Project Management KPIs 1667665878
Project Management KPIs 1667665878
Project
Management KPIs
# Earned man-hours % Delivery deadlines met % Project resource utilization # Schedule performance index (SPI) # Cost
schedule index (CSI) % Project budget variance at project end # To complete schedule performance index (TSPI) % Timely
production of management reports % Project schedule variance # Project issues identified % Order value variance from
original contract value # Conflicts arising during the project # To complete performance index (TCPI) % Overdue project tasks
$ Estimate at completion (EAC) # Cost performance index (CPI) % Requirements changed during project execution $ Cost
variance # Project delay # Time per project task $ Actual cost of work performed (ACWP) $ Budgeted cost of work performed
(BCWP) # Third party non-conformity identified during inspections % Project milestones missed % Project completion
predictability # Earned man-hours % Delivery deadlines met % Project resource utilization # Schedule performance index
(SPI) # Cost schedule index (CSI) % Project budget variance at project end # To complete schedule performance index
(TSPI) % Timely production of management reports % Project schedule variance # Project issues identified % Order value
variance from original contract value # Conflicts arising during the project # To complete performance index (TCPI) %
Overdue project tasks $ Estimate at completion (EAC) # Cost performance index (CPI) % Requirements changed during
project execution $ Cost variance # Project delay # Time per project task $ Actual cost of work performed (ACWP) $
Budgeted cost of work performed (BCWP) # Third party non-conformity identified during inspections % Project mileston
This report is the result of primary research conducted by the KPI Institute. It is available in PDF format on the smartKPIs.com
website. Terms of use available at: http://www.smartkpis.com/terms-of-use.html (‘Premium content terms’).
Indemnity statement
The KPI Institute has taken due care in preparing the analysis contained in this report. However, noting that some of the data
used for the analysis has been provided by third parties, The KPI Institute gives no warranty to the accuracy, reliability, fitness
for purpose, or otherwise of the information. The KPI Institute shall have no liability for errors, omissions or inadequacies in the
information contained herein or for interpretations thereof. The opinions expressed herein are subject to change without notice.
For the latest version of the documentation, smartKPIs Premium should be consulted.
Published by:
www.kpiinstitute.org | www.smartKPIs.com
Table of Contents
page 2 Executive Summary
3 About Key Performance Indicators (KPIs)
4 KPIs ... Naturally
6 smartKPIs.com Community Profile
8 2011-2012 smartKPIs.com Functional Areas Taxonomy
9 2011-2012 smartKPIs.com Industries Taxonomy
10 KPI Documentation Form Explained
12 Project Management as a Functional Area
13 Top 25 Project Management KPIs of 2011-2012 List
14 # Earned man-hours
16 % Delivery deadlines met
18 % Project resource utilization
20 # Schedule performance index (SPI)
22 # Cost schedule index (CSI)
24 % Project budget variance at project end
26 # To complete schedule performance index (TSPI)
28 % Timely production of management reports
30 % Project schedule variance
32 # Project issues identified
34 % Order value variance from original contract value
36 # Conflicts arising during the project
38 # To complete performance index (TCPI)
40 % Overdue project tasks
42 $ Estimate at completion (EAC)
44 # Cost performance index (CPI)
46 % Requirements changed during project execution
48 $ Cost variance
50 # Project delay
52 # Time per project task
54 $ Actual cost of work performed (ACWP)
56 $ Budgeted cost of work performed (BCWP)
58 # Third party non-conformity identified during inspections
60 % Project milestones missed
62 % Project completion predictability
64 Appendix A: Related reports
66 Appendix B: Training courses
68 Appendix C: Advisory services
70 Appendix D: Technology solutions
72 Appendix E: Glossary of terms
Executive Summary
Given the economic context and the competitive market nowadays, organizations focus increasingly on managing and measuring performance
as a key component in achieving the desired performance results for generating business value. Key Performance Indicators (KPIs) represent
a critical element for any performance management strategy in today’s challenging environment and many organizations have diverse
performance management initiatives, including the measurement of results against targets by using KPIs.
To provide a glimpse into the use of KPIs in practice, smartKPIs.com has launched in March 2011 the first edition of a series of reports
dedicated to analyzing the most popular KPIs across major functional areas and industries. The Top KPIs report series, which has reached
the second edition, are a synthesis of what smartKPIs.com is all about: they form an overview of how KPIs are used in practice today, by
combining input from the online community with analysis and insights from our research team.
The Top 25 Project Management KPIs of 2011-2012 report compiles the most popular 25 KPIs used by the Project Management function.
The methodology used to conduct the research consisted of ranking the KPI examples published in the Project Management functional
area of smartKPIs.com, based on their number of views in 2011. The hundreds of thousands of visits to smartKPIs.com and the thousands
of KPIs visited, bookmarked and rated by members of this online community in 2011 provided a rich data set, which combined with further
analysis from the editorial team, formed the basis of these research reports. Out of the more than 50 Project Management KPIs available
on smartKPIs.com, the 25 most viewed by the members and visitors of smartKPIs.com were selected and analysed in detail in this report.
2
# Schedule performance index (SPI)
Project Team Performance
# Cost schedule index (CSI)
Project Management KPIs are reflective of Project Management functions, and are grouped into subcategories, such as Project Budget,
Project Assessment, Project Timeline and Project Team Performance. From these subcategories Project Budget, Project Assessment and
Project Timeline were the most popular of Project Management, in 2011. One of the most important benefits that this report brings is
the international perspective it offers on the most popular KPIs for Project Management. Project Management KPIs provide quantifiable
measurements of factors determined to be important for the successful implementation of Project Management strategies. The skill in
applying KPIs is in the selection of the optimum number and appropriateness of KPIs.
While centered around the KPIs that in 2011 received the highest number of visits on smartKPIs.com, the Top KPIs of 2011-2012 reports
contain in addition to KPI names, a detailed description of each KPI, as documented in smartKPIs Premium (the premium content section of
smartKPIs.com) and other relevant content. By discussing the use of KPIs today, presenting the best practice in documenting them and listing
the most popular KPIs of 2011, the Top 25 Project Management KPIs of 2011-2012 report is a valuable resource in promoting the informed
use of KPIs or refreshing the existing performance measurement and management practice in any organization.
Both academic and practitioner literature uses interchangeably these terms, oftentimes even within the same organization.
Measure - A number or a quantity that records a directly observable value. All measures are composed of a number and a unit of measure.
The number provides magnitude (how much) for the measure, while the unit gives the number a meaning (what). Examples of unit
measures are: dollars, hours, meters, inches, etc.
Indicator - Indicators are defined in many ways, but the common meaning for all of them is that they refer to specific information. Thus, the
Organisation for Economic Co-operation and Development (OECD) defines an indicator as “a qualitative or quantitative factor or variable
that provides a simple and reliable means to measure achievement, to reflect changes connected to an intervention, or to help assess the
performance of a development actor”.1
Metric, Performance Measure or Performance Indicator - A generic term encompassing the quantitative basis by which objectives are
established and performance is assessed. It helps quantify the achievement of a result, the quantifiable component of an organization’s
performance. In the context of measuring and managing performance these terms are used interchangeably.
Key Performance Indicator (KPI) - A selected indicator considered key for monitoring the performance of a strategic objective, outcome,
or key result area important to the success of an activity and growth of the organization overall. KPIs make objectives quantifiable,
providing visibility into the performance of individuals, teams, departments and organizations and enabling decision makers to take action
in achieving the desired outcomes. Typically, KPIs are monitored and communicated through dashboards, scorecards and other forms of
performance reports.
While on paper the terms listed above can be differentiated, in practice, the difference between them is blurred and, at some extent,
irrelevant. As long as their purpose and use is clear and understood by members of the organization, whether they are called performance
measures or KPIs is a matter of preference.
At smartKPIs.com, we assess each example entered in the online database and label it as measure, performance indicator or KPI. It is an
empirical and subjective approach to catalogue each entry based on relevance. Ultimately, all entries in the online database are considered
KPI examples. In addition, to single out the entries that stand out in terms of relevance, we introduced a new label:
• Fulfillment of the criteria of how good KPIs should be defined and used.
1. Organisation for Economic Co-operation and Development, 2002, Glossary of Key Terms in Evaluation and Results Based Management, OECD
Publications, Paris, France
KPIs … Naturally
Measurement as a human activity is not new. It emerged in early history as a mean for discovery and sense making.
Archaeologists consider the first measurement tool used in human history to be the Lebombo bone, a baboon fibula
containing 29 cut notches. Dated 35,000 BC, this tally stick was discovered in the Lebombo mountains in Swaziland.
Evaluation, as a form of measurement was used as early as the 3rd century AD, when emperors of the Wei Dynasty
rated the performance of the official family members. The biased nature of individual performance evaluation was
noticed by Chinese philosopher Sin Yu, who reportedly criticized a rater employed by the Wei Dynasty with the
following words: “The Imperial Rater of Nine Grade seldom rates men according to their merits, but always according
to his likes and dislikes”.
A major milestone in making the connection between measuring as a human activity and performance was in
1494, when Luca Pacioli published in Venice ‘Summa de arithmetica, geometrica, proportioni et proportionalita’ (‘Everything on arithmetic,
geometry, proportions and proportionality’). It detailed a practice the Venetian sailors had in place to evaluate the performance of their sailing
expeditions, which became the basis of the double-entry accounting system.
In time, the subjective nature of individual performance evaluations and the dominance of financial indicators for evaluating enterprise
performance became stepstones for performance management in human activities.
The industrial revolution added to this combination the “organization as a machine” metaphor that played a major role in driving improvements
in efficiencies and effectiveness. The result was an organizational performance management model based on mechanistic, command-and-
control thinking, driven by subjective individual performance assessments and financial indicators and crowned by pay-for-performance
arrangements.
Did it work? To a certain extent, yes. Many organizations flourished and matured based on this model.
Does it have flaws? Many. And while historical circumstances attenuated them in time, today’s environment amplifies and exposes them at
an accelerated rate.
Is there a better way? Yes, but it is not simple. It requires a change at multiple levels, from the underlying philosophy of performance, to
mentalities and processes. This is not easy.
Over time, the use of Key Performance Indicators (KPIs) became synonym to performance measurement and management. KPIs are the
link between the old and the new in performance management. Their use, however, is much richer and rewarding in an environment based
on organic performance architecture principles:
Organizations are echo-systems in their own right. They vary in terms of maturity and the environment in which they operate. As such,
their use of performance management systems should reflect their own “personality”. You can try to build an igloo in Sahara, but it won’t be
sustainable. The performance architecture of each organization needs to be unique and to reflect its internal and external environment.
Systems thinking provides a much richer context for understanding and improving performance. Command-and-control worked
in time for the army, for increasing productivity of unskilled workers during the industrial revolution and for managing large organizations
(such as the public service). Today, knowledge workers form the majority of the workforce in developed economies, operate in a much more
interconnected environment and have to make decisions at an accelerated pace. Understanding the systems in which we operate, analyzing
flow and learning based on data become ever more important today and complement the traditional simplistic managerial approach of
executing orders from above.
KPIs should be used primarily for learning. The role of KPIs should be the one of providing the required information to assist in navigating
towards the desired results. The same principle is used by ants, who leave pheromone trails to assist each other in navigating towards the
food source. Similarly, the nerve impulses travel through the different points of the nervous system, transmitting information. KPIs results
should travel through the organization, facilitating communication, providing a base for analysis / synthesis and ultimately decision making
across all levels of the organization.
Data accuracy in human administration is an elusive desideratum. Neils Bohr once said: “Accuracy and clarity of statement are mutually
exclusive”. Accuracy is a challenge in exact sciences and even more in human administration. Striving to obtain any KPI data is a challenge
in itself for many organizations and data accuracy is an even bigger ask. The use of KPIs should acknowledge this aspect and be oriented
towards making the most out of existent data, oftentimes by using variance intervals. This approach is used by the human body. If the
temperature drops under a safe limit, we shiver. If the temperature increases, we sweat. Both are performance improvement initiatives of the
body, aimed to regulate its temperature back to safe limits. The KPI here is the temperature. While it is not a constant, its trend is good when
within certain safe limits.
The use of KPIs for rewards and punishment should be limited and driven by self-assessment. Purposeful oriented behavior is a
characteristic of living organisms. For humans and many other species, this behavior is amplified by rewards and punishment. Along with this
amplification, risks are amplified, too. Gaming of results, lack of cooperation, decreased morale and work accidents are some of the undesired
consequences. On the other hand, the majority of nerve impulses in the human body transmit general information. Only in particular situations
pleasure or pain signals. Similarly, the use of KPIs for rewards and punishment should be the exception to the rule, rather than the norm.
Embedding KPIs in organizations through visualization and communication of KPIs results is the key to maximizing their value
added. Variations in the KPIs used by the human body are felt by our senses as their impact is sensory rich. Similarly, KPIs used in
an organizational context should be embedded in everyday use and be a part of the working experience. The most important aspect of
communicating KPI results is their visual representation. This is key, both in terms of optimizing the layout of the data representation and
the presence of visual displays in the working environment. The range of media is diverse today: posters, whiteboards, banners, LED and
LCD monitors should be combined to bring results to life across the organization. KPI results should not be restricted to paper reports and
computer screens anymore.
New philosophy of performance, driven by self-assessment and purposeful achievement as a mean to happiness. While happiness
means many things to many, a common expression of this feeling is the result of the purposeful achievement of a desideratum. Achieving
something we want, while shared with others, is about us and reverberates strongly in our inner self. Transposing this powerful catalyst of
performance in both our personal and organizational life is facilitated by a new paradigm: Happiness is driven by achievement. Achievement
is an expression of performance. If we want to be in control of our happiness, we should be in control of our performance.
Self-assessment of performance results is not easy. However, if more emphasis is placed on building this capability in each employee,
organizations can benefit by creating a rewarding environment conducive to happiness. In this environment, managers can focus on
understanding and improving the working system, while employees can focus on self-assessment of the results’ achievement, learning and
communicating. Purposeful achievement of results in a well-structured working system would bring both individuals and organization much
closer to happiness and fulfilment compared to the payment of bonuses in the current command-and-control driven dominant paradigm.
KPIs are here to stay. The question we have to answer is how do we want to use them: mechanistically or naturally?
Aurel Brudan,
Performance Architect
smartKPIs.com
What sets the smartKPIs.com community apart is the profile of its members.
smartKPIs.com is a truly global community, with relatively uniformly spread representation in terms of membership around the world. While
the highest number of members comes from English speaking countries, no single country dominates in terms of representation. The
same applies in terms of the size of the organizations to which smartKPIs.com members belong. While membership is the highest among
companies with 11 to 500 employees, both small and large organizations in terms of headcount are well represented.
Country breakdown
43.90%
15.79%
13.09%
5.76% 7.32%
2.19% 2.21% 2.32% 2.82% 2.93% 3.85%
South Saudi Indonesia Canada United Arab Malaysia United Australia India United Others
Africa Arabia Emirates Kingdom States
Organization size
11-100 employees 20.17%
Self-employed 7.87%
Unspecified 0.79%
Industry affiliation
Food, Beverages & Tobacco 1.78%
Not-for-profit 1.90%
Government - State & Federal 2.00%
Construction / Capital Works 2.32% In terms of industry affiliation, the majority
Energy 2.79% of smartKPIs.com community members
Banking, Mortgages & Credit 3.19%
Engineering 3.53% operate in the consulting industry. The ICT,
Retail 3.67% manufacturing and education / training
Transportation / Logistics 3.73%
Telecommunications 3.80%
sectors follow in this hierarchy, which also
Finance 3.93% reflects wide interest from both the public
Healthcare
Other professional services
4.27%
4.65%
and not-for-profit sectors.
