Professional Documents
Culture Documents
MALE AND FEMALE DORMITORY-aug
MALE AND FEMALE DORMITORY-aug
MALE AND FEMALE DORMITORY-aug
580 600 600 ±397 600 600 600 600 ±63 ±323 600 600 ±267
CL OF DOOR
500
600
2500
MALE TOILET 600
3000
600 A
±500
200
1800 ±298
600
8600
600
600
600
5295
B 600
600
600
197
580 600 600 600 600 600 600 600 600 600 600 290
C
NOTE: THE DIMESION SEE IN DRAWING IS ACTUAL MEASUREMENT
BASEMENT 2
MALE LOCKER SHOWER AND TOILET
A1 DETAILED PLAN
PROJECT TITLE GENERAL CONTRACTOR OWNER SHEET CONTENTS DRAWING STATUS DRAWING NO. DWG. INFORMATION
PREMIER RESIDENCES
STAGES CORPORATION PROPOSED TILING LAYOUT SHOP DRAWING PACKAGE
BBH -WD-2019-001
ISSUED BY:
DATE:
32nd Floor ROBINSONS-EQUITABLE TOWER, ADB AVENUE,
ORTIGAS CENTER, PASIG CITY
ARCHITECTURAL WORKS PACKAGE CHECKED BY:
SAN MIGUEL AVENUE cor. LOURDES ST. ORTIGAS CENTER MANDALUYONG CITY