Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 2

Local Government Unit – San Marcelino, Zambales

INDIVIDUAL PERFORMANCE COMMITMENT AND REVIEW (ICPR)

I, MARGIE ARLANTICO GAMBOA, of the Office of the MUNICIPAL DISASTER RISK REDUCTION AND MANAGEMENT OFFICE (MDRRMO) commit to deliver and agree to be rated on the following targets in
accordance with the indicated measures for the period JULY to NOVEMBER, 2019.
ARSENIO EDAR C. MAURICIO III
Ratee
Date:_______________
Reviewed by Date Approved by Date
Success Indicator Rating
Output Actual Accomplishments Remarks
(Target + Measure)
Q¹ E² T³ A⁴

1. Design, program, DRRM activities Preparation of ___3__directives and Prepared 5 directives and communication for SM
consistent to NDRRM standards and communications for SMERT with ERT with O error.
guidelines minimum of 2 errors.
 Preparation of Program/Activity designs Conducted 4 Earthquake Drills
Legend:
 Issuance of program/activity directives to Conduct of ___2__ Earthquake Drills With 2 errors. 1-Quality
SMERT with a minimum of 5 errors. 2-Efficiency
3-Timeliness
4-Average

2. Facilitate and support risk assessment Updating of __1__ Municipal Updated 1 Municipal Contingency Plan with 3 errors.
and contingency planning activities of the Contingency plan with minimum of 10
Municipality errors.
 Conceptualization of contingency
planning activities

Consolidation and periodic updating of


3. Consolidate Local Disaster Risk __1__ Municipal Disaster Risk
Information Information Manual with minimum of 3 Consolidated and updating of 1 Municipal Disaster
Risk Information Manual with 0 error
 Natural Hazards errors.
 Vulnerabilities
 Climate Change Risk
 Local Risk Map

4. Formulation and implementation of Local Formulation and implementation of


DRRM plan __1__ Local DRRM plan in Formulated and implemented 1 Local DRRM Plan in
coordination with the MDRRMC with coordination with the MDRRMC with 1 error.
minimum of 5 errors

5. Preparation and submission of Annual Annual Formulation of Formulation of LDRRMF programming with minimum
DRRM Plan to the SB through the Local __1__ LDRRMF programming with of 0 error.
DRRM Council minimum of 5 errors.
 AIP for LDRRMO
Formulation of 1 BDRMC support with 1 error.
 Programming of LDRRMF Annual Formulation of
 Other dedicated DRRM resources __1__ BDRRMC support with minimum
of 5 errors.

You might also like