Education / Training 5.23%
Manufacturing 9.24%
Technology 9.90%
Consulting 12.72%
Other 21.36%
Job title
Engineer 2.83%
Manager 23.77%
Other 43.70%
Managerial role
QA Manager 0.79%
Product Manager 1.00% Overall, the profile of the smartKPIs.com
Quality Manager 1.17% community paints the picture of a global,
Marketing Manager 1.20%
diverse and highly qualified membership
Finance Manager 1.47%
base. Tapping into the collective
Operations Manager 1.51%
Sales manager 1.67%
intelligence of this community by analyzing
Senior Manager 1.70% visit trends is a reflection of both trends in
General Manager 2.39% performance management at international
IT Manager 4.45% level across industries / functional areas
Project manager 5.45% and of the relevance of the smartKPIs.com
HR Manager 6.01%
content.
Manager 19.95%
Other 51.26%
Key Performance Indicator (KPI) example unique Classification of performance indicators based Type of measurement unit to reflect results
identification number assigned
Name automatically
Functional Areas on their relevance
Sub-categories and level of analysis. Industries (number, percentage, monetary value).
when entered in the database.
%
N/A Hospital bed occupancy rate
Hospitals Healthcare
KPI record Indicator type Unit type
Name of the indicator, a brief
sK41 Succinct
smartKPI description of the indicator, % Other versions of the indicator name, as
Definition and variations
representation of its role. clarifying in business terms its name. used in practice.
Definition
Name
Measures the percentage
Functional Areas of beds in the hospital that are occupied by patients, from overall number of hospital
Sub-categories beds.
Industries
%
N/A Hospital bed occupancy rate
Hospitals Healthcare
Variations
KPI record Indicator type Unit type
% Bed occupancy rate - long-term patients
Definition and variations
% sK41
Bed occupancy rate - short-term patients smartKPI %
Definition
Related KPIs
#Name
Hospital the
Measures bedpercentage
capacity of beds in the hospital that are occupied by patients, from overall number of hospital beds.
$ Hospital operating profit per bed
% Hospital bed occupancy rate
#Variations
Functional
Hospital Areas rate per 10,000 inhabitants
admission Sub-categories Industries
% N/A
Bed occupancy rate - long-term patients Hospitals Healthcare
Tags
Definition
% KPI
Bed andrate
occupancy variations
- short-term patients
record Indicator type Unit type
hospital, occupancy
sK41 smartKPI %
Related KPIs
Definition
# Hospital bed capacity
Calculation
Measures the percentage of beds in the hospital that are occupied by patients, from overall number of hospital beds.
$ Hospital operating profit per bed
Name
#Subordinate
Hospital admission rate used
per 10,000 inhabitants
Variations measures for calculation
%
A % Hospital bed occupancy rate
=Bed occupancy
# Hospital
Tags rate -beds
inpatient long-term patients
occupied
% =Bed
B occupancy
# Hospital rate -beds
inpatient short-term patients
hospital, occupancy
Definition and variations
Related KPIs
List of other related indicators in the
Calculation
Calculation
# Hospital
database,
formula
bed capacity
either upstream (influenced
Formula type KeywordsTrend
relevant to thewhen
is good indicator, useful for navigating
by this indicator), or downstream
$ Hospital (with
Definition
(A/B)*100 influence
operating on bed
profit per this indicator). Rate by thematic clusters of similar examples.
Increasing
#Measures
Subordinate the measures
percentage
Hospital admission of beds
rate used
per forin
10,000 the hospital that are occupied by patients, from overall number of hospital beds.
calculation
inhabitants
Names of the measures TagsA =
used# Hospital inpatient
in calculating
Focus beds occupied
Variations
B = # Hospital inpatient beds
the indicator (if applicable).
% Bed occupancy
hospital, occupancyrate - long-term patients
Purpose
% Bed occupancy rate - short-term patients
To indicate the
Calculation hospital’s efficiency regarding bed management
formula Formula type and its spare capacity. Trend is good when
Calculation
Related KPIs
(A/B)*100
BSC perspective Rate
Measurement focus Increasing
Impact stage
# Hospital bed capacity
Subordinate measures used for calculation
Customer Volume Process
$ Hospital operating profit per bed
A Focus
#= # Hospital
Hospital
Indicator
inpatient
admission
focus
beds
rate peroccupied
10,000 inhabitants Measurment type Level
B = # Hospital inpatient beds
Leading
Purpose
Tags Quantitative Strategic
To indicate
hospital, the hospital’s efficiency regarding bed management and its spare capacity.
occupancy
Calculation formula Formula type Trend is good when
BSC
Data profile
perspective Measurement focus Impact stage
(A/B)*100
Calculation Rate Increasing
Customer Volume Process
Data capture period Standard reporting frequency Data integrity
as Focus
Expresses the indicator Indicator
a formula linking
Subordinate
Spot focusmeasures used for calculation DailyType of calculation
Measurment type formula, based on the combination
Level
High of Direction in which the results of the indicator
the subordinate measures
A =(if# applicable).
Leading Hospital inpatient beds occupied
Automation fit
subordinate measures (rate, ratio, index, composition).
Quantitative
Limitations
Strategic need to move for a positive result.
Purpose
B = # Hospital inpatient beds
Recommended
To Accurate reporting
indicate the hospital’s efficiency regarding bed management for this
and its spare KPI requires real-time registration of inpatients, so that no lag exists
capacity.
Explanation of the reason or business
Data profile Classification
between the actualofhospitalization
performance (and
indicators based onofwhat
the occupancy Strength
the bed) and registering it inofthe
thebed
indicator based on the stage of
justification for using theBSC perspective
indicator.
Calculation formula
Measurement
dimension
management
Formula
focus Impact stage
of an activity or result they are measuring.
typesystem. Trend is good when evaluation: input, process, output or outcome.
Customer
Data capture period Volume
Standard reporting frequency Process
Data integrity
(A/B)*100 Rate Increasing
Spot
Indicator focus Daily
Measurment type High
Level
Focus fit
Leading
Automation Quantitative
Limitations Strategic
Recommended Accurate reporting for this KPI requires real-time registration of inpatients, so that no lag exists
Purpose
Standard Balanced Data profile between the actual hospitalization (and the occupancy of the bed) and registering it in the bed
To indicate the hospital’s efficiency regarding bed management
managementand its spare capacity.
system.
Scorecard perspective
where the indicator BSC perspective
Data capture period Measurement
Standard focusfrequency
reporting Impact
Data stage
integrity
fits best. Customer
Spot Volume
Daily Process
High
Indicator focus
Automation fit Measurment type
Limitations Level
Leading
Recommended Quantitative
Accurate reporting for this KPI requires real-timeStrategic
registration of inpatients, so that no lag exists
between the actual hospitalization (and the occupancy of the bed) and registering it in the bed
management system.
Type of indicator based on the emphasis
Data profile of Measurement approach for the KPI Organizational level at which the indicator is
past activity or future performance. (Quantitative or qualitative). measured (strategic or operational).
Data capture period Standard reporting frequency Data integrity
Spot Daily High
Focus
Data profile
Suitability for automated data gathering by importing Other limitations (data or reporting system related) to be
data in the centralized reporting tool. considered during the use of the indicator.
Subjective evaluation of the suitability for benchmarking Additional information related to the Thresholds outlining the limits for positive and
based on indicator reporting standardization in the industry. target setting for this indicator. negative results, as well as the tolerance interval.
Targets
Statistics
Rating & bookmarking Views Last updated
smartKPIs
Rating (1/5)
Community 1780
Views 03 February
Last updated 2011
Other
Add popular KPI examples
rating (1/5) 1780
Share Save
03 February 2011
• # Average length of stay in ER
Add rating
• % Emergency Share admissions
Department visits resulting in hospital Save
• % Employee turnover
Rating button. smartKPIs Community Share button, for social media Option to save the indicator in a preferred list
Comments communication. available online at smartKPIs.com.
Other popular
smartKPIs KPI examples
Community
• # Average length of stay in ER
•Other popular KPI
% Emergency examples
Department visits resulting in hospital admissions
•%# Average
Employeelength of stay in ER
turnover
• % Emergency Department visits resulting in hospital admissions
Comments
• % Employee turnover
Comments
Other indicators saved in the preferred list along with the current Option to comment, provide feedback and engage with other members of the smartKPIs.com
example by smartKPIs.com community members. community on topics relating the documentation and use of the indicator.
Sub-categories
Project Budget - Involves the amount of resources allocated to the project.
Project Assessment - Refers to the reviewing process of the development of projects and their outcomes.
Project Timeline - Relates to use of schedules or charts used to plan and subsequently report project progress.
Project Team Performance - Refers to performance that meets the needs and expectations of company colleagues.
History
The development of the project management practices can be traced back to ancient times. The Great Wall in China or the Egyptian pyramids
are often given as examples of construction projects that required detailed planning and rigorous management. Despite the long history
of project management practices, only during the 1970s could one see the development of project management as a discipline in its own
right, with the development of the first project management methodologies. The rise of project management forced organizations to start
developing structured environments and approaches for project implementation.
1
Functional Areas Sub-categories
sK347 export date: 4 Dec 2012 - Page 1
Username: cristina.tarata@smartkpis.com
Industries
Member organization: Integerperform
Name
# Earned man-hours
Definition and variations
Definition
Measures the total man-hours corresponding to the completed work in place.
Variations
# Man-hours with completed work in place
Related KPIs
% Time sheets incorrectly filled
Tags
man-hours, constructions
Calculation
Focus
Purpose
To assess job productivity and projects progress.
Data profile
Targets
Threshold example
Red: <80 Yellow: 80-100 Green: >100
Overall notes
Involvement of organizations, especially the construction companies in measuring earned man hours reflects the maturity of project management. Dividing
the earned man-hours by the actual man-hours provides a productivity index that is frequently used in construction projects.
Additional resources
Reid, A. P. (1999), Project management: getting it right. Cambridge: Woodhead Publishing Limited
References
1. BURIC (2003), Measured mile labor analysis. AACE International 47th Annual Meeting: June 22-25, available at: http://www.buric.com/Measured_Mile.pdf
2. Cox et al. (2003), Management's perceptions of key performance indicators for construction. Journal of Construction Engineering and Management,
Volume 129, No. 2, Pages 142-151.
3. Rajendran, H. K. (2008), Process quality and capacity planning, available at:
http://soar.wichita.edu/dspace/bitstream/handle/10057/2040/t08033.pdf?sequence=1
Interdependencies
Data
Current status (active/inactive) Data source (report or system) Data source area
Activation date Earliest data available as of (date) Timing of data production
Target activation date Latest data available as of (date) Lead time for data availability
KPI evaluation
Reporting effort rating Cost of using the KPI KPI maturity level
©Also
The available at: 2012
KPI Institute http://www.smartkpis.com/kpi-key-performance-indicator/earned-man-hours-347.html
15
IDIndicator
number:documentation
sK0128291 © The KPI Institute Pty Ltd 2010. Terms of use available at: http://www.smartkpis.com/terms-of-use.html ('Premium content terms')
Top 25 Project Management KPIs of 2011-2012
2
Functional Areas Sub-categories
sK6358 export date: 4 Dec 2012 - Page 1
Username: cristina.tarata@smartkpis.com
Industries
Member organization: Integerperform
Name
Definition
Measures the percentage of service delivery request that were met on time out of the total delivery requests.
Variations
% Project delivery deadlines met
Related KPIs
# Customer shipment to delivery cycle time
Tags
delivery, deadline
Calculation
Focus
Purpose
To track the operational discipline in coordinating and executing a project, according to the planned schedule.
Data profile
Targets
Threshold example
Red: <70% Yellow: 70-80% Green: >80%
Overall notes
The project management team should prioritize projects according to their importance. Overdue and high importance projects should be analyzed and solved
first. Steps should be taken to stop projects from becoming overdue.
Additional resources
http://freelancefolder.com/how-to-meet-deadlines-and-boost-performance/
References
1. Davis Couriers (2012), Delivering a quality service across the UK - Sameday light haulage and removals, available at: http://www.daviscouriers.co.uk/
2. Mountaintop Consulting (2012), Project lifecycle management, available at:
http://www.mountaintop.net.au/Lifecycle.htm
3. The 51 fatal business errors (2012), Key performance indicators (KPIs), available at: http://www.51errors.com/kpi.html
Interdependencies
Data
Current status (active/inactive) Data source (report or system) Data source area
Activation date Earliest data available as of (date) Timing of data production
Target activation date Latest data available as of (date) Lead time for data availability
KPI evaluation
Reporting effort rating Cost of using the KPI KPI maturity level
©Also
The available at: 2012
KPI Institute http://www.smartkpis.com/kpi-key-performance-indicator/delivery-deadlines-met-6358.html
17
IDIndicator
number:documentation
sK0128291 © The KPI Institute Pty Ltd 2010. Terms of use available at: http://www.smartkpis.com/terms-of-use.html ('Premium content terms')
Top 25 Project Management KPIs of 2011-2012
3
Functional Areas Sub-categories
sK2624 export date: 4 Dec 2012 - Page 1
Username: cristina.tarata@smartkpis.com
Industries
Member organization: Integerperform
Name
Definition
Measures the percentage of resources dedicated for the project, expressed in man-hours, that are actually used out of the total resources allocated.
Variations
% Resource utilization
Related KPIs
# Project issues addressed ratio
Tags
project, resources
Calculation
Focus
Purpose
To indicate the accuracy of resource planning and efficiency of utilization.
Data profile
Targets
Threshold example
Red: <50% Yellow: 50-70% Green: >70%
Overall notes
Automated measurement and reporting can be done by using project management software. This KPI can be measured during project execution at different
project stages, milestones or upon completion.
Additional resources
http://www.brighthub.com/office/project-management/articles/19356.aspx
http://www.akamaiuniversity.us/PJST11_2_353.pdf
http://www.jstor.org/discover/10.2307/2627516?uid=3738920&uid=2&uid=4&sid=21101425593571
References
1. Dayal, S. (2008), Earned value management using Microsoft Office project: A guide for managing any size project effectively, Fort Lauderdale: J. Ross
Publishing, Page 49, available at: http://books.google.ro/books/about/Earned_Value_Management_Using_Microsoft.html?id=brrdqpTsdOoC&redir_esc=y
2. Alberts, R. (2008), Project portfolio management, Georgia State University available at: http://net.educause.edu/ir/library/pdf/SER08064A.pdf
3. Giese, H.(2004), Software quality assurance: V management, available at:
http://www2.cs.uni-paderborn.de/cs/ag-schaefer/Lehre/Lehrveranstaltungen/Vorlesungen/SoftwareQualityAssurance/WS0405/SQA-V.pdf
Interdependencies
Data
Current status (active/inactive) Data source (report or system) Data source area
Activation date Earliest data available as of (date) Timing of data production
Target activation date Latest data available as of (date) Lead time for data availability
KPI evaluation
Reporting effort rating Cost of using the KPI KPI maturity level
©Also
The available at: 2012
KPI Institute http://www.smartkpis.com/kpi-key-performance-indicator/project-resource-utilization-2624.html
19
IDIndicator
number:documentation
sK0128291 © The KPI Institute Pty Ltd 2010. Terms of use available at: http://www.smartkpis.com/terms-of-use.html ('Premium content terms')
Top 25 Project Management KPIs of 2011-2012
4
Functional Areas Sub-categories
sK486 export date: 4 Dec 2012 - Page 1
Username: cristina.tarata@smartkpis.com
Industries
Member organization: Integerperform
Name
Definition
Measures the value of work accomplished for each monetary unit of work performed, expressed as the ratio of budget cost of work performed to budget cost
of work scheduled.
