Zone-1 - Modified Route Construction NOC For DN 500 Dia Line

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 26

Common NOC Report

Transaction Registry: 11-20211230902-01-3-10-00-104

Project Number: D107604_Z1_DN500

Plot Number: Abu Dhabi - AL WATHBA - QASR AL WATHBA - -

Generated By: Contractor/Nawas MK LNT ECC Division

Generated date: 16 - 09 - 2021 03:03:51 PM

Owner Name: Abu Dhabi Distribution Company

Permit Category: Utility and Infrastructure Lines Approvals

Permit Type: Utilities Underground Cables or Pipelines

Permit Sub type: Treated-Water Trunk Line

Project Stage: Construction

Construction Phase: Phase 10

Submission Date: 18 - 08 - 2021 01:25:28 PM

NOC Reply Summary


Role System Default Transaction Focal Point Reply
Distribution Coordinator
Intervention
Description

Default NOC 26 26 26
NOC Without Conditions 2
NOC With Conditions 9
Conditions to Issue NOC

Objection

In Progress 11 11

Page Number: 1 / 26 Transaction 11-20211230902-01-3-10-00 Report generated On:16-09-2021 03:03:


Municipal approval replies

ADM
Aaehsa Abdulrahman Jasem
2. Conditions for Approval 9/14/21 9:27 AM 11-20211230902-01-3-10-00
Conditions Subject to Requester Approval

Remaining required NOC(s) must be


completed (see NOC detailed report)

Issuing Entities Focal NOC Replies

System Default Focal Point


Entity Name Focal Point NOC Reply Reply Date
Action Action

8/31/21 9:19
AM
Abu Dhabi For Action
ADDC Assets FP For Action
Distribution
Supervisor B) NOC with
Company Conditions

9/16/21 1:34
PM
For Action
Municipality of Abu For Action
ADM Al Wathba FP
Dhabi City B) NOC with
Conditions

9/2/21 2:25 PM
Abu Dhabi National For Action
Oil Company ADNOC HQ FP For Action
A) NOC with No
(ADNOC) Conditions

9/5/21 12:46
PM
Abu Dhabi For Action
ADSSC Sewerage For Action
Sewerage Services
AD FP B) NOC with
Company Conditions

8/30/21 2:44
PM
Department of DCT Culture and For Action
Culture and Tourism Tourism FP - AD For Action
A) NOC with No
- Abu Dhabi and WR Conditions

Page Number: 2 / 26 Transaction 11-20211230902-01-3-10-00 Report generated On:16-09-2021 03:04:


System Default Focal Point
Entity Name Focal Point NOC Reply Reply Date
Action Action

9/2/21 10:33
AM
Emirates Integrated For Action
Telecommunication Du Telecom FP For Action
B) NOC with
Company - Du Conditions

8/30/21 2:42
Emirates PM
For Action
Telecommunication Etisalat Telecom For Action
Corporation - FP - Abu Dhabi B) NOC with
Etisalat Conditions

8/30/21 7:28
AM
UAE Armed Forces GHQ Military For Action
General Works and For Action
B) NOC with
Headquarters Telecom FP Conditions

9/7/21 10:11
AM
For Action
Integrated Transport ITC Right-of-Way For Action
Centre FP - AD B) NOC with
Conditions

9/1/21 8:37 AM
For Action
Monitoring and MCC Monitor and For Action
Control Center Control FP B) NOC with
Conditions

8/30/21 9:28
AM
Abu Dhabi Transco For Action
Transmission and Infrastructure For Action
B) NOC with
Despatch Company Services FP Conditions

Not for Action


General Directorate AD Police Telecom Not for Action
of Abu Dhabi Police FP
Default NOC

Not for Action


General Directorate AD Police Traffic Not for Action
of Abu Dhabi Police Safety FP
Default NOC

Not for Action


Abu Dhabi Ports AD Ports FP Not for Action
Default NOC

Page Number: 3 / 26 Transaction 11-20211230902-01-3-10-00 Report generated On:16-09-2021 03:04:


System Default Focal Point
Entity Name Focal Point NOC Reply Reply Date
Action Action

Not for Action


AD Ports Marine Not for Action
Abu Dhabi Ports
FP
Default NOC

ADAC Air Not for Action


Abu Dhabi Airports Not for Action
Navigation
Company
Services FP Default NOC

Abu Dhabi Not for Action


ADDC Customer Not for Action
Distribution
Services FP
Company Default NOC

Abu Dhabi Not for Action


ADDC Plot-Related Not for Action
Distribution
FP - Electrical
Company Default NOC

Abu Dhabi Not for Action


ADDC Plot-Related Not for Action
Distribution
FP - Water
Company Default NOC

Not for Action


Municipality of Abu ADM Al Shahama Not for Action
Dhabi City FP
Default NOC

Not for Action


Municipality of Abu ADM City Center Not for Action
Dhabi City FP
Default NOC

Not for Action


Municipality of Abu Not for Action
ADM Mossafah FP
Dhabi City
Default NOC

Not for Action


Municipality of Abu ADM Services Not for Action
Dhabi City Corridor FP
Default NOC

Page Number: 4 / 26 Transaction 11-20211230902-01-3-10-00 Report generated On:16-09-2021 03:04:


System Default Focal Point
Entity Name Focal Point NOC Reply Reply Date
Action Action

Not for Action


Municipality of Abu Not for Action
ADM Traffic FP
Dhabi City
Default NOC

Not for Action


Municipality of Abu ADM Zayed City Not for Action
Dhabi City FP
Default NOC

Not for Action


Abu Dhabi Maritime Not for Action
Abu Dhabi Maritime
FP
Default NOC

Not for Action


Dolphin Energy Not for Action
Dolphin Energy FP
Limited
Default NOC

Not for Action


Environment Agency Not for Action
EAD FP
- Abu Dhabi
Default NOC

Not for Action


Emirates Nuclear Not for Action
ENEC FP
Energy Corporation
Default NOC

Not for Action


Etihad Rail Etihad Rail FP Not for Action
Default NOC

Emirates Not for Action


Etisalat Telecom
Telecommunication Not for Action
FP - Western
Corporation -
Region Default NOC
Etisalat

Kizad Industrial Not for Action


Khalifa Industrial Not for Action
Customer Service
Zones Abu Dhabi
FP Default NOC

Page Number: 5 / 26 Transaction 11-20211230902-01-3-10-00 Report generated On:16-09-2021 03:04:


System Default Focal Point
Entity Name Focal Point NOC Reply Reply Date
Action Action

Not for Action


Abu Dhabi National TAQA Generation Not for Action
Energy Company FP
Default NOC

National Central Not for Action


Tabreed Cooling Not for Action
Cooling Company
FP
PJSC Default NOC

Abu Dhabi Transco Plot- Not for Action


Transmission and Related Services Not for Action
Despatch Company FP Default NOC

Higher Corporation ZonesCorp Not for Action


for Specialized Industrial Customer Not for Action
Economic Zones Services FP Default NOC

