the
manholes works & covers (separate detail drawing for each ADSSC
manhole modification, type of cover and any other works).
Note: Submit all ADSSC requirements in compressed (.zip) file name it
ADSSC

Page Number: 17 / 28 Transaction 11-20201082532-01-3-01-00 Report generated On:24-08-2020 01:35:


you have to submit all crossing and parallel distance , if you want to
except any part of the project you need to remove it from the proposal.

GHQ
GHQ Military Works and Telecom FP
‫ ﻣﻦ ﻗﻴﺎﺩﺓ ﺳﻼﺡ ﺍﻻﺷﺎﺭﺓ ﻣﻜﺘﺐ‬2020/07/15 ‫ ﻭﺍﻟﺼﺎﺩﺭﺓ ﺑﺘﺎﺭﻳﺦ‬1080/1079 ‫ﺣﺴﺐ ﺍﻟﻤﻌﺎﻣﻠﺔ ﺭﻗﻢ‬
‫ﻋﺪﻡ ﺍﻟﻤﻤﺎﻧﻌﻪ ﻳﺠﺐ ﺗﻨﻔﻴﺬ ﺍﻟﻤﻼﺣﻈﺎﺕ ﺍﻟﻤﺘﻔﻖ ﻋﻠﻴﻬﺎ ﻣﻦ ﻗﺒﻞ ﺍﻓﺮﺍﺩ ﻣﻜﺘﺐ ﻋﺪﻡ ﺍﻟﻤﻤﺎﻧﻌﻪ ﻭﻳﺠﺐ ﺍﺧﺬ ﺍﻟﺤﻴﻄﻪ‬
. ‫ﻭﺍﻟﺤﺬﺭ ﺍﺛﻨﺎﺀ ﺍﻟﻌﻤﻞ ﻭﺗﺘﺤﻤﻞ ﺍﻟﺸﺮﻛﺔ ﺍﻱ ﺿﺮﺭ ﻳﺤﺪﺙ ﻟﺨﺪﻣﺎﺕ ﺍﻟﻘﻮﺍﺕ ﺍﻟﻤﺴﻠﺤﺔ ﺍﺛﻨﺎﺀ ﺍﻟﻌﻤﻞ‬

Du
Du Telecom FP
1. Please be informed that this NOC given refer to drawing
(Proposed Tse Line Crossing With Existing Du Cable Layout Zone-1)
ONLY.
2. Please be informed that any work close to our network,
crossings or protection should be under our supervision, you may
contact Mr. Enrico Julao/ Senior Manager ? Fiber Network Email: Enrico.
Julao@du.ae; Mob: + 971 55 2288426 Tel: + 971 4 3915046 Fax: + 971
4 3655885 or Eng. Ibrahim Fauzi / Senior Engineer Infrastructure, Email:
Ibrahim.Fauzi@du.ae Mob: +971556426496 to arrange sending a site
engineer to be present in site.

ADSSC
ADSSC Sewerage AD FP
follow the previous comment please

Nothing Updated

wrong undertaken letter , follow the previous comment about the


drawings
Based on attached letter reference
LTCD\ADDC107604\WET\WI\NOC\ADSSC\2020\001 and drawing will
submit separate NOC for part which conflict with ADSSC Asset after you
get new TPD to avoid ADSSC Asset
Reviewed by: Eng. Zayed Al Areefi

1. To send the proposal for review to ADSSC Operations and


Maintenance Division before the commencement of any work.
2. For issues related to Storm Water services, please contact ?PRFD ?
Abu Dhabi Municipality? as ADSSC is not be responsible of such issues.
3. Enclosed herewith one set of detailed sewerage service?s As Built
drawings showing proximity locations, associated with a table that
indicates drawings numbers. However this does not relieve the
applicant(s) to confirm the same on actual ground before
commencement of any works.
4. No construction work is permitted within a limit of 10 Meters on either
side of our existing services which are highlighted on our attached As
Built drawings.
5.Following particular comments need to be adhered while performing
proposed works:-

Page Number: 18 / 28 Transaction 11-20201082532-01-3-01-00 Report generated On:24-08-2020 01:35:


-Excavation should be carried out by hand tools, within a distance of 3
meters on either side of the existing ADSSC services.
-We prohibit the movement of machinery and heavy equipment across
the lines or any other ADSSC assets, except where the safe passage is
designated.
-We prohibit dewatering within the limit of 50 meters on either side of our
pipeline or any other ADSSC assets.
-If the trench width exceeds 2.5 meters then it is a must to obtain
ADSSC?s approval for method deployed for protecting ADSSC
pipelines.
-To reinstate the site to its original form and shape at your own cost.
-Before you start the work, it is required to invite our site audit team of O
& M Division at the site for any intricacy, incase such a demand arises.
6. For all TSE line they have to take NOC and PTW from ADDC
7. For issues related to Irrigation services, please contact ?ADDC? as
ADSSC is not be responsible of such issues.
8. For any works related to sewerage network (proposed/modification)
should be done as per ADSSC standard specifications with submitting
method statement & drawings in details case by case before start any
work in the site.