Variations
# Project schedule performance index (SPI)
# SPI
Related KPIs
# Cost schedule index (CSI)
Tags
budget, earned value
Calculation
Focus
Purpose
To indicate the efficiency of the project, in terms of value generated.
Data profile
Targets
Overall notes
This KPI requires two secondary KPIs for calculation:
1. The budgeted cost of work scheduled (BCWS), which is the portion of the cost that is planned to be spent on a task between the starting date of the task
and the status date. For example, the total planned budget for a 4-day task is $100 and it starts on a Monday. If the status date is set to the following
Wednesday, the BCWS is $75.
2. The budgeted cost of work performed (BCWP), which is the percentage of the budget that should have been spent for a given percentage of work
performed on a task. This is literally the value earned for the work performed. For example, if after 2 days 60% of the work on a task has been completed,
you might expect to have spent 60% of the total task budget, or $60.
Additional resources
http://books.google.com/books?id=XjB30_XPikcC&printsec=frontcover&dq=The+project+management+question+and+answer+book&hl=en&src=bmrr&ei=Us
suTZniMYiTswaCkIH0Bw&sa=X&oi=book_result&ct=result&resnum=1&ved=0CDAQ6AEwAA#v=onepage&q&f=false
http://www.suu.edu/faculty/christensend/evms/usingtheCPI%20JCAM94.pdf
http://www.publicprocurementguides.treasury.gov.cy/OHS-EN/HTML/index.html?annex_7_11.htm
References
1. GSME Department (n.d.), Sharif MBA project management session 9, available at: http://gsme.sharif.edu/~projectmanagement/PMSession9.pdf
2. Christensen, D. (1993), Determining an accurate estimate at completion, The National Contract Management Journal, Volume 25, Pages 17-25, available
at: http://www.suu.edu/faculty/christensend/evms/eacncmj.pdf
3. Cornell Information Technology (2011), Estimate at completion (EAC), available at:
http://www2.cit.cornell.edu/computer/robohelp/cpmm/Glossary_Words/Estimate_at_Completion.htm
Interdependencies
Data
Current status (active/inactive) Data source (report or system) Data source area
Activation date Earliest data available as of (date) Timing of data production
Target activation date Latest data available as of (date) Lead time for data availability
KPI evaluation
Reporting effort rating Cost of using the KPI KPI maturity level
5
Functional Areas Sub-categories
sK487 export date: 4 Dec 2012 - Page 1
Username: cristina.tarata@smartkpis.com
Industries
Member organization: Integerperform
Name
Definition
Measures the likelihood of recovery for projects that are late and/or over budget.
Variations
# Project cost schedule index
# Cost schedule indicator
# CSI
Related KPIs
# Schedule performance index (SPI)
Tags
project costs, budget, actual cost, earned value
Calculation
where
A = # Budgeted cost of work performed divided by actual cost of work performed (BCWP/ACWP)
B= # Budgeted cost of work performed divided by budgeted cost of work scheduled (BCWP/BCWS)
Focus
Purpose
To provide an indication of the overall performance of the project, in terms of respecting the budget and the schedule.
Data profile
Targets
Threshold example
Red: >1.2 Yellow: 1-1.2 Green: <1
Overall notes
By using this KPI, a project manager has better control over cost and schedule variance, through earned value management. It supports the controlling stage
of project management, as it generates actions for future improvements.
Additional resources
http://books.google.ro/books?id=mj7yQiQEusUC&printsec=copyright#v=onepage&q&f=false
http://www.google.ro/url?sa=t&rct=j&q=&esrc=s&source=web&cd=7&cad=rja&ved=0CEgQFjAG&url=http%3A%2F%2Fwww.zenisoft.cn%3A10010%2Fcalibr
e%2Fget%2Fpdf%2F718&ei=rC-3UNWqFImy0QGp0YGAAg&usg=AFQjCNG3vi3HPdB-8I-EMgEfx7J7DpjADA&sig2=NAPFY3XwtM5zAvwm6L5OTw
http://www.google.ro/url?sa=t&rct=j&q=&esrc=s&source=web&cd=1&cad=rja&ved=0CDoQFjAA&url=http%3A%2F%2Fspemarti.googlecode.com%2Ffiles%2
FSchwaber2004.pdf&ei=1DC3UJPRBc670QHmnICwDA&usg=AFQjCNEVg_uRRLZKyXIPCX3G_5dWZb0sBg&sig2=liYICDm1js_TghctKmCCQg
References
1. Bagherpour, M., Zareei, A., Noori, S. and Heydari, M. (2010), Designing a control mechanism using earned value analysis: An application to production
environment, The International Journal of Advanced Manufacturing Technology, Volume 49, No. 5-8, Pages 419-429, available at:
http://www.springerlink.com/content/c77g6mx10536l8q4/
2. Christensen, D. S., (1993), Determining an accurate estimate at completion, The National Contract Management Journal, Volume 25, Pages 17-25
available at: http://www.suu.edu/faculty/christensend/evms/eacncmj.pdf
3. National Oceanic and Atmospheric Administration (n.d.), Earned value analysis, available at: www.cio.noaa.gov/itmanagement/evaslides.ppt
Interdependencies
Data
Current status (active/inactive) Data source (report or system) Data source area
Activation date Earliest data available as of (date) Timing of data production
Target activation date Latest data available as of (date) Lead time for data availability
KPI evaluation
Reporting effort rating Cost of using the KPI KPI maturity level
©Also
The available at: 2012
KPI Institute http://www.smartkpis.com/kpi-key-performance-indicator/cost-schedule-index-csi-487.html
23
IDIndicator
number:documentation
sK0128291 © The KPI Institute Pty Ltd 2010. Terms of use available at: http://www.smartkpis.com/terms-of-use.html ('Premium content terms')
Top 25 Project Management KPIs of 2011-2012
6
Functional Areas Sub-categories Industries
sK27 export date: 4 Dec 2012 - Page 1
Username: cristina.tarata@smartkpis.com
Member organization: Integerperform
Name
Definition
Measures the deviation between the actual and planned project cost upon completion.
Variations
% Budget variance upon project completion
Related KPIs
% Spending of current technology capital budget
Tags
budget
Calculation
Focus
Purpose
To indicate the financial discipline in planning and executing projects.
Data profile
Targets
Threshold example
Red: <90%; >110% Yellow: 90-95%; 105-110% Green: 95-105%
Overall notes
Usually, a project budget is exceeded due to an improper estimation of costs, or to a delay in the finish date which brings additional costs.
Additional resources
http://www.scribd.com/doc/16172481/PM4DEV-Project-Budget-Management
http://www.jefferson.edu/controller/reports/documents/ReadingaBudgetVarianceReport.ppt
http://www.ewp.rpi.edu/hartford/~stoddj/FinancialModels/Horngren/horngrenima14e_ch08.ppt
References
Interdependencies
Data
Current status (active/inactive) Data source (report or system) Data source area
Activation date Earliest data available as of (date) Timing of data production
Target activation date Latest data available as of (date) Lead time for data availability
KPI evaluation
Reporting effort rating Cost of using the KPI KPI maturity level
©Also
The available at: 2012
KPI Institute http://www.smartkpis.com/kpi-key-performance-indicator/project-budget-variance-at-project-end-27.html
25
IDIndicator
number:documentation
sK0128291 © The KPI Institute Pty Ltd 2010. Terms of use available at: http://www.smartkpis.com/terms-of-use.html ('Premium content terms')
Top 25 Project Management KPIs of 2011-2012
7
Functional Areas Sub-categories
sK489 export date: 4 Dec 2012 - Page 1
Username: cristina.tarata@smartkpis.com
Industries
Member organization: Integerperform
Name
Definition
Measures how hard the project team should work in utilizing the remaining time allocated to the project.
Variations
# To complete schedule performance indicator (TSPI)
# Project TSPI
Related KPIs
# To complete performance index (TCPI)
Tags
earned value
Calculation
Focus
Purpose
To indicate the efficiency at which the remaining time on the project should be utilized.
Data profile
Targets
Threshold example
Red: <1 Yellow: 1-1.2 Green: >1.2
Overall notes
This KPI is under the umbrella of Earned Value Management (EVM), a systematic project management process used to find variances in projects based on
the comparison of worked performed and work planned.
Additional resources
http://www.pmipprc.org/File/Presentations/2010/Sep%2009%202010%20EVM%20review.pdf
http://www.deepfriedbrainpmp.com/2009/08/to-complete-performance-index-tcpi.html
http://www.pmforum.org/library/second-edition/2009/PDFs/june/Fleming-Koppelman-EVM-paper.pdf
References
1. Christensen, D. S., (1994), Using performance indices to evaluate the estimate at completion, Journal of Cost
Analysis and Management, Pages 17-24, available at: http://www.suu.edu/faculty/christensend/evms/usingtheCPI%20JCAM94.pdf
2. Kendrick, T. (2010), The project management tool kit: 100 Tips and techniques for getting the job done right, AMACOM, New York, Page 54
3. U.S. Department of Interior (2005), The quarterly scorecard and corrective actions reports for constructed asset investments, available at:
http://www.doi.gov/pam/QuarterlyReportGuidance61605.pdf
Interdependencies
Data
Current status (active/inactive) Data source (report or system) Data source area
Activation date Earliest data available as of (date) Timing of data production
Target activation date Latest data available as of (date) Lead time for data availability
KPI evaluation
Reporting effort rating Cost of using the KPI KPI maturity level
©Also
The available at: 2012
KPI Institute http://www.smartkpis.com/kpi-key-performance-indicator/to-complete-schedule-performance-index-tspi-489.html
27
IDIndicator
number:documentation
sK0128291 © The KPI Institute Pty Ltd 2010. Terms of use available at: http://www.smartkpis.com/terms-of-use.html ('Premium content terms')
Top 25 Project Management KPIs of 2011-2012
8
Functional Areas Sub-categories
sK3558 export date: 4 Dec 2012 - Page 1
Industries
Username: teodora.cindrea@gmail.com
Member organization: Acumen Integrat
Name
Definition
Measures the percentage of management reports produced on time out of the total management reports due.
Variations
% Management reports produced on time
Related KPIs
% Employee probation reports assessed
Tags
reports
Calculation
Focus
Purpose
To evaluate the management reporting efficiency and compliance with the agreed reporting schedule.
Data profile
Targets
Threshold example
Red: <80% Yellow: 80-90% Green: >90%
Overall notes
Overdue management reports should be analyzed and solved first. Steps should be taken to stop management reports from becoming overdue.
Additional resources
http://books.google.com/books?id=Kpz-ceChSRAC&pg=RA1-PA14&lpg=RA1-PA14&dq=%22percentage+reduction+in+unauthorised+Changes+detected%2
2&source=bl&ots=srtvCpvGi9&sig=_n5yzuPoDn-WS7k2QbTbD1-jJGE&hl=en&ei=8VEFTb2YDIb0vQPn5bDNBg&sa=X&oi=book_result&ct=result&resnum=4
&ved=0CB0Q6AEwAw#v=onepage&q=%22percentage%20reduction%20in%20unauthorised%20Changes%20detected%22&f=false
https://www.xing.com/net/itservicemanagement/feedbackforum-735/kpi-csf-848151/868585/
References
1. Office of Government Commerce, (2002), Best practice for planning to implement service management, available at:
http://books.google.com/books?id=P6-xEPOcXOAC&pg=PA98&lpg=PA98&dq=%22percentage+reduction+in+unauthorised+Changes+detected%22&source
=bl&ots=WqPRz7xAcD&sig=iRjDtoSUaizMSjTP7XNadtbPuDg&hl=en&ei=8VEFTb2YDIb0vQPn5bDNBg&sa=X&oi=book_result&ct=result&resnum=3&ved=0
CBkQ6AEwAg#v=onepage&q=%22percentage%20reduction%20in%20unauthorised%20Changes%20detected%22&f=false
2. Office of Government Commerce (2002), Planning to implement service management, available at:
http://www.scribd.com/doc/6775899/Planning-to-Implement-Service-Management-Green-Book
3. State of California (2011), Capital outlay and local assistance grants, available at: http://smmc.ca.gov/Prop84Forms.html
Interdependencies
Data
Current status (active/inactive) Data source (report or system) Data source area
Activation date Earliest data available as of (date) Timing of data production
Target activation date Latest data available as of (date) Lead time for data availability
KPI evaluation
Reporting effort rating Cost of using the KPI KPI maturity level
©Also
The available at: 2012
KPI Institute http://www.smartkpis.com/kpi-key-performance-indicator/timely-production-of-management-reports-3558.html
29
IDIndicator
number:documentation
sK0128291 © The KPI Institute Pty Ltd 2010. Terms of use available at: http://www.smartkpis.com/terms-of-use.html ('Premium content terms')
Top 25 Project Management KPIs of 2011-2012
9
Functional Areas Sub-categories
sK488 export date: 4 Dec 2012 - Page 1
Username: cristina.tarata@smartkpis.com
Industries
Member organization: Integerperform
Name
Definition
Measures the variance in terms of schedule, highlighting the percentage of work that is yet to be completed as per project schedule.
Variations
% Schedule variance
Related KPIs
% Schedule flexibility rate
Tags
project, schedule
Calculation
Focus
Purpose
To track the operational discipline in coordinating and executing a project according to the planned schedule.
Data profile
Targets
Threshold example
Red: +/- (>15%) Yellow: +/- (10-15%) Green: +/- (5-10%)
Overall notes
This indicator can be measured at the end of the project, but also during project execution for tracking the status of different project stages.