Attachments

Entity Name Type Sub Type Date

Larsen & Toubro Administrative (1) - General Affection Plan 18 - 08 - 2021 13:42:34

Page Number: 6 / 26 Transaction 11-20211230902-01-3-10-00 Report generated On:16-09-2021 03:04:


Transaction History

User Name Workflow Step Reply Reply Date Solution Role

Nawas MK LNT ECC Division Request Submitted 18 - 08 - 2021 00:00:00 Contractor

Initiate request and define


Nawas MK LNT ECC Division Request Submitted 18 - 08 - 2021 14:21:26 Contractor
data

ADDC Projects
Review and authorize Requester Authorized By
Saeed Awadh Al Menhali 18 - 08 - 2021 14:23:59 Representative -
request Requesting Entity
Water

Submit transaction after


Nawas MK LNT ECC Division working on authorized Request Submitted 26 - 08 - 2021 12:43:16 Contractor
data

ADM TP Infrastructure
Aaehsa Abdulrahman Jasem Review request and
Claim 29 - 08 - 2021 14:38:50 Permitting Eng -
Alnuaimi perform further analysis
Utilities - Area3

Initiating NOC
ADM TP Infrastructure
Aaehsa Abdulrahman Jasem Review request and Transaction by the
29 - 08 - 2021 14:39:00 Permitting Eng -
Alnuaimi perform further analysis Permitting Body Project
Utilities - Area3
Representative

Applicant Reissue For


Nawas MK LNT ECC Division 30 - 08 - 2021 13:26:50 Contractor
Information Transaction

Applicant Reissue For


Nawas MK LNT ECC Division 01 - 09 - 2021 14:46:21 Contractor
Information Transaction

ADM TP Infrastructure
Aaehsa Abdulrahman Jasem View request and replies
Claim 14 - 09 - 2021 09:24:48 Permitting Eng -
Alnuaimi of Focal Points
Utilities - Area3

Conditions Sent From


ADM TP Infrastructure
Aaehsa Abdulrahman Jasem View request and replies Permitting Body Project
14 - 09 - 2021 09:27:40 Permitting Eng -
Alnuaimi of Focal Points Representative to
Utilities - Area3
Applicant for Approval or

Review conditions entered


Applicant Reissue For
Nawas MK LNT ECC Division by Permitting body project 14 - 09 - 2021 11:08:47 Contractor
Action Transaction
representative

Page Number: 7 / 26 Transaction 11-20211230902-01-3-10-00 Report generated On:16-09-2021 03:04:


Transaction Details
Administrative Information

Contact Person Information

First Name Middle Name Third Name


Nawas MK LNT
Family Name
ECC Division

Emirate Phone Number Email


0558429314 nawasmk@lntecc.com

Organization Information

Organization Organization Name Organization Phone


CN-1001544 Larsen & Toubro 037670225

Department

Requester Information (Project Owner)


Owner Type Email
Entity customerservice@addc.ae

Entity Name Phone Number


Abu Dhabi Distribution Company +971 2 416 6000

Organization Contact

Comments

Contractor Information
License Number /

Name Phone Number Email

Page Number: 8 / 26 Transaction 11-20211230902-01-3-10-00 Report generated On:16-09-2021 03:04:


Attachments

Entity Name User Name Workflow Step Attachment Attachment Date

AD-All larsen.toubro Initiate request and Administrative (1) - Emirates ID Copy 18 - 08 - 2021
define data General

AD-All larsen.toubro Initiate request and Administrative (1) - Commercial 18 - 08 - 2021


define data General Registration Copy

AD-All larsen.toubro Initiate request and Administrative (1) - Letter of Award or 18 - 08 - 2021
define data General Appointment

AD-All larsen.toubro Initiate request and Spatial Inputs / Affection Plan 18 - 08 - 2021
define data Drawings

AD-All larsen.toubro Initiate request and Spatial Inputs / Site Plan 18 - 08 - 2021
define data Drawings

AD-All larsen.toubro Initiate request and Spatial Inputs / Key Plan 18 - 08 - 2021
define data Drawings

AD-All larsen.toubro Initiate request and Administrative (3) - Valid NOC 18 - 08 - 2021
define data Pre-requisites Certificates
Clearances

AD-All larsen.toubro Initiate request and Spatial Inputs / Project Location 18 - 08 - 2021
define data Drawings

Page Number: 9 / 26 Transaction 11-20211230902-01-3-10-00 Report generated On:16-09-2021 03:04:


Basic Transaction Information

Transaction Nature
New Project

Permit Category Permit Type Project Stage


Utility and Infrastructure Lines Approvals Utilities Underground Cables or Pipelines Construction

Construction Phase
Permit Sub type
Treated-Water Trunk Line Phase 10

Expedited

Muncipality Name District Name Community Name Road Name Plot Number

ADM AL WATHBA QASR AL WATHBA

Project Information

Project Number Project ID


D107604_Z1_DN500 162924

Project Name
ADDC?D107604 Al Ain TSE Project Package B-Z1-DN500

Project Description

Supply of recycled water along Abu Dhabi al ain truck Road - revised route zone 1 location A

Project Start Date Closure Date

18 - 08 - 2021 22 - 02 - 2022

Transaction Data

Date Owner Corresponding Number


18 - Aug - 2021

Municipal Corresponding Number

Page Number: 10 / 26 Transaction 11-20211230902-01-3-10-00 Report generated On:16-09-2021 03:04:


Authorization
Authorization entity Authorizing project representative name
ADDC Saeed Awadh Al Menhali

Granted on
8/18/21 2:23 PM

Additional Transaction Information

Transaction Specific Information


Purpose/Activity Abnormal Load (tons) Install/Move Parking Machines/Signs
0 ● No ○ Yes
Typology (Building Usage) No. of Personal NDRC
0 ● No ○ Yes
Typology (Crane) No. of Blocks Distance (from Plot)
0 10
Typology (Land Usage) No. of Cranes Length of Network (km)
0
Typology (Onshore Projects) Period (days) No. of Floors
0 0
Typology (Public Realm) Event Period (days) Date Of Completion Certificate
0
Typology (Urban Road) Population (capita) Guarantee Period (months)
0 1
Typology (Utility) Surface Area (square meters) Partial Demolition
0 0
Voltage (kV) Master Plan
Developement Type
0
Land Allocation Navigation Capacity (dwt)
Allocation 0
Date of Event Noise Absorbtion Parameter
0
Diameter (meters) Include Removal of Towers
1 ● No ○ Yes
Estimated Time for Containment Install Parking Shades

Page Number: 11 / 26 Transaction 11-20211230902-01-3-10-00 Report generated On:16-09-2021 03:04:


‫‪48‬‬ ‫‪● No‬‬ ‫‪○ Yes‬‬
‫)‪Level of Backfill (meters‬‬ ‫‪Install Shelters‬‬
‫‪● No‬‬ ‫‪○ Yes‬‬

