INDODE Comprehensive Maintenance Center ETS Works dispatching ledger (progress)

INDODE ETS Work Zone ADAMA ETS Work Zone MIESO ETS Work Zone
Work group METEHARA ETS Work Zone
Chinese Chinese Ethiopi
date Department progress employee Ethiopians progress Work progress Chine Ethiopians progress Chinese Ethiopians progress
Work progress Pictue employees se Work progress Pictue Work progress Pictue employ ans
s Pictue empl employees employees employees
ees: employ
oyees ees:

➣Comprehensive patrolling from Metehara to


Mieso and Mieso to Metehara.
➣ Emergency happened between Meterhara and
Sirbakunkur station at K232+200 on mast
number #234 the cause is that the aegle perched
Comprehensive patrolling from Adama to on the catenary wire as the result rod insulator is
OCS On duty Meterhara and Methara to Adama burned and Mesenger wire was cut.the On duty
emergency handling process was finished
successfuly.Material Consumption 20m contact
wire,2 contact wire clamps,22m messenger
wire,4 messenger wire clamps and 2 rod
insulator.

➣Visual inspection on appearance of ➣Visual inspection of substation


traction substation equipment. such as
transformer/instrument transformer/circuit equipments,daily measurment of voltage
and current and data recording of active
9/5/2023 Power breaker/hand-operated isolator/anti- __ __ on duty __ __ on duty __ __ Substation equipments including record __ __
lightening ring/flexible busbar/wall- filling of temperature for indoor and
penetrating bushing/micro computer-based
protective device and AC/DC system at outdoor transformers in both Mieso and
Sirba kunkur Substation.
Indode substation

➣Repaired Wifi network and line


installation for civil storage room.due to the ➣visual inspection and cleaning of
lack of availability RJ45(communication equipments in the communication and
Communication material) the configuration network process On duty on duty information room of Mieso station and
postponed to tomorrow plan. communication room of Mieso Substation

➣Outdoor shaft checking, the close


contactness and fat edge of the turnout
➣performed outdoor shaft checking,signal
rail,adjust of notch of the indication rod and room health inspection and signal room
Signal On duty locking,check weather external bolt and nuts on duty
are loose,turnout and area clean,add oil for equipment inspection at Mieso station
the equipment at Mojo station