Additional resources
http://books.google.com/books?id=WGhKENjhouQC&printsec=frontcover&dq=Common+Sense+Project+Management&hl=en&ei=0MguTc_LGIe24gbo5sXq
Dg&sa=X&oi=book_result&ct=result&resnum=1&ved=0CCgQ6AEwAA#v=onepage&q&f=false
http://www.nd.gov/itd/services/project-management
http://www.srs.gov/general/EFCOG/05ProjectReferences/SRS/EVM/docs/CAMIM9520.pdf
References
1. Information Technology Department (2007), Large project summary report, available at:
http://www.nd.gov/itd/files/services/pm/reports/active-oversight-project-summary-cover-2007-q3.pdf
2. State of Michigan (2009), Measurement and analysis process manual, available at:
http://www.michigan.gov/documents/suite/Measurement_and_Analysis_Process_Manual_January_2009_265894_7.pdf
3. State of Michigan (2010), MiHIN shared services strategic and operational plan: Amendment 1, available at:
http://www.michigan.gov/documents/mihin/Michigan_Strategic_and_Operational_Plan_Amendment_8-10-10_330047_7.pdf
Interdependencies
Data
Current status (active/inactive) Data source (report or system) Data source area
Activation date Earliest data available as of (date) Timing of data production
Target activation date Latest data available as of (date) Lead time for data availability
KPI evaluation
Reporting effort rating Cost of using the KPI KPI maturity level
©Also
The available at: 2012
KPI Institute http://www.smartkpis.com/kpi-key-performance-indicator/project-schedule-variance-488.html
31
IDIndicator
number:documentation
sK0128291 © The KPI Institute Pty Ltd 2010. Terms of use available at: http://www.smartkpis.com/terms-of-use.html ('Premium content terms')
Top 25 Project Management KPIs of 2011-2012
10
Functional Areas Sub-categories
sK2623 export date: 4 Dec 2012 - Page 1
Username: cristina.tarata@smartkpis.com
Industries
Member organization: Integerperform
Name
Definition
Measures the number of new project issues that are identified and need to be addressed after the initiation of the project.
Variations
# New project issues identified
# New project problems
Related KPIs
# Conflicts arising during the project
Tags
administration
Calculation
Focus
Purpose
To assess the volume of challenges that appear during a project, as such new issues that arise might jeopardize the success of the project.
Data profile
Targets
Threshold example
Red: >3 Yellow: 1-3 Green: <1
Overall notes
An issue can be defined as a situation, problem or an activity that has happened or is happening and which impacts upon the approved project plan.
Examples of project issues can be: requests for change, off-specification or general issues (such as a conflict between various project stakeholders).
Additional resources
http://www.openoffice.org/scdocs/ProjectIssues
References
Interdependencies
Data
Current status (active/inactive) Data source (report or system) Data source area
Activation date Earliest data available as of (date) Timing of data production
Target activation date Latest data available as of (date) Lead time for data availability
KPI evaluation
Reporting effort rating Cost of using the KPI KPI maturity level
©Also
The available at: 2012
KPI Institute http://www.smartkpis.com/kpi-key-performance-indicator/project-issues-identified-2623.html
33
IDIndicator
number:documentation
sK0128291 © The KPI Institute Pty Ltd 2010. Terms of use available at: http://www.smartkpis.com/terms-of-use.html ('Premium content terms')
Top 25 Project Management KPIs of 2011-2012
11
Functional Areas Sub-categories
sK6865 export date: 4 Dec 2012 - Page 1
Username: cristina.tarata@smartkpis.com
Industries
Member organization: Integerperform
Supply Chain, Procurement, Distribution Contract Management Construction & Capital Works
Portfolio and Project Management Project Management
Construction of Buildings
Name
Definition
Measures the percentage of variance in order value, from overall contract value.
Variations
% Change order value to original contract value
% Change in contract price
Related KPIs
% Cost of construction
Tags
project management
Calculation
Focus
Purpose
To evaluate the level of changes made to contract value.
Data profile
Targets
Threshold example
Red: >10% Yellow: 2-10% Green: <2%
Overall notes
Along with $ Average order value, this KPI can be used to analyze variance in contract management.
Additional resources
http://constructionmarketingideas.blogspot.com/2007/10/change-order-boat-more.html
http://www.nmenv.state.nm.us/cpb/PDF%20Forms%20for%20Grantees/Change%20Order.pdf
http://pmbook.ce.cmu.edu/08_construction_pricing_and_conctracting.html
References
1. Highsmith, J. (2004), Agile project management: Creating innovative products, Boston, MA: Addison-Wesley, available at:
http://www.google.ro/url?sa=t&rct=j&q=&esrc=s&source=web&cd=6&cad=rja&ved=0CEMQFjAF&url=http%3A%2F%2Fwww.zenisoft.cn%3A10010%2Fcalibr
e%2Fget%2Fpdf%2F718&ei=Z1W3UP7LM4z6sgbyl4GQCQ&usg=AFQjCNG3vi3HPdB-8I-EMgEfx7J7DpjADA&sig2=fPMWjCmIs7yVF_-DMUsqIQ
2. Schwaber, K. (2004), Agile project management with Scrum (Microsoft Professional), Redmond, WA: Microsoft Press, available at:
2004.http://www.google.ro/url?sa=t&rct=j&q=&esrc=s&source=web&cd=1&cad=rja&ved=0CDoQFjAA&url=http%3A%2F%2Fspemarti.googlecode.com%2Ffil
es%2FSchwaber2004.pdf&ei=1DC3UJPRBc670QHmnICwDA&usg=AFQjCNEVg_uRRLZKyXIPCX3G_5dWZb0sBg&sig2=liYICDm1js_TghctKmCCQg
3. Indiana Department of Transportation (n.d.), Construction change order and time extension summary, available at:
http://www.westlafayette.in.gov/egov/docs/1307556830_975769.pdf
Interdependencies
Data
Current status (active/inactive) Data source (report or system) Data source area
Activation date Earliest data available as of (date) Timing of data production
Target activation date Latest data available as of (date) Lead time for data availability
KPI evaluation
Reporting effort rating Cost of using the KPI KPI maturity level
©Also
The available at: 2012
KPI Institute http://www.smartkpis.com/kpi-key-performance-indicator/order-value-variance-from-original-contract-value-6865.html
35
IDIndicator
number:documentation
sK0128291 © The KPI Institute Pty Ltd 2010. Terms of use available at: http://www.smartkpis.com/terms-of-use.html ('Premium content terms')
Top 25 Project Management KPIs of 2011-2012
12
Functional Areas Sub-categories Industries
sK28 export date: 4 Dec 2012 - Page 1
Username: cristina.tarata@smartkpis.com
Member organization: Integerperform
Name
Definition
Measures the total number of conflicts that have arisen within the project team throughout the project period.
Variations
# Conflicts arisen between project manager and team members during the project
# Conflicts arisen between team members during the project
Related KPIs
# Project issues identified
Tags
conflicts
Calculation
Focus
Purpose
To indicate the collaboration quality between the project team members.
Data profile
Targets
Threshold example
Red: >5 Yellow: 3-5 Green: <3
Overall notes
In some cases, organizations encourage conflicts as a means of giving birth to creative solutions to problems.
Additional resources
http://www.helium.com/items/318788-project-management-tips-for-conflict-resolution
http://www.exforsys.com/career-center/conflict-management/conflicts-during-project-management.html
http://blog.maia-intelligence.com/2008/02/25/key-performance-indicators-kpi-related-with-key-
References
1. GSA Office of Civil Rights (2010), Conflict management and collaboration summit, available at:
http://www.gsa.gov/graphics/staffoffices/Conflict_Management_Summit_Brochure.pdf
2. NYC Department of Citywide Administrative Services, Citywide Training Center (2011), The project management portfolio, available at:
http://www.nyc.gov/html/dcas/downloads/pdf/misc/ctc_projectmanagement.pdf
3. Villanova University (2007), Project management, available at: http://www.ntis.gov/pdf/univ/Villanova_ProjMgmt_T2.pdf
Interdependencies
Data
Current status (active/inactive) Data source (report or system) Data source area
Activation date Earliest data available as of (date) Timing of data production
Target activation date Latest data available as of (date) Lead time for data availability
KPI evaluation
Reporting effort rating Cost of using the KPI KPI maturity level
©Also
The available at: 2012
KPI Institute http://www.smartkpis.com/kpi-key-performance-indicator/conflicts-arising-during-the-project-28.html
37
IDIndicator
number:documentation
sK0128291 © The KPI Institute Pty Ltd 2010. Terms of use available at: http://www.smartkpis.com/terms-of-use.html ('Premium content terms')
Top 25 Project Management KPIs of 2011-2012
13
Functional Areas Sub-categories
sK493 export date: 4 Dec 2012 - Page 1
Username: cristina.tarata@smartkpis.com
Industries
Member organization: Integerperform
Name
Definition
Measures the future required cost efficiency needed to achieve a target Estimate At Completion (EAC) or Budget At Completion (BAC).
Variations
# TCPI
# Project TCPI
Related KPIs
# To complete schedule performance index (TSPI)
Tags
earned value, project
Calculation
Focus
Purpose
Provides a projection of the anticipated performance required to achieve either budget or schedule targets.
Data profile
Targets
Threshold example
Red: <1 Yellow: 1-1.2 Green: >1.2
Overall notes
This KPI gives an estimate of the efficiency at which the project team should be utilized for the remainder of the project.
Additional resources
http://www.deepfriedbrainpmp.com/2009/08/to-complete-performance-index-tcpi.html
http://www.pmforum.org/library/second-edition/2009/PDFs/june/Fleming-Koppelman-EVM-paper.pdf
https://acc.dau.mil/CommunityBrowser.aspx?id=236943
References
1. Christensen, D. S., (1994), Using performance indices to evaluate the estimate at completion, Journal of Cost
Analysis and Management, Pages 17-24, available at: http://www.suu.edu/faculty/christensend/evms/usingtheCPI%20JCAM94.pdf
2. Kendrick, T. (2010), The project management tool kit: 100 Tips and techniques for getting the job done right, AMACOM, New York, NY, Page 54
3. U.S. Department of Interior (2005), The quarterly scorecard and corrective actions reports for constructed asset investments, available at:
http://www.doi.gov/pam/QuarterlyReportGuidance61605.pdf
Interdependencies
Data
Current status (active/inactive) Data source (report or system) Data source area
Activation date Earliest data available as of (date) Timing of data production
Target activation date Latest data available as of (date) Lead time for data availability
KPI evaluation
Reporting effort rating Cost of using the KPI KPI maturity level
©Also
The available
KPI Institute
at: 2012
http://www.smartkpis.com/kpi-key-performance-indicator/to-complete-performance-index-tcpi-493.html
39
IDIndicator sK0128291 © The KPI Institute Pty Ltd 2010. Terms of use available at: http://www.smartkpis.com/terms-of-use.html ('Premium content terms')
number:documentation
Top 25 Project Management KPIs of 2011-2012
14
Functional Areas Sub-categories Industries
sK159 export date: 4 Dec 2012 - Page 1
Username: cristina.tarata@smartkpis.com
Member organization: Integerperform
Name
Definition
Measures the percentage of overdue tasks out of the total number of current project tasks.
Variations
% Project tasks over the deadline
% Project tasks not closed and not solved within the established time frame
% Overdue tasks
Related KPIs
# Project delay
Tags
project management, overdue tasks, project tasks
Calculation
Focus
Purpose
To track project progress as a large number of overdue project tasks can slow progress and put the project at risk.
Data profile
Targets
Threshold example
Red: >30% Yellow: 10-30% Green: <10 %
Overall notes
In order for this KPI to be as relevant as possible for the project management team, it should be complemented by task ranking according to their importance.
Overdue high importance tasks should be analyzed and solved first. Steps should be taken to stop tasks from becoming overdue.
Additional resources
http://www.mountaintop.net.au/Lifecycle.htm
http://blog.maia-intelligence.com/2008/02/22/key-performance-indicators-kpi-a-puzzle-solved/
http://wordpress.org/extend/plugins/project-tasks/
References
1. California Office of the State Chief Information Officer (1997), Project management planning, available at:
http://www.cioarchives.ca.gov/ITpolicy/pdf/PM3.3_Planning_Definition_and_Sequencing.pdf
2. Maryland Department of Information Technology (2007), Project management resources, available at:
http://doit.maryland.gov/contracts/Documents/cats_torfp_status/proj_mgmt_resourcese00p7200645.pdf
3. Lever, R. (2009), Project planning and identifying project tasks, 101 Business management, available at:
http://suite101.com/article/project-planning-and-identifying-project-tasks-a89840
Interdependencies
Data
Current status (active/inactive) Data source (report or system) Data source area
Activation date Earliest data available as of (date) Timing of data production
Target activation date Latest data available as of (date) Lead time for data availability
KPI evaluation
Reporting effort rating Cost of using the KPI KPI maturity level
©Also
The available at: 2012
KPI Institute http://www.smartkpis.com/kpi-key-performance-indicator/overdue-project-tasks-159.html
41
IDIndicator sK0128291 © The KPI Institute Pty Ltd 2010. Terms of use available at: http://www.smartkpis.com/terms-of-use.html ('Premium content terms')
number:documentation
Top 25 Project Management KPIs of 2011-2012
15
Functional Areas Sub-categories Industries
sK483 export date: 4 Dec 2012 - Page 1
Username: cristina.tarata@smartkpis.com
Member organization: Integerperform
Name
Definition
Measures the expected total cost of a scheduled activity as per work breakdown structure, or of the entire project, in cases where the scope of work that has
been previously defined will ultimately be completed.
Variations
$ EAC
Related KPIs
$ Estimate to complete
Tags
project costs, budget
Calculation
Focus
Purpose
To provide an indication of the total cost estimated at different stages during project execution or upon completion.
Data profile
Targets
Threshold example
Red: >15,000 Yellow: 10,000-15,000 Green: <10,000
Overall notes
The estimate at completion can be determined by deriving calculations based on the performance to date, or may be derived by the project leader or team
via using other miscellaneous factors entirely.
Additional resources
http://www.hud.gov/offices/cpo/evms/clause.pdf
http://www-glast.slac.stanford.edu/ProjectControls/Var_Howto.pdf
http://www.cebaf.gov/div_dept/directorate/proj_mgmt/manual/700analysis.pdf
References
1. Christensen, D. S. (1993), Determining an accurate estimate at completion, National Contract Management Journal, Vol. 25, pp. 17-25, available at:
http://www.suu.edu/faculty/christensend/evms/eacncmj.pdf
2. GSME Department (n.d.), Sharif MBA project management session 9, available at: http://gsme.sharif.edu/~projectmanagement/PMSession9.pdf
3. Highsmith, J. (2004), Agile project management: Creating innovative products, Boston, MA: Addison-Wesley, available at:
2004http://www.google.ro/url?sa=t&rct=j&q=&esrc=s&source=web&cd=6&cad=rja&ved=0CEMQFjAF&url=http%3A%2F%2Fwww.zenisoft.cn%3A10010%2F
calibre%2Fget%2Fpdf%2F718&ei=Z1W3UP7LM4z6sgbyl4GQCQ&usg=AFQjCNG3vi3HPdB-8I-EMgEfx7J7DpjADA&sig2=fPMWjCmIs7yVF_-DMUsqIQ
Interdependencies
Data
Current status (active/inactive) Data source (report or system) Data source area
Activation date Earliest data available as of (date) Timing of data production
Target activation date Latest data available as of (date) Lead time for data availability
KPI evaluation
Reporting effort rating Cost of using the KPI KPI maturity level
16
Functional Areas Sub-categories
sK485 export date: 4 Dec 2012 - Page 1
Username: cristina.tarata@smartkpis.com
Industries
Member organization: Integerperform
Name
Definition
Measures the numeric value that describes the overall performance in terms of cost for a project.
Variations
# Project cost performance index
# PCPI
Related KPIs
$ Project net present value (NPV)
Tags
earned value, cost
Calculation
Focus
Purpose
To indicate the efficiency of managing project work and budget resources.