Attachment Attachment Type Uploaded By Upload Step

Submit authorized
Spatial Inputs / Drawings Electrical zip files Nawas MK LNT
transaction

Submit authorized
Spatial Inputs / Drawings Water zip files Nawas MK LNT
transaction

Amendments Comments and Attachments

AD-All
Contractor
For ADSSC - Please find the revised drawings and other documents 8/4/20 12:00 AM
attached for review and approvals.
Attachment Attachment Type Uploaded By Upload Step

Proforma Application Form Nawas MK LNT Applicant - FYI

Undertaking for Damage Repair


- (2) Nawas MK LNT Applicant - FYI

Cross Sections Nawas MK LNT Review conditions

Cross Sections Nawas MK LNT Review conditions

Page Number: 19 / 28 Transaction 11-20201082532-01-3-01-00 Report generated On:24-08-2020 01:35:


Electrical zip files Nawas MK LNT Applicant - FYI

Water zip files Nawas MK LNT Applicant - FYI

Water zip files Nawas MK LNT Applicant - FYI

Submit authorized
Detailed Layout Plans Nawas MK LNT
transaction

Submit authorized
Detailed Layout Plans Nawas MK LNT
transaction

Cross Sections Nawas MK LNT Review conditions

Cross Sections Nawas MK LNT Review conditions

Cross Sections Nawas MK LNT Applicant - FYI

Other Technical Reports Nawas MK LNT Applicant - FYI

Detailed Layout Plans Nawas MK LNT Applicant - FYI

Page Number: 20 / 28 Transaction 11-20201082532-01-3-01-00 Report generated On:24-08-2020 01:35:


Map

Project Spatial Attributes


Design Version Map Feature
1 polyline

Location
Long, Lat DEM Elevation Sharing Duct
24.24600918 , 54.67184616 False

Grid Depth (Maximum) Height (Maximum)


40R BM68,40R BM58 10

Region
Ground Level Length (Meter)
14681.02
Buffer (Meters)
20 Width (Maximum)

Shape Area
551018.86

Design Change Reason



Comments from Issuing Entities


Changes in permitting requirements

NOC Reply

Page Number: 21 / 28 Transaction 11-20201082532-01-3-01-00 Report generated On:24-08-2020 01:35:


Individual NOC ID: 3903814822866
Solution Role ADDC Assets FP Supervisor

Entity Name ADDC


NOC Reply B) NOC with Conditions
Valid 1 Years Starting from:06 - 07 - 2020 10:46:35 till 05 - 07 - 2021 10:46:35

Conditions
Implementation Conditions

Contractor should apply specific safety


measures during implementation

Contractor should apply general safety


measures during implementation

Other Conditions

Other conditions as specified in the


comments or attachments

Further NOC would be required from VIP


entities (see comments / attachments)

Individual NOC ID: 3892577295


Solution Role ADM Asset Coordination FP

Entity Name ADM


NOC Reply B) NOC with Conditions
Valid 6 Months Starting from:05 - 07 - 2020 01:35:41 till 04 - 01 - 2021 01:35:41

Conditions
Implementation Conditions

Contractor should apply general safety


measures during implementation

Other Conditions

Other conditions as specified in the


comments or attachments

Page Number: 22 / 28 Transaction 11-20201082532-01-3-01-00 Report generated On:24-08-2020 01:35:


Individual NOC ID: 38725100100001
Solution Role ADNOC HQ FP

Entity Name ADNOC HQ


NOC Reply B) NOC with Conditions
Valid 6 Months Starting from:13 - 07 - 2020 07:53:32 till 12 - 01 - 2021 07:53:32

Conditions
Other Conditions

Other conditions as specified in the


comments or attachments

Individual NOC ID: 3969024904574


Solution Role ADSSC Sewerage AD FP

Entity Name ADSSC


NOC Reply B) NOC with Conditions
Valid 6 Months Starting from:24 - 08 - 2020 01:13:34 till 23 - 02 - 2021 01:13:34