‫‪Transaction comments and attachments‬‬

‫‪ADM‬‬
‫‪ADM Al Wathba FP‬‬
‫‪Your enclosed drawings, have being reviewed and we regret to issue‬‬
‫‪conditional NOC against your transaction, the applicant kindly requested‬‬
‫‪to provide Under taking letter, submitted / by the contractor/ owner‬‬
‫‪pledge to preserve the integrity of ADM assets and to compensate‬‬
‫‪unconditionally in case of any damaging occur to ADM Asset (storm‬‬
‫‪water, irrigation line-s & street light poles cables & plantation )at‬‬
‫‪proposed Plot, project, services route, soil investigation, maintenance‬‬
‫‪works , ,etc.‬‬
‫‪For any clarifications, don?t hesitate to contact ADM assets permit team‬‬
‫‪at MZ municipality, technical Directorate, 1std. floor Ascada Mussafah‬‬
‫‪(Eng.: Awadalkarim ) +971 2 6956499/0506156620‬‬

‫‪MCC‬‬
‫‪MCC Monitor and Control FP‬‬
‫ﻳﺮﺟﻰ ﺍﻟﺘﻔﻀﻞ ﺑﺎﻟﻌﻠﻢ ﺑﺄﻧﻪ ﻻﻣﺎﻧﻊ ﻟﺪﻳﻨﺎ ﻣﻦ ﺍﻟﺒﺪﺀ ﻓﻲ ﺍﻟﻤﻮﻗﻊ ﺍﻟﻤﺸﺎﺭ ﺇﻟﻴﻬﺎ ﻓﻲ ﺍﻟﻜﺘﺎﺏ ﺃﻋﻼﻩ ﺇﻻ ﺇﻧﻨﺎ ﻧﻮﺩ‬
‫‪:‬ﺍﻟﺘﻨﻮﻳﻪ ﻋﻠﻰ ﺿﺮﻭﺭﺓ ﺇﺗﺒﺎﻉ ﺍﻟﺸﺮﻭﻁ ﻭﺍﻟﺘﻌﻠﻴﻤﺎﺕ ﻭﺗﻮﻓﻴﺮ ﺍﻟﻤﺘﻄﻠﺒﺎﺕ ﺍﻟﺘﺎﻟﻴﺔ‬

‫‪.‬ﺍﻻﺑﺘﻌﺎﺩ ﻋﻦ ﺃﺻﻮﻝ ﻭﺧﺪﻣﺎﺕ ﻣﺸﺮﻭﻉ ﻋﻴﻦ ﺍﻟﺼﻘﺮ ﺩﻭﻥ ﺍﺧﺬ ﻣﻮﺍﻓﻘﺔ ﻣﺮﻛﺰ ﺍﻟﻤﺘﺎﺑﻌﺔ ﻭﺍﻟﺘﺤﻜﻢ ‪1.‬‬
‫ﺗﻮﻓﻴﺮ ﺍﻟﺤﻤﺎﻳﺔ ﺍﻟﻤﻨﺎﺳﺒﺔ ﻋﻨﺪ ﺍﻟﻄﻠﺐ ﻟﺠﻤﻴﻊ ﺃﺻﻮﻝ ﻭﺧﺪﻣﺎﺕ ﻣﺸﺮﻭﻉ ﻋﻴﻦ ﺍﻟﺼﻘﺮ ﺧﻼﻝ ﻣﺮﺍﺣﻞ ‪2.‬‬
‫‪.‬ﺍﻟﻤﺸﺮﻭﻉ ﺍﻹﻧﺸﺎﺋﻴﺔ ﻭﺗﺤﻤﻞ ﺍﻟﻤﺴﺆﻭﻟﻴﺔ ﺍﻟﻜﺎﻣﻠﺔ ﻋﻦ ﺃﻱ ﺃﺿﺮﺍﺭ ﻧﺎﺟﻤﺔ ﻭ ﺗﺼﺤﻴﺤﻬﺎ ﻓﻮﺭﺍً ﻭﺩﻓﻊ ﺍﻟﺘﻜﺎﻟﻴﻒ‬
‫‪.‬ﺗﻮﻓﻴﺮ ﺣﻤﺎﻳﺔ ﺑﺎﻟﺨﺮﺳﺎﻧﺔ ﺍﻷﺳﻤﻨﺘﻴﺔ ﻟﻜﺎﺑﻼﺕ ﻋﻴﻦ ﺍﻟﺼﻘﺮ ‪3.‬‬
‫‪.‬ﺗﻘﺪﻳﻢ ﺟﺪﻭﻝ ﺯﻣﻨﻲ ﻣﺤﺪﺙ ﻭﻣﻔﺼﻞ ﻟﻤﺸﺮﻭﻋﻜﻢ ﻓﻲ ﺃﻗﺮﺏ ﻭﻗﺖ ﻣﻤﻜﻦ ‪4.‬‬
‫‪.‬ﺍﻟﺘﻌﻬﺪ ﺑﺎﻟﺴﻤﺎﺡ ﻟﻤﻬﻨﺪﺱ ﻣﺮﻛﺰ ﺍﻟﻤﺘﺎﺑﻌﺔ ﻭﺍﻟﺘﺤﻜﻢ ﺑﺎﻟﺪﺧﻮﻝ ﻟﻠﻤﻮﻗﻊ ﺧﻼﻝ ﺍﻻﻋﻤﺎﻝ ‪5.‬‬
‫ﻳﺤﻖ ﻟﻤﻬﻨﺪﺱ ﻣﺮﻛﺰ ﺍﻟﻤﺘﺎﺑﻌﺔ ﻭﺍﻟﺘﺤﻜﻢ ﺇﻳﻘﺎﻑ ﺃﻱ ﺃﻋﻤﺎﻝ ﻓﻲ ﻧﻄﺎﻕ ﺍﻟﻤﺸﺮﻭﻉ ﻗﺪ ﺗﻀﺮ ﺑﺄﺻﻮﻝ ﻭﺧﺪﻣﺎﺕ ‪6.‬‬
‫‪.‬ﺍﻟﻤﺮﻛﺰ‬
‫‪.‬ﻣﺮﺍﻋﺎﺓ ﺭﺑﻂ ﺟﻤﻴﻊ ﺍﻟﻤﻤﺮﺍﺕ ﻣﻊ ﻣﺸﺮﻭﻉ ﻋﻴﻦ ﺍﻟﺼﻘﺮ ﻓﻲ ﺣﺎﻝ ﻧﻘﻞ ﺍﻻﺻﻮﻝ ‪7.‬‬
‫ﺗﺸﺘﺮﻁ ﻫﺬﻩ ﺍﻟﻤﻮﺍﻓﻘﺔ ﻋﻠﻰ ﺗﻮﻓﻴﺮ ﺟﻤﻴﻊ ﻣﺘﻄﻠﺒﺎﺕ ﻣﺮﻛﺰ ﺍﻟﻤﺘﺎﺑﻌﺔ ﻭﺍﻟﺘﺤﻜﻢ ‪8.‬‬
‫‪ aalobaidi@admcc.ae‬ﺍﻟﺘﻮﺍﺻﻞ ﻭﺍﻟﺘﻨﺴﻴﻖ ﻣﻊ ﺍﻟﻤﻬﻨﺪﺱ ‪ /‬ﺃﺣﻤﺪ ﺍﻟﻌﺒﻴﺪﻱ ﻋﻠﻰ ﺍﻟﺒﺮﻳﺪ ﺍﻻﻛﺘﺮﻭﻧﻲ ‪9.‬‬
‫ﻗﺒﻞ ﺑﺪﺀ ﺍﻟﻌﻤﻞ ﻓﻲ ﺍﻟﻤﻮﻗﻊ ‪ sheed@admcc.ae‬ﻭﺍﻟﻤﻬﻨﺪﺱ ‪ /‬ﺷﻴﺪ ﻋﺰﻳﺰ ﻋﻠﻰ ﺍﻟﺒﺮﻳﺪ ﺍﻻﻟﻜﺘﺮﻭﻧﻲ‬
‫‪.‬ﺑﻴﻮﻣﻴﻦ‬