Data profile
Targets
Threshold example
Red: <0.7 Yellow: 0.8-1 Green: >1
Overall notes
This indicator requires the calculation of two measures:
1. The budgeted cost of work scheduled (BCWS), which is the portion of the cost planned to be spent on a task between the starting date of the task and the
status date. For example, the total planned budget for a 4-day task is $100 and it starts on a Monday. If the status date is set to the following Wednesday, the
BCWS is $75.
2. The actual cost of work performed (ACWP), which is the total actual cost incurred while working on a task during a given period. For example, if the 4-day
task actually incurs a total cost of $35 during each of the first 2 days, the ACWP for this period is $70 (but the BCWS is still $75).
Additional resources
http://www.ajdesigner.com/phpearnedvalue/cost_performance_index.php
http://www-glast.slac.stanford.edu/ProjectControls/Var_Howto.pdf
http://www.cebaf.gov/div_dept/directorate/proj_mgmt/manual/700analysis.pdf
References
1. Christensen, D. S., (1993), Determining an accurate estimate at completion, The National Contract Management Journal, Vol. 25, pp. 17-25, available at:
http://www.suu.edu/faculty/christensend/evms/eacncmj.pdf
2. GSME Department (n.d.), Sharif MBA project management session 9, available at:
http://gsme.sharif.edu/~projectmanagement/PMSession9.pdf
3. Schwaber, K. (2004), Agile project management with Scrum (Microsoft Professional), Redmond, WA: Microsoft Press, available at:
http://www.google.ro/url?sa=t&rct=j&q=&esrc=s&source=web&cd=1&cad=rja&ved=0CDoQFjAA&url=http%3A%2F%2Fspemarti.googlecode.com%2Ffiles%2
FSchwaber2004.pdf&ei=1DC3UJPRBc670QHmnICwDA&usg=AFQjCNEVg_uRRLZKyXIPCX3G_5dWZb0sBg&sig2=liYICDm1js_TghctKmCCQg
Interdependencies
Data
Current status (active/inactive) Data source (report or system) Data source area
Activation date Earliest data available as of (date) Timing of data production
Target activation date Latest data available as of (date) Lead time for data availability
KPI evaluation
Reporting effort rating Cost of using the KPI KPI maturity level
17
Functional Areas Sub-categories
sK2070 export date: 4 Dec 2012 - Page 1
Username: alexandru.muntean@smartkpis.com
Member organization: INTEGERPERFORM CEE
Industries
Portfolio and Project Management Project Management Any
Governance, Compliance and Risk Risk Management
Name
Definition
Measures the percentage of the initial requirements that were changed during project implementation.
Variations
% Requirements modified
Related KPIs
% Requirements to be reworked
Tags
project requirements
Calculation
Focus
Purpose
To indicate project alignment with the initial specifications.
Data profile
Targets
Threshold example
Red: >30% Yellow: 15-30% Green: <15%
Overall notes
Managing change requirements is an important project management stage and various project management methodologies propose a particular approach
towards this.
Additional resources
http://www.agilemodeling.com/essays/changeManagement.htm
http://www.ravenbrook.com/doc/2003/02/24/requirements-and-change
http://conferences.embarcadero.com/article/32153
References
1. California Office of the State Chief Information Officer (1997), Project execution: PM elements, available at:
http://www.cioarchives.ca.gov/ITpolicy/pdf/PM5.2_Project_Execution_Tracking_and_Monitoring.pdf
2. Jefferson Science Associates (2012), Project control system
manual, available at: http://www.cebaf.gov/div_dept/directorate/proj_mgmt/manual/manual.pdf
3. Maryland Department of Information Technology (2010), Request for resume (RFR): CATS II master contract, available at:
http://doit.maryland.gov/contracts/Documents/catsII_torfp_status/F50B0400045CCURequisiteProRFR.pdf
Interdependencies
Data
Current status (active/inactive) Data source (report or system) Data source area
Activation date Earliest data available as of (date) Timing of data production
Target activation date Latest data available as of (date) Lead time for data availability
KPI evaluation
Reporting effort rating Cost of using the KPI KPI maturity level
©Also
The available at: 2012
KPI Institute http://www.smartkpis.com/kpi-key-performance-indicator/requirements-changed-during-project-execution-2070.html
47
IDIndicator
number:documentation
sK0128291 © The KPI Institute Pty Ltd 2010. Terms of use available at: http://www.smartkpis.com/terms-of-use.html ('Premium content terms')
Top 25 Project Management KPIs of 2011-2012
18
Functional Areas Sub-categories
sK492 export date: 4 Dec 2012 - Page 1
Username: cristina.tarata@smartkpis.com
Industries
Member organization: Integerperform
Name
$ Cost variance
Definition and variations
Definition
Measures the difference between the budgeted cost of work performed and actual cost of work performed, as being under or above budget.
Variations
$ Project budget variance
$ Project budget deviation
Related KPIs
% Construction cost in use
Tags
project costs, actual cost
Calculation
Focus
Purpose
To track the efficiency of project execution from the cost perspective, as a difference between the work value obtained and the work cost performed.
Data profile
Targets
Threshold example
Red: <0 Yellow: 0-1 Green: >1
Overall notes
One way to maintain a favorable cost variance is to minimize the actual costs to the extent possible, due to the fact that this indicator depends directly on the
earned value and the actual cost. This KPI offers an overarching picture of cost performance on a particular project.
Additional resources
http://www.project-management-knowledge.com/definitions/v/variance/
http://www-project.slac.stanford.edu/ilc/planning/resources/controlsyst.html
http://en.wikipedia.org/wiki/Earned_value_management
References
1. GSME Department (n.d.), Sharif MBA project management session 9, available at: http://gsme.sharif.edu/~projectmanagement/PMSession9.pdf
2. International Linear Collinder (2008), Project management control systems, available at:
http://www-project.slac.stanford.edu/ilc/planning/resources/controlsyst.html
3. Schwaber, K. (2004), Agile project management with Scrum (Microsoft Professional), Redmond, WA: Microsoft Press, available at:
http://www.google.ro/url?sa=t&rct=j&q=&esrc=s&source=web&cd=1&cad=rja&ved=0CDoQFjAA&url=http%3A%2F%2Fspemarti.googlecode.com%2Ffiles%2
FSchwaber2004.pdf&ei=1DC3UJPRBc670QHmnICwDA&usg=AFQjCNEVg_uRRLZKyXIPCX3G_5dWZb0sBg&sig2=liYICDm1js_TghctKmCCQg
Interdependencies
Data
Current status (active/inactive) Data source (report or system) Data source area
Activation date Earliest data available as of (date) Timing of data production
Target activation date Latest data available as of (date) Lead time for data availability
KPI evaluation
Reporting effort rating Cost of using the KPI KPI maturity level
©Also
The available at: 2012
KPI Institute http://www.smartkpis.com/kpi-key-performance-indicator/cost-variance-492.html
49
IDIndicator
number:documentation
sK0128291 © The KPI Institute Pty Ltd 2010. Terms of use available at: http://www.smartkpis.com/terms-of-use.html ('Premium content terms')
Top 25 Project Management KPIs of 2011-2012
19
Functional Areas Sub-categories
sK2704 export date: 4 Dec 2012 - Page 1
Username: cristina.tarata@smartkpis.com
Industries
Member organization: Integerperform
Name
# Project delay
Definition and variations
Definition
Measures the total delay of the project by summing the delays registered in each of the stages of project implementation.
Variations
# Total project delay time
Related KPIs
% Overdue project tasks
Tags
project, delay
Calculation
Focus
Purpose
To provide an indication of the total delay time, as such event can have drastic consequences on the success of the project.
Data profile
Targets
Threshold example
Red: >45 Yellow: 30-45 Green: <30
Overall notes
This KPI is recommended for projects with a strict timeframe for delivery, as project delays might severely impact the client - contractor relationships. Good
communication and client contractor relationships are important for the success of any project, so making provisions in a project for events such as weather
delays, resources scarceness reduces disputes.
Additional resources
http://www.emeraldinsight.com/Insight/viewContentItem.do;jsessionid=B34F8EF2A72F9D26C9E550BECA4F4190?contentType=Article&hdAction=lnkpdf&co
ntentId=1577603
http://www.dummies.com/how-to/content/how-to-identify-and-correct-causes-of-project-dela.html
http://www.themanagementor.com/enlightenmentorareas/sm/ms/whyproj.htm
References
1. Arcuri, F. J. and Hildreth, J. C. (2007), The principles of schedule impact analysis, available at:
http://www.vdot.virginia.gov/business/resources/const/0703_PrinciplesofSIA.pdf
2. State of California Department of Transportation, Business, Transportation and Housing Agency (2010), Request to extend the period of project allocation
for locally-administered stip projects, per Stip Guidelines Waiver-10-14", Memorandum, available at:
http://www.dot.ca.gov/hq/transprog/ctcliaison/2010/0410/RBI_Tab94_2_8a1_BI_Rev.pdf
3. Trauner, T. J. (2009), Construction delays: Understanding them clearly, analyzing them correctly,San Diego: Elsevier Butterworth-Heinemann, CA, Page
86, available at: http://www.knovel.com/web/portal/browse/display?_EXT_KNOVEL_DISPLAY_bookid=2738
Interdependencies
Data
Current status (active/inactive) Data source (report or system) Data source area
Activation date Earliest data available as of (date) Timing of data production
Target activation date Latest data available as of (date) Lead time for data availability
KPI evaluation
Reporting effort rating Cost of using the KPI KPI maturity level
©Also
The available at: 2012
KPI Institute http://www.smartkpis.com/kpi-key-performance-indicator/project-delay-2704.html
51
IDIndicator
number:documentation
sK0128291 © The KPI Institute Pty Ltd 2010. Terms of use available at: http://www.smartkpis.com/terms-of-use.html ('Premium content terms')
Top 25 Project Management KPIs of 2011-2012
20
Functional Areas Sub-categories
sK410 export date: 4 Dec 2012 - Page 1
Username: cristina.tarata@smartkpis.com
Industries
Member organization: Integerperform
Name
Definition
Measures the total number of hours that are allocated on average for completing a project task.
Variations
# Hours per task estimate
# Estimated hours per task
# Estimated time per task
# Planned hours per task
Related KPIs
% Time spent as planned
Tags
project, hours, time
Calculation
Focus
Purpose
To indicate how long it takes in average to complete a task.
Data profile
Targets
Threshold example
Red: <2; >5 Yellow: 2-3; 4-5 Green: 3-4
Overall notes
This KPI should be tracked regularly, to check progress against the plan and estimate the work left against the hours remaining (to estimate completion by
plan).
Additional resources
http://www.smashingmagazine.com/2009/06/11/effective-strategy-to-estimate-time-for-your-design-projects/
http://www.sitepoint.com/blogs/2009/04/14/how-to-estimate-time-for-a-project/
References
1. Adept (2009), Adept project-share project and resource management quick overview, available at:
http://www.msprojecttools.com/LinkClick.aspx?fileticket=_qYyMFCttvI%3D&tabid=64&mid=397
2. Brynjolfsson, E. and Van Alstyne, M. (2004), Information worker productivity: Task level evidence, available at:
info.freeman.tulane.edu/iom/seminarpapers/BrynjolfssonVanalstyne.doc
3. California Office of the State Chief Information Officer (1997), Project management planning, available at:
http://www.cioarchives.ca.gov/ITpolicy/pdf/PM3.3_Planning_Definition_and_Sequencing.pdf
Interdependencies
Data
Current status (active/inactive) Data source (report or system) Data source area
Activation date Earliest data available as of (date) Timing of data production
Target activation date Latest data available as of (date) Lead time for data availability
KPI evaluation
Reporting effort rating Cost of using the KPI KPI maturity level
©Also
The available at: 2012
KPI Institute http://www.smartkpis.com/kpi-key-performance-indicator/time-per-project-task-410.html
53
IDIndicator
number:documentation
sK0128291 © The KPI Institute Pty Ltd 2010. Terms of use available at: http://www.smartkpis.com/terms-of-use.html ('Premium content terms')
Top 25 Project Management KPIs of 2011-2012
21
Functional Areas Sub-categories
sK2644 export date: 4 Dec 2012 - Page 1
Username: cristina.tarata@smartkpis.com
Industries
Member organization: Integerperform
Name
Definition
Measures the actual amount of money spent for accomplishing the work scheduled to be performed for project completion.
Variations
$ ACWP
Related KPIs
$ Budgeted cost of worked scheduled (BCWS)
Tags
cost
Calculation
Focus
Purpose
To indicate the total actual expenses incurred by the organization.
Data profile
Targets
Threshold example
Red: <8,000; >14,000 Yellow: 8,000-10,000; 12,000-14,000 Green: 10,000-12,000
Overall notes
Actual cost can be calculated for direct labor hours alone, direct costs alone, or all costs including indirect costs.
Additional resources
http://articles.techrepublic.com.com/5100-10878_11-5030576.html
http://www.ajdesigner.com/phpearnedvalue/cost_performance_index_awcp.php
http://www.project-management-knowledge.com/definitions/e/estimate-at-completion/
References
1. Christensen, D. S. (1993), Determining an accurate estimate at completion, The National Contract Management Journal, Volume 25, Pages 17-25,
available at: http://www.suu.edu/faculty/christensend/evms/eacncmj.pdf
2. Cornell University, Cornell Information Technologies (n.d.), Estimate at completion (EAC), available at:
http://www2.cit.cornell.edu/computer/robohelp/cpmm/Glossary_Words/Estimate_at_Completion.htm
3. GSME Department (n.d.), Sharif MBA project management session 9, available at:
http://gsme.sharif.edu/~projectmanagement/PMSession9.pdf
Interdependencies
Data
Current status (active/inactive) Data source (report or system) Data source area
Activation date Earliest data available as of (date) Timing of data production
Target activation date Latest data available as of (date) Lead time for data availability
KPI evaluation
Reporting effort rating Cost of using the KPI KPI maturity level
©Also
The available at: 2012
KPI Institute http://www.smartkpis.com/kpi-key-performance-indicator/actual-cost-of-work-performed-acwp-2644.html
55
IDIndicator
number:documentation
sK0128291 © The KPI Institute Pty Ltd 2010. Terms of use available at: http://www.smartkpis.com/terms-of-use.html ('Premium content terms')
Top 25 Project Management KPIs of 2011-2012
22
Functional Areas Sub-categories
sK2645 export date: 4 Dec 2012 - Page 1
Username: cristina.tarata@smartkpis.com
Industries
Member organization: Integerperform
Name
Definition
Measures the budgeted cost of work that has actually been performed during a specific period of time in accordance with the project scheduled tasks.
Variations
$ Earned value
$ BCWP
Related KPIs
$ Budgeted cost of worked scheduled (BCWS)
Tags
cost, project
Calculation
Focus
Purpose
To indicate how much of the work that was actually done up to a certain point should have cost, if everything went according to the plan.
Data profile
Targets
Threshold example
Red: <8,000; >14,000 Yellow: 8,000-10,000; 12,000-14,000 Green: 10,000-12,000
Overall notes
If the $ Budgeted Cost of Work Performed (BCWP) is less than the $ Budgeted Cost of Work Scheduled (BCWS), it means that work is done slower than
originally planned.