Conditions
Other Conditions

Other conditions as specified in the


comments or attachments

Page Number: 23 / 28 Transaction 11-20201082532-01-3-01-00 Report generated On:24-08-2020 01:35:


Individual NOC ID: 38725100340001
Solution Role ADTCA Tourism and Culture FP - AD and WR

Entity Name ADTCA


NOC Reply B) NOC with Conditions
Valid 1 Years Starting from:29 - 06 - 2020 09:57:40 till 28 - 06 - 2021 09:57:40

Conditions
Other Conditions

Other conditions as specified in the


comments or attachments

Individual NOC ID: 38725100190001


Solution Role DoT Right-of-Way FP - AD

Entity Name DoT


NOC Reply A) NOC with No Conditions
Valid 6 Months Starting from:05 - 07 - 2020 02:30:17 till 04 - 01 - 2021 02:30:17

Conditions
Not Relevant Project
Other notes that may enhance the business
rules as specified in the comments /
attachments

Page Number: 24 / 28 Transaction 11-20201082532-01-3-01-00 Report generated On:24-08-2020 01:35:


Individual NOC ID: 3936414860601
Solution Role Du Telecom FP

Entity Name Du
NOC Reply B) NOC with Conditions
Valid 6 Months Starting from:03 - 08 - 2020 11:44:57 till 02 - 02 - 2021 11:44:57

Conditions
Other Conditions

Other conditions as specified in the


comments or attachments

Individual NOC ID: 3906104825083


Solution Role EAD FP Supervisor

Entity Name EAD


NOC Reply B) NOC with Conditions
Valid 3 Years Starting from:07 - 07 - 2020 12:34:47 till 06 - 07 - 2023 12:34:47

Conditions
Other Conditions

Other conditions as specified in the


comments or attachments

Page Number: 25 / 28 Transaction 11-20201082532-01-3-01-00 Report generated On:24-08-2020 01:35:


Individual NOC ID: 389257231553
Solution Role Etihad Rail FP Supervisor

Entity Name Etihad Rail


NOC Reply B) NOC with Conditions
Valid 6 Months Starting from:09 - 08 - 2020 02:33:23 till 08 - 02 - 2021 02:33:23

Conditions
Other Conditions

Other conditions as specified in the


comments or attachments

Individual NOC ID: 3892572464146


Solution Role Etisalat Telecom FP - Abu Dhabi

Entity Name Etisalat


NOC Reply B) NOC with Conditions
Valid 3 Months Starting from:18 - 08 - 2020 09:38:56 till 17 - 11 - 2020 09:38:56

Conditions
Implementation Conditions

Contractor should apply specific safety


measures during implementation

Other Conditions

Other conditions as specified in the


comments or attachments

Page Number: 26 / 28 Transaction 11-20201082532-01-3-01-00 Report generated On:24-08-2020 01:35:


Individual NOC ID: 3935284859637
Solution Role GHQ Military Works and Telecom FP

Entity Name GHQ


NOC Reply B) NOC with Conditions
Valid 3 Years Starting from:22 - 07 - 2020 02:15:16 till 21 - 07 - 2023 02:15:16

Conditions
Other Conditions

Other conditions as specified in the


comments or attachments

Individual NOC ID: 38725100080001


Solution Role MCC Monitor and Control FP

Entity Name MCC


NOC Reply B) NOC with Conditions
Valid 3 Months Starting from:30 - 06 - 2020 11:47:15 till 29 - 09 - 2020 11:47:15

Conditions
Other Conditions

Other conditions as specified in the


comments or attachments

Page Number: 27 / 28 Transaction 11-20201082532-01-3-01-00 Report generated On:24-08-2020 01:35:


Individual NOC ID: 38725100280002
Solution Role Transco Infrastructure Services FP

Entity Name TRANSCO


NOC Reply B) NOC with Conditions
Valid 6 Months Starting from:01 - 07 - 2020 03:11:00 till 31 - 12 - 2020 03:11:00

Conditions
Implementation Conditions

Contractor should apply general safety


measures during implementation

Other Conditions

Other conditions as specified in the


comments or attachments

Individual NOC ID: 38725100310001


Solution Role ZonesCorp Industrial Customer Services FP

Entity Name ZonesCorp


NOC Reply A) NOC with No Conditions
Valid 6 Months Starting from:29 - 06 - 2020 01:55:49 till 28 - 12 - 2020 01:55:49

Conditions
Not Relevant Project

Such type/subtype doesn't require NOC


within the given service/activity area