‫"‪.‬ﻋﺪﻡ ﺍﻻﻟﺘﺰﺍﻡ ﺑﺎﻟﺸﺮﻭﻁ ﺍﻟﻤﺬﻛﻮﺭﺓ ﺃﻋﻼﻩ ﺳﻴﺒﻄﻞ ﻫﺬﻩ ﺍﻟﻤﻮﺍﻓﻘﺔ ﺍﻟﻤﺸﺮﻭﻃﺔ"‬


‫‪ ،،،‬ﻭﺗﻔﻀﻠﻮﺍ ﺑﻘﺒﻮﻝ ﻓﺎﺋﻖ ﺍﻹﺣﺘﺮﺍﻡ‬

‫‪TRANSCO‬‬
‫‪Transco Infrastructure Services FP‬‬

‫‪Page Number: 12 /‬‬ ‫‪26‬‬ ‫‪Transaction‬‬ ‫‪11-20211230902-01-3-10-00‬‬ ‫‪Report generated On:16-09-2021 03:04:‬‬
Dear Applicant
Please be informed that according to your marked location on the ENOC
system, we have No Objection for your work as we have no existing
water or power transmission lines within your project area.
Also, please contact before the start of your works at site our
Consultants, M/s.TRACTEBEL ENGINEERING CONSULTANCY,Tel.No.
02 6794615, Abu Dhabi. M/s.Mott Macdonalds .,Tel.No. 02 4457470 ,
Abu Dhabi. M/s.Tebodin M.E.,Tel.No. 02 4066000, Abu Dhabi. M/s.
ENERGO CONSULT L.L.C. .,Tel.No. 02 6763554, Abu Dhabi. M/s. WSP
| Parsons Brinckerhoff Limited,Tel.No. 02 6529222, Abu Dhabi.for details
of Transmission lines being constructed/will be constructed under their
supervision.

ADDC
ADDC Assets FP Supervisor

1. You are fully responsible to propose additional requirements for


relocation/protection of existing ADDC assets found during the
construction stage, which are not included in the NOC given by the
ADDC, the same shall be submitted for review and approval prior to
execution.
2. You have to liaise with all the concerned developers in your
project area to get their approval to avoid any conflict with their
developments.
3. Thick Protection slaps above electrical cables are not accepted,
in case the cables are in footpath/tiles area concrete tiles 5*25*50cm
with warning tapes to be used as per ADDC standards.
4. Before starting any site activities in the vicinity of ADDC Assets
You shall obtain PTW (Permit To Work) / LAP from
Water/Electricity/Recycled Water O&M Divisions. If you do not obtain the
subject PTW/LAP, you shall be penalized as per ADDC rules and
regulations and the granted NOC will be considered not valid.
5. You have to comply with ADDC Guidelines for
Protection/Relocation of Water/Electricity/Recycled Water Assets (copy
from Guidelines submitted to you along with NOI). In case there is any
deviation, you have to raise the issue to get approval for the subject
deviation.
6. You have to follow ADDC HSEQ guidelines (GL.GN.06 Issue
01 dated 01/09/2013) during any construction works in vicinity/crossing
ADDC assets. Only approved competent safety officer allowed to work in
vicinity of ADDC assets with supervision of the consultant staff and
coordination with O&M Engineer, (copy from Guidelines submitted to you
along with NOI).
7. All the protection/relocation works on ADDC assets shall be
carried out as per DOE/ADDC Standards and Specifications and through
an ADDC approved Contractor for such works and in coordination with
the concerned ADDC O&M Engineer. In case of relocation / cancellation
of ADDC Assets, you shall exhume the cancelled assets and return them
back to ADDC stores under full supervision of ADDC O&M Engineer.
8. During exposing of existing ADDC water/Recycled Water
Pipelines not more than one joint to be exposed and provide proper
support for the joint.
9. You shall not operate any of the ADDC assets within the limit of
Contract.
10. No heavy equipment shall be moved over ADDC Assets without
proper protection and under supervision of the concerned O&M staff.
11. It is not allowed to excavate at any concrete thrust blocks for
the DI Bends/Tees unless getting PMT/LAP from the concerned ADDC
O&M Engineer.

Page Number: 13 / 26 Transaction 11-20211230902-01-3-10-00 Report generated On:16-09-2021 03:04:


12. 24x7 access shall be provided to ADDC O&M staff and vehicles
for any O&M emergency or planned works within the limit of
construction. The Developer contractor shall remove any site
obstruction/Construction materials to access ADDC asset within the limit
of construction and no construction materials shall be stacked over
ADDC assets.
13. Existing underground services shall be identified/tracing
properly using suitable approved calibrated devices. You shall conduct
manual trial excavations prior to start any machine excavation work to
verify ADDC Asset Depth to avoid any damage to ADDC Assets. After
confirming the exact level of the assets, cross section drawings to be
revisited and updated in coordination with the concerned ADDC O&M
Engineer.
14. It is not allowed to keep cable joints inside or near the proposed
split duct.
15. Indication plate to be installed in each side of the proposed
extended split ducts/new ducts.
16. Any modification/relocation/protection of ADDC assets shall be
carried out by ADDC approved contractors as per ADDC procedures and
specifications in coordination with O&M staff.
17. You will bear the full responsibility in case of any damage to
ADDC assets within your project area. You shall contact ADDC
Customers Service center (8002332) informing them about the subject
damage.
18. In case of any NDRC/Directional drilling works, you have to
make trial pits to reach to ADDC assets and know asset depth before
commencement of your work to avoid any damage.
19. You have to reinstate th

Etisalat
Etisalat Telecom FP - Abu Dhabi
Your proposed work should be carried out in compliance with the notes
given below and the attached Guidelines Annexure 1 & 2, stating safety
precautions, Contractors responsibilities to be followed from your side
prior to and during the proposed work at site.
During the construction period contractor need to submit all required
detailed drawing to Etisalat Plant Protection Office for site verification.
Moreover, your works program/schedule of proposed works should be
submitted to Etisalat Plant Protection office (Telephone 02 ?
6162728,0505794949) well in advance of commencement of any for
their information & co-ordination.
Locate the entire existing telecom network at site where your proposed
works crossing Etisalat telecom network or running parallel and provide
Marker post tied with Etisalat warning tape at the intervals of 100m to
indicate the presence of Etisalat network at the project area.