Additional resources
http://articles.techrepublic.com.com/5100-10878_11-5030576.html
http://www.ajdesigner.com/phpearnedvalue/cost_performance_index_awcp.php
http://books.google.ro/books?id=TdipsIckL2cC&pg=PA9&source=gbs_toc_r&cad=4#v=onepage&q&f=false
References
1. Christensen, D. S. (1993), Determining an accurate estimate at completion, National Contract Management Journal, Volume 25, Pages 17-25, available at:
http://www.suu.edu/faculty/christensend/evms/eacncmj.pdf
2. Cornell University, Cornell Information Technologies, Estimate at completion (EAC), available at:
http://www2.cit.cornell.edu/computer/robohelp/cpmm/Glossary_Words/Estimate_at_Completion.htm
3. GSME Department (n.d.), Sharif MBA project management session 9, available at:
http://gsme.sharif.edu/~projectmanagement/PMSession9.pdf
Interdependencies
Data
Current status (active/inactive) Data source (report or system) Data source area
Activation date Earliest data available as of (date) Timing of data production
Target activation date Latest data available as of (date) Lead time for data availability
KPI evaluation
Reporting effort rating Cost of using the KPI KPI maturity level
©Also
The available at: 2012
KPI Institute http://www.smartkpis.com/kpi-key-performance-indicator/budgeted-cost-of-work-performed-bcwp-2645.html
57
IDIndicator
number:documentation
sK0128291 © The KPI Institute Pty Ltd 2010. Terms of use available at: http://www.smartkpis.com/terms-of-use.html ('Premium content terms')
Top 25 Project Management KPIs of 2011-2012
23
Functional Areas Sub-categories
sK2662 export date: 5 Dec 2012 - Page 1
Username: adelaida.patrasc@smartkpis.com
Industries
Member organization: Integerperform
Name
Definition
Measures the number of non-conformity ranging from the production / project methodology process to the compliance with the quality standards found during
an inspection to a third party / vendor location.
Variations
# Non-conformity during vendor inspection
# Non-conformity during source inspection
Related KPIs
# Time to investigate a procedural violation
Tags
faulty projects
Calculation
Focus
Purpose
To indicate the reliability of the third party.
Data profile
This KPI does not provide indication of any impact brought by non-conformity.
Targets
Threshold example
Red: >5 Yellow: 2-5 Green: <2
Overall notes
Inspections on conformity is to ensure effectiveness of quality management. Other tools for quality control include control charts, statistical sampling, trend
analysis, etc.
Additional resources
http://www.nap.edu/openbook.php?record_id=1847&page=7
http://www.bus.iastate.edu/nilakant/ProjectMgmt/pmbok8.pdf
References
1. Applus Velosi (2011), Vendor inspection and expediting services, available at: http://www.velosi.com/downloads/Velosi%20Insert%2011.pdf
2. Vbautomation.110mb.com (2007), Inventory key performance indicators (KPI), scorecard and dashboard, available at:
http://vbautomation.110mb.com/INVENTORY%20MGMT/kpi.htm
3. Caliper Inspection (2012), Our services, available at: http://www.caliperinspection.com/services/
Interdependencies
Data
Current status (active/inactive) Data source (report or system) Data source area
Activation date Earliest data available as of (date) Timing of data production
Target activation date Latest data available as of (date) Lead time for data availability
KPI evaluation
Reporting effort rating Cost of using the KPI KPI maturity level
©Also
The available at: 2012
KPI Institute http://www.smartkpis.com/kpi-key-performance-indicator/third-party-non-conformity-identified-during-inspections-2662.html
59
IDIndicator
number:documentation
sK0128291 © The KPI Institute Pty Ltd 2010. Terms of use available at: http://www.smartkpis.com/terms-of-use.html ('Premium content terms')
Top 25 Project Management KPIs of 2011-2012
24
Functional Areas Sub-categories
sK2661 export date: 4 Dec 2012 - Page 1
Username: cristina.tarata@smartkpis.com
Industries
Member organization: Integerperform
Name
Definition
Measures the percentage of milestones missed during the project out of the total number of project milestones.
Variations
% Milestones missed
Related KPIs
% Projects with at least one milestone missed
# Issues raised per project
Tags
milestones, projects
Calculation
Focus
Purpose
To assess project adherence to the initial milestones schedule.
Data profile
Targets
Threshold example
Red: >30% Yellow: 10-30% Green: <10%
Overall notes
Measurement can refer to all project milestones or it can be made separately for milestones with different levels of importance.
Additional resources
http://www.brighthub.com/office/project-management/articles/68427.aspx
http://apps.mtc.ca.gov/meeting_packet_documents/agenda_920/3b_Financial_Projection_Assumptions_0907.pdf
http://books.google.ro/books/about/The_Advanced_Project_Management_Office.html?id=uWEAGfjMX5cC&redir_esc=y
References
1. Australian Government, Land and Water Australia (2008), Project milestone reporting guidelines, available at:
http://lwa.gov.au/files/pages/3188/pm-f-54-project-milestone-reporting-guidelines-oct.pdf
2. Goddard Space Flight Center (1977), Proceedings of second summer software engineering workshop, available at:
http://ntrs.nasa.gov/archive/nasa/casi.ntrs.nasa.gov/19820068873_1982068873.pdf
3. Jha, M. C., (2005), Project management matters, available at: http://www1.eere.energy.gov/industry/imf/pdfs/6_projectmanagementmatters.pdf
Interdependencies
Data
Current status (active/inactive) Data source (report or system) Data source area
Activation date Earliest data available as of (date) Timing of data production
Target activation date Latest data available as of (date) Lead time for data availability
KPI evaluation
Reporting effort rating Cost of using the KPI KPI maturity level
©Also
The available at: 2012
KPI Institute http://www.smartkpis.com/kpi-key-performance-indicator/project-milestones-missed-2661.html
61
IDIndicator
number:documentation
sK0128291 © The KPI Institute Pty Ltd 2010. Terms of use available at: http://www.smartkpis.com/terms-of-use.html ('Premium content terms')
Top 25 Project Management KPIs of 2011-2012
25
Functional Areas Sub-categories
sK2718 export date: 4 Dec 2012 - Page 1
Username: adelaida.patrasc@smartkpis.com
Industries
Member organization: Integerperform
Name
Definition
Measures the percentage of projects that are being completed with a maximum or minimum of +/- 5% deviation of the estimated timescale from the total
number of projects that are completed.
Variations
% Project time forecasting
% Project time predictability
Related KPIs
% Projects on time
Tags
timeliness
Calculation
Focus
Purpose
To assess the level of efficiency in project completion on time (within acceptable deviation of timescale).
Data profile
Targets
Threshold example
Red: <50% Yellow: 50-70% Green: >70%
Overall notes
By using the variance and assuming the normal distribution, the
analyst can determine the probability for project completion on schedule.
Additional resources
http://urp.unca.edu/sites/urp.unca.edu/files/documents/N2011IEM.pdf
References
1. Cooke-Davies, T.J. (2001), Towards improved project management practice: Uncovering the evidence for effective practices through empirical research.
USA: Dissertation.com, Page 197, available at:
http://books.google.com/books?id=a9yvH7sNBQEC&pg=PT208&lpg=PT208&dq=%22%25+Project+time+predictability%22&source=bl&ots=1PTeL1soNK&si
g=Rzr05XUKmFuAsXZkUe9CQr-APK4&hl=en&ei=g6ZnS7LBEoTAsgPmq_ieBQ&sa=X&oi=book_result&ct=result&resnum=2&ved=0CAkQ6AEwAQ#v=onep
age&q=%22%25%20Project%20time%20predictability%22&f=false
2. Enfield Council (n.d.), Corporate Asset Management Plan 2007-2009, available at:
http://www.enfield.gov.uk/downloads/file/396/asset_management_plan_2007_2009
3. Contructing Excellence, Castleoack and Department for Business Enterprise & Regulatory Reform (2009), UK Industry Performance Report 2009,
available at: http://www.constructingexcellence.org.uk/pdf/Industry_Performance_Report_2009.pdf
Interdependencies
Data
Current status (active/inactive) Data source (report or system) Data source area
Activation date Earliest data available as of (date) Timing of data production
Target activation date Latest data available as of (date) Lead time for data availability
KPI evaluation
Reporting effort rating Cost of using the KPI KPI maturity level
©Also
The available at: 2012
KPI Institute http://www.smartkpis.com/kpi-key-performance-indicator/project-completion-predictability-2718.html
63
IDIndicator
number:documentation
sK0128291 © The KPI Institute Pty Ltd 2010. Terms of use available at: http://www.smartkpis.com/terms-of-use.html ('Premium content terms')
Top
Top
2525
Project
Human Management
Resources KPIs of 2011-2012
Customer Academic
comprehensive and well documented selection of Key Performance Indicator (KPI) examples in the world, the ‘gold standard’ in KPI
documentation.
Service Education
KPIs of 2010 KPIs of 2010 KPIs of 2010 KPIs of 2010 KPIs of 2010
PurposefulIdentity.com contains a free online catalogue illustrating the use of corporate identity elements in practice by organizations
KPIs of 2010
from around the world. Registered users can explore, bookmark and comment on hundreds of referenced online resources that contain
organizational values, mission statements, value drivers and vision statements used in actual business context.
Culori
R=110 R=176
IntegratingPerformance.com is an online platform for integrating performance management knowledge, at strategic, operational and
G=110 G=176
# Berry ratioindividual
# Laborlevels. It reviews the evolution of Performance
ratio #Management as well
% as the key tools,expense
systems and software
(MER)used
# at discipline
B=109 B=176
$ Cost of goods sold (COGS) # Days in accounts receivable % Billing accuracy $ Selling, general and administrative % On-time delivery # Time to rectify defects % Customer complaints due to poor service or product quality # Call multiplier % Capital acquisition Liquidity ratio Management ratio % Attendance rate per course % Drop-out rate # National examination score % Student acceptance rate % Gradu- %Agent utilization $ Revenue per successful call # Call handling time # Hourly sales per agent # Call volume % First $ Revenue per available seat hour (RevPASH) % Canceled reservations # Complaints per restaurant order % Posi-
at each of these levels. It combines the analysis of theory and architecture with insights regarding good practice and key directions, ation rate % Student scholarships per year % Students participating in research activities # Students grades %
expenses (SG&A expenses) $ Working capital per employee $ Working capital $ Fixed assets $ Operating expenses handling time % First contact resolution rate % Complaints resolved # Longest call hold % Customer satisfaction Altman Z-Score (for privately held manufacturing companies) % Sustainable growth rate (SGR) % Return on capital call resolution rate # Longest call hold % Call abandon rate # Longest delay in queue % Customer calls answered tive feedback from guests % Reserved tables # Guests per table # Tables served per waiter $ Revenue per available
enabling visitors to gain comprehensive insights into the nature of Performance Management as an integrating discipline. Students involved in extracurricular activities % Student satisfaction rate # Extracurricular activities per student #
$ Net income after taxes (NIAT) # Breakeven point (BEP) $ Financial expenses % Aging of uncollected bills $ Fixed with service levels % Orders delivered with damaged products % Call abandon rate # Complaints received # Pick-to- employed (ROCE) % Gross profit margin $ Net cash flow $ Free cash flow (FCF) $ EBIT (Earnings Before Interest and in the first minute # Service requests per agent % Calls answered within service level time # Talk time % Blockage # square meter (RevPAM) % Customers satisfied with the time to be served % Restaurants that apply principles of
assets per FTE (Full Time Equivalent) % Invoices under query # Days in accounts payable # Days of purchases paid ship cycle time for customer orders # Longest delay in queue % Customer calls answered in the first minute % Work Taxes) $ Earnings per share (EPS) $ Economic value added (EVATM) # Asset turnover % Return on investment (ROI) Students per class % Students - professor ratio # Students to computer ratio % Entering students through transfer Average speed of answer (ASA) $ Cost per call (CPC) # On-hold time % Call completion rate # After call work time % workplace safety and sanitation % Unavailability of menu items % Restaurants that apply principles of menu plan-
$ Fixed costs % Contribution margin ratio % Financial reports submitted as correct and on time $ Earnings before orders closed within the specified time period % Service charges of profits # Service requests per agent % Calls % Cash-on-cash return (CCR) # Altman Z-Score (for public manufacturing companies) # Price to sales ratio # Acid
Culori $ Academic activity cost per student % Ethnic minority students % Student repetition rate # Teaching experience % Call transfer rate % Agent availability rate # Dials per hour # Web call-backs handled % Repeat calls % Agent sched- ning $ Revenue per table # Time per table turn % Restaurants that apply principles of managing the purchasing pro-
interest, taxes, depreciation and amortization (EBITDA) # Sales to general and administrative expenses $ Expenses answered within service level time % Sales invoices issued on time # Talk time % Timeliness of issues resolution % test ratio % Net profit margin # Interest
R=109 R=255
cover % Annual equivalent rate # Benefit cost ratio (BCR) % Total expense Graduate employment rate # Time to graduate % International students % National accreditation study programs # ule adherence %Agent utilization $ Revenue per successful call # Call handling time # Hourly sales per agent # Call cess $ Amount of dining % Food service strike rate % Food loss % Tips from total collected % Food costs from food
# Working capital turnover # Current ratio # Average days past-due invoices $ Cost of goods sold (COGS) # Days in Blockage % Resolution of queries the same day # Orders processed # Average speed of answer (ASA) % On-time ratio (TER) # Berry ratio
G=33
# Labor multiplier
G=0
% Capital acquisition ratio # Liquidity ratio % Management expense ratio Students enrolled per academic year # Male to female student ratio % Attendance rate per course % Drop-out rate volume % First call resolution rate # Longest call hold % Call abandon rate # Longest delay in queue % Customer sales # New menu items # Guests # Product quality uniformity % Beverage loss % Front of house labor $ Revenue
accounts receivable % Billing accuracy $ Selling, general and administrative expenses (SG&A expenses) $ Working delivery # Time to rectify defects % Customer complaints due to poor service or product quality # Call handling time (MER) # Altman Z-Score B=20
(for privatelyB=0
held manufacturing companies) % Sustainable growth rate (SGR) % Return on # National examination score % Student acceptance rate % Graduation rate % Student scholarships per year % calls answered in the first minute # Service requests per agent % Calls answered within service level time # Talk time per available seat hour (RevPASH) % Canceled reservations # Complaints per restaurant order % Positive feedback
BalancedScorecardReview.com is the most comprehensive online resource dedicated to the Balanced Scorecard. It contains a review Students participating in research activities # Students grades % Students involved in extracurricular activities %
capital per employee $ Working capital $ Fixed assets $ Operating expenses $ Net income after taxes (NIAT) # Break- % First contact resolution rate % Complaints resolved # Longest call hold % Customer satisfaction with service capital employed (ROCE) % Gross profit margin $ Net cash flow $ Free cash flow (FCF) $ EBIT (Earnings Before Inter- % Blockage # Average speed of answer (ASA) $ Cost per call (CPC) # On-hold time % Call completion rate # After call from guests % Reserved tables # Guests per table # Tables served per waiter $ Revenue per available square meter
of this popular management concept following its evolution and use around the world in various industries or companies. It presents its Student satisfaction rate # Extracurricular activities per student # Students per class % Students - professor ratio
even point (BEP) $ Financial expenses % Aging of uncollected bills $ Fixed assets per FTE (Full Time Equivalent) levels % Orders delivered with damaged products % Call abandon rate # Complaints received # Pick-to-ship cycle est and Taxes) $ Earnings per share (EPS) $ Economic value added (EVATM) # Asset turnover % Return on invest- work time % Call transfer rate % Agent availability rate # Dials per hour # Web call-backs handled % Repeat calls % (RevPAM) % Customers satisfied with the time to be served % Restaurants that apply principles of workplace safety
various interpretations, compares it to other concepts and explores its impact on organizations as well as the opinions of critics. # Students to computer ratio % Entering students through transfer $ Academic activity cost per student % Ethnic
% Invoices under query # Days in accounts payable # Days of purchases paid $ Fixed costs % Contribution margin time for customer orders # Longest delay in queue % Customer calls answered in the first minute % Work orders ment (ROI) % Cash-on-cash return (CCR) # Altman Z-Score (for public manufacturing companies) # Price to sales Agent schedule adherence %Agent utilization $ Revenue per successful call # Call handling time # Hourly sales per and sanitation % Unavailability of menu items % Restaurants that apply principles of menu planning $ Revenue per
ratio % Financial reports submitted as correct and on time $ Earnings before interest, taxes, depreciation and amorti- closed within the specified time period % Service charges of profits # Service requests per agent % Calls answered ratio # Acid test ratio % Net profit margin # Interest cover % Annual equivalent rate # Benefit cost ratio (BCR) % Total minority students % Student repetition rate # Teaching experience % Graduate employment rate # Time to graduate agent # Call volume % First call resolution rate # Longest call hold % Call abandon rate # Longest delay in queue % table # Time per table turn % Restaurants that apply principles of managing the purchasing process $ Amount of
zation (EBITDA) # Sales to general and administrative expenses $ Expenses # Working capital turnover # Current ra- within service level time % Sales invoices issued on time # Talk time % Timeliness of issues resolution % Blockage expense ratio (TER) # Berry ratio # Labor multiplier % Capital acquisition ratio # Liquidity ratio % Management ex- % International students % National accreditation study programs # Students enrolled per academic year # Male to Customer calls answered in the first minute # Service requests per agent % Calls answered within service level time dining % Food service strike rate % Food loss % Tips from total collected % Food costs from food sales # New menu
female student ratio % Attendance rate per course % Drop-out rate # National examination score % Student acceptan
Culori
tio # Average days past-due invoices $ Cost of goods sold (COGS) # Days in accounts receivable % Billing accuracy % Resolution of queries the same day # Orders processed # Average speed of answer (ASA) % On-time delivery pense ratio (MER) #R=0 Altman Z-ScoreR=127 (for privately held manufacturing companies) % Sustainable growth rate (SGR) # Talk time % Blockage # Average speed of answer (ASA) $ Cost per call (CPC) # On-hold time % Call completion rate items # Guests # Product quality uniformity % Beverage loss % Front of house labor $ Revenue per available seat
G=0 G=147
Publication date: 25 May 2011 Publication date: 10 June 2011 Publication date:
Life.lab1Building,
June Suite
2011606, 198 Harbour Esplanade, Melbourne Docklands, VIC 3008 Publication date: 10 March 2011 Publication date: 18 August 2011
eabID number: sK0118021 eabID number: sK0118031 eabID number:T: +61 3 9670 2979, E: office@eabgroup.com.au
sK0118041 eabID number: sK0118152 eabID number: sK0118161 eabID number: sK0118171
Publication date: 10 March 2011 Publication date: 30 March 2011 Publication date: 17 June 2011 Publication date: 30 March 2011 Publication date: 25 August 2011 Publication date: 9 August 2011
eabID number: sK0118051 eabID number: sK0118061 eabID number: sK0118071 eabID number: sK0118181 eabID number: sK0118191 eabID number: sK0118201
Publication date: 15 March 2011 Publication date: 22 June 2011 Publication date: 20 June 2011 Publication date: 5 September 2011 Publication date: 29 August 2011 Publication date: 15 August 2011
eabID number: sK0118081 eabID number: sK0118121 eabID number: sK0118091 eabID number: sK0118211 eabID number: sK0118221 eabID number: sK0118241
Publication date: 22 June 2011 Publication date: 14 March 2011 Publication date: 21 June 2011 Publication date: 21 March 2011 Publication date: 28 August 2011 Publication date: 29 July 2011
eabID number: sK0118101 eabID number: sK0118131 eabID number: sK0118141 eabID number: sK0118251 eabID number: sK0118261 eabID number: sK0118271
www.smartkpis.com/premium/products/reports/browse-top-kpis-reports
© The KPI Institute 2012
64
ID number: sK0128291
sK0117081
Top 25 Human
Project Resources
ManagementKPIs
KPIsof of
2011-2012
2011-2012
# Call volume # Call arrival rate # Text-Chat volume % Call transfer rate % Blockage % Call drop rate (CDR) % Calls # Call volume # Call arrival rate # Text-Chat volume % Call transfer rate % Blockage % Call drop rate (CDR) % Calls # Call volume # Call arrival rate # Text-Chat volume % Call transfer rate % Blockage % Call drop rate (CDR) % Calls # Call volume # Call arrival rate # Text-Chat volume % Call transfer rate % Blockage % Call drop rate (CDR) % Calls
answered within service level time # Average speed of answer (ASA) # On-hold time # Longest delay in queue # answered within service level time # Average speed of answer (ASA) # On-hold time # Longest delay in queue # answered within service level time # Average speed of answer (ASA) # On-hold time # Longest delay in queue # answered within service level time # Average speed of answer (ASA) # On-hold time # Longest delay in queue #
Average wait time before abandon % Customer satisfaction with service levels % Call abandon rate # After call Average wait time before abandon % Customer satisfaction with service levels % Call abandon rate # After call Average wait time before abandon % Customer satisfaction with service levels % Call abandon rate # After call Average wait time before abandon % Customer satisfaction with service levels % Call abandon rate # After call
work time # Talk time # Call handling time # Longest call length % Agent utilization # Service requests per agent % work time # Talk time # Call handling time # Longest call length % Agent utilization # Service requests per agent % work time # Talk time # Call handling time # Longest call length % Agent utilization # Service requests per agent % work time # Talk time # Call handling time # Longest call length % Agent utilization # Service requests per agent %
Agent availability rate % Agent schedule adherence % Interactions routed properly % Repeat calls % First contact Agent availability rate % Agent schedule adherence % Interactions routed properly % Repeat calls % First contact Agent availability rate % Agent schedule adherence % Interactions routed properly % Repeat calls % First contact Agent availability rate % Agent schedule adherence % Interactions routed properly % Repeat calls % First contact
resolution rate % Accuracy in completion of records % Customer complaints resolved on the first contact % Customer resolution rate % Accuracy in completion of records % Customer complaints resolved on the first contact % Customer resolution rate % Accuracy in completion of records % Customer complaints resolved on the first contact % Customer resolution rate % Accuracy in completion of records % Customer complaints resolved on the first contact % Customer
satisfaction with complaints handling % Complaints resolved $ Customer care funding per resolved complaint # satisfaction with complaints handling % Complaints resolved $ Customer care funding per resolved complaint # satisfaction with complaints handling % Complaints resolved $ Customer care funding per resolved complaint # satisfaction with complaints handling % Complaints resolved $ Customer care funding per resolved complaint #
Call volume # Call arrival rate # Text-Chat volume % Call transfer rate % Blockage % Call drop rate (CDR) % Calls Call volume # Call arrival rate # Text-Chat volume % Call transfer rate % Blockage % Call drop rate (CDR) % Calls Call volume # Call arrival rate # Text-Chat volume % Call transfer rate % Blockage % Call drop rate (CDR) % Calls Call volume # Call arrival rate # Text-Chat volume % Call transfer rate % Blockage % Call drop rate (CDR) % Calls
answered within service level time # Average speed of answer (ASA) # On-hold time # Longest delay in queue # answered within service level time # Average speed of answer (ASA) # On-hold time # Longest delay in queue # answered within service level time # Average speed of answer (ASA) # On-hold time # Longest delay in queue # answered within service level time # Average speed of answer (ASA) # On-hold time # Longest delay in queue #
Average wait time before abandon % Customer satisfaction with service levels % Call abandon rate # After call Average wait time before abandon % Customer satisfaction with service levels % Call abandon rate # After call Average wait time before abandon % Customer satisfaction with service levels % Call abandon rate # After call Average wait time before abandon % Customer satisfaction with service levels % Call abandon rate # After call
work time # Talk time # Call handling time # Longest call length % Agent utilization # Service requests per agent % work time # Talk time # Call handling time # Longest call length % Agent utilization # Service requests per agent % work time # Talk time # Call handling time # Longest call length % Agent utilization # Service requests per agent % work time # Talk time # Call handling time # Longest call length % Agent utilization # Service requests per agent %
Agent availability rate % Agent schedule adherence % Interactions routed properly % Repeat calls % First contact Agent availability rate % Agent schedule adherence % Interactions routed properly % Repeat calls % First contact Agent availability rate % Agent schedule adherence % Interactions routed properly % Repeat calls % First contact Agent availability rate % Agent schedule adherence % Interactions routed properly % Repeat calls % First contact
resolution rate % Accuracy in completion of records % Customer complaints resolved on the first contact % Customer resolution rate % Accuracy in completion of records % Customer complaints resolved on the first contact % Customer resolution rate % Accuracy in completion of records % Customer complaints resolved on the first contact % Customer resolution rate % Accuracy in completion of records % Customer complaints resolved on the first contact % Customer
satisfaction with complaints handling % Complaints resolved $ Customer care funding per resolved complaint satisfaction with complaints handling % Complaints resolved $ Customer care funding per resolved complaint satisfaction with complaints handling % Complaints resolved $ Customer care funding per resolved complaint satisfaction with complaints handling % Complaints resolved $ Customer care funding per resolved complaint
Publication date: September 2012 ID number: sK0117081 Publication date: September 2012 ID number: sK0117081 Publication date: September 2012 ID number: sK0117081 Publication date: September 2012 ID number: sK0117081
By Functional Area
Top 25 Accounting KPIs of 2011-2012 Top 25 Governance KPIs of 2011-2012 Top 25 Public Relations KPIs of 2011-2012
Top 25 Accounts Payable and Receivable KPIs of 2011- Top 25 Human Resources KPIs of 2011-2012 Top 25 Quality Management KPIs of 2011-2012
2012
Top 25 Advertising KPIs of 2011-2012 Top 25 Information Technology KPIs of 2011-2012 Top 25 R&D KPIs of 2011-2012
Top 25 Application Development KPIs of 2011-2012 Top 25 Innovation KPIs of 2011-2012 Top 25 Recruitment KPIs of 2011-2012
Top 25 Compensation and Benefits KPIs of 2011-2012 Top 25 Inventory Management KPIs of 2011-2012 Top 25 Retention KPIs of 2011-2012
Top 25 Compliance and Audit Management KPIs of Top 25 IT Security KPIs of 2011-2012 Top 25 Risk Management KPIs of 2011-2012
2011-2012
Top 25 Contract Management KPIs of 2011-2012 Top 25 Knowledge Management KPIs of 2011-2012 Top 25 Sales KPIs of 2011-2012
Top 25 Corporate Travel KPIs of 2011-2012 Top 25 Logistics / Distribution KPIs of 2011-2012 Top 25 Service Delivery KPIs of 2011-2012
Top 25 CSR KPIs of 2011-2012 Top 25 Maintenance KPIs of 2011-2012 Top 25 Service Management KPIs of 2011-2012
Top 25 Customer Service KPIs of 2011-2012 Top 25 Marketing KPIs of 2011-2012 Top 25 Supply Chain Management KPIs of 2011-2012
Top 25 Data Center KPIs of 2011-2012 Top 25 Network Management KPIs of 2011-2012 Top 25 Supply Chain, Procurement, Distribution KPIs
of 2011-2012
Top 25 eCommerce KPIs of 2011-2012 Top 25 Portfolio Management KPIs of 2011-2012 Top 25 Talent Development KPIs of 2011-2012
Top 25 Enterprise Architecture KPIs of 2011-2012 Top 25 Procurement / Purchasing KPIs of 2011-2012 Top 25 Web Analytics KPIs of 2011-2012
Top 25 Environmental Care KPIs of 2011-2012 Top 25 Production KPIs of 2011-2012
Top 25 Finance KPIs of 2011-2012 Top 25 Project Management KPIs of 2011-2012
By Industry
Top 25 Academic Education KPIs of 2011-2012 Top 25 Hotel KPIs of 2011-2012 Top 25 Publishing KPIs of 2011-2012
Top 25 Accounting Services KPIs of 2011-2012 Top 25 Insurance KPIs of 2011-2012 Top 25 Railways KPIs of 2011-2012
Top 25 Airlines KPIs of 2011-2012 Top 25 Investments KPIs of 2011-2012 Top 25 Real Estate Transactions KPIs of 2011-2012
Top 25 Airports KPIs of 2011-2012 Top 25 Land Transport (Road & Rail) KPIs of 2011-2012 Top 25 Employment Services KPIs of 2011-2012
Top 25 Banking and Credit KPIs of 2011-2012 Top 25 Legal Practice KPIs of 2011-2012 Top 25 Restaurant KPIs of 2011-2012
Top 25 Broadcasting (TV and Radio) KPIs of 2011-2012 Top 25 Libraries and Archives KPIs of 2011-2012 Top 25 Retail KPIs of 2011-2012
Top 25 Business Consulting KPIs of 2011-2012 Top 25 Livestock, Hunting and Fishing KPIs of 2011- Top 25 Roads KPIs of 2011-2012
2012
Top 25 Call Center KPIs of 2011-2012 Top 25 Local Government KPIs of 2011-2012 Top 25 Shipping KPIs of 2011-2012
Top 25 Coal and Minerals Mining KPIs of 2011-2012 Top 25 Local Public Transport KPIs of 2011-2012 Top 25 Sport Club Management KPIs of 2011-2012
Top 25 Crops KPIs of 2011-2012 Top 25 Medical Practice KPIs of 2011-2012 Top 25 Sport Event Organisation KPIs of 2011-2012
Top 25 Electricity KPIs of 2011-2012 Top 25 Natural Gas KPIs of 2011-2012 Top 25 State Government KPIs of 2011-2012
Top 25 Engineering KPIs of 2011-2012 Top 25 NGO KPIs of 2011-2012 Top 25 Sustainability KPIs of 2011-2012
Top 25 Film and Music KPIs of 2011-2012 Top 25 Oil and Gas KPIs of 2011-2012 Top 25 Water and Sewage KPIs of 2011-2012
Top 25 Forestry and Logging KPIs of 2011-2012 Top 25 Ports KPIs of 2011-2012 Top 25 Telecommunications KPIs of 2011-2012
Top 25 Healthcare KPIs of 2011-2012 Top 25 Postal and Courier Services KPIs of 2011-2012
Top 25 Hospital KPIs of 2011-2012 Top 25 Property Management KPIs of 2011-2012
Delivery approach • Highly interactive, numerous exercises, case studies and group discussions
• Experiential learning simulations
All training courses • Six months of free access to the premium content of www.smartkpis.com
include: • Free toolkit of pre-populated templates to assist you with applying the course
learnings
• Library of relevant examples from practice
Performance through people training catalogue
Always treat your employees exactly as you want them to treat your best customers. - Stephen R. Covey It is always wise to look ahead, but difficult to look further than you can see. - Winston Churchill Business and human endeavors are systems…we tend to focus on snapshots of isolated parts of the system.