Signboard to be installed on existing Etisalat network to indicate the


presence of Etisalat Network to avoid chances of getting network
damage. In this regard, please find attached standard drawing no.
ETC/PPO/1001/18 showing the specifications of warning sign board.

Construction vehicle moving area to be protected with 10cm thick


concrete.

Mechanical excavation is not allowed near to Etisalat telecom network


and all excavations are to be carried out manually.

Contractor has to arrange un-interrupted any time access to our


operational team to access the telecom joint boxes that are falling inside
the area of construction / LOC.

Page Number: 14 / 26 Transaction 11-20211230902-01-3-10-00 Report generated On:16-09-2021 03:04:


Protection and method statement should be submitted to Plant
Protection Office before starting works activities.
Our existing telephone plant found nearest your works activity make trial
pit excavation (copy attached) and submit accordingly for approval.
Etisalat service corridor shall be not be affected due to any type of
activities and the contractor/consultant shall hold full responsibility in
case of Etisalat service disturbance.
Likewise, any damage inflicted on existing Telephone plant during the
course of your works will be dealt as per prevailing damage claims
procedures.
Existing Telephone duct that falls under newly paved area or areas
disturbed by your works are to be tested and if any damage/blockage
noticed, should be rectified.
Etisalat requirement to take precautionary measures for existing
Telecom line plant at junction/road crossing points while executing the
work at site.
Contractor will be liable to pay any damage caused during the
construction works in this area.
Please note that, the contractor shall be held liable for any accidental
damage happens to the existing telephone plant during the course of
works and any damage claims will be dealt as per the prevailing
procedures and it?s to be ?Deliberate category? case.

Du
Du Telecom FP
Please provide us the following:
1. Detail CAD file (2010) of proposed work (pipeline and corridor)
ONLY (without existing work or base map) following projection UTM
WGS84 ZONE 40.
2. Fill du application form.

ITC
ITC Right-of-Way FP - AD
The granting of this NOC does not absolve the applicant from the
responsibility of third party damage.
It is mandatory to obtain Traffic Detour Permit from Traffic Management
Division in the Integrated Transport Centre through the online service in
ITC website https://dot.gov.abudhabi/ar/services/Road_Work_Permit
prior to commencement of any works within the Right Of Way to avoid
Fines and Violations as per the Issued Executive Regulation for Traffic
Detours in the Emirate of Abu Dhabi. For further information or inquiries
please contact number 80088888.
All safety measures must be considered and the Traffic Management
and Safety Plan must be reviewed and approved by Abu Dhabi Police.
No Roads shall be closed without prior permission from the ITC.

No ITC assets are to be relocated or removed without prior approval of


ITC.
subject to no impact on existing bus services and its bus stop
infrastructure

Page Number: 15 / 26 Transaction 11-20211230902-01-3-10-00 Report generated On:16-09-2021 03:04:


ADSSC
ADSSC Sewerage AD FP
Reviewed by: Eng. Zayed Al Areefi
Incomplete Documents, Please Submit:
- New ADSSC undertaking letter (fill the undertaking letter form as
described, and if the form is not filled completely, it will not be accepted)
(Attached)

- Clear and colored proposed drawing (show your proposed work,


legends, coordinates ?in zone 40 for Al Dhafrah Region? and contractor
information as PDF)

- (CAD WGS84 2010, the CAD should be single lines for the proposed
work only) *coordinates ?in zone 40 for Al Dhafrah Region?*

Note:
- Submit all ADSSC requirements (undertaking letter + proposed
drawings CAD & PDF) in compressed file name it ADSSC.

GHQ
GHQ Military Works and Telecom FP
‫ﻻﻣﺎﻧﻊ ﻟﺪﻳﻨﺎ ﺑﺸﺮﻁ ﺍﻹﻟﺘﺰﺍﻡ ﺑﺎﻟﻤﺨﻄﻂ ﺍﻟﻤﺮﻓﻖ ﻭﻋﺪﻡ ﺗﺠﺎﻭﺯ ﺍﻟﻤﺴﺎﺣﺔ ﺍﻟﻤﻄﻠﻮﺑﺔ ﻭﺍﻹﻟﺘﺰﺍﻡ ﺑﺎﻹﺣﺪﺍﺛﻴﺎﺕ‬
‫ﺍﻟﻤﺮﻓﻘﺔ ﻓﻘﻂ ﻭﻓﻲ ﺣﺎﻟﺔ ﻣﺨﺎﻟﻔﺔ ﺫﺍﻟﻚ ﺗﺘﺤﻤﻞ ﺍﻟﺸﺮﻛﺔ ﺍﻟﻤﻨﻔﺬﺓ ﻛﺎﻓﺔ ﺍﻟﻤﺴﺆﻭﻟﻴﺔ ﻓﻲ ﺣﺎﻝ ﻭﺟﻮﺩ ﺃﻱ ﺿﺮﺭ‬
. ‫ﻳﺤﺪﺙ ﻟﺨﺪﻣﺎﺕ ﺍﻟﻘﻮﺍﺕ ﺍﻟﻤﺴﻠﺤﺔ‬

ADNOC
ADNOC HQ FP
Please be informed that we have reviewed your request together with
submitted enclosures and have No Objection for the proposed works.
This NOC is for ADNOC assets protection only and you are requested to
approach other government sectors and utilities providers for their NOCs
and Permits. Any change to the proposed work needs to be referred
back to us for our review.

ADSSC
ADSSC Sewerage AD FP

‫ ﻳﺮﺟﻰ ﻣﺮﺍﺟﻌﺔ ﺷﺮﻛﺔ ﺃﺑﻮ ﻇﺒﻲ ﻟﺨﺪﻣﺎﺕ ﺍﻟﺼﺮﻑ ﺍﻟﺼﺤﻲ ﺇﺩﺍﺭﺓ ﺍﻟﺘﺸﻐﻴﻞ ﻭ ﺍﻟﺼﻴﺎﻧﺔ ﻭﺫﻟﻚ ﻟﻤﺮﺍﺟﻌﺔ‬.1
.‫ﻣﻘﺘﺮﺣﻜﻢ ﻭﺫﻟﻚ ﻗﺒﻞ ﺑﺪﺀ ﺍﻟﻌﻤﻞ‬
‫ ﻳﺮﺟﻰ ﻣﺮﺍﺟﻌﺔ ﺑﻠﺪﻳﺔ ﻣﺪﻳﻨﺔ ﺃﺑﻮ ﻇﺒﻲ ?ﺇﺩﺍﺭﺓ ﺍﻟﺤﺪﺍﺋﻖ ﻭ‬،‫ ﺑﺨﺼﻮﺹ ﺧﺪﻣﺎﺕ ﺻﺮﻑ ﻣﻴﺎﻩ ﺍﻷﻣﻄﺎﺭ‬.2
.‫ﺍﻟﻤﻨﺘﺰﻫﺎﺕ ﺍﻟﺘﺮﻓﻴﻬﻴﺔ? ﺣﻴﺚ ﺃﻥ ﺷﺮﻛﺔ ﺃﺑﻮﻇﺒﻰ ﻟﺨﺪﻣﺎﺕ ﺍﻟﺼﺮﻑ ﺍﻟﺼﺤﻲ ﻏﻴﺮ ﻣﺴﺌﻮﻟﺔ ﻋﻨﻬﺎ‬
‫ ﻣﺮﻓﻖ ﻃﻴﻪ ﻣﺠﻤﻮﻋﺔ ﻭﺍﺣﺪﺓ ﻣﻦ ﻣﺨﻄﻄﺎﺕ ﺍﻟﺨﺪﻣﺎﺕ ﺍﻟﺘﻔﺼﻴﻠﻴﺔ ﺣﺴﺐ ﺍﻟﻤﻨﻔﺬ ﺗﻮﺿﺢ ﺍﻟﻤﻮﺍﻗﻊ ﺍﻟﺘﻘﺮﻳﺒﻴﺔ‬.3
‫ﻟﺨﻄﻮﻁ ﺍﻟﺼﺮﻑ ﺍﻟﺼﺤﻲ ﻭ ﺍﻟﻤﺎﻧﻬﻮﻻﺕ ﺍﻟﺘﺎﺑﻌﺔ ﻟﻬﺬﺍ ﺍﻟﻘﺴﻢ ﻣﻊ ﺟﺪﻭﻝ ﻭﺍﺣﺪ ﻳﻮﺿﺢ ﺃﺭﻗﺎﻡ ﻫﺬﻩ ﺍﻟﻤﺨﻄﻄﺎﺕ‬
.‫ ﻭﻋﻠﻴﻜﻢ ﺗﺤﺪﻳﺪ ﺍﻟﻤﻮﺍﻗﻊ ﺑﺪﻗﺔ ﻋﻠﻲ ﺃﺭﺽ ﺍﻟﻮﺍﻗﻊ ﻗﺒﻞ ﺑﺪﺀ ﺍﻟﻌﻤﻞ‬،
‫ ﻣﺘﺮ? ﻋﻠﻲ ﻛﻼ ﺟﺎﻧﺒﻲ ﺧﻄﻮﻁ ﺍﻟﺼﺮﻑ ﺍﻟﺼﺤﻲ‬10? ‫ ﻳﺤﻈﺮ ﺍﻟﻘﻴﺎﻡ ﺑﺄﻱ ﺃﻋﻤﺎﻝ ﺇﻧﺸﺎﺋﻴﺔ ﻓﻲ ﺣﺪﻭﺩ‬.4
‫ﺍﻟﻤﻮﺿﺤﺔ ﺑﻤﺨﻄﻄﺎﺕ ﺍﻟﺨﺪﻣﺔ ﺍﻟﺘﻔﺼﻴﻠﻴﺔ ﺍﻟﻤﺮﻓﻘﺔ‬
:‫ ﻳﺠﺐ ﺍﻻﻟﺘﺰﺍﻡ ﺑﺎﻟﻤﻼﺣﻈﺎﺕ ﺍﻵﺗﻴﺔ ﺃﺛﻨﺎﺀ ﺃﺩﺍﺀ ﺍﻟﻌﻤﻞ ﺍﻟﻤﻘﺘﺮﺡ‬.5

Page Number: 16 / 26 Transaction 11-20211230902-01-3-10-00 Report generated On:16-09-2021 03:04:


- ‫ ﺃﻣﺘﺎﺭ? ﻋﻠﻲ ﺟﺎﻧﺒﻲ ﺧﻄﻮﻁ ﺍﻟﺨﺪﻣﺎﺕ ﺍﻟﺘﺎﺑﻌﺔ ﻟﺸﺮﻛﺔ‬3 ? ‫ﻳﺠﺐ ﺇﺗﺒﺎﻉ ﺇﺳﻠﻮﺏ ﺍﻟﺤﻔﺮ ﺍﻟﻴﺪﻭﻱ ﻓﻲ ﺣﺪﻭﺩ‬
‫ﺃﺑﻮﻇﺒﻰ ﻟﺨﺪﻣﺎﺕ ﺍﻟﺼﺮﻑ ﺍﻟﺼﺤﻲ‬.
- ‫ﻳﺤﻈﺮ ﻣﺮﻭﺭ ﺍﻵﻟﻴﺎﺕ ﻭ ﺍﻟﻤﻌﺪﺍﺕ ﺍﻟﺜﻘﻴﻠﺔ ﻋﺒﺮ ﺧﻄﻮﻁ ﺍﻟﺨﺪﻣﺎﺕ ﺍﻟﺘﺎﺑﻌﺔ ﻟﺸﺮﻛﺔ ﺃﺑﻮﻇﺒﻰ ﻟﺨﺪﻣﺎﺕ ﺍﻟﺼﺮﻑ‬
‫ﺍﻟﺼﺤﻲ ﺑﺎﺳﺘﺜﻨﺎﺀ ﺍﻟﻤﻮﺍﻗﻊ ﺍﻟﻤﻌﻴﻨﺔ ﺑﺸﻜﻞ ﻣﺤﺪﺩ‬.
- ‫ ﻣﺘﺮ? ﻋﻠﻲ ﻛﻼ ﺟﺎﻧﺒﻰ ﺧﻄﻮﻁ ﺍﻟﺨﺪﻣﺎﺕ‬50? ‫ﻳﺤﻈﺮ ﺍﻟﻘﻴﺎﻡ ﺑﺄﻱ ﺃﻋﻤﺎﻝ ﻧﺰﺡ ﻟﻠﻤﻴﺎﻩ ﺍﻟﺠﻮﻓﻴﺔ ﻓﻲ ﺣﺪﻭﺩ‬
‫ﺍﻟﺘﺎﺑﻌﺔ ﻟﺸﺮﻛﺔ ﺃﺑﻮﻇﺒﻰ ﻟﺨﺪﻣﺎﺕ ﺍﻟﺼﺮﻑ ﺍﻟﺼﺤﻲ‬.
- ‫ ﻣﺘﺮ? ﻳﺘﻌﻴﻦ ﺍﻟﺤﺼﻮﻝ ﻋﻠﻲ ﺗﺼﺪﻳﻘﻨﺎ ﻋﻠﻲ ﺇﺳﻠﻮﺏ ﺣﻤﺎﻳﺔ ﺧﻄﻮﻁ‬2.5?‫ﺇﺫﺍ ﺗﺠﺎﻭﺯ ﻋﺮﺽ ﺍﻟﺨﻨﺪﻕ‬
‫ﺍﻟﺨﺪﻣﺎﺕ ﺍﻟﺘﺎﺑﻌﺔ ﻟﺸﺮﻛﺔ ﺃﺑﻮﻇﺒﻰ ﻟﺨﺪﻣﺎﺕ ﺍﻟﺼﺮﻑ ﺍﻟﺼﺤﻲ‬.
- ‫ﻋﻠﻴﻜﻢ ﺇﻋﺎﺩﺓ ﺍﻟﻤﻮﻗﻊ ﺇﻟﻲ ﺣﺎﻟﺘﻪ ﺍﻷﻭﻟﻴﺔ ﻋﻠﻲ ﻧﻔﻘﺘﻜﻢ ﺍﻟﺨﺎﺻﺔ‬.
- ‫ﺿﺮﻭﺭﺓ ﻣﺮﺍﺟﻌﺔ ﺷﺮﻛﺔ ﺃﺑﻮﻇﺒﻰ ﻟﺨﺪﻣﺎﺕ ﺍﻟﺼﺮﻑ ﺍﻟﺼﺤﻲ ? ﻗﻄﺎﻉ ﺍﻟﺘﺸﻐﻴﻞ ﻭ ﺍﻟﺼﻴﺎﻧﺔ ﻗﺒﻞ ﺍﻟﺒﺪﺀ ﺑﺄﻱ‬
‫ﺃﻋﻤﺎﻝ ﺑﺎﻟﻤﺸﺮﻭﻉ ﻟﻠﻤﺘﺎﺑﻌﺔ‬
7. ‫ﺑﺨﺼﻮﺹ ﺷﺒﻜﺔ ﺍﻟﺮﻱ ﻳﺮﺟﻰ ﻣﺮﺍﺟﻌﺔ ﺷﺮﻛﺔ ﺃﺑﻮﻇﺒﻲ ﻟﻠﺘﻮﺯﻳﻊ ﻟﻠﺤﺼﻮﻝ ﻋﻠﻰ ﺷﻬﺎﺩﺓ ﻋﺪﻡ ﺍﻟﻤﻤﺎﻧﻌﺔ‬
‫ﺣﻴﺚ ﺃﻥ ﺷﺮﻛﺔ ﺃﺑﻮﻇﺒﻲ ﻟﺨﺪﻣﺎﺕ ﺍﻟﺼﺮﻑ ﺍﻟﺼﺤﻲ ﻏﻴﺮ ﻣﺴﺌﻮﻟﺔ ﻋﻨﻬﺎ‬.
8. ‫ﻳﺠﺐ ﺍﺗﺒﺎﻉ ﻣﻌﺎﻳﻴﺮ ﻭﻣﻮﺍﺻﻔﺎﺕ ﺷﺮﻛﺔ ﺍﺑﻮﻇﺒﻲ ﻟﺨﺪﻣﺎﺕ ﺍﻟﺼﺮﻑ ﺍﻟﺼﺤﻲ ﺑﺸﺎﻥ ﺟﻤﻴﻊ ﺍﻷﻋﻤﺎﻝ ﺍﻟﻤﺘﻌﻠﻘﺔ‬
‫ ﺍﻟﺦ( ﻗﺒﻞ ﺍﻟﺒﺪﺀ ﺑﺄﻱ ﺃﻋﻤﺎﻝ ﻓﻲ‬،‫ ﺍﻟﺤﻤﺎﻳﺔ‬،‫ ﺍﻟﻤﻨﺎﺳﻴﺐ‬،‫ﺑﺸﺒﻜﺔ ﺍﻟﺼﺮﻑ ﺍﻟﺼﺤﻲ ) ﺧﻄﻮﻁ ﺍﻟﺼﺮﻑ ﺍﻟﺼﺤﻲ‬
‫ﺍﻟﻤﻮﻗﻊ‬.

1. To send the proposal for review to ADSSC Operations and


Maintenance Division before the commencement of any work.
2. For issues related to Storm Water services, please contact ?PRFD ?
Abu Dhabi Municipality? as ADSSC is not be responsible of such issues.
3. Enclosed herewith one set of detailed sewerage service?s As Built
drawings showing proximity locations, associated with a table that
indicates drawings numbers. However this does not relieve the
applicant(s) to confirm the same on actual ground before
commencement of any works.
4. No construction work is permitted within a limit of 10 Meters on either
side of our existing services which are highlighted on our attached As
Built drawings.
5.Following particular comments need to be adhered while performing
proposed works:-
-Excavation should be carried out by hand tools, within a distance of 3
meters on either side of the existing ADSSC services.
-We prohibit the movement of machinery and heavy equipment across
the lines or any other ADSSC assets, except where the safe passage is
designated.
-We prohibit dewatering within the limit of 50 meters on either side of our
pipeline or any other ADSSC assets.
-If the trench width exceeds 2.5 meters then it is a must to obtain
ADSSC?s approval for method deployed for protecting ADSSC
pipelines.
-To reinstate the site to its original form and shape at your own cost.
-Before you start the work, it is required to invite our site audit team of O
& M Division at the site for any intricacy, incase such a demand arises.
6. For all TSE line they have to take NOC and PTW from ADDC
7. For issues related to Irrigation services, please contact ?ADDC? as
ADSSC is not be responsible of such issues.
8. For any works related to sewerage network (proposed/modification)
should be done as per ADSSC standard specifications with submitting
method statement & drawings in details case by case before start any
work in the site.

Du
Du Telecom FP
This NOC given refer to CAD file (Zone-1 Location-A Route Only).

Page Number: 17 / 26 Transaction 11-20211230902-01-3-10-00 Report generated On:16-09-2021 03:04:


ADM
ADM Al Wathba FP
1- This approval is valid for 6 months only.
2- Any minor or major changes during the construction will cancel
this NOC and you should obtain new NOC request.
3- This NOC issued depending on GIS layers and ADM Makani
program and any observed line or conflict with ADM Assets on the field
you should inform ADM and the owner should take the responsibility to
Relocate or protect the lines/Assets under his cost.
4- Submit a permits in the IPS System for the Following (Asphalt
cutting, Tile Lifting, NDRC, Soft/ Hard Landscape, Storm Water,
Installing Temporary Container, Temporary Sign Board, Temporary
Hump, SCADA integration, Loading And Offloading of Excavation
Material, Loading And Offloading of Quaries Material, street Light, Mobile
Crane, General Bank Guarantee Release, Earthwork Clearance
Certificate) throw this link: https://ips.adm.gov.ae/.
5- Approve any required relocation/protection/Connection for
storm water/street light or lines VIA IDAS SYSTEM.(forgit VIA External
Centers)
6- Coordinating with ADM Consultant if there any conflicts with
ADM Musanada projects.
7- Any required detours/ramps should be approved online by
DOT.
8- All ADM Specifications and Quality directory should applied.
9- Safety assurance should applied during the work.
10- GET A FINAL APPROVAL FROM THE DEVELOPER IT THE
AREA STILL UNDER HIS CUSTODY.
11- The Consultant should fill UP the attached form and upload it in
the system.