And wonder why our deepest problems never get solved. - Peter Senge
Change is the law of life and those who look only to the past or present are certain to miss the future. - John F. Kennedy The transition to a sustainable society requires a careful balance between long-term and short-term goals and an emphasis on A system is a network of interdependent components that work together to try to accomplish the aim of the system.
sufficiency, equity, and quality of life. - Denis L. Meadows A system must have an aim. Without an aim, there is no system - W. Edwards Deming. The New Economics
PERFORMANCE
STRATEGY
Process Management
In building a strong foundation
for performance, organiza- Risk Management
tions should leverage systemic
thinking and excellence in Project Management
managing change, projects,
Change Management
risks and processes
Systems Thinking
© The KPI Institute 2012
68 ©IDThe KPI Institute 2012
68 number: sK0117081
ID number: sK0128291
Top 25 Human
Project Resources
ManagementKPIs
KPIsof of
2011-2012
2011-2012
INTEGERPERFORM
the consulting arm of The KPI Institute, dedicated to assisting
European office: +40 721 233 084 / +40 369 801 650
Australian office: +61 42 456 8088 / +61 3 9670 2979
organisations in deploying best practice performance Email: office@integerperform.com, www.performanceintegrators.com
improvement solutions
Service categories
Consulting Technology Solutions
Applied solutions clustered around the Software and hardware that facilitate the
performance integration architecture developed by operation of successful performance improvement
The KPI Institute: peformance through people, initiatives
systems and innovation
Performance through systems - advisory services catalogue
Strategic and operational planning Operational performance management solutions
• Facilitation of strategic planning sessions. Supplier performance management – Development and
• Strategic research: environmental scans, strategic planning implementation of supplier scorecards for both products and
tools deployment (Five forces, SWOT analysis, competitor services suppliers
review).
Portfolio performance management
• Development of Portfolio Dashboards and Project Scorecards
Organizational Performance Management Systems • Identification of Key Risk Indicators and establishment of Risk
Implementations Scorecards
• Integrated performance management systems based on the Benefits realization management
Balanced Scorecard. • Development of benefits management plans
• Application at all organizational levels, or limited to strategic • Project or program evaluation
level, operational level or individual level.
Alliances performance
• Establishment of Alliances Scorecards
Key Performance Indicators Advice • Development of Service Level Agreements
• Overhaul of existing KPIs, by reviewing and updating them Assessment / Audit / Review
in accordance to organizational strategy and best practice.
• Assistance with KPI selection. Audit of organizational performance management systems at
• KPI documentation support – customisation of smartKPIs strategic, operational or individual levels.
Premium templates to reflect organizational needs. Organizational capability assessment using TKI’s proprietary
• Development of customised KPI catalogues. tools:
• Assistance in identifying reliable benchmarking resources. • Performance Management Maturity Model
• Performance Measurement Maturity Model
9 Browse 7000+ KPI examples 9 Browse 7000+ KPI examples 9 Browse 7000+ KPI examples
9 Access 17 documentation fields 9 Access 17 documentation fields 9 Access 40 documentation fields
9 View 200 documented KPIs 9 View 200 documented KPIs 9 Export 1000 documented KPIs
Research Research Research
One research report: Two research reports: Three generic Excel templates
9 Top 20 KPIs of 2010 9 Top 20 KPIs of 2010 pre-populated with over 70 KPI
9 Top 25 KPIs of 2010 report examples:
of your choice 9 Balanced Scorecard
9 KPI Dashboard
9 Performance Healthogram
Testimonials
On smartKPIs.com premium content
“Guys we are very thankful of the hard work you do. “Really a very good and useful website, I am excited “Access to all smartKPIs.com research reports
Your website really guides us on the daily about the content and comprehensiveness of data and advance functionality in searching the online
performance management of our organization.” on your website, and I will recommend it to all catalogue helps my office in facilitating the
professional in the governmental sector in United understanding, selection and usage of KPIs across
Omphile Macheng, Botswana Arab of Emirates, Wish you all the best.” the organization.”
On our publications
“The Top 25 Call Center KPIs of 2010 helps in “smartKPIs.com provided a simple yet powerful “I was pleasantly surprised of the level of experience
understanding all the performance measures scorecard and dashboard model to start building our and knowledge of the smartKPIs.com team. The
which should be taken into account to optimize own with our business intelligence tools.” toolkit delivered was what I had anticipated to be.”
performance...”
Jacob Brown, United States Humberto E Della Torre, El Salvador Alex Giammona, Australia
Characteristics
9 Intuitive, robust, fully live and interactive
9 Reliable in any economic environment
9 Offers optimal return on investment
Benefits
9 Real time control of your business
9 Easy monitoring, analysis and reporting of KPis
9 Perfect for Balanced Scorecard automation
9 Fast consolidalion of information
Configuration
9 Easy to access and to use, fully web-based
9 Possibility of external, in-cloud hosting, as well as on-site
9 Easy to access from any device or location having Internet access
www.integerperform.com/kpi-dashboard-balanced-scorecard-software
© The KPI Institute 2012
71
ID number: sK0117081
sK0128291
Top 25 Project Management KPIs of 2011-2012
Rate – A specific type of ratio expressed in many cases as part to whole. Examples of rates are the natality or mortality rate, expressed as the
number of births or deaths per a certain number of population or the currency exchange rate, where the value of one currency is compared
to the value of the other currency.
Ratio – A relation between two measures that might be distinct, but which are part of the same category of elements, such as the ratio of boys
to girls, teachers to students, doctors to patients, revenues to expenditure.
Composition – A composite indicator is formed when individual indicators are compiled into a single index, on the basis of an underlying
model of the multi-dimensional concept that is being measured. It measures multi-dimensional concepts (e.g. competitiveness, e-trade or
environmental quality) which cannot be captured by a single indicator.
Index – A number computed from a specific formula or calculation methodology, used to characterize a complex set of data.
Leading – Drive the performance of the outcome indicators, being predictors of success or failure. Examples of leading indicators are: “%
Employees involved in the innovation process”, “% Conversion rate” or “% Inventory quality ratio (IQR)”.
Lagging – Type of indicators that reflect the success or failure after an event has been consumed. Examples include: “$ Operating profit per
room”, “$ Earnings before interest and taxes (EBIT)” or “$ Cost avoidance savings”.
Input – Reflects assets and resources invested in or used to generate business results. Examples include: “# Headcount”, “$ Cost per
broadcast hour” and “# Knowledge materials distributed to employees”.
Process – Refers to the efficiency or productivity of a business process. Examples include: “% On time delivery”, “# Conflicts arisen during
the project”, “# Average call handling time” and “# Mean time to repair”.
Output – Measures the financial and nonfinancial deliverables or results of business activities. Examples include: “% Passenger seats sold”,
“# New customers acquired” or “$ Revenue per successful call”.
Outcome – Reflects overall results or impact of the business activity in terms of generated benefits, as a quantification of performance.
Examples include: “% Customer retention”, “% Employee turnover”, “$ Net income after taxes (NIAT)” or “% Brand awareness”.
Qualitative – A descriptive characteristic, an opinion, a property or a trait. The most common ones gauge customer or employee satisfaction
through subjective assessments. Based on a subjective interpretations of a customer’s or employee’s opinions. Oftentimes these type of
indicators are not expressed numerically, but as narrative text. Sometimes a rating is allocated to rank between levels (i.e. Likert scale).
Quantitative – A measurable characteristic, resulted by counting, adding or averaging numbers. Quantitative data is most common in
measurement and therefore forms the backbone of most KPIs. Operational systems that manage inventory, supply chain, purchasing, orders,
accounting, financial systems, all gather quantitative data by means of KPIs. Other examples of quantitative KPIs are “# Employee tenure”,
“# Units per man-hour” or “# Maintenance backlog”.
CE
RT I F I E D Certified KPI Professional
Training Course
KEY
PERFORMANCE
INDICATORS
MANAGEMENT
FRAMEWORK
KP
• Understand the complexities of working with KPIs and learn how to address them
AL
v 1.0 2012
PR N
I
OFESSIO • Develop a working knowledge of the Key Performance Indicators Management Framework
• Use over 30 performance measurement tools to facilitate the deployment and value added by KPIs.
Getting Key Performance Indicators (KPIs) right by using a rigorous KPI management framework
It was indeed a great opportunity to be able to participate at the KPI training course. Look forward for
Oct Kuala Lumpur
2013 Istana Hotel
other future programmes with Aurel. Aini, Malaysia
KPI
It was a good programme, through which I got a clear idea about modern practices in using KPIs. PRO
Shamima, Bangladesh
16-18 Dubai
12/12 Dusit Thani Nov Sydney
Good program, well organized. Well experienced trainer. Great job. Definitely recommendable. Jan Melbourne 2013 Karstens
Raech, India KPI Hotel 2013 The ANU
Conference &
KPI House
PRO KPI
I contacted smartKPIs.com for an in-house training with my team. We found both the material and the PRO Training Centre
PRO
way of explaining concepts by doing examples invaluable. I would also say that this is a great value for
money if you want to build the competency within your organization. Fahad, Saudi Arabia
Thank you for the excellent training workshop on KPIs. It was an eye-opening experience and provided
much needed guidance and clarification. The information gained has provided focus and depth.
Parsa, Bahrain
The feedback from the participants was gratifying and positive, and we are glad that we took the time
and effort to develop such a program to meet the need of our staff for extending their knowledge in the
area of KPI and all related. Hanan, Qatar
Aurel is knowledgeable of all KPI aspect and answers all questions. We were never bored. as the course
was very interactive. The course was beyond what expected. Nahla, Abu Dhabi I really learned a lot from the program. As a result, I am more equipped in in-
stalling performance management systems, by being able to integrate the con-
The trainer was excellent. I look forward to attend more sessions with him in the future. My knowledge
in the area has improved significantly. Great job! Neeti, Dubai
cepts of the MBO, Balanced Scorecard, KPI and Competencies into the system.
Thanks so much for the knowledge you shared during our 3 days of training.
I became a lot more knowledgeable about the KPI concept now. Manzuma, Nigeria Tess, Philippines
m R
vacant position % Performance appraisals completed on time % HR projects on time, on budget and according to
$ Net cash flow sK67 M 22.903 17.303 24.000 72% Comments Sep 2011
Optimize revenues and expenses
m ü
achievement.
Build an environment that fosters creativity and innovation
# Employee engagement index sK1836 Q 37 35 m 65 54% û Comments Sep 2011
# Ideas for new / improved service from employees sK4657 M 25 47 k 20 235% ü Comments Sep 2011
Continuously develop skills and competences
m ü
Publication date: 1 March 2011
# Training hours per full time equivalent (FTE) sK7 M 17 16 20 80% Comments Sep 2011
% Employees meeting continuing professional development requirements sk4673 Q 95% 83% m 85% 98% R Comments Sep 2011
Nurture high performing and motivated employees
% Employee satisfaction sk5912 Q 76% 92% k 70% 132% R Comments Sep 2011 ID number: sK0117011
% Employee turnover sK1 M 4% 9% k 7% 135% ü Comments Sep 2011
* Trend = current vs. previous month results ** Figures expressed in thousands of dollars Data not available due to measure being inactive
Dashboard
performance at organizational level.
Customer Service - Inbound Call Center Dashboard
Aug 2011
8.578
8.442
7.774
7.029
6.776
6.695
6.599
6.512
5.883
5.527
27% 30% 28% 49% 58% 59% 41% 43% 48% 51% 50% 47% 45% 58% 43% 45% 10 9 9 9
24% 23% 23% 6 6 8 6 6 7
14% 5 5 5
8% 11% 8% 7%
2% 0%
Employee turnover # Employee tenure # Average time to promotion % Accession rate % Succession plans for key
5 5 5
39% 38% 37% 39% 37% 39% 37% 40% 36% 37% 4 4 4 4
5 5 5 5 30% 31% 34% 33% 3 3
4 4 22% 26%
3 3 3 3 18% 14% 20% 17% 13% 17% 2 2
1 1 1 11% 1 1
4% 2% 1%
% Call transfer rate
Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Unscheduled absence rate # Lost time injury frequency rate (LTIFR) # Employee engagement index # Employee
satisfaction # Employee advocacy for products and services # Employee advocacy for the organization as an em-
2010 2011 2010 2011 2010 2011 2010 2011
Customer Satisfaction
ployer % Performance appraisals completed on time % Training penetration rate $ Training investment per full time
% Customer satisfaction with service levels Target
equivalent (FTE) % Training return on investment # Employment brand strength % Job offer acceptance rate # Appli-
86% 87% 98% 99% 98%
62% 62% 55% 68% 51% 50% 72% 62%
Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug
2010 2011
Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug
level wage to local minimum wage % Unscheduled absence rate # Lost time injury frequency rate (LTIFR) # Employee
engagement index # Employee satisfaction # Employee advocacy for products and services # Employee advocacy
2010 2011 2010 2011 2010 2011 2010 2011
Agent Performance for the organization as an employer % Performance appraisals completed on time % Training penetration rate $
Training investment per full time equivalent (FTE) % Training return on investment
% Agent utilization # Service requests per agent % Agent availability rate 95% % Agent schedule adherence
88% 87% 79%
75% 69% 80% 75% 70% 68% 58% 73% 61% 70% 62%
58% 47% 52% 66% 63% 59% 66%
46% 50 56% 55% 50% 98% 82% 86% 94%
38 42 40 37 35 34 72% 62% 65% 65% 68% 79% 90% 70% 79%
Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug
ID number: sK0117021
2010 2011 Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug
2010 2011 2010 2011 2010 2011
Template © eab group Pty Ltd 2010. Terms of use available at: http://www.smartkpis.com/terms-of-use.html (“Template Terms”)
Budget
system.
Current State
Performance
Portfolio of Initiatives Performance Report
Scorecard
Mandate
Performance
Dashboard
KPI Description
smartKPIs.com pre-populated template. Developed for demonstration purposed only. To be customised as per the environment in which each organisation operates.
Template © The KPI Institute Pty Ltd 2012. Terms of use available at: http://www.smartkpis.com/terms-of-use.html (“Template Terms”)
PERFORMANCE
Jobs
MANAGEMENT 9 781478 181019
Legislation
in 2012
State of the discipline annual magazine Interviews
Performance Management... has to Organizations use principles, tools
Explore t
mos
online the sive
do with how to monitor, control and and techniques of Performance
manage the strategic and operational Management to ensure that the
comprehen of
direction of an organization... purpose of their existence is fulfilled.
catalogue KPI
d
documente .
examples
December 2012
Practitioners . Consultants keywords in Google Trends and articles . Portals . Communities
book launch
and public sector implementations in . Business Intelligence . Employee
182 countries reviewed CAREER Performance Management
Job trends by region . Salaries by industry