Attachment Attachment Type Uploaded By Upload Step

Submit authorized
Spatial Inputs / Drawings Electrical zip files Nawas MK LNT
transaction

Submit authorized
Spatial Inputs / Drawings Water zip files Nawas MK LNT
transaction

Submit authorized
Spatial Inputs / Drawings Key Plan Nawas MK LNT
transaction

Administrative (3) - Pre-requisites Submit authorized


Design NOC Approval Nawas MK LNT
Clearances transaction

Attachment Attachment Type Uploaded By Upload Step

Cross Sections Nawas MK LNT Applicant - FYI

Page Number: 18 / 26 Transaction 11-20211230902-01-3-10-00 Report generated On:16-09-2021 03:04:


Other Drawings Nawas MK LNT Applicant - FYI

Undertaking for Damage Repair Submit authorized


- (2) Nawas MK LNT
transaction

Location Plan or Map Nawas MK LNT Applicant - FYI

Standards Details Drawing Nawas MK LNT Applicant - FYI

Page Number: 19 / 26 Transaction 11-20211230902-01-3-10-00 Report generated On:16-09-2021 03:04:


Map

Project Spatial Attributes


Design Version Map Feature
1 polyline

Location
Long, Lat DEM Elevation Sharing Duct
24.23450648 , 54.72576129 False

Grid Depth (Maximum) Height (Maximum)


40R BM68 8

Region
Ground Level Length (Meter)
114.06
Buffer (Meters)
20 Width (Maximum)

Shape Area
5511.06

Design Change Reason



Comments from Issuing Entities


Changes in permitting requirements

NOC Reply

Page Number: 20 / 26 Transaction 11-20211230902-01-3-10-00 Report generated On:16-09-2021 03:04:


Individual NOC ID: 45552100060001
Solution Role ADDC Assets FP Supervisor

Entity Name ADDC


NOC Reply B) NOC with Conditions
Valid 1 Years Starting from:31 - 08 - 2021 09:19:31 till 30 - 08 - 2022 09:19:31

Conditions
Implementation Conditions

Contractor should apply specific safety


measures during implementation

Contractor should apply general safety


measures during implementation

Other Conditions

Other conditions as specified in the


comments or attachments

Further NOC would be required from VIP


entities (see comments / attachments)

Individual NOC ID: 4602415672716


Solution Role ADM Al Wathba FP

Entity Name ADM


NOC Reply B) NOC with Conditions
Valid 6 Months Starting from:16 - 09 - 2021 01:34:44 till 15 - 03 - 2022 01:34:44

Conditions
Implementation Conditions

Contractor should apply general safety


measures during implementation

Other Conditions

Other conditions as specified in the


comments or attachments

Page Number: 21 / 26 Transaction 11-20211230902-01-3-10-00 Report generated On:16-09-2021 03:04:


Individual NOC ID: 45552100100001
Solution Role ADNOC HQ FP

Entity Name ADNOC


NOC Reply A) NOC with No Conditions
Valid 6 Months Starting from:02 - 09 - 2021 02:25:52 till 01 - 03 - 2022 02:25:52

Conditions
Not Relevant Project
Other notes that may enhance the business
rules as specified in the comments /
attachments

Individual NOC ID: 4579965646927


Solution Role ADSSC Sewerage AD FP

Entity Name ADSSC


NOC Reply B) NOC with Conditions
Valid 6 Months Starting from:05 - 09 - 2021 12:46:28 till 04 - 03 - 2022 12:46:28

Conditions
Other Conditions

Other conditions as specified in the


comments or attachments

Page Number: 22 / 26 Transaction 11-20211230902-01-3-10-00 Report generated On:16-09-2021 03:04:


Individual NOC ID: 45552100340001
Solution Role DCT Culture and Tourism FP - AD and WR

Entity Name DCT


NOC Reply A) NOC with No Conditions
Valid 1 Years Starting from:30 - 08 - 2021 02:44:56 till 29 - 08 - 2022 02:44:56

Conditions
Not Relevant Project
Other notes that may enhance the business
rules as specified in the comments /
attachments

Individual NOC ID: 4579965646926


Solution Role Du Telecom FP

Entity Name Du
NOC Reply B) NOC with Conditions
Valid 6 Months Starting from:02 - 09 - 2021 10:33:52 till 01 - 03 - 2022 10:33:52

Conditions
Other Conditions

Other conditions as specified in the


comments or attachments

Page Number: 23 / 26 Transaction 11-20211230902-01-3-10-00 Report generated On:16-09-2021 03:04:


Individual NOC ID: 4573012464146
Solution Role Etisalat Telecom FP - Abu Dhabi

Entity Name Etisalat


NOC Reply B) NOC with Conditions
Valid 3 Months Starting from:30 - 08 - 2021 02:42:30 till 29 - 11 - 2021 02:42:30

Conditions
Implementation Conditions

Contractor should apply specific safety


measures during implementation

Other Conditions

Other conditions as specified in the


comments or attachments

Individual NOC ID: 45552100260001


Solution Role GHQ Military Works and Telecom FP

Entity Name GHQ


NOC Reply B) NOC with Conditions
Valid 3 Years Starting from:30 - 08 - 2021 07:28:55 till 29 - 08 - 2024 07:28:55

Conditions
Other Conditions

Other conditions as specified in the


comments or attachments

Page Number: 24 / 26 Transaction 11-20211230902-01-3-10-00 Report generated On:16-09-2021 03:04:


Individual NOC ID: 45552100190001
Solution Role ITC Right-of-Way FP - AD

Entity Name ITC


NOC Reply B) NOC with Conditions
Valid 3 Years Starting from:07 - 09 - 2021 10:11:56 till 06 - 09 - 2024 10:11:56

Conditions
Next Stage Clearances

Further Permit-to-Work from O&M


Department is NOT required

Individual NOC ID: 45552100080001


Solution Role MCC Monitor and Control FP

Entity Name MCC


NOC Reply B) NOC with Conditions
Valid 3 Months Starting from:01 - 09 - 2021 08:37:55 till 30 - 11 - 2021 08:37:55

Conditions
Other Conditions

Other conditions as specified in the


comments or attachments

Page Number: 25 / 26 Transaction 11-20211230902-01-3-10-00 Report generated On:16-09-2021 03:04:


Individual NOC ID: 45552100280002
Solution Role Transco Infrastructure Services FP

Entity Name TRANSCO


NOC Reply B) NOC with Conditions
Valid 6 Months Starting from:30 - 08 - 2021 09:28:49 till 27 - 02 - 2022 09:28:49

Conditions
Implementation Conditions

Contractor should apply general safety


measures during implementation

Other Conditions

Other conditions as specified in the


comments or attachments

Page Number: 26 / 26 Transaction 11-20211230902-01-3-10-00 Report generated On:16-09-2021 03:04: